Home / Financial Firm (Unknown - Insurer) / Determination 360742
Determination 360742
Dispute over $150,000 cash settlement offer for two storm damage claims, applicant seeking $369,600
Summary
The landlord disputed a $150,000 cash settlement for hail and storm damage across two claims and sought $369,600. AFCA found the policy allowed cash settlement, the offer was reasonable and largely funded already, and much of the delay was the insured's, so no further payment or interest was ordered.
The policy allows the insurer to choose its settlement method, and the insured's quotation included unrelated items and exceeded the sum insured, so the cash offer discharged the insurer's liability.
Issues
- Claim amount dispute primary · not upheld
“The FSP's offer of $150,000 in full and final settlement is fair in all the circumstances and adequately discharges its liability under the policy.”
- Delay secondary · not upheld
“It is clear much of the delay is attributable to the Applicant. On this basis, an award of compensation is not appropriate.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 360742 Determination Page 1 of 5
Case number : 360742 3 December 2014
1 Overview
1.1 Dispute
The Applicant holds a landlord policy with the Financial Services Provider (FSP),
covering a tenanted property for a sum insured of $275,000, with contents insured
for $7,500.
On 7 March 2010, the property was damaged by a severe hailstorm and a claim
lodged with the FSP (claim one). The claim was accepted, however, before any
works were undertaken, the property was again damaged by storm on 21 June
2011 (claim two).
The FSP has offered the Applicant the sum of $150,000 , in full and final
settlement for the damage sustained in both events. The Applicant disputes that
amount and maintains she is entitled to settlement in the sum of $369,600,
although her preferred option is that the FSP assume conduct of authorising and
undertaking repairs to the home.
1.2 Issues and key findings
Is the FSP able to cash settle the claims?
The FSP is entitled to settle both claims by way of cash settlement in lieu of
repairs because this is in accordance with the terms of the policy.
Does the FSP’s cash settlement offer adequately discharge its liability under
the policy terms?
Considering the circumstances particular to these two claims, the FSP‟s offer of
settlement is reasonable in the circumstances and adequately discharges its
liability under the policy terms.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to settle the claims by way of cash settlement in lieu of
repairs, in accordance with the policy terms. The FSP‟s offer of settlement
adequately discharges the FSP‟s obligation pursuant to the policy.
Case No: 360742 Determination Page 2 of 5
2 Reasons for Determination
2.1 Was the FSP entitled to settle the claim by cash payment?
The terms of the policy allow the FSP to cash settle the claim
The terms of the policy are clear in that it allows the FSP the authority to
determine which method of settlement to use for a claim. Accordingly, the FSP‟s
ultimate decision to settle the claims by cash settlement was in accordance with
the terms of the policy.
Although the FSP originally chose to authorise repairs for claim one to building
firm “T”, it later decided to settle the claim by way of cash payment as the
Applicant and T were unable to reach agreement on certain matters to allow
works to commence.
The Applicant has not provided any evidence to suggest she was prejudiced by
the FSP‟s revised settlement method or its decision to settle claim two on th e
same basis.
Given the difficulties in bringing this matter to a conclusion, which will be
addressed in more detail below, the FSP‟s decision to alter its method of
settlement to a cash payment was reasonable in the circumstances and in
accordance with its own policy terms.
2.2 Does the FSP’s offer adequately discharge its liability under the
terms of the policy?
The FSP’s offer is fair in all the circumstances
The FSP has offered the total sum of $150,000 in full and final settlement of both
claims. This amount was largely derived from an updated quotation for works
prepared by builder “Q” in November 2013, agreed to by all parties , after a site
meeting to try and resolve the outstanding issues.
It is of note that the FSP made several offers of settlement. All offers have been
rejected by the Applicant. The first offer was made on 16 September 2010, shortly
after T‟s involvement in the claim was terminated by the Applicant. This offer was
not formally rejected by the Applicant until 26 October 2012, more tha n two years
later.
It is clear that the Applicant and/or her broker have not conducted themselves in a
manner conducive to bringing these matters to a timely conclusion.
It also seems likely that had works been undertaken after claim one, in a timely
manner, that no further damage would have been occasioned to the property in
the second event. At the very least, any damage would have been minimised,
notwithstanding that the FSP arranged for a „make safe‟ of the premises after
claim one.
Case No: 360742 Determination Page 3 of 5
Accordingly, the inaction of the Applicant has contributed to the happening of the
second claim and most likely its severity. The property has also continued to
deteriorate over the years due to the inaction of the Applicant to undertake any
works to safeguard the property, including a period in excess of one year where
the property was not insured with the FSP.
