Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 361475 Determination Page 1 of 10
Case number : 361475 10 November 2014
1 Overview
1.1 Dispute
The Applicants lodged a claim under their home building insurance policy with the
Financial Services Provider (FSP) for damage to their home, a bungalow and
several sheds at their rural property caused by a hail storm in October 2013.
The FSP obtained a scope of works for the necessary repairs and offered to cash
settle the claim for $15,265. However, the Applicants say that the cash settlement
is insufficient because the scope of works approved by the FSP does not cover all
of the items damaged in the hail storm.
1.2 Issue and key findings
Is the cash settlement sufficient?
The FSP’s building consultant (M) did not take appropriate steps to assess the
extent of the hail damage to the roofs and hot water system and therefore it is
likely that the cash settlement underestimates the extent of the repairs required.
The cash settlement should also be increased to include the replacement of an
additional four rain gauges. The FSP sh ould finalise the Applicants’ claim for the
damaged flyscreen, if it has not already done so. The FSP is not liable for the
damage to the solar pool blanket as this is outside the scope of cover under the
policy.
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is to cash settle the Applicants for the cost of repairing the hail damage
to their property, based on a revised scope of works and quotation to be obtained
as set out in section 2.1 below. The FSP is to pay interest o n the cash settlement
amount on the basis set out in this Determination.
The FSP is to pay the Applicants an additional amount of $250, as compensation
for costs incurred in obtaining a building surveyor’s report.
Case No: 361475 Determination Page 2 of 10
2 Reasons for Determination
2.1 Is the cash settlement sufficient?
Policy provides cover for hail damage
The Applicants’ policy provides cover for accidental damage to their building and
contents, subject to the conditions and exclusions set out in the policy. Under the
terms of the policy, the FSP is required to repair or replace the damaged items, or
pay the Applicants the reasonable costs of doing so.
The FSP has accepted that the Applicants’ property was damaged by the hail
storm in October 2013 and has offered the Applicants a cash settlement of
$15,265 for the costs of repairing the damage.
The FSP determined the amount of the cash settlement based on a quote
provided by its builder (L) for the repair of the damage included in a scope of
works prepared by its building consultant (M). However, the Applicants say that
M’s scope of works does not include all of the hail damage to their property.
Experts disagree about extent of hail damage
The buildings at the Applicants’ property consist of the main dwelling, three sheds
and a bungalow. The FSP’s bu ilding consultant (M) identified hail damage to the
following areas:
the roof on the western side of the main dwelling;
the newer section of the roof on Shed 1; and
the whirly bird ventilators on Shed 1 and Shed 2.
However, M concluded that the remaining sections of the roofs (and the walls of
the three sheds and the bungalow) had not suffered hail damage.
The Applicants disagree with M’s findings and say that all of the roofs and iron
wall sheets have been damaged and need to be replaced. In support of their
position, they have provided a report from their building surveyor (S) which states
that there is hail damage to the roof sheets and capping in all areas of the main
dwelling and the “bruising” to the iron wall sheets of the sheds and the bungalow.
FS P is liable for damage caused by hail indentations but not “scuffing” or
“bruising”
The reports provided by the FSP’s building consultant (M) and the Applicants’
building surveyor (S) refer to two different types of damage to the roofs and wall
sheets – f irstly, indentations caused by hail and secondly, “scuffing” or “bruising”.
Having reviewed the various reports provided by the parties (including the
photographs contained therein), the Panel considers that the FSP is only liable for
indentations caused by hail and is not liable for “scuffing” or “bruising” of the roof
and wall sheeting.
The FSP’s building consultant (M) has sought to argue that some of the areas of
the roofs in which hail indentations have been identified should not be included in
Case No: 361475 Determination Page 3 of 10
the scope of works, on the basis that the indentations do not affect the structural
integrity of the roofs or (in his view) detract from their aesthetic appeal. However,
the Panel is satisfied that the presence of hail indentations is sufficient to
constitute “accidental damage” for the purposes of the Applicants’ policy and
therefore the FSP is liable for the replacement of these sections of the roofs.
