Home / Financial Firm (Unknown - Insurer) / Determination 360068
Determination 360068
Denial of Claim - Exclusion/Condition
Summary
Applicants claimed earthquake damage to their home after the FSP denied the claim under policy exclusions. AFCA found the FSP not entitled to deny, ordered cash settlement of repairs at an agreed cost, and ordered reimbursement of expert costs with interest.
Expert evidence established the earthquake as the primary cause of the damage and did not support the exclusions relied on by the FSP.
Issues
- Claim denial primary · upheld“The FSP is not entitled to deny the Applicants' claim because the expert evidence establishes the cause of the damage was the earthquake.”
- Claim amount dispute secondary · upheld“Fair in all the circumstances that the FSP cash settle the claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Determination
Case No: 360068 Determination Page 1 of 17
Case number: 360068 9 December 2014
1. Overview
1.1 Dispute
The Applicants lodged a claim on 10 September 2013 for earthquake damage to
their home which occurred on 19 June 2012.
The Financial Services Provider (FSP) denied the Applicants’ claim because the
damage being claimed was not as a result of an earthquake or any other insured
event. Additionally, the FSP relied on policy exclusions which it says applies, to
deny the Applicants’ claim.
T he Applicants’ disagree with the FSP’s decision and want the FSP to pay for the
earthquake damage and other loss.
1.2 Issues and key findings
Is the FSP entitled to deny the Applicants’ claim?
The FSP is not entitled to deny the Applicants’ claim because the expert evidence
establishes on the balance of probabilities:
the cause of the damage was the earthquake
it does not support reliance on the exclusions relied upon by the FSP.
Is the FSP prejudiced by the delay in making the claim?
The FSP is not prejudiced by the delay as the experts were able to distinguish
between pre-existing damage and earthquake damage.
Are the Applicants entitled to their costs in pursuing the matter?
The Applicants are entitled to their costs pursuant to the Terms of Reference as
the Applicants’ reports addressed complex technical issues and helped the
Applicants establish their claim.
Does the FSP have to pay compensation to the Applicants?
The FSP does not have to pay compensation to the Applicants because the
physical inconvenience or time taken to make a decision about the claim after it
was lodged was not unusual.
1.3 Determination
This Determination is substantially in favour of the Applicants.
Case No: 360068 Determination Page 2 of 17
The FSP is to use GH’s earthquake damage scope of works (SOW) in order to
fulfil its obligations under the policy to repair the damage.
Within 14 days of acceptance of this Determination, the Applicants and the FSP
are each to obtain a quotation about the cost to repair the earthquake damage
based on the SOW and provide to each other current costings for building repairs
caused by the earthquake.
The parties are to work together cooperatively and in good faith to establish the
reasonable cost of repairs caused by the earthquake within 14 days of provision
of the current costings.
Once costings are agreed the FSP is to cash settle this amount to the Applicants
within seven days of agreement.
Should any additional or further claim related repairs become apparent during the
repair process, the parties are to further assess this damage and provide each
other with a quotation for this additional work (if there is any).
These repairs (if any) are to be authorised by the FSP within seven days of
receiving the revised quotation and the parties agreeing the amount of any
additional or further claim related repairs.
If there is further earthquake damage detected during the repair process, the
parties are to work together cooperatively and in good faith to establish the
reasonable further cost of repairs caused by the earthquake.
Temporary accommodation costs are only payable if the home is uninhabitable as
a result of the EQ damage or during the repairs of same.
Within seven days of acceptance of the Determination the FSP is to pay GH’s
costs to GH of $6,908 and reimburse the Applicants as follows:
$550 (Architect fees)
$30.25 (sewerage easement plan fees)
$1,600 (deposit paid to GH)
In addition, the FSP is to pay interest on the amounts paid to the Applicants only
from the date of payment of the said sums by the Applicants until the date the
FSP makes reimbursement. The applicable interest rate is calculated pursuant to
Section 57 of the Insurance Contracts Act 1984 (Cth)
The FSP is not otherwise obliged to pay compensation to the Applicants.
