Home / Financial Firm (Unknown - Insurer) / Determination 358476
Determination 358476
Service quality
Summary
The Applicant's home was damaged by fire and the FSP's consultants demolished a repairable northern section beyond the approved scope. AFCA ordered the FSP to fund rebuilding of that section on a quotation basis, plus interest and $1,500 non-financial loss.
The FSP's agents breached its obligations by demolishing a recoverable part of the house without authority and the FSP failed to manage the claim, so compensation is not limited by the sum insured.
Issues
- Repairs or contractors primary · upheld“Demolition of the northern section was excessive, unauthorised and beyond the make-safe scope of works.”
- Poor claim handling secondary · upheld“FSP took no active involvement in managing the claim despite repeated concerns from the Applicant.”
- Third-party or outsourcing failure secondary · upheld“Sub-contractors undertook excessive demolition in complete disregard for the engineer's SOW.”
Subjects and remedies
home or building damagepay compensationpay interestpay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Service quality
Determination
Case No: 358476 Determination Page 1 of 9
Case number : 358476 29 September 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim for significant fire damage to his home which was
insured under a Home Building and Contents Insurance Policy (the policy) with
the Financial Services Provider (FSP).
The FSP has accepted the claim for both building and contents. However the
Applicant remains dissatisfied with the settlement of the building component on
the basis that the FSP‟s consultants‟ alleged excessive demolition of the insured
building has caused him additional loss.
The Applicant‟s claim for lost or damaged contents was paid out in full, and there
is no dispute as to that aspect of the claim.
1.2 Issues and key findings
What is the scope of the policy?
The policy provides indemnity for loss or damage to the insured property arising
from the listed events (including the event of “Fire”), subject to the specified policy
limitations and exclusions (including a maximum sum insured).
Did the FSP breach its obligations to the Applicant?
The FSP breached its obligations to the Applicant by failing to ensure the
adequate management of the demolition works completed under the claim. This
resulted in the unnecessary demolition of the northern section of the Applicant‟s
house.
Is the FSP required to compensate the Applicant?
The Applicant is entitled to compensation for the additional costs of rebuilding the
property because of the excessive demolition works. The Applicant is also entitled
to compensation for non-financial los s suffered as a result of the FSP‟s breach.
1.3 Determination
This Determination is substantially in favour of the Applicant.
The FSP is to arrange further payment to the Applicant on the basis of a quote to
be obtained by the FSP in line with this Determination, for the cost of rebuilding
the demolished northern section of the property. The FSP is to pay interest upon
Case No: 358476 Determination Page 2 of 9
the final settlement amount at the rate applicable under section 57 of the
Insurance Contracts Act 1984 (the Act) from 10 December 2013 (being the date
the FSP received WK‟s final report) until the date of payment.
The FSP is to pay the Applicant $1,500 as compensation for non-financial loss, in
line with section 9.3(b) of the ToR.
Case No: 358476 Determination Page 3 of 9
2 Reasons for Determination
2.1 What is the scope of the policy?
The policy is an insured events policy with a maximum sum insured
The contract of insurance provides indemnity for loss or damage to the insured
property arising from the listed insured events (including the event “Fire”), subject
to the specified policy limitations and exclusions.
The policy provides that the most the FSP will pay under a claim for loss or
damage to the insured building is the sum insured shown on the Certificate of
Insurance (COI), which in this instance was $370,000.
As the estimated cost of reinstating the insured building following the fire
exceeded the building sum insured, the FSP provided a cash settlement for the
full amount of the building sum insured, plus other benefits under the policy. The
FSP therefore submits that it has fully met its obligations under the policy.
2.2 Did the FSP breach its obligations to the Applicant?
Dispute is limited to extent of demolition works
On the face of it, the FSP has issued payments to the Applicant representing the
full extent of its liability with respect to the policy. However, this dispute does not
relate to the damage arising from the fire event, but to the further loss the
Applicant claims to have incurred arising from the FSP‟s alleged mismanagement
of the claim and the actions of its commissioned consultants.
