Determination 357904
Claim denied for building damage under subsidence exclusion, earthquake extension disputed
Summary
The FSP denied a home building claim for cracking, relying on subsidence and earth movement exclusions. AFCA found most damage excluded but accepted that some damage was caused by an earthquake within the policy extension, and directed the FSP to settle that part on a scope of works.
The FSP established the exclusions for most of the damage, but the earthquake write-back clause applies to damage occurring within 72 hours of the event and is established for part of the damage.
Issues
- Claim denial primary · upheld
“The FSP is liable to indemnify the Applicant for the damage identified as damage due to the earthquake but is otherwise entitled to rely upon the exclusions.”
- Product terms interpretation secondary · upheld
“The policy includes a write back clause that provides cover for loss or damage as a direct result of earthquake providing it occurs within 72 hours of the event.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Determination
Case No: 357904 Determination Page 1 of 9
Case number : 357904 1 7 March 2015
1 Overview
1.1 Dispute
This dispute arises as a result of the denial by the Financial Services Provider
(FSP) of the Applicant’s claim for damage to his home building, which allegedly
occurred during an earthquake event on 19 June 2012.
The FSP denied the claim because it says the damage was caused by
circumstances excluded from cover under the policy. The Applicant disputes this
outcome and seeks payment of his claim.
1.2 Issues and key findings
Has the Applicant established a prima facie claim?
The Applicant has established a prima facie claim because:
The policy provides cover for accidental physical loss or accidental physical
damage to the building.
There is no dispute that the building has suffered damage with cracking
identified to walls of the building and the slab.
Is the FSP able to establish the application of an exclusion?
The FSP has established the application of a relevant exclusion.
The FSP is entitled to rely upon the exclusion for most of the damage identified as
damage due to landslide, landslips, subsidence, settling or other earth movement.
Can the Applicant establish the application of the earthquake exception?
The Applicant has established the application of the earthquake extension for
some of the damage because:
On balance, the evidence is some of the damage is consistent with cracking
related to earthquake stresses.
1.3 Determination
This Determination is partially in favour of the Applicant.
The FSP is liable to indemnify the Applicant for the damage identified as damage
due to the earthquake but is otherwise entitled to rely upon the exclusions
contained in the policy to deny the balance of the Applicant’s claim.
Case No: 357904 Determination Page 2 of 9
The FSP is to obtain a statement of works from engineer MT identifying that
damage which is solely due to the earthquake. Once obtained, the FSP can
determine whether to cash settle the Applicant’s claim on the basis of the scope
of works or alternatively attend repairs.
Case No: 357904 Determination Page 3 of 9
2 Reasons for Determination
2.1 Can the Applicant establish a prima facie claim?
The Applicant bears the onus to establish, on the balance of probabilities, a prima
facie claim under the terms of the policy.
The policy covers accidental physical damage and loss to the building.
Reports provided by both the Applicant and the FSP identify the house was
subject to cracking. The Applicant’s engineer, MT identifies that there was
cracking to the building which resembles “seismic damage” and also damage to
the building that closely resembles reactive soil movement along with cracking
where the cause is unclear.
Photographs of the damage identifies cracking in various locations both internally
and externally as well as to the pathway.
I am satisfied based on the information established that the evidence is sufficient
to establish on the balance of probabilities that the Applicant’s property has
suffered accidental damage subsequent to inception of the policy.
2.2 Is the FSP able to establish an exclusion applies to the cover?
The FSP relies upon the general exclusions contained at page 31 of the policy to
refuse payment of the Applicant’s claim.
The FSP maintains that the damage to the Applicant’s property on the balance of
probabilities occurred due to subsidence, erosion, settling, expansion or other
earth movement.
In the FSP’s Notice of Response, the FSP has sought to rely upon the general
exclusions relating to subsidence, erosion etc. as well as gradual deterioration
including wear and tear, rust, corrosion, depreciation, inadequate maintenance,
inherent or structural defects and settlement from heaving, shrinkage, vibration or
expansion in the building’s foundations, walls or pavements.
The FSP obtained a report from a building consultant, AA.
