Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 361113 Determination Page 1 of 10
Case number : 361113 10 October 2014
1 Overview
1.1 Dispute
In July 2009, the Applicants lodged a claim under their landlord insurance policy
with the Financial Services Provider (FSP) for movement and cracking damage to
their rental property. The Applicants believed that the damage had been caused
by water leaking from a gully trap in the laneway next to the property, which had
been damaged by council works in April 2005.
The FSP denied the Applicants’ claim on the basis that the primary cause of the
damage was earth movement, which was excluded under the policy. The FSP
also says that the Applicants’ failure to repair the gully trap and their delay in
lodging the claim have contributed to the damage.
1.2 Issues and key findings
Is the FSP liable for the damage to the Applicants’ property ?
The available information establishes that the proximate cause of the bulk of the
cracking and movement damage to the Applicants’ property was water leaking
from the gully trap damaged by the co uncil works in 2005. In these
circumstances, the policy exclusion for earth movement does not apply because
earth movement was not the proximate cause of the damage.
The Applicants did not become aware of the damage to the gully trap until mid-
2009, at which time they took prompt action to repair the gully trap and notify the
FSP of their claim, The Applicants acted reasonably in the circumstances and the
FSP was not materially prejudiced by their actions.
However, it is likely that at least some of the damage was caused by factors other
than the damaged gully trap, which are excluded under the policy. In the
circumstances, it is appropriate that liability for the cost of repairing the damage
be apportioned between the FSP (as to 85%) and the Applicants (as to 15%).
Are the Applicants entitled to additional compensation?
The Applicants are not entitled to benefits for loss of rent under the policy, as the
property has not become uninhabitable as a result of the damage. However, the
Applicants are entitled to compensation of $3,000 for consequential financial loss
because they have been unable to rent the property at market rates due to the
extent of the damage.
Case No: 361113 Determination Page 2 of 10
The Applicants are entitled to compensation of $6,000 as reimbursement of
professional costs incurred in the course of this dispute. The nature of the issues
involved in the dispute required the Applicants to obtain professional advice and
the expert reports obtained have been critical in determining the outcome.
The Applicants are also entitled to compensation of $1,500 for non-financial loss
suffered as a result of the FSP’s delay in progressing the dispute and failure to
appropriately consider the additional information provided by the Applicants.
1.3 Determination
This Determination is in favour of the Applicants.
The FSP is to cash settle the Applicants for an amount equal to 85% of the cost of
repairing the damage to the rear extension of the Applicants’ property, based on a
scope of works and quotation to be obtained as set out in section 2.1 below.
The FSP is to pay the Applicants an additional amount of $10,500, comprising:
compensation for consequential financial loss ($3,000);
partial reimbursement of professional costs ($6,000); and
compensation for non-financial loss ($1,500).
The FSP’s maximum liability under this Determination is subject to the monetary
limitations in the Terms of Reference.
Case No: 361113 Determination Page 3 of 10
2 Reasons for Determination
2.1 Is the FSP liable for the damage t o the Applicants’ property ?
Application of policy depends on proximate cause of damage
The Applicants’ policy provides cover for accidental damage to their rental
property, subject to the conditions and exclusions set out in the policy.
The policy contains exclusions for accidental damage as a result of, or caused by
settling, shrinkage or any movement of earth;
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear; or
a defect in an item, structural defects or faulty workmanship or design.
The FSP accepts that the leaking water from the damaged gully trap has
contributed to the movement damage at the Applicants’ property. However, the
FSP says that this was not the proximate cause of the damage (that is, the real,
effective or dominant cause). The FSP says that the proximate cause was earth
movement, gradual deterioration and/or structural defects, each of which is
excluded under the policy.
As the FSP is seeking to rely on a policy exclusion or condition to deny the
Applicants’ claim, it bears the onus of establishing that, on the balance of
probabilities, the relevant exclusion or condition applies.
Proximate cause of bulk of damage was water escaping from broken gully
trap
The available information establishes that, on the balance of probabilities, the bulk
of the damage to the rear extension of the Applicants’ property was caused by
water leaking from the damaged gully trap over a period of several years. This led
to excessive moisture in the surrounding soils which caused earth movement,
resulting in major cracking and misalignment in the rear section of the property.
Both parties have provided copies of several reports from their respective
engineers, in which each engineer sets out his own findings as to the cause of the
damage and rebuts the views expressed by the other.