The Panel is satisfied the issue in dispute is limited to the extent of demolition
works undertaken by the FSP‟s contractors at the property. The Applicant
maintains these demolition works were excessive, were not in line with the
approved “Make Safe” scope of works (SOW) and resulted in the further loss of
part of his house which was otherwise repairable. Conversely, the FSP maintains
that these works were necessary.
It is not in dispute that the demolition of the insured building exceeded the scope
of works prepared by the FSP‟s engineer (WK). However, the FSP maintains the
excessive demolition works were both necessary and completed in the interests
of the Applicant‟s safety.
Demolition works were not required to address asbestos issues
The assessment of the insured building after the fire established the presence of
asbestos which raised concern and required adequate investigation, management
and removal. The FSP arranged for the appointment of suitably qualified asbestos
experts to investigate the extent of asbestos contamination, identify the areas of
contamination, propose the manner in which the asbestos was to be removed and
undertake testing of the property so that a „Clearance Certificate‟ could be issued.
Case No: 358476 Determination Page 4 of 9
The available evidence establishes that while the asbestos contamination was
identified in several different areas, it was limited to the southern end of the home.
The northern end of the home was determined to be free of any contamination.
The FSP arranged for the decontamination and subsequent removal of the
asbestos from the property, after which asbestos specialists (“AS”) attended and
issued a Clearance Certificate dated 12 August 2013 confirming all asbestos had
been cleared from the site.
The asbestos treatment and removal, process necessarily resulted in some
additional damage to the dwelling and required limited demolition works to be
undertaken by the FSP‟s consultants.
However, this dispute concerns the demolition works undertaken to the northern
section of the property. The photographic evidence shows that this section had
not been demolished as at 13 August 2013, by which time all asbestos had been
cleared and related debris removed. Accordingly, it appears the disputed
demolition works were unrelated to the asbestos contamination.
Demolition of northern section of house was unnecessary
Although the insured building was significantly damaged by the fire, it was not
completely burnt to the ground. The building (flooring, walls, windows, bathroom
fittings etc.) remained intact in some areas, particularly towards the northern end.
As part of the FSP‟s assessment, its engineers (WK) provided a report and a
“Make Safe” scope of works dated 2 July 2013 which identified which areas of the
building structure needed to be demolished as well as proposing that certain
areas be allowed to remain (including the northern section of the home).
The main issue in contention between the parties relates to the extent of
demolition works arranged by the FSP‟s appointed consultants MS. The Applicant
maintains these works were excessive and not in line with the approved SOW
proposed by the engineers WK. The available evidence establishes that the
Applicant contacted the FSP to express his concerns about the extent of the
demolition works on a number of occasions from very early on in the course of the
claim and while the works were being undertaken.
However, it appears that the FSP did not take any action to address the
Applicant‟s concerns about the exten t of the demolition works undertaken (which
included the complete northern section of the house) and instead maintained that
the additional works were required to facilitate the safe removal of asbestos and
related materials. This position was strongly refuted by the Applicant.
The FSP subsequently stated that the additional demolition works were also
completed in the Applicant‟s interests, on the basis that they were necessary to
make the site safe.
The Panel has carefully considered the available information including the very
helpful photographic evidence and the reports referred to in Section 3. The Panel
is satisfied that the evidence, on balance, establishes that:
while the building was contaminated by asbestos as a result of the fire,
adequately qualified and trained consultants had investigated, contained and
Case No: 358476 Determination Page 5 of 9
successfully removed all asbestos and asbestos related materials from the
area by 12 August 2013
the northern section of the dwelling had not been demolished as part of the
asbestos removal works, was not subject to asbestos contamination and had
been cleared of all other debris by 12 August 2013. Accordingly, the available
evidence does not support the FSP‟s position that the excessive demolition
works to the northern section, were necessary for asbestos removal
MS has confirmed (in an email dated 24 July 2014) that the dwelling was not
demolished to the allow safe removal of asbestos but as part of the scope of
works it was provided with by the FSP
the northern section of the house clearly did not form part of the areas that
were to be demolished under the make safe SOW proposed by the engineers
(WK)
the sub-contractors (P) appointed by MS undertook excessive demolition
works despite the repeated concerns raised by the Applicant and in complete
di sregard for the engineer‟s SOW
WK‟s report and proposed SOW specifically provided that approval was to be
obtained before any additional demolition was undertaken beyond that
identified in the make safe SOW
Based on the above, the Panel does not accept the excessive demolition works
were required or authorised in connection with the asbestos contamination of the
dwelling. Further, it is clear the demolition works undertaken were both excessive
(when compared to WK‟s SOW) and undertaken without seeking prio r approval.