Following inspection of the Applicant’s property, AA concluded that the evidence
suggested damage identified in the building and externally was consistent with
long-term downward deflection and subsidence, long-term fracturing and long-
term ingress of surface and stormwater into the founding soils undermining their
bearing capacity. The damage identified by AA would fit within the relevant
exclusions relied upon by the FSP. I note however, that AA states that he cannot
categorically disregard the earth tremor event as having contributed to the
damage cited.
A second report was obtained from CD, building consultants and engineers. CD
provided a detailed report and concluded that the majority of the damage was due
to differential footing movement associated with the reactive clay soil and
Case No: 357904 Determination Page 4 of 9
exacerbated by moisture variation; i ncluding the drying effect of trees as well as
the drainage and maintenance issues. CD considered cracks to the walls and
feature pillars to the north side of the patio were the result of tree root pressure
whilst cracks to the cellar walls were the result of inadequate design construction
and construction of the wall.
Again, CD’s report and conclusions are consistent with the FSP’s reliance upon
the relevant exclusions contained within the policy.
I accept based on the evidence presented b y the FSP that the majority of the
damage identified to the property was most likely due to subsidence, earth
movement and inadequate design and construction.
I accept that the engineer report provided by the Applicant is in the main
consistent with these findings.
In the circumstances I am satisfied that the FSP has established the application of
a relevant exclusion to the majority of the damage.
2.3 Is the Applicant able to establish the earthquake exception
applies?
The policy includes a write back clause that provides cover for loss or damage as
a direct result of earthquake providing it occurs within 72 hours of the event.
There is no dispute that the Applicant’s property was subject to an earthquake.
According to the information exchanged a 5.4 magnitude earth tremor occurred
on 19 June 2012 with its epicentre located southwest of Moe, Victoria.
At that time the Applicant was overseas for a seven week period starting in late
May 2012 and finishing on 16 July 2012. Based on the Applicant’s information it
was on returning home that the Applicant noticed the damage to the internal wall
linings, tiling, external brick surfaces and concrete foundations.
According to information provided by the FSP from Geoscience Australia (GA) an
earthquake of a 5.4 magnitude would have caused damage up to 20kms away.
The Applicant’s property is a few kilometres out of the 20km radius (about 27km).
Considering GA’s information is an estimate , it is not unreasonable to think the
radius of damage could have been more extensive in certain areas. This suggests
there is a possibility of the damage having been caused by the earthquake event.
The Applicant has presented evidence from a builder, B.
B was of the opinion that the damage appeared to have been caused by the earth
tremor as the rest of the house was in excellent condition. B recommended a
structural engineer be appointed.
The Applicant arranged for engineer MT to attend the property. In MT’s report of
29 October 2014 he identified features and defects typical of reactive clay
movement and soil movement but also identified evidence to the back, side and
internal walls consistent with seismic stress cracking. He considered however that
quantifying the damage attributable to each cause is difficult and considered that
Case No: 357904 Determination Page 5 of 9
there were also issues with site maintenance which would further complicate the
analysis of the analytical forensics.
I also note as indicated earlier that the FSP’s building consultant also considered
the contribution to the damage by the earthquake cannot be categorically
disregarded although he does limit the extent of that damage. The FSP’s
engineer, CD, on the other hand dismisses the earthquake as being a cause of
some damage. It is unclear however, whether damage to the plasterboard and
brickwork which was less than 1mm was considered related to the earthquake.
In my view the evidence presented is sufficient to establish that some of the
damage sustained to the Applicant’s building would, on the balance of
probabilities, be due to earthquake.
Although the Applicant is unable to present any direct evidence of having
observed the damage occurring within the 72 hours of the earthquake, in my view
it is reasonable to accept the Applicant’s comments that he first noticed the
fracturing of the internal wall lining, ceramic floor, wall tiling, external brick
surfaces and concrete foundations on his return home.
In my view it is reasonable to accept that this damage, or at least some of this
damage, would have occurred within a 72 hour period of the earthquake
occurring.
Quantum
The FSP did not want to participate in a case conference and I am unable, based
on the information exchanged, to determine the extent of the earthquake related
damage. It is appropriate in these circumstances that a scope of works be
completed.