Case No: 360068 Determination Page 3 of 17
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties. I am satisfied that the
documentation I have relied on has been provided to both parties
2.1 Is the FSP entitled to deny the Applicants’ claim?
Expert evidence confirms the primary cause of damage is the earthquake
It is an accepted insurance principle that the Applicants must establish, on the
balance of probabilities, they have suffered a loss caused by an insured event.
This is known as a prima facie claim. Once the Applicant has established a prima
facie claim, the FSP must show, on the balance of probabilities, the loss falls
within an exclusion clause in the policy, or the claim is not otherwise covered, in
order to deny the claim.
When the Applicants lodged their claim with the FSP they provided a report from
an architect (ID ). ID identified the cause of the damage to the Applicants’ property
as being from the earthquake in June 2012.
The FSP’s appointed loss adjuster was concerned that ID was an architect and
wanted an engineer to comment on the cause of damage.
An engineer (AB) was appointed by the FSP. AB also engaged other experts and
relied upon a plumbing report and geotechnical advice. He concluded that as
there were elevated soil moisture conditions and the footings were built on clay
soil which is highly reactive that the damage he observed was consistent with
differential footing movement.
AB concluded the damage is not consistent with earthquake damage but he also
says that it is possible that the earthquake made the pre-existing cracks worse
and developed new cracks because of the stresses already present due to the
footings movement. This conclusion reflects the opinion of the other civil engineer
AB engaged.
The Applicants then appointed their own engineer GH to provide his opinion on
the causes of damage at the property. GH identified some areas which he
considered to be pre-existing and not caused by earthquake and other areas
which he considered as being earthquake related.
GH acknowledges the information from Geoscience Australia that damage is
unlikely beyond a radius of 18km from the epicentre. It is not in dispute the
Applicants’ property is about 120kms from the epicentre.
I have carefully considered all the expert reports and I accept that on the balance
of probabilities the Applicants have established that the cause of the damage was
the earthquake even though the property was not in the typical zone of damage.
GH has made extensive and detailed inspections of the property and taken
Case No: 360068 Determination Page 4 of 17
photographs to illustrate his position. Not only does he rebut the basis of the
opinions of the FSP’s engineers with his testing and inspection but he explains at
length the failure mode and the actual type of damage to the property which is
caused by an earthquake. He says that the failure mode was such that the
damage he saw was caused by an earthquake and was not the type of damage
he would expect to see if there was failure of the footings.
I acknowledge that ID is an architect but I do not accept an architect has no
standing at all to make comment as to the cause of damage when their expertise
includes building technologies and construction methods. In any event the
Applicants are also supported by a civil engineer.
The thorough and extensive nature of testing conducted by GH and his findings
are highly persuasive. Further AB has not commented on or rebutted GH’s
contention about the failure mode and how it identifies the cause of the damage.
Therefore, I accept the Applicants have established on the balance of probabilities
that the primary cause of the majority of damage to the Applicants’ property was
the June 2012 earthquake.
Expert evidence does not support the exclusions relied upon by the FSP
The FSP says the damage was not caused by the earthquake or was not mainly
caused by the earthquake.
The FSP’s evidence is that a broken storm water pipe and other causes of water
ingress caused the damage. However it says that the damage was not caused
within 72 hours of the escape of liquid but over time and so it is entitled to deny
the claim.
The FSP relies on the following policy exclusions and says it does not have to pay
a claim when the damage is:
not directly caused by an insured event or
from pre-existing loss or damage or
erosion, subsidence, landslide, settling, shrinkage, undermining, washing
away or any other earth movement except when loss or damage is caused by
earthquake, storm or rainwater, explosion or escape of liquid and occurring
within 72 hours after the event
AB concluded a number of sources of poor drainage at the Applicants’ site had
contributed to excessive moisture in the soil which had in turn, caused movement
to the footings of the Applicants’ home. Additionally, AB identified a storm water
drain which had broken/cracked which also contributed to the soil moisture and
the ground movement.