MS has said that the additional demolition works were undertaken to ensure the
property was left in a safe condition. However, the Panel has not been provided
with any information which establishes, on balance, that there were genuine
safety concerns which required the demolition of the northern section. If this was
the case, WK should have been consulted (as provided for under the SOW), as it
was the more appropriately qualified and responsible consultant to make a
decision about any additional demolition works.
WK confirmed in its report dated 10 December 2013 that it was likely that some
additional demolition works would have been required in any event, subject to a
“condition inspection”. In this context , WK referred to relatively limited works only
(such as the removal of floor finishes and internal wall linings), rather than the
wholesale demolition of the northern section of the house. The unauthorised
demolition of the entire northern section means that it is now impossible to
determine to what extent any additional works may have been approved by WK
following a further condition inspection. However, the Applicant has accepted that
some of the additional demolition works were required (for example, the
demolition of the bathroom brickwork) and has excluded these from the scope of
this dispute.
Having considered the available evidence the Panel does not accept the FSP‟s
position that the significant additional demolition works to the northern section of
the house were required due to asbestos removal works nor has it been
established, on balance, they were needed due to safety concerns. Given the
inconsistencies in the various statements by the FSP‟s agents, and having noted
Case No: 358476 Determination Page 6 of 9
the timeline of events as detailed by the Applicant (which has not been disputed)
the Panel cannot be confident that the various justifications for the works put
forward by the FSP‟s contractors can be relied upon.
Applicant has suffered loss as a result of excessive demolition works
It is clear from the FSP‟s claim fi le notes that the Applicant was proactive in
identifying and reporting potential issues early in the process and contacted the
FSP on a number of occasions to seek its intervention. However, there is no
evidence that the FSP took any active involvement in the management of the
claim.
Despite the Applicant‟s very reasonable protestations, the FSP‟s contractors
continued down their own path, with the result that contrary to the FSP‟s earlier
agreement, a recoverable part of the house was demolished. This has caused the
Applicant significant additional cost. While there is no evidence that the FSP was
deliberately obstructionist, its failure (for whatever reason) to intervene led to the
Applicant‟s further loss.
2.3 Is the FSP required to compensate the Applicant?
Applicant’s ability to recover is not limited by sum insured
The loss suffered by the Applicant arose not from the insured event but from the
FSP‟s failure to appropriately manage the claim and the actions of its
commissioned consultants.
In these circum stances, the Applicant‟s entitlement to compensation is not limited
by the sum insured under the policy.
Applicant is entitled to compensation for direct financial loss
For the purpose of bringing this matter to a conclusion, the Panel relies on its
remit to do what it fair in all the circumstances.
The Applicant has estimated the extra costs incurred as a result of the excessive
demolition works to be $93,500, but has provided no evidence to support this.
In the circumstances, it is appropriate for the FSP to arrange for:
WK to prepare a scope of works to rebuild the structure of the northern section
of the dwelling that was to be retained in line with the original make safe
SOW; and
obtain a quotation to carry out these works from an appropriately qualified
builder. This quotation is to be prepared without taking into account any
discounts or rebates available to the FSP.
The FSP is to make an additional cash payment to the Applicant for the amount of
the quotation obtained as set out above. Further, the FSP is to pay interest upon
this amount at the rate applicable under section 57 of the Act from 10 December
2013 (being the date the FSP received WK‟s final report) until the date the
payment is issued to the Applicant.
Case No: 358476 Determination Page 7 of 9
The Panel requires the parties to work cooperatively to agree a scope of works
and quotation. However if the parties are unable to agree a final position this
issue may be referred back to the Service for further determination.