The Applicants’ engineer (IE) considered that the movement damage was
predominantly due to the excessive moisture content in the soil as a result of
water leaking from the broken gully trap, which caused upward movement
(“heave”) of the surrounding soils.
In his report, IE states that the nature and extent of the damage evident in the
rear extension was not consistent with it having been caused by other factors,
given:
the soil profile, type of footings and drainage systems at the property;
the manner in which the rear extension had been constructed;
the results of soil moisture tests conducted at various locations at the
property;
the nature and location of the cracking damage to the rear extension; and
Case No: 361113 Determination Page 4 of 10
the comparatively mi nimal damage to other areas of the building.
The Applicants have provided extensive additional material in support of their
claim, including a number of photographs of the property taken prior to the council
works in 2005, and over the course of subsequent years as the damage
progressed.
These photographs (together with the other material provided) establish a strong
causal connection between the council works and the cracking damage. In
particular:
the photographs establish that the rear extension showed minimal cracking
damage in March 2005 (that is, before the council works were carried out).
The pre-purchase inspection report (obtained by the Applicants in December
2000) and the valuation (obtained in June 2005) do not suggest that the
property had a significant history of ongoing differential foundation movement;
the extent and increasing severity of the damage between April 2005 (when
the council works were carried out) and July 2009 (when the cause of the
problem was finally identified) strongly suggests that the water leaking from
the gully trap was the source of the problem; and
the location of the bulk of the cracking and movement damage to the rear
extension (and the fact that the front part of the house remained largely
unaffected) is consistent with the location of the broken gully trap.
While the FSP’s engineer (M) has identified a number of alternative factors as the
proximate cause of the movement damage, the Panel is satisfied that the
information provided by the Applicants and their engineer (IE) effectively rebuts
M’s conclusion that the damage is predominantly attributable to one or more of
these factors. In particular, the Panel notes that:
while M has referred to poor drainage due to the defective design of
downpipes at the premises, IE has confirmed that the majority of the storm
water flows through the drainpipe at the front of the premises, where there are
minimal signs of movement damage;
M has referred to various defects in the construction of the rear extension
(which was built i n the 1980s and renovated in 1996). However, some of the
information to which M refers appears inconsistent with the more detailed
structural information provided by the Applicants and their engineer about the
manner of construction of the rear extension. Further, to the extent that there
were any construction defects, the Panel considers these to be relatively
minor and unlikely to have led to the significant damage observed, particularly
as this damage did not become apparent until many years after the extension
had been built (and subsequently renovated); and
M has referred to the effects of damage mitigation undertaken by one of the
Applicants’ contractors “U” (who undertook a compaction grouting treatment to
provide further support for the structure). However, the available information
establishes that substantial damage had occurred prior to any steps being
taken by U.
Accordingly, the Panel is satisfied that, on the balance of probabilities, the
proximate cause of the cracking and movement damage to the rear extension of
the Applicants’ property was the damage to the gully trap caused by the council
Case No: 361113 Determination Page 5 of 10
works in 2005, which caused water to leak into the surrounding soil over a period
of several years.
Exclusion for earth movement does not apply
As outlined above, the policy excludes cover for damage “as a result of or caused
by” earth movement. Given the way in which this exclusion is expressed, it
applies where earth movement is the proximate cause of the relevant damage.
As the Panel is satisfied that the proximate cause of the bulk of the damage in the
present case was the broken gully trap (which caused the subsequent earth
movement), the exclusion for earth movement does not apply.
FSP has not been materially prejudiced by Applicants’ actions
The FSP says that it has been prejudiced by the Applicants’ failure to repair the
gully trap and the delay in lodging their claim. Under the terms of the policy, the
Applicants are required to take reasonable precautions to avoid a claim being
made, notify the FSP of a claim as soon as possible and take reasonable steps to
prevent any further loss or damage.
The available information establishes that the Applicants arranged for the repair of
the gully trap as soon as they became aware that it was damaged. Unfortunately,
this did not occur until mid-2009 when the Applicants were first advised by their
tenant about the council works carried out in 2005. The Applicants had been
unaware of these works as they were living interstate and renting out the property
at the time.
The movement damage in the rear extension of the property first became
apparent in 2007 and worsened significantly during the following two years. The
Applicants say that they initially assumed (based on advice from their property
manager) that the damage was due to the usual seasonal variations and therefore
did not investigate further until the damage became more significant.