In relation to the “scuffing” or “bruising” damage, the Panel notes that:
the FSP has provided a copy of a technical bulletin issued by the
manufacturer of the roof and wall sheets which confirms that scuff marks of
this nature do not affect the structural integrity of the roof; and
the FSP ’s building consultant (M) has advised that these marks are due to the
hail having removed the layer of oxidisation on the surface of the sheets. M
has confirmed that these marks will disappear over time (as the oxidisation
returns) or can be removed by cl eaning. The photographs included with M’s
report demonstrate the effectiveness of cleaning to reduce the marks.
Accordingly, the FSP is not liable for the repair of this damage as it is of a
temporary nature only.
FSP did not take adequate measures to assess the extent of the damage
During her initial inspection of the damage to the Applicants’ property, the FSP’s
loss adjuster (C) concluded that all of roofs of the main dwelling and the three
sheds needed to be replaced.
However, C recommended that a building consultant (M) should be engaged to
prepare a detailed scope of work for the hail damage. The scope of works
subsequently prepared by M after attending the property was more limited than
C’s initial assessment of the damage.
The Panel accepts that it was appropriate for the FSP to rely on the scope of
works prepared by M (a qualified builder) rather than the initial assessment of the
damage provided by C (a loss adjuster).
However, based on the available information, the Panel is not satisfied that the
steps taken by M were adequate to accurately determine the nature and extent of
the hail damage to the roofs at the property.
M has confirmed that, on the day he attended the property it was extremely windy
and therefore he did not go on to the roofs due to safety concerns. M says that he
examined the roofs of each building closely from gutter level and is satisfied that
he was able to identify all of the damage “reasonably well” from this position.
However, the Panel is not satisfied that M’s approach was adequate to identify all
of the hail damage to the roofs, particularly given the size and shape of the roof of
the main dwelling. It would have been more appropriate for M to arrange a further
inspection of the roofs under better weather conditions and using appropriate
safety equipment.
The Panel notes that, while it is difficult to conclusively identify hail damage from
photographs, several of the photographs taken by the Applicants’ surveyor (S)
appear to show hail indentations in areas which had not been identified by M
Case No: 361475 Determination Page 4 of 10
(such as the bullnose verandah roof of the main dwelling and the roofs of Shed 1
and the bungalow).
M has subsequently reviewed the photographs taken by S and advised that, in his
opinion, some of the additional indentations visible i n the photographs occurred
during the construction of the roof, rather than as a result of the hail storm.
However, the Panel is not satisfied that M had a sufficient basis for his conclusion
in this regard, given that he had not personally inspected the relevant
indentations.
Extent of hail damage to roofs should be reassessed
For the reasons outlined above, the Panel is not satisfied that M’s inspection was
adequate to identify all of the hail damage to the roofs. Accordingly, it is likely that
M’s scope of works (and L’s quotation) underestimate the extent of the repairs
required.
However, nor is the Panel satisfied that the reports and quotations provided by
the Applicants accurately identify the extent of the repairs required.
While the report provid ed by the Applicants’ surveyor (S) identified damage to a
number of areas of the roofs, S did not express a view as to the extent of the
repairs required. It does not appear from the photographs taken by S that the
damage is so extensive as to require the replacement of all of the roofs in their
entirety. While the Applicants’ roofing plumber (JR) confirmed that all of the roofs
required replacement, it appears that JR did not personally inspect the roofs.
The Applicants have provided copies of two quotations for $77,575 and $79,392
respectively. However, these quotations are not itemised and are for the
replacement of all of the roofs in their entirety. Accordingly, it is likely that these
quotations overestimate the cost of the necessary repairs.
In these circumstances, the Panel considers that there is insufficient information
available to enable an accurate assessment of the extent of the damage, and the
cost of the necessary repairs.