Applicant is entitled to compensation for non-financial loss
The Service is able to award compensation up to a maximum of $3,000 as
compensation for non-financial loss where there has been an unusual degree or
extent of physical inconvenience, time take to resolve the situation or interference
with the Applicant‟s ex pectation of enjoyment or peace of mind.
There is no doubt that the Applicant was proactive in attempting to avoid the
situation occurring and has acted reasonably in trying to resolve this dispute.
Although there is no evidence the FSP has deliberately a voided its obligations, it
appears not to have acted on the Applicant‟s concerns and failed to adequately
manage its agents, who appear to have acted outside their authority.
Having considered the available evidence, the circumstances of the claim, the
unreasonable time taken to resolve this dispute and the poor management of the
Applicant‟s claim, the FSP is to pay the Applicant $1,500 by way of compensation
for non-financial loss in line with section 9.3(b) of the ToR.
3 Supporting information
3.1 FOS approach to this dispute
General considerations
As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
All of the provided material has been read and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of
this Determination, commentary is restricted to only those issues considered
directly relevant to the outcome.
3.2 Consultants’ evidence
Record Key points
Assessor’s Report
23 May 2013
Date of loss 22 May 2013
Claim not assessed to be suspicious
Noted major structural damage
Case No: 358476 Determination Page 8 of 9
Recommended appointment of engineer
AS (Asbestos) Report
12 June 2013
Asbestos detected in fibreboard sheet in upper level
southern rear wall
Fibrous cement sheet and debris found in the lower level
ceiling and floor of the laundry showing asbestos conte nt
MP Engineer Report
28 June 2013
Reviewed photographs of the dwelling and provided
opinion on extent of demolition which may be required in
order to make remaining structure reasonably safe
Recommended undamaged wall linings and external
cladding remain in place
WK Engineer Report
and SOW
2 July 2013
Recommended initial temporary make safe works of
priority
Recommended protection of existing remaining finishes
from damage during demolition works
Stated that where additional works are required these will
need to be approved by the FSP prior to the work being
carried out
Attached mapping of the insured property showing clouded
area of northern section (including bedrooms, walk in robe,
bathroom, WC) where perimeter and walls to remain and
not be demolished
AS (Asbestos) Report
12 August 2013
Carried out inspection of asbestos work area to confirm
asbestos removal works had been completed
Inspection revealed the asbestos material from all relevant
areas had been removed
Area declared safe for re - occupation by consultants
WK Site Visit Report
24 August 2013
Site visit following demolition works
Removal of all ground floor walls (internal and external)
was beyond the extent of the make safe scope of works.
Demolition contractor considered this was necessary for
removal of asbestos.
Complete removal of all the ground floor flooring and
timber floor structure was beyond the extent of the make
safe scope of works
Chimneys were considered unsafe in current state
Assessor Report
8 October 2013
WK had confirmed that the demolition plan was completely
ignored. Approximately 2/3 of the home did not require
complete demolition
External paving crushed by consultants‟ truck movement
Further demolition works which were not required have
escalated re - b uilding costs by $50,000 or more
Quotes for rebuilding
insured dwelling
WK‟s quote $981,214
RN‟s quote $797,250
LS‟s quote $739,380
WK Engineer Report
10 December 2013
The original scope of works and report clearly provided
that any variations to the scope of works needed to be
Case No: 358476 Determination Page 9 of 9
approved prior to being carried out
Significant additional demolition work was undertaken in
particular to the northern end beyond the scope of w orks
The ground floor and walls scoped to remain would have
required a further condition inspection following the initial
demolition works and asbestos removal
It was likely further demolition/removal of finishes would
have been required including at minimum removal of floor
finishes throughout and removal of internal wall linings to
remaining walls
MS Report The works completed were not only necessary but the
additional work completed outside the scope of works was
completed as a duty of care
Witho ut carrying out the additional work MS would not
have been able to leave the site which it deemed to be
unsafe
Also had to remove areas to gain a safe area for asbestos
removal
3.3 Relevant term of the FOS Terms of Reference
9.3 Other compensation
…
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Service Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time
take to resolve the situation or interference with the Applicant‟s
expectation of enjoyment or peace of mind has occurred…
…
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute.