Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Claim amount
Case number : 360476 28 July 2015
1 Overview
1.1 Dispute
The Applicant is a beneficiary under a residential strata title policy between an
owner ‟ s corporation and the Financial Services Provider (FSP). The Applicant lodged
a claim for water damage to her property due to a burst pipe in her neighbour‟s
property. The FSP accepted the claim and arranged for a scope of work (SOW) for
the repairs.
The Applicant disputes the SOW by the FSP‟s approved b uilder (T) considering it
inadequate and failing to take into account her family‟s medical conditions.
1.2 Issues and key findings
Did the FSP correctly determine the repairs and work required?
In respect of protection to the interior and exterior of the property, the FSP correctly
assessed and determined the works required to meet its obligations under the policy.
However, the FSP is to conduct further investigations in respect of the noise.
How much is the Applicant entitled to for additional costs?
The Applicant is entitled to $1,436.05 for M‟s professional costs, $1,570 for
replacement carpet, $3,000 for legal costs, and removal and storage costs of
$2,670.80 and $16 per week. The Applicant is also entitled to reasonable temporary
accommodation costs as set out in this Determination.
1.3 Determination
This Determination is partly in favour of the Applicant. On acceptance of this
Determination by the Applicant, the FSP must:
Engage an acoustic consultant to test the sound noise from the repaired pipe and
take further action if required, as set out in the body of this Determination.
Otherwise settle the claim in accordance with an updated quote for T‟s SOW .
Obtain a rental valuation for the Applicant‟s property as set out in the body of this
Determina tion and settle the Applicant‟s temporary accommodation costs for the
time taken to make the repairs.
Pay the Applicant $8,676.85 (for additional costs noted above), plus $16 per
week storage costs.
Case No: 360476 Determination Page 2 of 12
2 Reasons for Determination
2.1 Did the FSP correctly determine the repairs and work required?
Policy covers accidental damage subject to exclusions
The Applicant‟s policy provides insurance against accidental loss or damage
sustained to the Applicant‟s property during the period of insurance.
The parties do not dispute there was accidental damage to the Applicant‟s property
caused by a burst water pipe at her neighbour‟s property on 26 October 2013.
Extent of damage and scope of repairs are in dispute
The FSP relies on T‟s assertion that the SOW would return th e Applicant‟s property
to the condition that it was in before the burst water pipe.
The Applicant submits that T‟s SOW does not provide sufficient:
protection from dust and dirt , which is relevant to the family‟s medical conditions
rectification of the noise transmission issues
high standard of works, given the Applicant had just completed a $900,000
renovation
protection to the outside landscaping, given the Applicant had just spent $80,000
on this
provision for removal and storage costs.
In support of this position, the Applicant relies on the SOW submi tted by the FSP‟s
builder (BP). The Applicant requested BP to include items that were not included in
T‟s quote.
T‟s quote for its SOW was $ 28,215. BP‟s qu ote for its SOW was $50,728. Both
quotes are for the repair of damage to the Applicant‟s house and her neighbour‟s.
T’s SOW is adequate for the purposes of the policy
Where accidental damage occurs to the Applicant‟s property, the policy states the
FSP may choose to either rebuild, replace, repair or pay the amount it would cost to
do so, to settle the claim.
The policy defines replacement to mean the reasonable cost of rebuilding, replacing
or repairing to a condition which is equivalent to or substantially the same as , but not
better nor more extensive, than when it was new.
The FSP is required to use due skill and care in the fulfilment of its obligations under
the policy. This means the FSP must take reasonable measures to prevent the
property from exposure to dust. There is no special endorsement on the policy to
require the FSP to provide a higher level of protection or care than what it must
ordinarily do.