Accordingly, the Panel considers that the FSP should arrange for a n appropriately
qualified building consultant (who has not been involved in the claim to date) to
inspect the roofs of the main dwelling, the three sheds and the bungalow and
prepare a revised scope of works for the repair of the hail damage (including all
areas with hail indentations but excluding any scuffing damage).
Once the revised scope of works has been provided, the FSP should obtain a
revised quote from its builder (L) for the repair of the damage identified in the
scope of works, excluding any rebates or discounts available to the FSP.
Hail damage to solar hot water system should be reassessed
The FSP’s loss assessor (C) identified damage to the tank on the solar hot water
system and the frames around the solar panels. The Applicants’ surveyor (S)
confirmed that there was damage to the cover of the solar hot water unit.
Case No: 361475 Determination Page 5 of 10
After reviewing the photographs of the claimed damage to the hot water system,
the FSP’s building consultant (M) concluded that the marks on the solar hot water
tank were hail splatter marks, which had removed the oxidation layer but had not
damaged the unit itself. M also considered that the solar panels had not sustained
any damage.
However, M has confirmed that he was unable to inspect the solar hot water unit
directly and that the angle of the sun made the marks difficult to see. In these
circumstances, the Panel considers that the solar hot water system should be
reassessed for hail damage, in the course of preparing the revised scope of works
referred to above.
FSP is not liable for hail damage to pool blanket
Under the terms of the policy, the Applicants are not entitled to cover for a pool
blanket which was damaged during the hail storm.
The pool blanket is categorised as a contents item for the purposes of the policy.
The Applicants have confirmed that the blanket was not fixed to the swimming
pool, but floated on the surface.
The policy only provides cover for damage to contents items if the items were in
the Applicants’ residence at the time they were damaged. Accordingly, the FSP is
not liable for the damage to the pool cover.
FSP should finalise settlement for other outstanding items
The FSP has acknowledged that M’s scope of works o nly includes the
replacement of one of the five rain gauges which were damaged in the hail storm.
Accordingly, the cash settlement amount should be increased by $340 to allow for
the replacement of an additional four rain gauges.
The Applicants have referred to a damaged flyscreen which was identified by the
FSP’s loss assessor (C) in her report. The Applicants have previously provided
the FSP with a quote for $140.50 which C had recommended should be cash
settled. However, it is not clear from the information provided whether this aspect
of the Applicants’ claim has been resolved. To the extent it has not already done
so, the FSP should finalise this aspect of the claim.
Applicants are entitled to reimbursement for costs of S’s report
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require an FSP to
contribute to legal or other professional costs incurred by an Applicant in the
course of their dispute.
The Applicants have incurred costs of $250 in obtaining S’s report. While S’s
report was expressed in relatively general terms, the Panel considers that the
additional photographs taken by S during his inspection of the roofs assisted the
Applicants in establishing the likelihood that there was additional hail damage
which had not been included in t he FSP’s scope of works.
In these circumstances, the Panel considers that the FSP should reimburse the
Applicants for the costs of $250 incurred in obtaining S’s report.
Case No: 361475 Determination Page 6 of 10
FSP is to pay interest on cash settlement
The FSP is to pay interest on the amount of any cash settlement paid to the
Applicants, at the rate determined in accordance with section 57 of the Insurance
Contracts Act 1984 from 19 March 2014 (being the date of the FSP’s IDR letter)
until the payment date.
The Panel notes the FSP’s submission t hat it has acted reasonably in managing
the Applicants’ claim and therefore should not be required to pay interest on the
final cash settlement amount.
However, the Panel is not satisfied that it was reasonable for the FSP to continue
to uphold its denial of the Applicants’ claim without undertaking a further
assessment of the claimed damage, in circumstances where the FSP’s own
building consultant (M) had acknowledged that he had not gone onto the roof to
assess the damage, and the Applicants had provided a report from their own
consultant (S) which indicated that the damage was more extensive than had
been identified by M.
