Determination 357375

Impact damage claim: repairs and cash settlement dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,500
Non-financial loss$933
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed for impact damage to her home, and the repairs and ongoing moisture problems remained unresolved. AFCA rejected a full rebuild, ordered a cash settlement based on a builder's quote, a contents review, and payments for non-financial loss, professional costs and consequential financial loss.

Expert evidence attributed the continuing moisture to causes unrelated to the claim, so a cash settlement based on the scope of works, rather than a rebuild, was the appropriate method of settlement.

Issues

Subjects and remedies

health or medicalhome or building damagemotor vehicle collisionpay claimpay compensationpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim General Insurance - Domestic Insurance - Home Building - Service - Service quality Determination Case No: 357375 Determination Page 1 of 16 Case number : 357375 3 February 2015 1 Overview 1.1 Dispute The Applicant lodged a claim for impact damage to her home that occurred on 4 April 2009 under a policy she held with the Financial Services Provider (FSP). The repairs completed by the FSP following this were unsatisfactory. Due to continual moisture ingress resulting predominantly from these repairs, it was unsafe for the Applicant to remain in the property. As a result, she has been placed in alternative accommodation whilst mould remedial action has been undertaken at her home. The claim remains ongoing, during which time the Applicant has remained in alternative accommodation. Currently, the FSP has accepted liability for a portion of the repairs sought by the Applicant. The Applicant remains substantively dissatisfied with the claim and is seeking a range of remedies, including:  $200,000 cash settlement for every year the claim has remained ongoing  the costs of rebuilding the home  medical expenses, and  legal costs. This is underpinned by the negligent handling of the claim by the FSP and its contractors. 1.2 Issues and key findings Should the home be rebuilt? The home should not be rebuilt as none of the expert evidence supports such a requirement. Instead, the building claim should be resolved by way of cash payment given the longstanding matter and issues with the concrete slab, which the Applicant is required to address. The cash settlement should be based on S’s scope of works as there is no evidence refuting it accurately sets out what is required. How should the Applicant’s contents claim be settled? This should be settled with the assistance of the FSP’s expert, RS, as there i s insufficient evidence discrediting their involvement to date. This is particularly Case No: 357375 Determination Page 2 of 16 evident by their last report where the findings were supported by a mycologist and building biologist. RS is to review all of the items currently in storage and identify which are non- salvageable, require further remediation or are suitable for return. This is to ensure that items returned to the Applicant are suitable based on the current state of affairs. For the items that are non-salvageable or require further remediation, the FSP should pay for the cost to dispose and replace same. With respect to the latter, it is not fair in all the circumstances that the FSP has another opportunity to conduct further remediation given it had ample opportunity to do so already. Given this, the FSP is to continue to pay for storage costs until the later of the following occurs:  the review is completed, or  six weeks have passed since the Applicant received confirmation that the cash settlement for the building repairs is based on a builder prepared to do the works privately for her. Should the FSP pay an amount for non-financial loss? The FSP should pay the maximum amount given the substantive levels of inconvenience sustained by the Applicant as a result of the protracted claim. This amounts to $933.25 after deducting the amount the FSP has already agreed to pay ($2,066.75) towards this head of damage. The amount the FSP paid towards the cost of installing an agricultural drain should not be included in this deduction given it is a financial loss. Neither is the Applicant able to split her claim to seek multiple awards for non-financial loss given it has been the totality of her experience that has been considered. Should the FSP pay an amount towards professional costs or consequential financial loss? The FSP is required to contribute $500 towards professional costs because:  There is an indication that the solicitors engaged by the Applicant added some, but limited, value to this dispute .  There is, however, insufficient basis to substantiate the cost required to obtain an independent medical report to review her health. The FSP should pay $3,000 towards consequential financial loss given the following:  The Applicant has likely incurred expenses greater than this during this protracted claim.  This is the maximum amount FOS can award .  It is reasonable to conclude the amount of effort undertaken substantively exceeded what was reasonably contemplated by the parties at the time the contract was entered into. Case No: 357375 Determination Page 3 of 16 1.3 Determination I determine that this claim should be resolved in favour of the Applicant on the following basis: Issue Method of Resolution Building Repairs  The FSP pay a cash amount towards the building claim based on a builder who has: - prepared a quote pursuant to S’s scope of works, and - is prepared to do the works privately for the Applicant.  