Home / Financial Firm (Unknown - Insurer) / Determination 358476

Determination 358476

Service quality

FirmFinancial Firm (Unknown - Insurer)
Decided2014-10-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed$93,500
SourceAFCA PDF

Summary

The Applicant's home was damaged by fire and the FSP's consultants demolished a repairable northern section beyond the approved scope. AFCA ordered the FSP to fund rebuilding of that section on a quotation basis, plus interest and $1,500 non-financial loss.

The FSP's agents breached its obligations by demolishing a recoverable part of the house without authority and the FSP failed to manage the claim, so compensation is not limited by the sum insured.

Issues

Subjects and remedies

home or building damagepay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Service - Service quality Determination Case No: 358476 Determination Page 1 of 9 Case number : 358476 29 September 2014 1 Overview 1.1 Dispute The Applicant lodged a claim for significant fire damage to his home which was insured under a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). The FSP has accepted the claim for both building and contents. However the Applicant remains dissatisfied with the settlement of the building component on the basis that the FSP‟s consultants‟ alleged excessive demolition of the insured building has caused him additional loss. The Applicant‟s claim for lost or damaged contents was paid out in full, and there is no dispute as to that aspect of the claim. 1.2 Issues and key findings What is the scope of the policy? The policy provides indemnity for loss or damage to the insured property arising from the listed events (including the event of “Fire”), subject to the specified policy limitations and exclusions (including a maximum sum insured). Did the FSP breach its obligations to the Applicant? The FSP breached its obligations to the Applicant by failing to ensure the adequate management of the demolition works completed under the claim. This resulted in the unnecessary demolition of the northern section of the Applicant‟s house. Is the FSP required to compensate the Applicant? The Applicant is entitled to compensation for the additional costs of rebuilding the property because of the excessive demolition works. The Applicant is also entitled to compensation for non-financial los s suffered as a result of the FSP‟s breach. 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is to arrange further payment to the Applicant on the basis of a quote to be obtained by the FSP in line with this Determination, for the cost of rebuilding the demolished northern section of the property. The FSP is to pay interest upon Case No: 358476 Determination Page 2 of 9 the final settlement amount at the rate applicable under section 57 of the Insurance Contracts Act 1984 (the Act) from 10 December 2013 (being the date the FSP received WK‟s final report) until the date of payment. The FSP is to pay the Applicant $1,500 as compensation for non-financial loss, in line with section 9.3(b) of the ToR. Case No: 358476 Determination Page 3 of 9 2 Reasons for Determination 2.1 What is the scope of the policy? The policy is an insured events policy with a maximum sum insured The contract of insurance provides indemnity for loss or damage to the insured property arising from the listed insured events (including the event “Fire”), subject to the specified policy limitations and exclusions. The policy provides that the most the FSP will pay under a claim for loss or damage to the insured building is the sum insured shown on the Certificate of Insurance (COI), which in this instance was $370,000. As the estimated cost of reinstating the insured building following the fire exceeded the building sum insured, the FSP provided a cash settlement for the full amount of the building sum insured, plus other benefits under the policy. The FSP therefore submits that it has fully met its obligations under the policy. 2.2 Did the FSP breach its obligations to the Applicant? Dispute is limited to extent of demolition works On the face of it, the FSP has issued payments to the Applicant representing the full extent of its liability with respect to the policy. However, this dispute does not relate to the damage arising from the fire event, but to the further loss the Applicant claims to have incurred arising from the FSP‟s alleged mismanagement of the claim and the actions of its commissioned consultants. The Panel is satisfied the issue in dispute is limited to the extent of demolition works undertaken by the FSP‟s contractors at the property. The Applicant maintains these demolition works were excessive, were not in line with the approved “Make Safe” scope of works (SOW) and resulted in the further loss of part of his house which was otherwise repairable. Conversely, the FSP maintains that these works were necessary. It is not in dispute that the demolition of the insured building exceeded the scope of works prepared by the FSP‟s engineer (WK). However, the FSP maintains the excessive demolition works were both necessary and completed in the interests of the Applicant‟s safety. Demolition works were not required to address asbestos issues The assessment of the insured building after the fire established the presence of asbestos which raised concern and required adequate investigation, management and removal. The FSP arranged for the appointment of suitably qualified asbestos experts to investigate the extent of asbestos contamination, identify the areas of contamination, propose the manner in which the asbestos was to be removed and undertake testing of the property so that a „Clearance Certificate‟ could be issued. Case No: 358476 Determination Page 4 of 9 The available evidence establishes that while the asbestos contamination was identified in several different areas, it was limited to the southern end of the home. The northern end of the home was determined to be free of any contamination. The FSP arranged for the decontamination and subsequent removal of the asbestos from the property, after which asbestos specialists (“AS”) attended and issued a Clearance Certificate dated 12 August 2013 confirming all asbestos had been cleared from the site. The asbestos treatment and removal, process necessarily resulted in some additional damage to the dwelling and required limited demolition works to be undertaken by the FSP‟s consultants. However, this dispute concerns the demolition works undertaken to the northern section of the property. The photographic evidence shows that this section had not been demolished as at 13 August 2013, by which time all asbestos had been cleared and related debris