AB relied upon information from a plumber and a geotechnical expert who
conducted one borehole test at the Applicants’ property. This test revealed
excessive moisture in the soil. It is noted the borehole was located in the vicinity
of the broken storm water pipe. The soil was not tested in a laboratory and the
engineer relied on his experience to determine the level of moisture in the soil. No
Case No: 360068 Determination Page 5 of 17
other intrusive tests were conducted and the geotechnical expert relied on his
observations and experience to provide an opinion on the other sources of water
at the property. He said he couldn’t prove the source of water but identified four
drainage faults.
GH considered the possible sources of water. Conversely, GH conducted physical
tests at the property to show the flow of water at the site and effectively disproved
AB’s opinion on the sources of water.
ID didn’t conduct extensive tests but also commented on site drainage and
concluded it was adequate. He found no evidence of pooling or water collecting
along the base of the walls of the house or under the house.
I note also that GH reviewed the water rate accounts at the time of the earthquake
and these accounts show no great increase in water usage.
The FSP sought further advice from AB about GH’s opinion. However AB merely
reiterated his previous advice of the earthquake not being the primary cause of
damage. He again stated excessive soil moisture from a number of sources as
being the main cause of the damage. He did not provide any further quantitative
evidence to support this opinion or to rebut GH’s opinion and testing that the four
identified water sources were not the cause of the damage.
The work done and tests done by GH are extensive. Having considered what he
says, the tests done and the photographs he took of the tests and the relevant
parts of the site, I accept that the four identified sources of the water did not cause
the damage. Accordingly on the balance of probabilities I am not persuaded of the
FSP’s contention that the damage was caused by water ingress whi ch in turn
caused the footings to move and was not directly caused by the earthquake.
2.2 Has the delay in making the claim prejudiced the FSP?
Delay was occasioned by family bereavement
I am satisfied that an analysis of all the expert opinion establishes that the cause
of the damage is as a result of the earthquake. The evidence provided by the
Applicants is they noticed the damage immediately. This has not been disputed
by the FSP.
The FSP says it has been prejudiced as it could not assess the extent of the
damage immediately following the earthquake. I accept that there was a delay
between the claimed event and the claim. The Applicants have explained the
delay was caused by their personal circumstances of the illness and death of
family members and their bereavement. In the absence of any evidence to the
contrary I accept the Applicants’ explanation for the delay.
Expert opinion has distinguished pre-existing damage from the earthquake
damage
The delay is not ideal in the assessment of the extent of damage but both ID and
GH have identified the damage and confirmed that in their professional opinion it
Case No: 360068 Determination Page 6 of 17
was caused by the earthquake. GH has considered the extent of damage very
carefully and has also identified in great detail the pre-existing damage, the
damage made worse by the earthquake and the damage caused by the
earthquake.
Applicants undertake to pay for repairs to pre-existing damage
Further, the Applicants admit there was some pre-existing damage to the property
which they have undertaken to repair at their own cost and therefore, do not seek
payment from the FSP for these repairs.
Based on the expert evidence provided the FSP has not, on the balance of
probabilities, established exclusions apply or that the damage is otherwise not
covered by the policy. Therefore, the FSP have not established that it can deny
the Applicants’ claim.
2.3 How is the claim to be settled?
All experts describe the repairs needed
Both of the FSP’s expe rts describe the work required to remedy the damage.
After his inspection on 15 April 2013 ID described the recommended rectification
in paragraph 7 of his report.
GH prepared comprehensive scope of works (SOW)
GH inspected the property in December 2013 and February 2014. GH has
provided a comprehensive scope of works detailing all work required to repair the
earthquake related to damage only. He has prepared separate scopes of work for
non- claim related repairs which the Applicants’ inte nd to undertake at their own
expense.
On 3 September 2013 PB quoted for damage caused by earthquake in the
kitchen, family and living rooms to be $31,680.
The FSP has not addressed the scope of works or the cost of repairs. The quote
provided by PB is over one year old.
The policy describes how the FSP settles claims. At its option the FSP can repair
the home or pay for the cost of repairs.
The Applicants do not want the FSP’s builders to undertake repairs. On the other
hand they are concerned to take a cash settlement as their builder may find more
damage once repairs are commenced.
GH has done a very thorough assessment of the damage and indicated that the
damage has probably not extended into the timber joints above the ceiling rafters
but this requires confirmation during the repairs.