If additional building costs are incurred by the Applicant that were not addressed in S’s two scope of works, the FSP is to pay for same upon production of invoices . Alternative accommodation  The FSP is to pay for alternative accommodation costs until six weeks have passed since confirmation is provided to the Applicant that she has received a cash settlement in line with the “Method of Resolution” for building repairs  If additional costs are i ncurred by the Applicant that were not addressed in S’s two scope of works, the FSP is to pay for additional accommodation costs if these works increase the time estimated to complete the repairs . Contents Claim  The FSP is to engage RS to review all of the items in storage and provide a report as to whether they are non - salvageable, require further remediation or are ready to be returned .  The FSP is to pay for the costs of disposing and replacing items that are non - salvageable or require further remediat ion .  The FSP is to pay for storage costs until the later of the following occurs: - RS completes its review, or - six weeks have passed since the Applicant received confirmation her building claim is based on a builder prepared to do the works privately .  The FSP is entitled to credit any amount already paid to the Applicant in its cash settlement towards the second and third bullet points above . Non-Financial Loss  The FSP is to pay an additional $933.25 . Professional Costs  The FSP is required to pay the am ount of $500 . Consequential Financial Loss  The FSP is to pay the Applicant $3,000, being the maximum amount that FOS can award for this head of damage . Case No: 357375 Determination Page 4 of 16 2 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. I have taken into account all the material submitted by the parties. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. 2.1 Should the home be rebuilt? This decision will focus on the current state of affairs This is a long, protracted claim. Both parties have provided an extensive amount of information. Much of this sets out the backgro und to the claim which, given the timeframe that has lapsed, explains the amount of information. This background is useful given it explains why the dispute has reached the stage it has. However, given the parties are unable to resolve their dispute, the focus of this decision will be on substantive current issues. This will enable FOS to offer parties an outcome that may resolve this longstanding dispute. As a result, much of the background material or incidents referred to by the parties may not be relevant given it involves issues that were either resolved or evolved into what is now the current state of affairs. Therefore, for the sake of brevity and conciseness, I will only refer to the relevant material and/or events that underpin the substantive issues. The FSP states its liability to the Applicant is limited to $36,468 The FSP has submitted that the extent of its liability is the sum of $36,468, comprising of the following: Basis Amount Internal building repairs – Based on S’s scope of works $ 19,239.08 Carpet in the lounge room $ 2,194.17 Temporary accommodation – 1 additional month $ 6,500.00 Non - financial loss $ 2,066.75 Storage costs – 1 additional month $ 990.00 Cost to return contents $ 4,862.00 Cost of disposing non - salvageable contents $ 616.00 In line with this, the FSP sent the Applicant a cash payment for the above sum. Case No: 357375 Determination Page 5 of 16 The Applicant has disputed this and is seeking a much higher sum, as set out in section 1.1 of this Determination. The available evidence does not support the Applicant’s position that the home should be rebuilt The Applicant is seeking the total cost to rebuild the home. However, the available evidence does not support such a remedy. First, and of most significance, are JWS’s reports. JWS is a senior forensic structural engineer . In all of JWS’s reports, he identified minimal evidence of distress throughout the home. Although the Applicant has disputed the contents of his reports, I consider they are persuasive for the following reasons:  JWS is the most appropriately qualified to provide an opinion on this substantive issue  the reasoning provided is logical and plausible  it is unrefuted by any other expert opinion. Second, based on RS’s most recent report, it appears the mould remediation activities have been largely successful. The current issue appears to be the continuing water ingress and the cause for same. This is fairly isolated and does not, of itself, form a basis to conclude that the home needs to be rebuilt. Particularly given:  the rectification associated with the previous poor roof repairs has been completed – this appears to have addressed the source of much of the moisture, and  JWS has set out a proposed method of repair that would address the continued moisture ingress. Third, there is no builder or expert that supports such a requirement. The expert opinions support the water ingress is due to issues not related to the claim or the poor repairs Water ingress to the property appears to be still occurring. The latest report by RS, along with the supporting reports from a mycologist and building biologist, conclude that there is a rising