Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim amount
Determination
Case No: 357716 Determination Page 1 of 5
Case number : 357716 11 February 2015
1 Overview
1.1 Dispute
The Applicant represents building company “M”, which held a landlord insurance
policy covering a home building and contents rented to tenants. For simplicity and
convenience, references to the Applicant will be taken to mean both the Applicant
and the insured party, M.
The Applicant lodged a claim for damage to his home building and contents
caused by a burst pipe.
The Financial Services Provider (FSP) accepted liability for the damage, arranged
for a scope of works and quotation by builder “U” for the repair, and authorised U
to undertake the repairs.
The Applicant requested the claim be cash settled based on a quotation from M.
Further, although the FSP paid for loss of rent up to 27 March 2014, the Applicant
seeks payment for rent lost while the matter has been in dispute.
1.2 Issues and key findings
Is the FSP required to replace all the carpet in the Applicant’s home?
The FSP is not required to replace, or pay the cost to replace, all the carpet in the
Applicant’s home because:
The carpet damage was only to the hallway, staircase and stairwell.
The policy provides that the FSP will replace property with the nearest
equivalent property, and is required to pay for carpets only in the room, hall or
passage where the damage or loss occurred.
The FSP obtained a quotation for a nearest quality equivalent to the damaged
carpet, which is no longer available.
How should the building damage portion of the claim be settled?
The FSP is required to cash settle the claim based on the quotation by U plus a
margin of 15% because:
The policy requires the FSP to pay the cost to repair the damaged portions of
the Applicant’s building to the condition when they were new – there is no
provision within the policy for the FSP to authorise repairs in the
circumstances.
The quotation by U reflects the cost at which the FSP could perform the
repairs if it were permitted to do so and the cost to repair any further damage
Case No: 357716 Determination Page 2 of 5
revealed during the course of such repairs would rise above the amount of the
quotation by U and must be borne by the FSP.
It is doubtful that the Applicant could complete the repairs for the amount of
the quotation by U.
It is fair in all the circumstances that the building damage claim be settled by
applying a margin of 15% to the quotation by U.
Is the FSP required to make any further payments for loss of rent?
The FSP is required to make a further two weeks payment for loss of rent
because:
The policy provides that where the home is unable to be lived in as a result of
claimed damage, the FSP will pay loss of rent until the building has been
repaired.
The amount already paid by the FSP for loss of rent is only sufficient to cover
the time U says it would take to complete repairs and makes no allowance to
repair damage which may not be revealed until repairs have commenced .
1.3 Determination
This Determination is partially in favour of the Applicant.
The FSP is not required to replace, or pay for the replacement of, the carpet in the
Applicant’s entire home.
The FSP is required to pay the Applicant an additional $3,394.82, being 15% of
the quotation by U, as settlement of the building portion of the claim.
The FSP is required to pay loss of rent for a period of two weeks, over and above
the loss of rent which has already been paid.
The FSP is required to pay interest at the statutory rate on any amounts paid to
the building claim and loss of rent pursuant to this Determination, calculated from
30 May 2014, being the date of the FSP’s final decision letter on the matter, to the
date settlement is made.
Case No: 357716 Determination Page 3 of 5
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions. I have taken into account all the material submitted by the
parties, both before and after the Recommendation. There has been a full
exchange of all documents relied on to make this Determination and each party
has had the opportunity to address any issues raised by the other.
A Case Manager made a Recommendation in this dispute partially in favour of the
Applicant. The FSP accepted the Recommendation but it was rejected by the
Applicant. A copy of the Recommendation is attached.
The Applicant made a post-Recommendation submission.
I am satisfied that the findings and outcome in the Recommendation are correct.
2.1 Is the FSP required to replace all the carpet in the Applicant’s
home?
Policy cover limited to equivalent replacement of carpet in damaged area
The policy provides that the FSP:
will replace property with the nearest equivalent property
is required to pay for carpets only in the room, hall or passage where the
damage or loss occurred.
Carpet damage was only to the hallway, staircase and stairwell
The terms and conditions of the FSP’s policy limit the replacement of the carpet to
those areas where the damage occurred. The evidence is that the areas of carpet
damaged are in the hallway, staircase and stairwell.
FSP obtained a quotation for a nearest quality equivalent to the damaged
carpet, which is no longer available
The FSP has provided a quotation from carpet supply firm “MC” which indicates
the carpet in the Applicant’s home is no longer manufactured and cannot be
matched. MC has indicated it has quoted for an equivalent quality product.