Fair in all the circumstances that the FSP cash settle the claim
Case No: 360068 Determination Page 7 of 17
I accept that the policy allows the FSP to choose to repair or cash settle but I also
accept that it is fair in all the circumstances of this matter that the FSP cash settle
this claim.
The FSP is to use GH’s earthquake damage scope of works (SOW) in order to
fulfil its obligations under the policy to assess the damage.
Within 14 days of acceptance of this Determination, the Applicants and the FSP
are each to obtain a quotation for the cost to repair the damage based on the
SOW and provide to each other current costings for building repairs caused by
the earthquake.
The reasonable cost of repairs is to be established cooperatively
The parties are to work together cooperatively and in good faith to establish the
reasonable cost of repairs caused by the earthquake within 14 days of provision
of the current costings.
Once costings are agreed the FSP is to cash settle this amount to the Applicants
within seven days of agreement.
Should any additional or further claim related repairs become apparent during the
repair process, the parties are to further assess this damage and provide each
other with a quotation for this additional work (if there is any).
Repairs are to be authorised by the FSP within seven days of receiving the
revised quotation and the parties agreeing the amount of any additional or further
claim related repairs.
Again, in the event there is further earthquake damage detected during the repair
process, the parties are to work together cooperatively and in good faith to
establish the reasonable further cost of repairs caused by the earthquake.
Temporary accommodation costs are only payable if the home is
uninhabitable
The Applicants also claim temporary accommodation is to be paid while the
property is being repaired. The policy provides an additional benefit for
emergency accommodation but only if the home becomes uninhabitable as a
result of an insured event.
The Applicants and their family have li ved in the house since the earthquake. The
photographs indicate cracking damage but not that the house is uninhabitable
because of the earthquake.
It is fair in all the circumstances that temporary accommodation is paid while
repairs are done but only if the Applicants establish that the repairs caused by the
earthquake make the house uninhabitable. This concept entails more than mere
inconvenience and discomfort caused by repairs.
The parties are to work together cooperatively and in good faith to reach
agreement if the Applicants claim the repairs caused by the earthquake make the
house uninhabitable.
Case No: 360068 Determination Page 8 of 17
2.4 Are the Applicants entitled to their costs in pursuing the claim?
On 15 April 2013, ID invoiced the Applicants $550 for his report. The invoice
notes it was paid on 15 April 2013.
On 30 June 2014 GH invoiced the Applicants $8,508 for his reports. The invoice
notes $1,600 was paid on 5 April 2014.
The Applicants claim $30.25 fee for the cost of obtaining a sewage easement
from the local council. I assume this has been paid at or about the same time. The
Applicants are to provide to the FSP proof of payment and the date of the
payment.
These claims were made by the Applicants when they lodged the dispute with
FOS. The FSP has not responded to this part of the claim at any time.
TOR establishes FSP may contribute to professional costs
Paragraph 9.4 of the Terms of Reference provides that FOS may decide that an
FSP contribute to the professional costs incurred by an Applicant in the course of
a dispute. FOS will not require the FSP to contribute more than $3,000 to these
costs unless exceptional circumstances apply.
The sewerage easement information was necessary to identify where the
sewerage was to eliminate that the sewerage was leaking which was done.
I consider the technical issues in the dispute were complex and necessitated
expert advice which enabled the Applicants to establish their case. Further the
amount claimed for repairs to the home was not insubstantial.
Reports addressed complex technical issues and helped the Applicants
establish their claim
The reports from ID and GH were very useful to me in understanding the technical
issues in the dispute and helped me considerably in making this Determination.
The cost of the reports from GH is not inconsiderable. On the other hand, GH has
inspected the property on at least three occasions and written a number of
lengthy and extremely detailed reports. He took numerous photographs all of
which are annotated. The reports he wrote were extensive and assisted in not
only establishing the prima facie claim but also assisted in rebuttal of the
application of policy exclusions.
I am satisfied that these are exceptional circumstances and that it is fair in all the
circumstances that the FSP contribute to these costs and pay the balance owing
to GH of $6,908.