Although I acknowledge the comments of the Applicant’s engineer that it is
difficult to quantify the damage attributable to each cause, in my view it is
reasonable that the FSP obtain a scope of works from the Applicant’s engineer,
MT and that MT provide to the best of his ability a scope of works to cover that
damage which is, on the balance of probabilities, damage due to the earthquake.
I am satisfied that in these circumstances the FSP is entitled to determine
whether to cash settle the Applicant’s claim or to attend to those repairs identified
as earthquake damage.
I emphasise for the purpose of the negotiations that may occur between the
parties as to the quantum in dispute that in my view the majority of the damage
identified is excluded under the terms of the policy. I accept however that most
likely some of the damage is due to the earthquake. In the event that the parties
are unable to agree as to the quantum following receipt of the scope of works
then the parties may make further submissions to the Service in order to settle the
quantum issue.
Case No: 357904 Determination Page 6 of 9
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, FOS has considered it appropriate to proceed directly to Determination in
line with the Operational Guidelines to the FOS Terms of Reference.
There has been a full exchange of the relevant material between the parties and
each party has had the opportunity to address the issues raised.
The Applicant is represented. For the sake of clarity and brevity in this dispute,
the Applicant and his representative have been referred to as “the Applicant”.
3.2 Key points on expert materials/statements
Record Key points
Applicant’s
builder (B)
Report
13 Nov 2012
There is damage to the external brickwork of the garage and front
veranda. There is cracking to the front entrance tiled steps, both
sides of the steps, a free standing wall (with evidence of repair
attempts) and external brickwork.
There is also significant cracking/dislodgemen t of brick in the
subfloor and ineffective draining of the toilet waste pipe in the
storage area under the house.
Floor tiles have cracked in the ensuite, wall tiles are extremely loose
in the powder room and the cornice in the master bedroom is
cracked to the ceiling. There has been significant movement
throughout the property.
The damage appears to have been caused by the earth tremor
event as the rest of the house is in excellent condition.
A structural engineer should attend the site to inspect the dama ge
and provide a full report on the exact cause of damage.
FSP’s building
consultant
( AA )
Report
3 Dec 2012
Email
25 Feb 2013
The house appeared in good condition apart from some outstanding
maintenance issues.
A 5.4 magnitude earth tremor (the event) occ urred on 19 June 2012
with its epicentre located southwest of Moe.
The Applicant was overseas for a seven week period starting in late
May 2012 and finishing on 16 July 2012.
Upon returning home, he noted fracturing to the internal wall linings,
ceramic fl oor, wall tiling, external brick surfaces throughout the
home and the concrete foundations and brickwork in the subfloor
area under the front veranda. He attributed them to the event.
Ground, surface and stormwater appeared to be inundating the
founding soils, giving insight as to the cause of the majority of
fractures along the west and south sides.
Fracturing evident within the external brickwork appeared aged and
consistent with long term fracturing, which resulted from long term
ingress of surface and storm water into the founding soils.
Case No: 357904 Determination Page 7 of 9
Fracturing and partial collapse to the base brickwork within the
subfloor area has resulted from back filled soils built up against
single skin brickwork with piers.
Water staining on concrete and brick surfaces in th e subfloor and
past attempts to manage water ingress by making concrete
channels indicate this has been an ongoing long term problem.
Movement to foundations in the basement areas (including garage,
store room and subfloor areas) and subsequent fracturing of brick
surfaces is attributable to water ingress.
Moderate amounts of long term deflection had occurred to the
suspended concrete floor slab throughout the home.
As deflection within the internal floor slab occurred, a counter level
action has taken plac e, causing the front edge of the veranda to rise
and become dislodged from the supporting brickwork.
Subsidence and downward deflection to the suspended concrete
floor structure caused the majority of fracturing evident to the
internal walls and ceiling li nings misalignment of door frames and
fracturing in the floor and wall tiles of the bathrooms and ensuite.
The bow up of the veranda floor slab indicates long term movement
to the home has been an ongoing concern.
The vast majority of fracturing evident to brick surfaces appeared
well established. In N’s opinion this have developed over an
extended period of time well before the event.
The settlement has been a long term issue predating any recent
lateral movement from the event.