Although the FSP‟s policy does place a condition of cover on the property being
maintained in good repair and all reasonable precautions taken to prevent loss or
damage occurring, the FSP has agreed to accept the second claim in good faith.
Given the FSP eventually simply closed its file due to the Applicant‟s inaction , the
FSP‟s acceptance of claim two was fair in the circumstances.
Whilst the Applicant has provided a quotation in the sum of $369,600 , from
builder “C”, it is clear this quotation includes items which are not related to the
claimed event. Further, this quotation is well in excess of the sum insured, which
is the maximum entitlement under the policy terms.
Although C‟s quotation attributes the „majority‟ of damage to the initial storm event
in 2010 his conclusion is unpersuasive in the face of the other evidence on file.
Photographs taken shortly after the event show the property was in a dilapidated
state and it is doubtful the deterioration evident occurred in such a short period,
as to be wholly attributable to the storm.
Further, S and Q‟s reports make it clear they both attributed a significant
proportion of the damage evident to pre -existing and maintenance issues at the
site. It would also appear from reading Q‟s report and final quotation, that he has
given the Applicant the „benefit of the doubt‟ on a number of items included in the
scope of works, notably the costs to replaster the home.
On this basis, S and Q‟s reports are more persuasive.
It is my view the FSP‟s offer of $150,000 in full and final settlement of the claim , is
fair in all the circumstances. Certainly, the Applicant has not satisfactorily
demonstrated she is entitled to additional funds or that the FSP‟s scope of works
does not encompass all of the storm damage to the property.
On this basis, the FSP‟s offe r is reasonable in the circumstances and adequately
discharges its liability under the terms of the policy. As Q‟s quotation was
prepared with current pricing as at November 2013, with the funds remitted to the
Applicant shortly afterwards, albeit she refused to accept those funds until
October 2014, an award of interest is not appropriate in the circumstances.
Likewise, although this matter has taken over four years to reach conclusion, it is
clear much of the delay is attributable to the Applicant. On this basis, an award of
compensation is not appropriate in the circumstances.
Insofar as the property may be considered uninhabitable as a result of the
claimed event or whilst works are undertaken, the FSP is to assess its liability
under the policy terms should any claim for lost rental income be forthcoming from
the Applicant.
Case No: 360742 Determination Page 4 of 5
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, it was appropriate to proceed directly to a Determination in line with the
Operational Guidelines to the FOS Terms of Reference.
There has been a full exchange of information between the parties and each party
has had the opportunity to address any issues raised by the other. Material
supplied by the parties will only be referred to in this decision where relevant and
in context.
3.2 Expert reports
Record Key points
FSP’s expert ( S )
Building Consultant
13 Sep 2011
the property is a single story timber weatherboard clad
premises with a metal roof, constructed on a timber bearer
and joist floor
it is estimated to be approximately 60 years old and is
considered to be in poor condition for its age
the property was inspected in the company of the insureds
and their son
the roof of the house had sustaine d hail damage as had
the machinery shed, garage and bungalow
there were many maintenance related issues evident at the
site
there was also surface corrosion to approximately 50% of
the roof sheets of the bungalow and approximately 70% of
the roof sheets of the garage
there was an absence of storm water guttering to the
bungalow and the gutters to the garage were significantly
corroded and no longer fit for purpose
the fascia beam of the bungalow was sagging indicating
the support post is failing below groun d level
there was hail damage to the pergola of the house and
structural damage where a tree had impacted the pergola
hail damage was evident to the canvas awning blinds,
metal fly screens and timber weatherboard cladding on the
northern and western elevat ions
weatherboards to the entire residence were generally in
poor condition, with deterioration and decay evident
there is evidence of wear and tear to the timber roof frame
of the pergola
the hardboard ceiling lining of the front veranda showed
evidence of water damage
there is evidence of water staining and water related
damage to most of the ceilings throughout the residence
Case No: 360742 Determination Page 5 of 5
hairline fractures to the plaster, cracked cornices and at the
wall/ceiling junctions were observed
the playroom showed significan t sagging of the plaster
ceiling and cracking in and around the window openings
the playroom was most likely previously part of the original
veranda
the water damage to the plasterboard ceilings and wall
linings is as a result of water ingress from the two claimed
events
however the cause of the damage to the plasterboard
linings is due to normal building movement over time
seasonal moisture changes have caused differential
settlement of the footings supporting the stumps, which
has cracked the plasterboard wall linings
therefore although the property requires re - stumping, this
is not as a result of the claimed event
S was unable to comment on the further deterioration
between the two events save to say that had a new roof
been installed prior to the June 20 11 event, water would
not have entered the premises
S prepared two separate scopes of works, one for claim
related damage and the other for maintenance related
works.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.