T has confirmed the measures that it will take to protect the property from dust,
based on the comments the Applicant made compar ing BP‟s and T‟s SOW. T notes it
can provide brand new heavy duty plastic and canvas drop sheets at the start of
every work shift but could not provide an estimate for this. T also states it will seal
Case No: 360476 Determination Page 3 of 12
and protect cupboards, light fittings, etc, but that it cannot fully guarantee such
protection, given T needs to have smoke detectors operational and would need to be
able to turn on the lights. T recommended the Applicant and her family relocate
during the period of the works.
The Applicant also wishes for superior protection to the garden and front of house. T
responded that it is unreasonable that they could not walk on the grass or mix
materials anywhere (including on the nature strip) and for them to cover grout lines in
the pavers. T states the amount of airborne dust on a daily basis that would settle in
this area would outweigh any dust from its work.
Having considered all the circumstances and the parties ‟ obligations, on balance I
accept that T‟s SOW is reasonable in respect of the protection of the Applicant‟s
property from dust, landscaping and the building‟s exterior in the manner required
under the policy.
While the Applicant may wish to have brand new protective sheets at the end of
every shift, and other protective measures given her family‟s medical conditions and
her new renovations and landscaping, such additional measures are not required by
the terms of the policy and would need to be separately addressed by the Applicant.
The Applicant also objected to T‟s SOW not including the removal of the pivot door to
the under stair cupboard and office door. T states the Applicant wants this because
dust may get into the pivot points on the door. For the reasons expressed above, I
accept that T has accounted for all reasonable measures in its SOW.
The FSP is therefore not required to include protective measures in its SOW
additional to those already provided for in T‟ s SOW. However, given the age of T‟s
SOW (5 June 2014) a new quote for this SOW is required given the FSP has elected
to cash settle the claim.
FSP is to conduct further investigations into sound transmission issue
The parties do not dispute there was no sound -proofing material used in the common
party wall between the Applicant‟s mid - level stairwell and the neighbour‟s property.
The Applicant claims a significant level of noise now transmits into her property when
her neighbour uses her bathroom, since the FSP‟s contractors conducted work on
the leaking pipe. The Applicant lists five independent contractors who she states
acknowledged the problem. The Applicant also refers to an email from the FSP‟s
assessor in which the FSP agreed to reduce the noise levels.
The Applicant states the advice she received from BP and her own builder is that the
increased noise levels are because the solid mass of the double brick wall behind the
basin and toilet embedding the water pipes has been significantly compromised
whilst plumbing contractors were hacking through the wall to access the pipe. This
has not been appropriately remedied, allowing noise t ransfer from the neighbour‟s
bathroom to her home.
This is consistent with the photo of the exposed pipe and also with S‟s invoice which
stated:
Case No: 360476 Determination Page 4 of 12
“we smashed our the way to expose the burst copper pipe. We welded the split and
tested on completion; all re paired.”
It is also consistent with remedial works describing replacing bits of bricks.
The Applicant relies on the report by her engineer (M) dated 6 May 2015 to seek the
FSP be directed to investigate and rectify the sound-proofing problem. M ‟s report
recommended engaging an acoustic consultant to measure the noise levels to see if
they comply with Building Code of Australia (BCA) requirements.
I accept that there may be additional noise as a result of the repair works. It is
reasonable for the FSP to test the noise levels. In the event they do not comply with
the BCA, the FSP is to obtain a scope of work and quote for the rectification of the
noise levels in conjunction with the acoustic consultant. The FSP is then to cash
settle the Applicant in respect of these works.
2.2 How much is the Applicant entitled to for additional costs?
The temporary accommodation costs must be reasonable
The parties do not dispute the Applicant and her family are required to vacate the
property while repairs are undertaken. The dispute relates to the costs claimed for
the accommodation sought by the Applicant.
The policy provides the special benefit of reasonable costs of temporary
accommodation necessarily incurred if the property is unfit to be occupied for its
intended purpose.
The Applicant provided an email trail dated 25 February 2015, between her and a
serviced apartment company (C) for the temporary accommodation costs sought. C
indicated it would cost $400 per night for a three-bedroom townhouse in September
2015 (this included 2 housekeeping services per week).