removed. Accordingly, it appears the disputed demolition works were unrelated to the asbestos contamination. Demolition of northern section of house was unnecessary Although the insured building was significantly damaged by the fire, it was not completely burnt to the ground. The building (flooring, walls, windows, bathroom fittings etc.) remained intact in some areas, particularly towards the northern end. As part of the FSP‟s assessment, its engineers (WK) provided a report and a “Make Safe” scope of works dated 2 July 2013 which identified which areas of the building structure needed to be demolished as well as proposing that certain areas be allowed to remain (including the northern section of the home). The main issue in contention between the parties relates to the extent of demolition works arranged by the FSP‟s appointed consultants MS. The Applicant maintains these works were excessive and not in line with the approved SOW proposed by the engineers WK. The available evidence establishes that the Applicant contacted the FSP to express his concerns about the extent of the demolition works on a number of occasions from very early on in the course of the claim and while the works were being undertaken. However, it appears that the FSP did not take any action to address the Applicant‟s concerns about the exten t of the demolition works undertaken (which included the complete northern section of the house) and instead maintained that the additional works were required to facilitate the safe removal of asbestos and related materials. This position was strongly refuted by the Applicant. The FSP subsequently stated that the additional demolition works were also completed in the Applicant‟s interests, on the basis that they were necessary to make the site safe. The Panel has carefully considered the available information including the very helpful photographic evidence and the reports referred to in Section 3. The Panel is satisfied that the evidence, on balance, establishes that:  while the building was contaminated by asbestos as a result of the fire, adequately qualified and trained consultants had investigated, contained and Case No: 358476 Determination Page 5 of 9 successfully removed all asbestos and asbestos related materials from the area by 12 August 2013  the northern section of the dwelling had not been demolished as part of the asbestos removal works, was not subject to asbestos contamination and had been cleared of all other debris by 12 August 2013. Accordingly, the available evidence does not support the FSP‟s position that the excessive demolition works to the northern section, were necessary for asbestos removal  MS has confirmed (in an email dated 24 July 2014) that the dwelling was not demolished to the allow safe removal of asbestos but as part of the scope of works it was provided with by the FSP  the northern section of the house clearly did not form part of the areas that were to be demolished under the make safe SOW proposed by the engineers (WK)  the sub-contractors (P) appointed by MS undertook excessive demolition works despite the repeated concerns raised by the Applicant and in complete di sregard for the engineer‟s SOW  WK‟s report and proposed SOW specifically provided that approval was to be obtained before any additional demolition was undertaken beyond that identified in the make safe SOW Based on the above, the Panel does not accept the excessive demolition works were required or authorised in connection with the asbestos contamination of the dwelling. Further, it is clear the demolition works undertaken were both excessive (when compared to WK‟s SOW) and undertaken without seeking prio r approval. MS has said that the additional demolition works were undertaken to ensure the property was left in a safe condition. However, the Panel has not been provided with any information which establishes, on balance, that there were genuine safety concerns which required the demolition of the northern section. If this was the case, WK should have been consulted (as provided for under the SOW), as it was the more appropriately qualified and responsible consultant to make a decision about any additional demolition works. WK confirmed in its report dated 10 December 2013 that it was likely that some additional demolition works would have been required in any event, subject to a “condition inspection”. In this context , WK referred to relatively limited works only (such as the removal of floor finishes and internal wall linings), rather than the wholesale demolition of the northern section of the house. The unauthorised demolition of the entire northern section means that it is now impossible to determine to what extent any additional works may have been approved by WK following a further condition inspection. However, the Applicant has accepted that some of the additional demolition works were required (for example, the demolition of the bathroom brickwork) and has excluded these from the scope of this dispute. Having considered the available evidence the Panel does not accept the FSP‟s position that the significant additional demolition works to the northern section of the house were required due to asbestos removal works nor has it been established, on balance, they were needed due to safety concerns. Given the inconsistencies in the various statements by the FSP‟s agents, and having noted Case No: 358476 Determination Page 6 of 9 the timeline of events as detailed by the Applicant (which has not been disputed) the Panel cannot be confident that the various justifications for the works put forward by the FSP‟s contractors can be relied upon. Applicant has suffered loss as a result of excessive demolition works It is clear from the FSP‟s claim fi le notes that the Applicant was proactive in identifying and reporting potential issues early in the process and contacted the FSP on a number of occasions to seek its intervention. However, there is no evidence that the FSP took any active involvement in the management of the claim. Despite the Applicant‟s very reasonable protestations, the FSP‟s contractors continued down their own path, with the result that contrary to the FSP‟s earlier agreement, a recoverable part of the house was demolished. This has caused the Applicant significant additional cost. While there is no evidence that the FSP was deliberately obstructionist, its failure (for whatever reason) to intervene led to the Applicant‟s further loss. 2.3 Is the FSP required to compensate the Applicant? Applicant’s ability to recover is not limited by sum insured The loss suffered by the Applicant arose not from the insured event but from the FSP‟s failure to appropriately