Case No: 361475 Determination Page 7 of 10
3 Supporting information
3.1 FOS approach
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it been referred directly to a Panel for Determination, in line
with the Operational Guidelines to the FOS Terms of Reference . The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
There has been a full exchange of all material information relied on for the
purposes of this determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed all of the material provided by the parties, including the
various c onsultant’s reports obtained. However, for the purposes of this
Determination, the Panel has limited its commentary to the matters which it
considers directly relevant to the outcome.
3.2 Reports
Report Key points
Applicant s ’ roofing
plumber (JR)
Letter - 21 Nov ember
2013
There was hail damage to the house roof, including the solar
unit. All roof surfaces had hail markings.
The three sheds also had hail damage, including to the whirly
birds .
All roof surfaces require replacement to remove hail damage,
inclu ding all whirly birds and the solar unit.
FSP’s loss assessor
(C)
Report - 14
Dec ember 2013
Although relatively minor, there are small hail indent ations to
the iron roof sheets of the house and the three sheds .
The roof sheets , cappings and flashings of t he dwelling and
three sheds should be replaced, as well as the whirly birds on
Sheds 1 and 2.
The tank on the solar hot water system, the frames around the
solar panels and the hail damaged gable end capping should
also be replaced.
The re was damage to a flyscreen at the northern side of the
house, as well as damage to the pool blanket and five rain
gauges.
The quotations provided by the Applicants’ roofing plumber
(AP) and their son (a licensed builder) (CA) are excessive.
CA’s quotation is not itemised a nd AP’s is illegible.
A building consultant ( M ) should be engaged to provide a
scope of work for the hail damage so that an itemised quote
can be obtained .
FSP’s building
consultant (M)
He inspected the roof from a ladder at gutter level.
Shed 1 had a Colorbond roof. The Colourbond protection had
started to oxidise. The roof did not have hail indentations and
Case No: 361475 Determination Page 8 of 10
Report Key points
First report - 14
January 2014
therefore did not need replacing. T he hail had removed the
oxidisation on the roof, leaving scuff marks which were eas ily
removed. This did not impact the structural integrity of the
roof. The whirly bird ventilator may need replacing as these
ventilators are often made of softer material than the roof
sheets and therefore may have suffered hail damage.
Shed 2 had a Color bond roof constructed at two different
times. The older part of the roof had been affected by the hail
storm in the same manner as the roof of Shed 1. It did not
require replacement. However, eight roof sheets in the newer
part of the roof had hail indenta tions. The whirly bird would
most probably have been damaged and require replacing.
Shed 3 had a Colorbond corrugated roof, which had hail
indentations. These indentations did not detract from the
structural integrity of the roof and would not pond water.
However, the roof sheets (but not the gutters) should be
replaced. T he walls of the shed had not been damaged by
hail .
The main dwelling has a corrugated roof and three bullnose
verandas. N o hail damage was detected to the roof sheeting
on the front, easte rn or southern sides (although hail had
removed oxidisation o n the eastern side , leaving marks which
were easily removed ) .
The western side of the house had ha il damage to the roof
sheeting which could be detected from the ground. This area
of roof sheetin g would require replacing.
The hot water system could not be inspected but did not
appear to have been damaged when viewed from the ladder.
The solar panels had not experienced hail damage.
He did not detect any damage to the steel bungalow (which
was not included in the claim) .
FSP’s building
consultant (M)
Second r eport - 10
February 2014
He did not access the roof during his inspection on 8 January
2014 due to safety concerns, as it was extremely windy. The
Applicants shared his concern and specifically asked him not
to go on the roof due to liability issues .