The Applicant argues this is the only accom modation which met most of her family‟s
needs and is commensurate to her property. The Applicant provided a list of criteria
she required from the temporary accommodation. The list includes:
Easy disability access to meet her daughter‟s needs
Close to her daughter‟s school and on the relevant tram line so her daughter
can get to school
Quiet residential locale and outdoor living access.
The FSP has provided evidence of a three bedroom Caulfield property that was
available for $150 per night based on a three week stay.
Having viewed the website for both, it is clear they provide entirely different
standards of accommodation. I am not satisfied that either is reasonable in all the
circumstances. The F SP‟s choice of accommodation is a low standard. On the other
hand, temporary accommodation almost always involves a degree of compromise
that the Applicant must be willing to accept.
As it is clear the parties will not be able to reach agreement, the FSP must obtain a
valuation of the daily rental of the Applicant‟s p roperty based on a one month stay. It
Case No: 360476 Determination Page 5 of 12
is important the valuation is based on a one month stay as short accommodation is
always more expensive than long term accommodation. The FSP must pay the
Applicant the cost of this accommodation for the duration the Applicant is required to
vacate her premises for the repair works.
Removal and storage costs are reasonable
The FSP is required to pay the reasonable removal and storage costs necessarily
incurred, under a special benefit of the policy. This includes removing, storing,
returning and insuring the undamaged contents.
On 12 May 2014, the FSP authorised its assessor to offer cover for the Applicant‟s
artwork and asked the Applicant to obtain a quote.
T also recommended the Applicant remove her furniture. In a letter dated 21 October
2014, the FSP‟s solicitor indicated it would cover such costs.
The Applicant provided quotes from her decorator, art removalist and storage
specialist to remove and re-install her blinds, curtains and window treatments,
artwork and furniture. Quotes were obtained in 2014 and updated in 2015. The
quotes totalled $2,670.80 plus $16 a week to store the blinds and window treatments.
The FSP has not disputed the costs, but indicated it could only finalise these costs
once the parties agree to a SOW. It is fair in all the circumstances for the FSP to pay
the Applicant $2,670.80 and $16 a week to cover the costs in accordance with the
policy.
The Applicant is to be reimbursed for M ’s professional costs
The Applicant seeks $1,436.05 for the cost of engaging M, a structural and civil
engineer to provide a report on the noise transmission following repairs to the pipe
and wall.
The policy provides an additional benefit for professional fees necessarily incurred in
the replacement of the property.
As the Applicant had been advised by numerous parties that there were issues with
the noise levels to the wall and the FSP had previously accepted liability for this
work, it was reasonable for the Applicant to engage an engineer for his view. Further,
I have accepted the recommendations of M.
It is fair in all the circumstances for the FSP to reimburse the Applicant the cost of
obtaining M‟s repo rt.
FSP agreed to pay for carpet damage and legal costs
During the dispute, the Applicant also raised issues with the FSP‟s liability to pay for:
replacing damaged carpet on her stairwell, and
legal costs.
On 15 May 2015, the FSP:
agreed to organise the replacement of the damaged carpet, and
offered $3,000 in full and final settlement of the Applicant‟s legal expenses.
Case No: 360476 Determination Page 6 of 12
The Applicant accepted the FSP‟s offer. I consider the FSP‟s offer is fair and
reasonable, and the FSP should contribute $3,000 towards the Applicant‟s legal fees.
In relation to the carpet damage, in March 2015 the Applicant provided a quote of
$1,570 to replace the carpet. The FSP did not dispute this cost as unreasonable, and
agreed to replace the carpet. The FSP is to pay the Applicant $1570 for the
replacement carpet.
Case No: 360476 Determination Page 7 of 12
3 Supporting information
3.1 The FOS Approach
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
Financial Ombudsman Service (FOS) decisions (but I am not bound by these). I have
taken into account all the material submitted by the parties.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues raised
by the other. For the purposes of this Determination, I have restricted commentary to
those issues which I consider directly relevant to the outcome only.
