Dispute over $150,000 cash settlement offer for two storm damage claims, applicant seeking $369,600

FirmFinancial Firm (Unknown - Insurer)
Decided2014-12-05
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$369,600
SourceAFCA PDF

Summary

The landlord disputed a $150,000 cash settlement for hail and storm damage across two claims and sought $369,600. AFCA found the policy allowed cash settlement, the offer was reasonable and largely funded already, and much of the delay was the insured's, so no further payment or interest was ordered.

The policy allows the insurer to choose its settlement method, and the insured's quotation included unrelated items and exceeded the sum insured, so the cash offer discharged the insurer's liability.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 360742 Determination Page 1 of 5 Case number : 360742 3 December 2014 1 Overview 1.1 Dispute The Applicant holds a landlord policy with the Financial Services Provider (FSP), covering a tenanted property for a sum insured of $275,000, with contents insured for $7,500. On 7 March 2010, the property was damaged by a severe hailstorm and a claim lodged with the FSP (claim one). The claim was accepted, however, before any works were undertaken, the property was again damaged by storm on 21 June 2011 (claim two). The FSP has offered the Applicant the sum of $150,000 , in full and final settlement for the damage sustained in both events. The Applicant disputes that amount and maintains she is entitled to settlement in the sum of $369,600, although her preferred option is that the FSP assume conduct of authorising and undertaking repairs to the home. 1.2 Issues and key findings Is the FSP able to cash settle the claims? The FSP is entitled to settle both claims by way of cash settlement in lieu of repairs because this is in accordance with the terms of the policy. Does the FSP’s cash settlement offer adequately discharge its liability under the policy terms? Considering the circumstances particular to these two claims, the FSP‟s offer of settlement is reasonable in the circumstances and adequately discharges its liability under the policy terms. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to settle the claims by way of cash settlement in lieu of repairs, in accordance with the policy terms. The FSP‟s offer of settlement adequately discharges the FSP‟s obligation pursuant to the policy. Case No: 360742 Determination Page 2 of 5 2 Reasons for Determination 2.1 Was the FSP entitled to settle the claim by cash payment? The terms of the policy allow the FSP to cash settle the claim The terms of the policy are clear in that it allows the FSP the authority to determine which method of settlement to use for a claim. Accordingly, the FSP‟s ultimate decision to settle the claims by cash settlement was in accordance with the terms of the policy. Although the FSP originally chose to authorise repairs for claim one to building firm “T”, it later decided to settle the claim by way of cash payment as the Applicant and T were unable to reach agreement on certain matters to allow works to commence. The Applicant has not provided any evidence to suggest she was prejudiced by the FSP‟s revised settlement method or its decision to settle claim two on th e same basis. Given the difficulties in bringing this matter to a conclusion, which will be addressed in more detail below, the FSP‟s decision to alter its method of settlement to a cash payment was reasonable in the circumstances and in accordance with its own policy terms. 2.2 Does the FSP’s offer adequately discharge its liability under the terms of the policy? The FSP’s offer is fair in all the circumstances The FSP has offered the total sum of $150,000 in full and final settlement of both claims. This amount was largely derived from an updated quotation for works prepared by builder “Q” in November 2013, agreed to by all parties , after a site meeting to try and resolve the outstanding issues. It is of note that the FSP made several offers of settlement. All offers have been rejected by the Applicant. The first offer was made on 16 September 2010, shortly after T‟s involvement in the claim was terminated by the Applicant. This offer was not formally rejected by the Applicant until 26 October 2012, more tha n two years later. It is clear that the Applicant and/or her broker have not conducted themselves in a manner conducive to bringing these matters to a timely conclusion. It also seems likely that had works been undertaken after claim one, in a timely manner, that no further damage would have been occasioned to the property in the second event. At the very least, any damage would have been minimised, notwithstanding that the FSP arranged for a „make safe‟ of the premises after claim one. Case No: 360742 Determination Page 3 of 5 Accordingly, the inaction of the Applicant has contributed to the happening of the second claim and most likely its severity. The property has also continued to deteriorate over the years due to the inaction of the Applicant to undertake any works to safeguard the property, including a period in excess of one year where the property was not insured with the FSP. Although the FSP‟s policy does place a condition of cover on the property being maintained in good repair and all reasonable precautions taken to prevent loss or damage occurring, the FSP has agreed to accept the second claim in good faith. Given the FSP eventually simply closed its file due