manage the claim and the actions of its commissioned consultants. In these circum stances, the Applicant‟s entitlement to compensation is not limited by the sum insured under the policy. Applicant is entitled to compensation for direct financial loss For the purpose of bringing this matter to a conclusion, the Panel relies on its remit to do what it fair in all the circumstances. The Applicant has estimated the extra costs incurred as a result of the excessive demolition works to be $93,500, but has provided no evidence to support this. In the circumstances, it is appropriate for the FSP to arrange for:  WK to prepare a scope of works to rebuild the structure of the northern section of the dwelling that was to be retained in line with the original make safe SOW; and  obtain a quotation to carry out these works from an appropriately qualified builder. This quotation is to be prepared without taking into account any discounts or rebates available to the FSP. The FSP is to make an additional cash payment to the Applicant for the amount of the quotation obtained as set out above. Further, the FSP is to pay interest upon this amount at the rate applicable under section 57 of the Act from 10 December 2013 (being the date the FSP received WK‟s final report) until the date the payment is issued to the Applicant. Case No: 358476 Determination Page 7 of 9 The Panel requires the parties to work cooperatively to agree a scope of works and quotation. However if the parties are unable to agree a final position this issue may be referred back to the Service for further determination. Applicant is entitled to compensation for non-financial loss The Service is able to award compensation up to a maximum of $3,000 as compensation for non-financial loss where there has been an unusual degree or extent of physical inconvenience, time take to resolve the situation or interference with the Applicant‟s ex pectation of enjoyment or peace of mind. There is no doubt that the Applicant was proactive in attempting to avoid the situation occurring and has acted reasonably in trying to resolve this dispute. Although there is no evidence the FSP has deliberately a voided its obligations, it appears not to have acted on the Applicant‟s concerns and failed to adequately manage its agents, who appear to have acted outside their authority. Having considered the available evidence, the circumstances of the claim, the unreasonable time taken to resolve this dispute and the poor management of the Applicant‟s claim, the FSP is to pay the Applicant $1,500 by way of compensation for non-financial loss in line with section 9.3(b) of the ToR. 3 Supporting information 3.1 FOS approach to this dispute General considerations As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions to the Service. For the purpose of this Determination, commentary is restricted to only those issues considered directly relevant to the outcome. 3.2 Consultants’ evidence Record Key points Assessor’s Report 23 May 2013  Date of loss 22 May 2013  Claim not assessed to be suspicious  Noted major structural damage Case No: 358476 Determination Page 8 of 9  Recommended appointment of engineer AS (Asbestos) Report 12 June 2013  Asbestos detected in fibreboard sheet in upper level southern rear wall  Fibrous cement sheet and debris found in the lower level ceiling and floor of the laundry showing asbestos conte nt MP Engineer Report 28 June 2013  Reviewed photographs of the dwelling and provided opinion on extent of demolition which may be required in order to make remaining structure reasonably safe  Recommended undamaged wall linings and external cladding remain in place WK Engineer Report and SOW 2 July 2013  Recommended initial temporary make safe works of priority  Recommended protection of existing remaining finishes from damage during demolition works  Stated that where additional works are required these will need to be approved by the FSP prior to the work being carried out  Attached mapping of the insured property showing clouded area of northern section (including bedrooms, walk in robe, bathroom, WC) where perimeter and walls to remain and not be demolished AS (Asbestos) Report 12 August 2013  Carried out inspection of asbestos work area to confirm asbestos removal works had been completed  Inspection revealed the asbestos material from all relevant areas had been removed  Area declared safe for re - occupation by consultants WK Site Visit Report 24 August 2013  Site visit following demolition works  Removal of all ground floor walls (internal and external) was beyond the extent of the make safe scope of works. Demolition contractor considered this was necessary for removal of asbestos.  Complete removal of all the ground floor flooring and timber floor structure was beyond the extent of the make safe scope of works  Chimneys were considered unsafe in current state Assessor Report 8 October 2013  WK had confirmed that the demolition plan was completely ignored. Approximately 2/3 of the home did not require complete demolition  External paving crushed by consultants‟ truck movement  Further demolition works which were not required have escalated re - b uilding costs by $50,000 or more Quotes for rebuilding insured dwelling  WK‟s quote $981,214  RN‟s quote $797,250  LS‟s quote $739,380 WK Engineer Report 10 December 2013  The original scope of works and report clearly provided that any variations to the scope of works needed to be Case No: 358476 Determination Page 9 of 9 approved prior to being carried out  Significant additional demolition work was undertaken in particular to the northern end beyond the scope of w orks  The ground floor and walls scoped to remain would have required a further condition inspection following the initial demolition works and asbestos removal  It was likely further demolition/removal of finishes would have been required including at minimum removal of floor finishes throughout and removal of internal wall linings to remaining walls MS Report  The works completed were not only necessary but the additional work completed outside the scope of works was completed as a duty of care  Witho ut carrying out the additional work MS would not have been able to leave the site which it deemed to be unsafe  Also had to remove areas to gain a safe area for asbestos removal 3.3 Relevant term of the FOS Terms of Reference 9.3 Other compensation … b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Service Provider compensate the Applicant for non- financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time take to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred… … The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.