This dispute has been expedited to a Determination. No Recommendation was
issued.
3.2 Relevant sections of the policy
“Product Di sclosure Statement
Important Information and Notice s
This document is a Product Disclosure Statement (PDS) and is also our insurance policy
wording. …
This document contains important information to help you understand this insurance. It is up to
you to choose the cover you need. This document contains information which can help you
decide. … You should carefully consider the information provided having regard to your
personal circumstances to decide if this insurance is right for you.
…
What you should read
To understand the features, benefits and risks of this insurance and to determine if it is
appropriate for you, it is important that you read:
all of the Product Disclosure Statement - this information is designed to help you
understand this insurance and your rights and obligations under it;
the Policy Wording part ... It tells you about:
o what mak es up the insuranc e (i.e. your contract with us which we call a Policy);
…
o the cover we can provide (s ee Policies 1 to 10);
…
o when you are not insured (see General exclusions and other exclusions under
Policies 1 to 10)
…
Monetary limits on the cover
We can insure you up to the amount of the sum insured or ot her specified limits for your insured
property. …
You need to make sure you are happy with the relevant sum(s) insured and limits. If you do not
adequately insure yourself you may have to bear the uninsured proportion of any loss yourself.
…
Policy wording
…
It is very important that You read this Policy carefully and make sure You are satisfied with this
insurance.
…
General definitions - the meaning of some words
The words listed below have been given a specific meaning in this Policy and these specific
meanings apply when the words begin with a capital letter.
Case No: 360476 Determination Page 8 of 12
…
Common Area
means the area at Your Situation that is not part of any Lot/Unit.
…
Indemnity Value
means the cost to rebuild, replace or repair property to a condition which is equivalent to or
substantially the same as but not better nor more extensive than its condition at the time of loss
taking into consideration age, condition and remaining useful life.
Insured property
… Building means:
building or buildings as defined by the Strat a Schemes Management Act, Strata Titles Act,
Comm unity Titles Act or similar legislation applying where Your Building is situated…
… Replacement
means:
a the reasonable cost of rebuilding, replacing or repairing to a condition which is
equivalent to or substantially the same as but not better nor more extensive than when
it was new …
You, Your, Yours
means:
a in respect of Policies 1, 8, and 10:
the Body Corporate, Corporation, Owners Corporation, Plan or Company named on the
Schedule including:
i the interest therein of Members;
ii Lot Owners in respect of Sp ecial Benefits 1 … of Policy 1 …
…
Policy 1 - Insured Property
Policy 1 is a „broad form‟ accidental loss and damage ins urance contract in terms of the
Insuranc e Contracts Act, 1984 .
What we insure
We insure You up to the Sum Insured shown for Policy 1 on the Schedule, against
ACCIDENTAL LOSS or DAMAGE to Your Ins ured Property which occurs during the Period of
Insuranc e.
…
Additional benefits
When Your Sum Insured under Policy 1 is not otherwise expended in respect of any one
Event We will pay for:
1 Architects and profe ssi onal fees, removal of debris
a the cost of architects fees, surveyors fees and other professional fees;
b the cost of removal, storage and/or disposal of debris, being the residue of Your
damaged Ins ured Property (including debris required to be removed from adjoining or
adjacent public or private land), damaged Lot Owners and occupiers Contents and of
anything which caus ed the damage; …
You necessarily incur in the Replacement of Your Insured Property as a result of loss or
damage that is admitted as a claim under Policy 1.
…
Special benefits
Special Benefits are included in addition to Your Sum Insured for Policy 1.