While the Applicants took some measures to address the damage and mitigate
further problems during 2008 and early 2009, they did not lodge their claim until
July 2009.
While there was a significant delay between the damage first becoming apparent
and the Applicants lodging their claim with the FSP, the Panel is satisfied that the
Applicants acted reasonably in the circumstances. Prior to mid-2009, there was
no reason for the Applicants to believe that the damage had been caused by a
water leak, rather than by naturally occurring earth movement (which is excluded
under the policy).
In any event, the Panel is satisfied that the FSP has not been materially
prejudiced by the delay. The available information suggests that, regardless of
when the Applicants’ claim was lodged, the FSP would have relied on the opinion
of its engineer (M) to deny the claim.
Case No: 361113 Determination Page 6 of 10
Some of the damage is likely to have been caused by excluded factors
While the Panel considers that the bulk of the damage to the rear extension was
caused by the broken gully trap, it also accepts that some portion of the damage
is likely to have been caused by factors which are excluded under the policy, such
as naturally occurring earth movement, gradual deterioration and/or minor
structural defects. This is particularly relevant in instances where the damage has
occurred in areas which are further away from the broken gully trap.
The pre-purchase report obtained by the Applicants establishes that the property
did have some existing internal cracking and movement damage when the
Applicants purchased it in 2000 (although this was of a materially different nature
from damage which subsequently became apparent in the rear extension). The
inspector who prepared the report noted the risk that further damage might occur
in the future.
In the circumstances, the Panel considers that it is appropriate that liability for the
damage be apportioned between the FSP (as to 85%) and the Applicants (as to
15%).
FSP should cash settle the Applicants for 85% of the cost of repairs
There is insufficient information available to allow the Panel to accurately
determine the cost of repairing the damage to the rear extension. The Applicants’
engineer (IE) considers that the extension needs to be demolished in its entirety
and rebuilt. The Applicants have obtained a quote for approximately $250,000 on
this basis.
However, it is not clear to what extent the compacting grouting treatment carried
out by the Applicants’ contractor (U) and further repairs carried out by the
Applicants (if any) have overcome the need for the rear extension to be
completely rebuilt.
In order to accurately determine the cost of the repairs required, the FSP should:
engage an engineer (who has not been involved in the claim to date) to
prepare a scope of works for the necessary repairs; and
obtain a quotation from an appropriately qualified builder to carry out the
repairs in accordance with the scope of works. This quotation is to be
prepared without taking into account any discounts or rebates available to the
FSP.
The FSP is to cash settle the Applicants for an amount equal to 85% of the cost of
repairing the damage to the rear extension, based on the quotation provided by
the builder. The quoted amount should include any amounts for which the FSP
would be liable under the terms of the policy (for example, under the additional
cover provided for demolition costs and professional fees incurred in connection
with rebuilding).
Case No: 361113 Determination Page 7 of 10
2.2 Are the Applicants entitled to additional compensation?
Policy provides cover for loss of rent only where property is uninhabitable
The Applicants had elected to take out the optional cover available under their
policy for loss of rent. However, this cover is only available where the property
becomes uninhabitable as the result of an insured event.
The Applicants’ tenant continued to reside in the property for several years
despite the movement damage. Accordingly, the property did not become
uninhabitable as a result of the damage and therefore the Applicants are not
entitled to benefits for loss of rent under the policy.
Applicants are entitled to compensation for consequential financial loss
The Applicants have provided copies of correspondence which establishes that
the tenant rejected market rent increases proposed by the Applicants, in light of
the extensive movement damage to the property.
In the present case, the Applicants have suffered consequential financial loss
(resulting from their inability to increase the rent) due to the insured event and the
FSP’s failure to pay their claim.
FOS’s ability to award compensation for consequential f inancial loss is subject to
a cap of $3,000. The information provided by the Applicants establishes that their
actual loss exceeds this amount. Accordingly, the Applicants are entitled to the
maximum available compensation of $3,000.
Applicants are entitled to partial compensation for professional costs
incurred
The Applicants have incurred significant costs during the course of this dispute,
including U’s fees of $17,078 for undertaking the compacting grouting treatment
and various other costs incurred in identifying and repairing the broken gully trap.
The Panel has taken into account the repair and mitigation costs incurred by the
Applicants to date for the purpose of determining the appropriate apportionment
of liability for the further repairs required.
However, the Applicants have also incurred engineers’ fees of $6,397 for
undertaking inspections and preparing reports and legal fees of $16,693 for
advice in relation to the dispute.