The FSP is also to reimburse the Applicants as follows:
$550
$30.25
$1,600
Case No: 360068 Determination Page 9 of 17
In addition, the FSP is to pay interest on the reimbursed amounts from the date of
payment of the said sums by the Applicants until the date the FSP makes the
reimbursement. The applicable interest rate is calculated pursuant to Section 57
of the Insurance Contracts Act 1984 (Cth).
2.5 Are the Applicants entitled to compensation under the Terms of
Reference (TOR)?
Physical inconvenience or time taken to resolve the situation was not
unusual
The Applicants say they have been very badly treated and that they and their
family have suffered stress. They also claim recompense for the time and
expense of attending to the claim and the dispute. This latter claim is not payable
under the Terms of Reference or pursuant to the policy.
However 9.3 of Terms of Reference enables FOS to decide to compensate an
Applicant where there has been physical inconvenience, time taken to resolve the
situation or interference with an Applicant’s peace of mind.
The FSP says the claim has been handled in a professional and timely manner. It
says the decision made on the claim is based on expert opinion and the terms of
the policy. It points out that the claim was lodged some 15 months after the
claimed event.
The Applicants did delay lodging their claim with the FSP due to a number of
personal issues and family bereavement. But once the claim was lodged, I accept
that the FSP appointed its experts to assess the claim which necessarily involved
inspections of the Applicants’ property which may have been intrusive.
Whilst the Applicants have endured a number of people entering their property in
order to conduct these inspections I accept that the inspections were necessary in
order to determine the cause and extent of damage.
I also accept that the time taken to conduct these assessments by the FSP’s
experts and to provide reports is within industry standard timeframes.
I accept that the claims process is stressful but the issues involved were
complicated and although the final decision of the FSP was not in the Applicants’
favour the decision was not made capriciously but was made on the basis of its
expert reports.
Having considered all matters carefully and the Terms of Reference I am not
satisfied that it is fair in all the circumstances that the FSP pay compensation to
the Applicants.
Case No: 360068 Determination Page 10 of 17
3 Supporting information
3.1 FOS Approach
It is accepted the Applicants must establish, on the balance of probabilities, they
have suffered a loss caused by an insured event. This is known as a prima facie
claim. Once the Applicant has established a prima facie claim, the FSP must
show, on the balance of probabilities, the loss falls within an exclusion clause in
the policy, or the claim is not otherwise covered, in order to deny the claim.
3.2 Extracts from policy
The Insured Events You Are Covered For
You are covered for the following insured events causing loss, damage or destruction to your home or home
contents (Sections 1 and 2), subject to the terms, conditions and exclusions of this policy.
We will settle losses resulting from: We will not settle losses relating to:
… …
4. Earthquake
All damage that occurs within a period
of 48 hours will be regarded as one
incident
9 Storm and/or rainwater
Including loss or damage from:
the escape of rainwater from any
water pipe, drain or gutter.
Loss or damage:
…
By erosion, subsidence, landslide,
mudslide, shrinkage or any other earth
movement except when damage or
destruction is caused by soil or other
debris striking or ent ering a permanent
structure having walls, a roof and a floor
as a result of storm and/ or rain water and
occurring within 72 hours after the storm
and/or rainwater.
10 Bursting, leaking, discharging or
overflowing
of fixed apparatus, fixed tanks, or pipes
used to carry liquid of any kind.
Where claimable damage has occurred
we will pay up to $2, 000 fo r the
exploratory costs incurred (subject to
there being claimable damage) in
identifying and locating the cause of the
destruction or damage if it is necessary
to do so to carry out repairs.
Repairing or replacing the tank, pipe, system
or other apparatus which has failed.
Storm: violent wind (including cyclones and tornadoes ), thunderstorms and hail, which may be
accompanied by rain or snow.
General Exclusions
These General Exclusions apply to all sections of the policy.
In addition to these General Exclusions, sections of this policy may be subject to specific
exclusions.
This policy does not cover :
The amount of any excess shown in your policy schedule.