to the Applicant‟s inaction , the FSP‟s acceptance of claim two was fair in the circumstances. Whilst the Applicant has provided a quotation in the sum of $369,600 , from builder “C”, it is clear this quotation includes items which are not related to the claimed event. Further, this quotation is well in excess of the sum insured, which is the maximum entitlement under the policy terms. Although C‟s quotation attributes the „majority‟ of damage to the initial storm event in 2010 his conclusion is unpersuasive in the face of the other evidence on file. Photographs taken shortly after the event show the property was in a dilapidated state and it is doubtful the deterioration evident occurred in such a short period, as to be wholly attributable to the storm. Further, S and Q‟s reports make it clear they both attributed a significant proportion of the damage evident to pre -existing and maintenance issues at the site. It would also appear from reading Q‟s report and final quotation, that he has given the Applicant the „benefit of the doubt‟ on a number of items included in the scope of works, notably the costs to replaster the home. On this basis, S and Q‟s reports are more persuasive. It is my view the FSP‟s offer of $150,000 in full and final settlement of the claim , is fair in all the circumstances. Certainly, the Applicant has not satisfactorily demonstrated she is entitled to additional funds or that the FSP‟s scope of works does not encompass all of the storm damage to the property. On this basis, the FSP‟s offe r is reasonable in the circumstances and adequately discharges its liability under the terms of the policy. As Q‟s quotation was prepared with current pricing as at November 2013, with the funds remitted to the Applicant shortly afterwards, albeit she refused to accept those funds until October 2014, an award of interest is not appropriate in the circumstances. Likewise, although this matter has taken over four years to reach conclusion, it is clear much of the delay is attributable to the Applicant. On this basis, an award of compensation is not appropriate in the circumstances. Insofar as the property may be considered uninhabitable as a result of the claimed event or whilst works are undertaken, the FSP is to assess its liability under the policy terms should any claim for lost rental income be forthcoming from the Applicant. Case No: 360742 Determination Page 4 of 5 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. There has been a full exchange of information between the parties and each party has had the opportunity to address any issues raised by the other. Material supplied by the parties will only be referred to in this decision where relevant and in context. 3.2 Expert reports Record Key points FSP’s expert ( S ) Building Consultant 13 Sep 2011  the property is a single story timber weatherboard clad premises with a metal roof, constructed on a timber bearer and joist floor  it is estimated to be approximately 60 years old and is considered to be in poor condition for its age  the property was inspected in the company of the insureds and their son  the roof of the house had sustaine d hail damage as had the machinery shed, garage and bungalow  there were many maintenance related issues evident at the site  there was also surface corrosion to approximately 50% of the roof sheets of the bungalow and approximately 70% of the roof sheets of the garage  there was an absence of storm water guttering to the bungalow and the gutters to the garage were significantly corroded and no longer fit for purpose  the fascia beam of the bungalow was sagging indicating the support post is failing below groun d level  there was hail damage to the pergola of the house and structural damage where a tree had impacted the pergola  hail damage was evident to the canvas awning blinds, metal fly screens and timber weatherboard cladding on the northern and western elevat ions  weatherboards to the entire residence were generally in poor condition, with deterioration and decay evident  there is evidence of wear and tear to the timber roof frame of the pergola  the hardboard ceiling lining of the front veranda showed evidence of water damage  there is evidence of water staining and water related damage to most of the ceilings throughout the residence Case No: 360742 Determination Page 5 of 5  hairline fractures to the plaster, cracked cornices and at the wall/ceiling junctions were observed  the playroom showed significan t sagging of the plaster ceiling and cracking in and around the window openings  the playroom was most likely previously part of the original veranda  the water damage to the plasterboard ceilings and wall linings is as a result of water ingress from the two claimed events  however the cause of the damage to the plasterboard linings is due to normal building movement over time  seasonal moisture changes have caused differential settlement of the footings supporting the stumps, which has cracked the plasterboard wall linings  therefore although the property requires re - stumping, this is not as a result of the claimed event  S was unable to comment on the further deterioration between the two events save to say that had a new roof been installed prior to the June 20 11 event, water would not have entered the premises  S prepared two separate scopes of works, one for claim related damage and the other for maintenance related works.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.