Determination 359860

Claim for retaining wall damage declined as no insured event established

FirmFinancial Firm (Unknown - Insurer)
Decided2014-11-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insureds claimed for damage to their retaining wall, attributing it to vehicle impact or a burst stormwater pipe during excavation works. The insurer declined the claim, and AFCA found the insureds had not established an insured event and ordered no remedy.

The policy covers only specified events, such as impact from a vehicle, and the insureds bore the onus of establishing one; the excavation and expert evidence did not establish contact or a leaking pipe that caused the damage.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 359860 Determination Page 1 of 7 Case number : 359860 17 November 2014 1 Overview 1.1 Dispute The Applicants claimed for damage to their retaining wall under their home policy with the Financial Services Provider (FSP). The FSP refused the claim, contending that the damage was:  not caused by an event insured by their policy  due to faulty design and workmanship of the wall. The Applicants maintain they are entitled to indemnity because the damage was caused by:  impact from a vehicle  a burst stormwater pipe. 1.2 Issue and key findings Are Applicants entitled to indemnity for the damage to the retaining wall? The Applicants are not entitled to indemnity for the damage to the retaining wall because the available evidence does not support a view that it was damaged b y:  impact from a vehicle  the burst stormwater pipe  any other event covered by their policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to decline liability in response to the claim and need take no further action. Case No: 359860 Determination Page 2 of 7 2 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. 2.1 Are Applicants entitled to indemnity for the damage to the retaining wall? Applicants’ onus to establish claim covered by his policy The Applicants’ policy is an insured events policy i n that it only covers them for loss or damage caused by certain events specified in the policy. At law, they have the onus to establish a claim covered by their policy at first instance, in that the retaining wall was damaged by at least one of the events specified in their policy. This is known as a prima facie claim. Provided a prima facie claim has been established at first instance, the onus then falls on the FSP to prove the operation of an exclusion to decline the claim. Experts have provided inconsis tent opinions as to the cause of wall’s movement The parties do not dispute that the relevant retaining wall has sustained movement related damage in a sense that it had somewhat bulged, rotated outwards and vertically moved. The parties have a provided a number of opinions from various parties purporting to be experts for purposes of establishing the cause of the wall’s movement. Whilst all opinions have been reviewed, it is unnecessary to refer to the FSP’s and council’s opinions in any specific detail (b ecause there is insufficient evidence to support a view that the wall damage was caused by an event insured by the policy) other than to briefly state their respective positions as follows:  the council’s position is that the damage may due to a build -up of hydrostatic pressure behind the wall, caused by the placement of a plastic sheet on the inner side of the wall (to prevent water from seeping through the gaps in the wall’s blocks and staining the outer face of the wall)  the FSP’s experts suggest that the damage was caused by faulty construction because the wall was ultimately meeting loads beyond its design capability. The Applicants’ position is supported by experts comprising a landscaper, an engineer, an excavator operator and the wall’s builder, all o f whom have essentially and collectively suggested:  the wall was properly constructed  the wall’s damage was caused by an excavator carrying out works too close to the wall, thereby undermining the integrity of the wall’s founding soils  the breaking of a stormwater pipe (by the excavator) caused a blockage which prevented water from escaping, leading to build -up of hydrostatic pressure Case No: 359860 Determination Page 3 of 7 behind the wall and in turn, caused the bulging and outward movement of the wall  the fence and palm trees in the Applicants’ home did not impose additional loads on the retaining wall. It has not been seriously disputed there was contact between the relevant excavator’s tyre and the lower course of the wall at some stage during the concrete path’s construction. However, the nat ure of the contact appears to be a graze against the wall, leaving no physical impact damage other than tyre marks. Excavator’s contact with wall unlikely to have caused the damage claimed Importantly, none of the Applicants’ experts appear to seriously su ggest (or substantiate) that the tyre contact had caused the damage claimed apart from the block’s manufacturer (BMB), whose evidence on the matter can effectively be discounted for lack of an actual inspection of the wall and because he has proceeded on the assumption that the vehicle did in fact come in contact with the wall. Applicants have not established an insured event even if the opinion of the experts are accepted Ultimately, the opinions of the Applicants’ experts do not establish that the wall was damaged by an event insured by the policy even if they are accepted in preference to the opinions of the council and the FSP’s experts. Soil excavation and excavator’s proximity to wall does not constitute impact from vehicle or any other insured event Even if the experts’ first suggestion – that the excavator had undermined the stability of the wall’s founding soil – is accepted as the proximate cause of the wall’s movement, the excavation of soil or the presence of the excavator next to the retaining wall does not constitute impact damage or for that matter, any other specified event insured by the policy. The policy only covers damage caused by impact from a vehicle so there must be contact between the excavator and the wall, and this contact must have caused the damage claimed. In the absence of significant contact, the relevant insured event is not activated to begin with. Broken stormwater pipe unlikely to have caused the damage claimed and was outside the insured property site The experts’ second su ggestion – that the excavator’s breakage of the stormwater pipe outside the home had caused damage claimed – is somewhat difficult to follow and reconcile with the facts. Firstly, it is not entirely clear if the Applicants’ experts were providing consisten t propositions with respect to how the broken stormwater pipe allegedly damaged the wall. Case No: 359860 Determination Page 4 of 7 Landscaper MB’s suggestion is that the crushed pipe would have caused stormwater to back up and overflow through the: “properties (sic) surface drains and would have eroded the walls (sic) foundation due to the fact that walls (sic) main area of damage coincides with the lowest point of property boundary and the area that water would