I find that by paying the Applicant the cost for the replacement of the carpet in the
hallway, staircase and stairwell with an equivalent product, the FSP has fulfilled
its obligations to the Applicant for this aspect of the claim.
2.2 How should the building damage portion of the claim be settled?
Policy requires the FSP to pay the Applicant for the cost of repairs
The Applicant’s policy includes a Replacement Benefit.
Under the policy the FSP can settle the building portion of the claim by paying the
cost of restoring the damaged portions of the Applicant’s building to the condition
Case No: 357716 Determination Page 4 of 5
in which they were when new. It does not, however, provide for the FSP to
perform the repair of the damage.
Accordingly, the only option available to the FSP is a cash settlement. Further, it
is noted that the Applicant requested a cash settlement from the FSP.
Overall cost for Applicant to repair damage likely to be greater than FSP’s
quotation
I am satisfied with the analysis in the Recommendation that the repair damage is
likely to be gre ater than the FSP’s quotation.
Doubtful that the Applicant could complete the repairs for the amount of the
quotation by U
I accept the analysis in the Recommendation that it was unlikely that the Applicant
could complete the repairs for the amount in the FSP’s quotation.
Fair in all the circumstances to apply a margin of 15% to the quotation by U
I agree with the Recommendation that it is fair in all the circumstances, the FSP is
required to pay an additional $3,394.82, being a margin of 15% on the FSP’s
quotation, as settlement of the building portion of the claim.
2.3 Is the FSP required to make any further payments for loss of
rent?
FSP to pay loss of rent until home building is repaired
The policy provides that where the home is unable to be lived in as a result of
claimed damage, the FSP will pay loss of rent until the building has been
repaired.
FSP has paid the Applicant equivalent of 66 days loss of rent
The FSP has indicated that it paid the Applicant the equivalent to 66 days loss of
rent.
Time estimated by U for repairs may not have been sufficient
I am again satisfied with the analysis in the Recommendation that the time
estimated in the FSP’s q uotation may not have been sufficient to complete the
repairs.
I find it is fair in all the circumstances that the FSP pay an additional two weeks
loss of rent benefit to the Applicant. This is considered to be sufficient to cover the
time it would take to repair any additional damage revealed.
Case No: 357716 Determination Page 5 of 5
3 Supporting information
Post-Recommendation submission
Recommendation
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim Amount
Recommendation
Case No: 357716 Recommendation Page 1 of 7
Case number : 357716 10 December 2014
1 Overview
1.1 Dispute
The Applicant represents building company “M”, which held a landlord insurance
policy covering a home building and contents rented to tenants. For simplicity and
convenience, references to the Applicant will be taken to mean both the Applicant
and the insured party, M.
The Applicant lodged a claim for damage to his home building and contents
caused by a burst pipe.
The Financial Services Provider (FSP) accepted liability for the damage, arranged
for a scope of works and quotation by bu ilder “U” for the repair, and authorised U
to undertake the repairs.
The Applicant requested the claim be cash settled based on a quotation from M.
Further, although the FSP paid for loss of rent up to 27 March 2014, the Applicant
seeks payment for rent lost while the matter has been in dispute.
1.2 Issues and key findings
Is the FSP required to replace all the carpet in the Applicant’s home?
The FSP is not required replace, or pay the cost to replace, all the carpet in the
Applicant’s home because:
the carpet damage was only to the hallway, staircase and stairwell
the policy provides that the FSP will replace property with the nearest
equivalent property, and is required to pay for carpets only in the room, hall or
passage where the damage or loss occurred
the FSP obtained a quotation for a nearest quality equivalent to the damaged
carpet, which is no longer available.
How should the building damage portion of the claim be settled?
The FSP is required to cash settle the claim based on the quotation by U plus a
margin of 15% because:
the policy requires the FSP to pay the cost to repair the damaged portions of
the Applicant’s building to the condition when they were new – there is no
provision within the policy for the FSP to authorise repairs in the
circumstances
Case No: 357716 Recommendation Page 2 of 7
the quotation by U reflects the cost at which the FSP could perform the repairs
if it were permitted to do so and the cost to repair any further damage
revealed during the course of such repairs would rise above the amount of the
quotation by U and must be borne by the FSP
it is doubtful that the Applicant could complete the repairs for the amount of
the quotation by U
it is fair in all the circumstances that the building damage claim be settled by
applying a margin of 15% to the quotation by U
Is the FSP required to make any further payments for loss of rent?