1 Temporary accommodation / rent / contributions / storage
a Temporary accommodation
When You occupy Your Lot/Unit We will pay the reasonable cost of Temporary
Accommodation You necessarily incur if Your Lot/Unit is made unfit to be
occupied for its intended purpos e by:
i loss or damage that is admitted as a claim under Policy 1; or
We will pay:
under a i from the time of the Event until the time You reoccupy Your Lot/Unit following
completion of rebuilding, repairs or replacement …
h Lot owners’ removal and storage costs
We will pay the reasonable costs You necessarily incur in:
i removing undamaged Lot Owners‟ Contents to the nearest place of safe
keeping;
Case No: 360476 Determination Page 9 of 12
ii storing undamaged Lot Owners‟ Contents at that place or an equivalent
alternate plac e;
iii returning undamaged Lot Owners‟ Contents to Your Situation when
occupancy of their Lot/Unit is permitted;
iv insuring undamaged Lot Owners‟ Contents durin g such removal, storage
and return;
following loss or damage to Your Insured Property that is admitted as a
claim under Policy 1 that makes the Lot/Unit unfit to be occupied for its
intended purpose.
…
The combined total amount We will pay under Special Be nefit 1 arising out of any one Event
that is admitted as a claim under Policy 1 is limited to fifteen percent (15%) of the Sum
Insured for Policy 1 or such other percentage as We may agree in writing.
…
9 Exploratory costs, replacement of defective parts
We will pay for the reasonable exploratory costs You necessarily incur in locating the source
of bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or
carry liquid of any kind.
We will also pay for reasonable costs incurred in:
a repairing the area of Your Insured Property damaged by such exploratory
work …
Claims - how we will settle your claim
1 Replacement
If Your Insured Property is damaged, We may choose to either rebuild, replace, repair or pay
the amount it would cost to rebuild, replace or repair.
The amount We pay under Policy 1 will be the cost of Replacement at the time of
Replacement subject to the following provisions:
a the necessary work of rebuilding, replacing or repairing (which may be carried
out upon another site or in any manner suitable to Your requirements
provided Our liability is not increased), must be commenced and carried out
without unreasonable delay;
…
Such Replacement will be deemed to constitute Replacement for the purpose of this
insurance provided Our liability is not increased;
d if You cause unreasonable delays in commencing or carrying out
Replacement, We will not pay any extra costs that result from that delay;
e when We wish to rebuild, replace or repair and You do not want this to occur
We will only pay Indemnity Value.”
3.3 Reports of the damage
Record Key points
FSP’s builder (T )
6 May 2014
Scope of works
FSP’s builder (T )
Quotation
5 June 2014
$28,215 for reinstatement works to Applicant and neighbour‟s property.
See SOW for details.
FSP’s builder (T)
Scope of work
5 June 2014
Work areas included: two walls under - stairs on the mid - level and the
stairwell on the top - level.
Work included: c lean/drop sheets in area secured with masking tape;
seal and mask all doorways, lights, switches, GPO‟s, intercom panel,
office desk and overhead cabinets; remove blinds to study door;
remove, dispose and repair loose/drummy hard plaster and sand new
works; paint; remove and refit existing skirts ; p ull back carpet to top
landing to supply and fit new plasterb oard; set up of ladder and plank
Case No: 360476 Determination Page 10 of 12
Record Key points
scaffold; re - lay carpet; and professional clean after works completed.
Notes included: recommend Applicant vac ate premises during works
given children are asthmatic and limited access will be available to the
stairwell area ; no allowance for contents removal and storage; no
allowance for sound - proofing; cannot provide 100% dust protection;
Applicant‟s expectations, including multiple requests for “absolut e & total
protection” is simply not possible or practicable given requi red works. T
will make best effort to contain dust, etc, however, some should be
expected.
FSP’s builder (BP)
Job costings tender
20 May 2014
$41,157.60 for Applicant‟s property ($9,570 for neighbour‟s property).
Work included:
1. Preliminaries: insurance, rubbis h removal and site clean upon
completion.