flow towards when it escaped due to blocked and crushed pipes.” There are a number of difficulties with the proposition. Firstly, if the stormwater pipe was indeed blocked and MB is making the suggestion that the wall’s founding soil (in the area shown in the photo to figure 3 of his report) was flooded by back flow from the pipe, then the water that supposedly eroded the wall’s founding soil at that area could not logically have come from the stormwater pipe. If the pipe was blocked, water cannot leak or escape from it to begin with, so it is difficult to understand how the insured event of water leaking or escaping from a pipe could have been engaged in this circumstance. Secondly, the founding soil shown in the photo (to which figure 3 of MB’s report relates) is not the lowest point in that area. The lowest point is in fact the road and the photo shows that there is a stormwater escape outlet on the road kerb. As water tends to flow towards a low (rather than a higher) point, any excess water in the relevant area would likely flow onto the road and into the kerbside stormwater escape outlet. Thirdly, whilst MB has made references to the presence of “surface drains” at the Applicants’ property, no evidence has been led to show such drains exist. On this score, it is also noted that MB makes the reference to “surface drain sites in the backya rd” in relation to figure 4 of his report, but the photo shown in figure 4 appears to be of the front of the Applicants’ property (when the photo shown in figure 1 of his report is observed). If, by “surface drains”, MB was actually referring to the wall’s drainage backfill, it is then difficult to reconcile with the wall builder’s (JH) insistence that he had lined the inside of the wall with a porous fabric. If the fabric was indeed porous as claimed then the water – which MB says had pooled in the backyard after allegedly escaping the blocked stormwater pipe – ought to have seeped into the fill, penetrated the porous fabric and escaped through the gaps in the wall’s blocks; if it could not escape through the stormwater pipe. For the same reason, it is also difficult to accept engineer DJH’s suggestion that the blocked stormwater pipe would have caused a build -up of hydrostatic pressure behind the retaining wall, given JH’s insistence that the fabric used was porous. Finally I note the Council tested the storm water pipe not long after the footpath was built and its tests established it was not blocked and water ran to the kerb. Ultimately, the Applicants have not persuasively established on the balance of probabilities that the damage to their retaining wall was caused by water leaking or escaping from the blocked stormwater pipe. Case No: 359860 Determination Page 5 of 7 3 Supporting information 3.1 Key evidence Record Key points Applicant’s landscape expert (MB) Report undated  MB is a qualified landscaper and horticulturist.  Wall was built to “acce ptable industry standards”.  It has a road base with cement mixture foundation and block cores have been filled with blue metal.  Wall is 38 metres long, and ranges between 400mm and 1400mm in height (with the majority of the wall being under 860mm in height ).  Wall does not require steel reinforcing given its height.  Wall was only retaining 1100mm of backfill at its highest point and the top course was not retaining “any significant backfill”, which is within “acceptable industry standards”.  Wall is only dama ged in the area where the new concrete pathway was constructed and a heavy excavator was used.  Fence was not applying additional load to the wall because it did not move after he applied 150kg of force to its support post.  Palm trees was not applying addit ional load to the wall because it would be leaning over or following the wall if this was the case.  Palm trees were laid 2 years ago so their roots would not have had an influence on the wall. Block manufacturer (BMB) Report 13 May 201 4  Did not inspect wall and depended on oral advice to provide opinion.  Base of retaining wall was designed for pedestrian traffic, so a large vehicle should not be driven close to the bottom course.  Wall is not designed to withstand any type of impact and a vehicle coming i nto contact with it would have caused further damage to the base. Applicant ’s excavator expert ( CM ) Report 29 May 2013  CM is an approved heavy excavator, dump truck and compaction roller operator.  Inspected Applicants’ site in May 2013 and noticed heavy excavating machinery was used to dig area for a concrete path to be installed.  There were tyre scuff marks on the retaining wall’s ground level course of blocks.  Area surrounding the retaining wall has been forced downwards by the excavator’s wheels, causi ng subsidence of the ground base of the wall.  Retaining wall has buckled under pressure, and was visibly bent and out of alignment. Case No: 359860 Determination Page 6 of 7  The excavator should not have gone this close to the wall.  The ground should not have been excavated during wet periods beca use up to 1metre of the ground on either side of the excavator can bend, collapse or become heavily distorted. Applicant’s engineer (DJH) Report 2 June 2014  Wall has bulged outwards at several locations.  Vertical movement has also occurred so horizontal joints are no longer in a straight line.  Use of excavating equipment during construction of footpath may have damaged wall’s foundation and this would cause wall’s vertical movement.  Blocked stormwater pipe would have caused build - up of hydrostatic pressur e behind wall, and this can cause the bulging and outward movement of the wall.  Fence footings and tree roots can affect adjacent retaining walls but their effect is normally most noticeable directly adjacent to the fence footings and tree roots.  The undul ations and bulging does not coincide with the fence footings and tree roots. Applicant’s wall builder ( JH ) Report 5 June 2014  Built wall to “relative Australian standards” and followed “manufacturer’s instructions”.  Wall conforms to what an engineer would recommend for a wall of this size under 3 metres high.  He has consulted a civil engineer on many occasions and have built walls according to advice of structural engineers.  Wall’s foundation soil cannot accept the weight of any machinery within 1 metre of it.  Fence has its own concrete supports which extends below the level of the original ground and are fully secured by these supports.  Fence and palm trees are not imposing additional load on the wall.  A geo - tech fabric was placed on the inside of the wall , and it does not prevent water from escaping but serves hold backfill together.  Wall has sufficient drainage, comprising blue metal and an ag - pipe along its length that discharges into the stormwater pipe. 3.2 Relevant policy wordings Water and oil leaks … Not covered  water leaking or escaping from a: … - stormwat er pipe off your site Impact damage Case No: 359860 Determination Page 7 of 7 … Covered under Buildings Insurance …  loss or damage caus ed by the impact of: … - … vehicles …”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.