The FSP is required to pay a further two weeks for loss of rent because:
the policy provides that where the home is unable to be lived in as a result of
claimed damage, the FSP will pay loss of rent until the building has been
repaired
the amount already paid by the FSP for loss of rent is only sufficient to cover
the time U says it would take to complete repairs and makes no allowance to
repair damage which may not be revealed until repairs have commenced
1.3 Recommendation
This Recommendation is partially in favour of the Applicant.
The FSP is not required to replace, or pay for the replacement of, the carpet in the
Applicant’s entire home.
The FSP is required to pay the Applicant an additional $3394.82, being 15% of
the quotation by U as settlement of the building portion of the claim.
The FSP is required to pay loss of rent for a period of two weeks, over and above
the loss of rent which has already been paid.
The FSP is required to pay interest at the statutory rate on any amounts paid to
the building claim and loss of rent pursuant to this Recommendation, calculated
from 30 May 2014, being the date of the FSP’s final decision letter on the matter,
to the date settlement is made.
Case No: 357716 Recommendation Page 3 of 7
2 Reasons for Recommendation
2.1 Is the FSP required to replace all the carpet in the Applicant’s
home?
Carpet damage was only to the hallway, staircase and stairwell
W stated because the home’s carpet is no longer available, it therefore needed to
quote for the replacement o f all the home’s upstairs carpets and staircase.
W’s statement with respect to the need to quote for replacement of all upstairs
and staircase carpet cannot be accepted as reflective of the terms and conditions
of the policy, which limit the replacement to the carpet to those areas where the
damage occurred.
MC notes that the areas covered by its quotation are the hallway, staircase and
stairwell and the Applicant has not provided any evidence to show that the
damage to the carpet in his home extended beyo nd these areas.
Policy cover limited to equivalent replacement of carpet in damaged area
The policy provides that the FSP:
will replace property with the nearest equivalent property
is required to pay for carpets only in the room, hall or passage where the
damage or loss occurred.
FSP obtained a quotation for a nearest quality equivalent to the damaged
carpet, which is no longer available
The FSP has provided a quotation from carpet supply firm “MC” which indicates
the carpet in the Applicant’s home is no longer manufactured and cannot be
matched.
MC has indicated it has quoted for an equivalent quality product.
Carpet supplier “W”, in a letter provided by the Applicant dated 1 May 2014,
confirmed that the carpet in the home was no longer available.
Accordingly, it is accepted that by paying the Applicant the cost for the
replacement of the carpet in the hallway, staircase and stairwell with an
equivalent product, the FSP has fulfilled its obligations to the Applicant for this
aspect of the claim.
2.2 How should the building damage portion of the claim be settled ?
Policy requires the FSP to pay the Applicant for the cost of repairs
The Applic ant’s policy includes a Replacement Benefit.
According to the policy wording, for policies with this benefit, the FSP will settle
the building portion of the claim by paying the cost of repairing the damaged
portions of the Applicant’s building to the con dition they were when they were
Case No: 357716 Recommendation Page 4 of 7
new. It does not, however, provide for the FSP to perform the repair of the
damage.
The policy allows the FSP to choose whether it performs the repairs or pays the
cost of the repairs in other circumstances, none of which applied when this
dispute arose.
Accordingly, the only option available to the FSP is a cash settlement.
Further, it is noted that the Applicant did not want U to perform the repairs and
requested a cash settlement from the FSP.
Overall cost for Applicant to repair damage likely to be greater than
quotation by U
The quotation by U reflects the cost at which the FSP could have performed the
repairs, if it were permitted to do so.
However, in a scenario where U had been permitted to perform the repairs, any
further damage revealed during the course of such repairs would have increased
the overall cost borne by the FSP.
The possibility of such an increase is contemplated by U, as the quotation
includes a supplier note to the effect that “variation would apply if any bathroom
floor joists are found to be damaged following removal of bathroom floor tiles,
substrate and flooring”. However it is noted that the quotation by U includes no
allowances for prime cost items or provisional sums.
Doubtful that the Applicant could complete the repairs for the amount of the
quotation by U
It is accepted that the Applicant has access to building services through M.
Even so, because variations to the scope of work may be necessary once repairs
are underway (such as repair of any damage revealed in the floor joists) it is
doubtful that the Applicant could complete the repairs for the amount of the
quotation by U.
The quotation provided by M suggests that the cost for the repairs may be as high
as $36,000. The quotation from build er “I” (in the amount of $39,285) indicates the
cost may be even higher.
However, it is difficult to accept that the quotations of M and I as being definitive in
this regard because:
M is the own Applicant’s building firm and the insured party under the p olicy
M later altered its quotation amount to $30,000, without any information being
provided to explain the large variation from the original quotation
the quotation from I is not itemised.