The ceiling linings along t he north wall of bedroom 2 were caused
by the inadequate fixing of a heavy curtain and its rail being fixed
directly to the ceiling.
Given the alternative reasons for damage, the type of construction
and distance away from the epicentre, nil damage observe d is
consistent with earth tremors.
However, contribution by the event cannot be categorically
disregarded. However, the evidence suggests the damage was pre -
existing. The extent to which the event has contributed to the
damage is estimated as less than 1% .
Applicant’s
engineer (M T )
Report
29 Oct 2014
There are defects within the stand alone landscape walls that
resemble typical foundation underperformance with respect to
reactive clay.
Cracks and rotation in a retaining wall supporting the patio area at
the front of the building and cracks to front steps and garden bed
walls are due to general foundation underperformance.
There were also defects that were atypical of reactive clay
movement (vertical cracking of engaged piers without cracking to
the infill section).
Earthquake movement is usually more pronounced in areas with the
highest level of stiffness such as engaged piers. The cracking to the
engaged piers is consistent with damage by seismic stresses.
Damage to the back, side and internal walls of th e building was
consistent with seismic stress cracking.
Case No: 357904 Determination Page 8 of 9
There is cracking believed to resemble seismic damage, damage
that closely resembles reactive soil movement cracking and
cracking where the cause is unclear.
The building is considered a brittle stru cture, which is sensitive to
movements from soil reactivity or seismic actions.
Quantifying the damage attributable to each cause is difficult. Issues
with site maintenance (two water tanks overflow directly to the
ground and there are areas where existing drains are blocked) have
further complicated the analytical forensics.
In the absence of any reasonable alternative cause, where there is
a record of seismic activity, it can be reasonably assumed that
seismic stress propagated the crack.
The majority of damage to the building is of little structural
consequence. The building is safe in its present condition.
FSP’s engineer
(C D )
Report
19 Nov 2014
On 19 June 2012, an earthquake with epicentre approximately
10km below ground surface level occurred around 2 km southeast of
Thorpdale, with a magnitude of 5.4ML.
The damage radius indicated by Geoscience Australia was 20km.
The insured property is located about 27km from the epicentre.
Distress to buildings within the damage radius attributed to the
earthquake e vent was typically limited to cosmetic cracks to
plasterboard and brickwork with width of less than 1mm.
The nature of brickwork distress is typically consistent with
differential movement of reactive clay soil from cyclical drying by
tree roots and increa se in moisture from stormwater discharge.
Occurrence of further damage after repairs indicates the movement
is ongoing and thus the distress is not related to the seismic event.
Cracks to the retaining wall and feature pillars surrounding the patio
area is a result of outward pressure from tree roots due to the
proximity of trees and large shrubs adjacent to the southern face of
the wall. This has resulted in localised outward deflection of the
wall, resulting in vertical tension cracks within the brickwork .
The northern wall of the cellar was added after completion of the
residence. Its walls were of single skin construction with engaged
piers with a height of about 1.9m above footing level.
This brickwork is not suitable for the purpose of resisting latera l soil
pressure. The observed rotation and horizontal cracking is a result
of inadequate design/construction.
Distress to the southern elevation of the garage and the brickwork
over the laundry/garage door is a result of differential footing
movement related to reactive clay soil and exacerbation by moisture
variation and poor drainage from the adjacent garden bed area.
Distress to front steps was a result of differential footing movement.
Damage to the west elevation, ensuite tiles, hallway lining and north
elevation was caused by differential foundation movement due to
the drying effect of trees near the residence and
drainage/maintenance issues with overflow from rainwater tanks.
Cracking to the underside of the veranda floor is due to
thermal/shrink age movement of concrete. Localised spalling in this
area is due to inadequate cover and corrosion of reinforcement.
Case No: 357904 Determination Page 9 of 9
Cracks to walls and feature pillars at the north side of the patio area
were due to tree root pressure from trees and large shrubs located
adjacent to the inside face of the wall.
3.3 Other relevant materials relied upon
Product Disclosure Statement and Policy Wording prepared on 10 October
2011.
The Insurance Schedule for the period 2 December 2011 to 2 December
2012.
Information from Geoscience Australia regarding the earthquake event of 19
June 2012.
The parties’ submissions.