2. Protection: setting up and supervision
Sealing off work area, protection to all work areas/ floors and fixtures,
protect blinds and windows (recommend the Applicant remove blinds
and reinstall upon completion) , supply and pack up new heavy duty
plastic/canvas drop sheets every work shift, clean work areas at the end
of every work shift and a full - time foreman to set up, protect and clean
all work areas and ensure security of property during work hours.
3. Gyprock: plasterboard and carpentry for soundproofing
Obtain technical advice from a leading manufacturer for best solution to
provide stick - on heavy - duty acoustic board to affected areas, with
consideration for minimising damage to other walls and fixtures.
Stairwell: Remove and replace skirting, scotia cornice and supply/install
acoustic gyprock board with a minimum level 4 finish to jointing
compound materials to sheets.
Under - stairs storage/mid - level first floor: Remove and replace skirting,
cornice and su pply/install acoustic gyprock board with a minimum level
4 finish.
4. Painting: Applicant to specify precise Dulux colour specifications.
5. Carpets: nil allowance.
Applicant’ s
engineer (M)
Report
6 May 2015
Inspected premises on 1 May 2015.
W hen wate r is runni ng in the neighbour‟s bathroom , the noise of water
flowing through the pipes is quite evident and can be heard from the
staircase and i n the room at the top of the stairs.
I nstallation of soundproofing material on the inside face of the wall
would further reduce the width of the already narrow staircase (of
845mm) and reduce the amenity of the house .
BP‟s use soundproof pane lling is a “band - aide solution” and may or may
not effectively work.
The noise level would not comply with requirements of the BCA bas ed
on his experienc e, but further investigation is required.
The repair of the pipes most likely caused the noise transmission.
T ‟s quote w ill not rectify the noise issue .
BP‟s quote includes many extras not in T‟s (eg, the installation of
soundproofing and more rigorous attempt at dust abat ement ).
Case No: 360476 Determination Page 11 of 12
Record Key points
Recommended : e ngaging an ac oustic consultant to measure levels of
noise transference to Applicant‟s property to determine whet her they
comp ly with BCA requirements; r e - open holes made in the brickwork in
the neighbour‟s house, seek professional adv ice on repair techniques
and acoustic consultant to review ; m ake necessary adjustment s ; and
e ngage a building consultant/engineer to complete a SOW to undert ake
repairs.
Applicant’ s carpet
supplier (C)
Revised quote
19 March 2015
$1,570 to supply, make and install carpet to cover staircase.
Includes removal of existing carpet and laying foam underlay and
“smoothedge” installation.
3.4 Emails between the Applicant and FSP’s assessor
Applicant’s email dated 26 Novemb er 2013
“ As discussed this morning, my builder was at my place today and went into [my neighbour‟s
property], turned on the wat er and heard all the noise from the shower, toilet and basin which
are situated along the adjoining wall.
After looking at the photo (s ee below) and making an assessment on site … the builder
suspects that the cavity has been widened to effect the remedial works. This now allows the
noise to reverberate through the wall to my side …
… [T]he builder, has proposed one possible, and perhaps the most economical, solution at
this stage:
1. locate water pipes.
2. drill a series of holes around wat er pipes.
3. spray in expanding foam to fill cavity and to surround pipes.
4. grout holes.
5. patch wall.
…”
Email from FSP’s assessor dated 5 December 2013
“… [ The FSP] have also agreed to reduce the noise levels as per the email you sent to me
26/11/ 13.
Please have [your] Builder provide [an] invoice for this as per attached authority. …”
3.5 Further submissions regarding accommodation costs
On 29 July 2015, the FSP provided reference to the three bedroom Caulfield villa it
considered constituted suitable temporary accommodation. The FSP also requested
the opportunity to make further submissions regarding the costs of alternative
accommodation.
Case No: 360476 Determination Page 12 of 12
Given the length of this dispute and the previous opportunities the parties have had
to make submissions on temporary accommodation, I do not consider it either
desirable or fair for further submissions to be made.