Fair in all the circumstances to apply a margin of 15% to the quotation by U
Given the FSP is not in a position to perform the repairs, some allowance needs
to be made for any variations which may be required as a result of damage which
Case No: 357716 Recommendation Page 5 of 7
is revealed after the repairs have commenced (including, but not limited to,
damage to the bathroom floor joists).
Accordingly, after considering what is fair in all the circumstances, the FSP is
required to pay an additional $3,394.82, being a margin of 15% on the quotation
by U, as settlement of the building portion of the claim.
2.3 Is the FSP required to make any further payments for loss of
rent?
FSP to pay loss of rent until home building is repaired
The policy provides that where the home is unable to be lived in as a result of
claimed damage, the FSP will pay loss of rent until the building has been
repaired.
FSP has paid the Applicant equivalent of 66 days loss of rent
The FSP has indicated that it paid the Applicant the equivalent to 66 days loss of
rent and that this amount was calculated as follows:
loss of rent from 21 January 2014 (the date upon which the Applicant’s
tenants vacated the premises), until 25 February 2014 (the date upon which
the FSP says it authorised U to commence the repairs)
a further 30 days from 25 February 2014, up until 27 March 2014, which the
FSP contends was to allow for time for the repairs to be completed.
Time estimated by U for repairs may not have been sufficient
As noted earlier, the FSP did not have the option to perform the repairs, and
therefore its reference to the date upon which it authorised U to commence
repairs is of little relevance.
The quotation by U indicated that the repairs would take 15 working days (3
weeks) to complete, however this estimate may not have allowed for time
required to repair any further damage revealed after the repairs had commenced.
The quotation by I indicated a timeframe of 8 weeks for the repairs.
It is noted that:
the FSP paid the Applicant a cheque for settlement of the building and
contents portion of the claim on 25 February 2014, based on the quotations by
U and MC (for carpet supply)
the Applicant complained about the amount of the settlement, saying that it
was insufficient to complete the repairs
It is unclear whether the Applicant has completed the repairs to the home
however, as mentioned previously, he has access to building services through his
building firm M.
In any event, having regard for what is fair in all the circumstances, the FSP is
required to pay an additional two weeks loss of rent benefit to the Applicant. This
is considered to be sufficient to cover the time it would take to repair any
additional damage revealed.
Case No: 357716 Recommendation Page 6 of 7
3 Supporting information
3.1 Extract from relevant Schedule of Insurance
Building $ Contents Sum Insured
Building (Including Replacement Benefit) $ 214, 000
…
3.2 Policy provisions
How we pay a claim for your buildings
When damage or loss occurs to your buildings we will pay the cost of rebuilding your
building or repairing the damaged portions to the same condition as when they were new.
We will only do this when your schedule shows “including replacement benefit”. If your
schedule does not show “including replacement benefit” and there is damage or loss to your
buildings, your claim will be settled as shown on page 28 if this policy book let.
…
How we pay a claim for your contents
…
When damage or loss occurs to any other contents item we will do one of the following:
replace the property with the nearest equivalent new property, or
…
pay you the cost of replacement or repair.
We decide which one we will do.
We will pay for carpets, wall, floor and ceiling coverings, internal blinds and curtains, only in
the room, hall or passage where the damage or loss occurred.
…
Loss Of Rent
…
We will pay when the building or sections of the buildings an d/or cont ents are:
unable to be lived in aft er accidental damage or accidental loss has occurred, or
…
…
We will pay the amount that is equal to the rent up to the period of time your building have
been repaired or replaced.
3.3 Extract from quotation by carpet supplier MC
“ INSURANCE REPLACEMENT FLOORING QUOTE
…
Areas covered by quote : Hallway, Staircase and Stairwell – ripped carpet
…
Type/Make/Style : Square pattern cut and loop synthetic
…
Case No: 357716 Recommendation Page 7 of 7
B/LM : 11.70 b/lm
Underlay : Black rubber
…
Special Instructions : Carpet is no longer manufacturer and therefore can not be
matched. We have quoted an equivalent quality product. We have
quoted for trims at the doorways to separate the old carpet from
the new (and different). ” [sic]
3.4 Extract from quotation from builder U
“ Supplier Notes: - Variation would apply if any bathroom floor joists are found to be
damaged following removal of bathroom floor tiles, substrate and flooring.
…
Primary Costs (PC) or Provision Sums (PS) in this quotation (item and estimated cost)
There are no PC or PS amount in this quot ation. ”