Case No: 360068 Determination Page 11 of 17
Any loss, damage, or liability:
that is not directly caused by an insured event
…
From pre-existing loss or damage or
…
Loss, damage, destruction, consequential loss or liability directly or indirectly caused by,
contribut ed to by, resulting from, or arising out of or in connection wit h:
…
erosion, subsidence, landslide, settling, shrinkage, expansion, undermining, washing away or
any other earth movement except when loss or damage is caused by:
– earthquake
– storm or rainwater
– explosion or
– escape of liquid
and occurring within 72 hours after the event.
How We Settle Claims
Where your home is insured
We will at our option unless limited by this part:
reinstate, rebuild or repair your home to a condition equal to but not better or more extensive than its
condition when new….
Pay the cost of reinstatement, rebuilding, replacement or repair.
Benefits additional to your sum insured
We will pay over and above your sum insured:
Emergency accommodation…
The reasonable cost incurred with our agreement for comparable temporary
accommodation… should the home become uninhabitable as a result of an insured
event.”
3.3 Expert evidence
Record Key points
Extracts from
Geoscience Australia
and Google maps
The FSP obtained these extracts which are attached to
its Notice of Response. Noted:
The insured address is 122.211 km from the site of the
earth quake.
Quake SW of Moe magnitude 5.4 (ML).
Depth 10km.
Date and Time 19 June 2012 10:53:29.
Estimated this earthquake could have been felt by
people up to 252km away and could have caused
damage up to 20km away.
Date of loss advice
13 September 2013
Earthquake damage caused by Moe earthquake 19
June 2012 .
Delayed making claim as sick and dying parents.
Applicants’ expert (ID)
Architect report
ID inspected the property 15 April 2013 and described
and took photographs of the cracking damage to the
propert y.
Case No: 360068 Determination Page 12 of 17
15 April 2013 Damage is typical of a one off event which has caused
the southwest rear corner of the property to subside
slightly.
The slight subsidence resulted in stresses induced
through the roof structure and ceiling that has caused
the cosmetic damage described.
There is a moderate fall from the front to the rear.
Concrete paths surround the house and seem to
adequately direct water away from the base of the walls
of the house.
Site drainage seems adequate with no evidence of
pooling or water collecting along the base of the walls
of the house.
Limited inspection of the sub floor under the rear
southwest found the ground to be dry with no evidence
of pooling or water collecting underneath the house.
Light vegetation exists at the site with no significant
trees or plantings which would have an adverse effect.
No evidence of recent road works or building works
near the property which could contribute to the cause.
He notes a 5.3 magnitude earthquake was recorded as
hitting Melbourne at about 9.20pm on 19 June 2012.
B ased on evident visual damage, verbal advice of the
Applicants, and the record of the earthquake on 19
June 2012, ID’s professional opinion is the most likely
cause of the damage is earthquake.
He described the recommended rectification.
Quotation PB
3 Se ptember 2013
Quote for damage caused by earthquake $31,680 .
Work to kitchen, family and living room.
FSP’s expert (IG)
Assessor report
24 September 2013
IG attended to inspect with the Applicant 23/9/13.
The Applicant said that during the earthquake his
h ouse rattled and several minutes later cracking
started.
Cracks were noted by IB and photographed.
IB notes unable to determine cause.
Reviewed report from ID (noted ID is an architect) and
so recommended a structural engineer is engaged.
FSP’s expert (AB)
Building engineering
consultant
Report
8 November 2013
The engineer inspected the property with the Applicant,
a plumber and a geotechnical expert in October 2013 .
He arranged the CCTV plumbing inspection and
geotechnical site investigation.
An earth quake event did occur on 19 June 2012. It
registered 5.4 on the Richter scale. The “felt radius” of
the earthquake is about 250km. The “damage radius” is
about 20km. The insured property is about 125 km from
the epicentre of the earthquake.
The report desc ribes the damage to the building and
includes some photographs of it.
Case No: 360068 Determination Page 13 of 17
Reviewed the plumbing report including video footage
and a snapshot of the CCTV DVD which notes
”illustrates a major break to the below ground PVC
storm water drain located near the sou th eastern corner
of the (house) (i.e. approximately 2.6m upstream of a
surface storm water drain located at the south eastern
corner of the property) .