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a
financial services provider to contribute to legal or other professional costs
incurred by an applicant in the course of their dispute. A financial services
provider will generally not be required to contribute more than $3,000 unless
exceptional circumstances apply.
In the present case, the Panel is satisfied that it was necessary for the Applicants
to obtain an engineer’s report, in order to rebut the findings of the FSP’s engineer
(M). Further, in circumstances where the FSP continued to rely on M’s initia l and
subsequent reports despite certain of his assumptions proving to be invalid, it was
Case No: 361113 Determination Page 8 of 10
reasonable for the Applicants to re-engage their engineer to provide a further
response.
However, the Panel is not satisfied that the nature of the legal issues raised in this
dispute required the Applicants to obtain legal advice. FOS provides a service that
is free for applicants and it is generally unnecessary for either party to be legally
represented. If an applicant chooses to be represented, they will usually ha ve to
cover their legal fees themselves.
In the present case, the dispute revolved primarily around the cause of the
movement damage to the Applicants’ property. In these circumstances, the Panel
considers that legal advice is unlikely to add significant substantive value.
FOS adopts a prudent approach to awarding compensation for professional costs
exceeding $3,000. In the present case, the Panel considers that an award of
$6,000 is appropriate.
Applicants are entitled to compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award
compensation (capped at $3,000) for non-financial loss where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with their expectation of enjoyment or peace
of mind.
The Applicants say that they and their family have suffered considerable stress as
a result of the FSP’s continued denial of their claim over the years, and the time
and effort expended in seeking to have the FSP revisit its decision.
The FSP continued to rely on the findings of its engineer (M) to deny the
Applicants’ claim, despite the extensive additional material provided by the
Applicants. While the FSP is entitled to rely on the views of its consultants, it
should also review and consider any contrary information provided by the
Applicants, particularly where such information includes reports from qualified
professionals.
Further, it appears that the FSP delayed progressing the dispute for review by its
internal dispute resolution department (despite the Applicants’ express request
that it do so) and opted instead to keep referring the additional materials back to
M for further consideration. In the Panel’s view, this was not conducive to the
resolution of the dispute.
In the circumstances, the Panel considers that an award of compensation in the
amount of $1,500 is appropriate.
Case No: 361113 Determination Page 9 of 10
3 Supporting information
3.1 Terms of policy
Subject Terms
Accidental damage We will cover your buildings or contents for any accidental loss or
damage …
Any cover we provide is subject to exclusions.
Exclusions Exclusions to your cover
Any cover we provide is subject to the following exclusions .. .
Accidental Damage cover, Additional cover and Optional
cover exclusions
We will NOT cover any loss or damage as a result of, or caused
by
settling, shrinkage or any movement of earth
erosion, rust, corrosion, gradual deterioration, depreciation,
wear or t ear …
a defect in an item, structural defects or faulty workmanship or
design …
General exclusions
We will NOT cover any loss or damage , or liability as a result of,
or arising from
mildew, atmospheric or climatic conditions
Loss of rent … if your buildings or sections of your buildings suffer loss or
damage and are uninhabitable as a result, we will cover any loss
of rent equal to the weekly amount as stated on your rental
agreement or periodic tenancy agreement for up to 12 months …
This cover applies when … loss or damage to your buildings …
o ccurs as a result of an incident listed in this PDS …
Insured’s
obligations Your responsibilities when you are insured with us
… you must … take reasonable precautions to avoid a claim
being made
Your res ponsibilities when you are making a claim
… You must:
take safe and reasonable steps to prevent any further loss,
damage or liability occurring ..
not repair or replace any damaged buildings or contents without
our consent
How to make a claim
… You need to make your claim as soon as possible. Any delays
may …reduce the amount that we pay … or prevent us from
paying a claim.
Case No: 361113 Determination Page 10 of 10
3.2 Expert reports
The Panel has read and considered all of the material provided by the parties,
including the following consultants’ reports:
Applicants’ pre -purchase report dated 1 December 2000 prepared by building
consultant (A)
Applicants’ valuation report prepared by Applicants’ valuer (M) dated 2 June
2005;
reports prepared by the Applicants’ engineer (I E) dated 12 January 2011 and
16 May 2013
report prepared by the Applicants’ consulting engineer (S) dated 30 November
2009
reports prepared by the FSP’s engineer (M) dated 10 March 2010, 8 August
2012 and 20 July 2013