He agreed with the Applicants that he would inspect all the
roof surfaces closely from gutter level and is satisfied that he
has been able to identify all of the damage reasonably well
from this van tage point. He concluded that:
- t he western side of the main roof of the house was slightly
hail damaged. If there was denting to other sections, this
was not significant enough to cause any structural long
term issues;
- Shed 1 may have suffered hail damage to the whirly bird;
- Shed 2 had suffered minor hail damage to eight sheets of
roofing at the northern end and the whirly bird ;
- Shed 3 had suffered minor hail damage.
A photograph taken by C which is said to be of the roof sheets
of Shed 1 shows a hail dent however, he was unable to locate
Case No: 361475 Determination Page 9 of 10
Report Key points
this dent. The photographs may relate to Shed 2.
His scope of works allowed for replacement of the damaged
roof sheets on Sheds 2 and 3, because the hail damage
indentations on the relatively flat roof may allow water to p ond,
causing the roof sheets to rust over time.
His scope of works allowed for the fair and reasonable
reinstatement of the only hail affected areas that he inspected
where the long term structural integrity of the roof could have
been compromised by the h ail storm.
The marks on the solar water tank are indicative of hail
splatter that removed the oxidation layer but did not actually
dent the unit. Th e unit was not damaged by hail.
Applicant s ’ building
surveyor (S)
Report - 24 April 2014
There was hail dam age to the roof sheets of the house in all
areas, as well as damage to the cappings, bullnose roof and
rolled joints in the southern, northern and western areas .
There was hail damage to the roof sheets and capping in all
areas of Sheds 1, 2 and 3, as well as bruising to the iron wall
sheets.
There was hail damage to the roof sheets and capping in all
areas of the bungalow , as well as bruising to the iron wall
sheets .
The hail stor m possibly came from the west initially and then
back from the east , as shown by the bruising of the wall
sheets on the sheds.
Al l ridge cappings and barges had dents caused by hail and
the cover of the solar hot water system was also hail
damaged.
FSP’s building
consultant (M)
Comments on S’s
report - 18 June 2014
S’s report does not include any photographs of the hail
damage identified, which makes it difficult to reconcile his
findings in relation to specific areas.
S ’s report does not explain the detail, severity or type of hail
damage sustained and /or the areas o f the roofs th at have
been affected.
He is not familiar with the term “bruising” as used by S to
describe hail damage and this is not explained in S’s report.
In these circumstances, it is very difficult to make any
comment on S’s findings.
Nothing in S’s report alters the findings in M’s previous
reports.
FSP’s building
consultant (M)
Email - 11 July 2014
The images provided by S are very small and therefore it is
difficult to draw any conclusion from them.
Scuff marks on the roof and wall sheeting will not impact on
t he structural integrity of the building. These marks will
disappear in time or may be removed by cleaning.
He did not identify any damage to the walls that would impact
on their structural integrity or aesthetics.
The hail damage to the roof on the western side of the main
dwelling did not impact its structural integrity, as they would
Case No: 361475 Determination Page 10 of 10
Report Key points
not pond water. However, he had allowed for this area of the
roof sheeting to be replaced for aesthetic reasons.
The dents on the bullnose veranda roof are more consistent
with damage during the construction of the roof than hail
damage, as these dents are not of a random nature or
scattered over all the sheets as they are on the western side.
Although he is unable to conclusively identify the dents in S’s
photographs, these isolated dents would not be classified as
“hail damage” as they freely drain water and do not detract
from the aesthetics of the roof.
Scuff marks will not impact on the structural integrity of the
roof and will disappear as the oxidisation returns to the areas
where it has been removed by the hail.
Shed 1 did not have dents and the scuff marks do not impact
on the structural integrity of the roof. The marks on the
flashings shown in S’s photos appear more consistent with
damage during construction. Furthe r, they would not
constitute “hail damage” for the reasons noted in relation to
the main dwelling.
The dents to shed 2 shown in S’s photos are in the areas
where M had recommended that the roof sheets be replaced.
The bungalow was not in the original claim but he did not
identify any hail damage to it. The dents shown in S’s photos
do not look as if they would pond water or detract from the
roof’s aesthetics.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.