There was no damage to sewerage pipes.
A geotechnical survey was undertaken which revealed
elevated soil moisture conditions.
There is a maximum variation of 41mm of relative
levels across the dwelling (floor levels).
Noted two sources of excessive water in addition to the
broken storm water pipe – these are blocked roof
gutters of the neighbouring property which causes
overflow to be directed toward the Applicants’ property
and roof guttering on the Applicants’ home was rusted
through causing excessive localised discharge of storm
water alongside the dwelling.
Noted the clay soil is highly reactive and the d amage is
consistent with differential footing movement as a
consequence of significant variations in moisture
condition of the foundation clays across the subject
site, in particular within the sub - floor area of the
dwelling due to the above mentioned caus es.
The damage is not co nsistent with seismic movement.
It is possible the earthquake has contributed to
worsening of some pre - existing cracks and the
development of new cracks because of the significant
stresses already present due to the differential foo ting
movement.
The work required to remedy the damage is described.
Borehole log
Date drilled 21 October
2013
A hand auger was used to bore to 1.5m to show soil
profile of silt, clay and debris and then of clay. The soil
was noted as moist and then very moist.
FSP’s expert (FE)
Civil engineer
Report
30 October 2013
FE undertook the geotechnical investigation on 21
October 2013 and reported to AB.
He drilled one test location and assessed the samples;
inspected the house footings in one location; moist ure
probe tested in several locations; and measured the
interior and exterior floor levels.
He noted the surface gradient falls from south to south
west, no significant trees and the cracks in the house
and brickwork especially near the rear south east
hou se corner.
The external ground level at the borehole is 600mm
higher than the ground level under the house as there
is fill over the rear south east corner.
Case No: 360068 Determination Page 14 of 17
There was soil moisture to the full depth of the borehole
Probe testing at the east identified elev ated soil
moisture in all locations tested to the rear of the garage.
The main damage to the house is caused by
subsidence and outward rotation of the rear south east
corner of the house.
The primary cause is excessive moisture in the soil
here.
He couldn’t prove the source of the excess water but
identified 4 drainage fault including: seepage coming
from house next door as it has blocked roof gutters,
rusted gutters on the east side of the insured house,
ground fall such that run off will flow from the house
next door and the broken storm water drain in the south
east corner.
He did not agree that the earthquake caused the
damage but said: “it is possible that the earthquake
event did impose additional stresses on the house
superstructure and because elements were already
under stress due to footing movement some additional
plaster cracking and distortion occurred during this
event”.
He went on: “..if the house was not already under
stress, then the earthquake event on its own would not
have resulted in any significant damage to this house.”
He went on to make recommendations to fix the
damage.
FSP’s expert (FE)
Civil engineer
Email 17 December
2013
“it can reasonably be assumed that the moisture
problems have contributed to the differential footin g
movement and resultant building damage over a period
of many years”.
FSP’s expert (FE)
Civil engineer
Email 31 January 2014
The Applicant considered the bore log and asked for
more information. FE replied that the moisture testing
was based on qualitat ive testing using his own
judgement and not based on actual lab testing results.
Applicants’ expert (GH)
Consultant civil engineer
report
8 April 2014
GH read the FSP’s reports, inspected and took
numerous photographs on 20 December 2013 and 1
and 22 February 2014.
He concluded there was some minor pre - existing
damage, which was worsened by the earthquake, but
that the proximate cause of the damage as described in
paragraph 22 of his report was as a result of the
earthquake in Moe 19 June 2012.
He ackn owledges the information from Geoscience
Australia that damage is unlikely beyond a radius of
18km from the epicentre but says: “ notwithstanding
this, it is my considered opinion that the damage seen
in this properly….was caused by an earthquake.”
Case No: 360068 Determination Page 15 of 17
He expla ins at length the failure mode in an earth
quake and the kind of damage he would expect to see
if there was a failure of the footings – he says the
failure mode would include cracks to brickwork and
lesser cracks to plaster walls and yet he says there are
none here in the right hand rear corner.
The damage has probably not extended into the timber
joints above the ceiling rafters but this requires
confirmation during building repair works.
Relocation may be necessary while repairs take place.
Scope of work s was provided but no amounts for cost
of repairs stated.
He noted certain recommendations which included
discussion with the neighbour about water runoff but
said this was to comply with legislation not because it
was a cause of the damage.
He made observ ations about the site including: the
slope of the land means the right rear side is the lowest
part of the site and this is where there is most ceiling
damage; and the stormwater drain has inspection
points and showed the interior of the line to be clear;
water heard running freely.
He describes the various possible water sources and
eliminates them for the reasons stated.
Both the sides and the rear of the dwelling are
surrounded by concrete pathways which slope away
from the building to ensure water dra ins away from the
building.
The pathway to the left side of the residence has a
significant spoon drain which directs any water away
from the dwelling and into storm water drains – physical
water tests using a hose were completed,
photographed and demonstr ate the flow of water away
from the home, into the collection point and drained
away.
Any rainwater falling onto this pathway from the
“rusted” gutters is directed away from the home into the
spoon drain and away from the house – the rust holes
are not sign ificant enough to cause an excessive
amount of water to fall onto the pathway.
The neighbouring property was inspected and tested by
use of a hose – water drains away from the Applicants’
property or towards the spoon drain to the left side of
the propert y near the pathway, and into storm water
drains or at the front into the street. Quantities of water
from this roof are small. Further it falls on to a concrete
path in the neighbour’s yard. The garage gutter rain fall
run off was not considered to be a th reat as evidenced
by the good condition of the garage next to the home
office.
Case No: 360068 Determination Page 16 of 17
The burst storm water pipe was located outside the
building line and downhill, indicating any leak from this
area would generally drain away from the building, not
towards it.
E xamination of the water rate accounts shows no great
increase in water usage.
Applicants’ expert (GH)
Explanation Section A
8 April 2014
Criticism of the FSP’s experts’ methodology.
If high levels on moisture contents at the 4 points why
nearest footing and floors not sunk?
Applicants’ expert (GH)
Undated email
Comments on FSP’s Response
Reiterates the damage is “clearly and simply
earthquake”.
Earthquake damage is diagnosable from the actual
type of damage to the building and distance is no
impediment to damage occurring when the destructive
frequency is reached.
Reiterates criticism of the FSP’s experts’ methodology
namely:
No thorough Terrain Assessment.
Disagrees water comes from neighbour.
No laboratory testing of soil.
Cracks not deemed significant by the plumber and the
crack is at an in ground pipe drop in a well drained free
flowing pipe where water does not pond for sufficient
time to infiltrate the soil.
Further it is improbable that the water travelled from left
to right across the site and only to cause soil softening
under the kitchen/lounge/dining area and no damage at
the local rear and left side wall corner where there is no
damage.
FSP’s expert (AB)
Email
10 June 2014
AB reviewed the report from GH.
He cites his qualification s - qualified in structural
engineering and been in the building industry for 16
years and he relied on a registered plumber with 30
years ’ experience and a geotechnical engineer with 20
years ’ experience.
In addition to the reasons given in his earlier re ports he
refers to the extreme climate change in the region in
recent history.
The earthquake may have contributed to the damage
but it was not the primary cause.
He also says his information is that there was no
significant damage to other buildings in Me lbourne
because of this earthquake (125kms from epicentre).
FSP’s expert (AB)
Email
AB reviewed the letter from GH.
He and the geotechnical engineer did a visual terrain
Case No: 360068 Determination Page 17 of 17
14 July 2014 assessment.
GH has not given alternative suggestions as to the
source of elevated moisture conditions.
Confirmation the geotechnical engineer’s qualitative soil
testing did not involve laboratory testing, rather he
relied upon his experience in the field to determine the
level of moisture in the soil samples taken.
He has 30 years ’ experience as was satisfied with this
testing for the purpose of this investigation.
He stands by his original advice on the cause of
damage and does not agree the primary cause of
damage was earthquake.
Yarra Valley water
accounts
1/7/12 – 30/9/12 $566.95 .
1/4/12 – 30/6/12 $448.70 .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.