damp or capillary action of moisture through the concrete slab. JL’s report dated 17 April 2014 supports this. Although the installation of an agricultural drain on the south-west boundary assisted in reducing the moisture ingress, there is still evidence of a high moisture content in the property. JWS’s latest report concluded that the high moisture content could be due to a number of factors. All of them are associated with non-claim related issues, such as:  ineffective or absence of vapour barrier under the concrete slab;  inadequate protection of the footing system, and  reactive clay soils at the site. Case No: 357375 Determination Page 6 of 16 The Applicant has disputed this, noting there were no pre-existing issues prior to the impact damage in 2009. However, the weight of expert opinions do not support her. In particular, JWS has provided a number of reports addressing the fact the impact only resulted in localised distress. Therefore, it could not be the source of the current issues with the slab or the foundation. JWS did acknowledge this impact resulted in water ingress through the roof and, due to the poor repairs conducted, this significantly exacerbated the issue. However, JWS categorically stated a number of times this impact did not result in foundation movement and the issues with the roof have now been rectified. Therefore, given the preponderance of expert opinions, I am not satisfied the current moisture ingress is due to the impact damage from 2009 or the poor repairs conducted. Due to the proposed works required to be undertaken by the Applicant and the longstanding matter, a cash settlement is appropriate The FSP is seeking to cash settle this dispute rather than follow through with its election to repair. This is due to the identification of the waterproof membrane failure in the slab which, based on a scope of works provided by S, could result in extensive costs of approximately $50,000. The FSP has argued that given this, the ability to continue with the repair is frustrated due to circumstances outside of its control. Given the proposed rectification cost required to address the moisture ingress and the Applicant’s position in this dispute, I agree that the FSP’s deci sion to repair the property is likely to be frustrated. Further, given the protracted nature of this dispute and the desire of both parties to achieve finality, a cash settlement would be an appropriate method of settlement. To ensure the cash settlement is appropriate, the amount must be based on a builder prepared to do the works directly for the Applicant The amount the FSP has allowed for the building repairs is based on a scope of works provided by S. S provided a second scope of works but this was to predominantly address the works required to be undertaken by the Applicant to address the moisture ingress. There is no evidence to refute S’s first scope of works accurately describes the works required for the claim related repairs. Although the Applicant has disputed it, she has provided no evidence from any other builder to support her position. The FSP is relying on BBS’s quote which was based on S’s scope of works. However, this amount ($19,239.08) was substantively lower than the amount quoted by S ($28,948.12). It is also unclear whether: Case No: 357375 Determination Page 7 of 16  BBS or S were prepared to do the works directly for the Applicant for the amounts quoted, and  the likelihood of further adjustments being identified as the works commenced. Any cash settlement based on S’s first s cope of works must be sufficient to ensure the Applicant can have the works done for the amount provided. The discrepancy of the two quotes and the above queries raise concerns about the feasibility of this. To reduce the possibility of this emerging, particularly in light of this longstanding claim, it is my opinion that it is fair in all the circumstances that the building aspect of the dispute be settled in the following manner: 1. If either BBS or S are prepared to do the works privately for the Applicant, then the cash settlement be based on the builder with the lowest quote. 2. If neither BBS nor S are prepared to do the works privately, the FSP must source a builder who can and base a settlement on that sum. 3. If the Applicant does engage the builder that the FSP has based its cash settlement on and additional costs are incurred that are claim related, the FSP is to pay these sums upon production of invoices. Alternative accommodation should continue to be paid until six weeks after the Applicant receives confirmation about the cash settlement I acknowledge alternative accommodation has been paid until the end of January based on a monthly rental of $6,500. This includes the one month timeframe estimated by the builders for the claim related repairs to be conducted. However, until confirmation is received that a cash settlement is based on a builder who is prepared to do the works privately for the Applicant, then it is fair in all the circumstances that alternative accommodation costs continue to be paid until this is resolved. The reason is that it would be inequitable for the Applicant to have to fund her own alternative accommodation when it is not clear that she could engage a builder with the funds made available to complete the works set out by S. Once it is confirmed that the Applicant has received a cash payment that would enable her to engage a builder to complete the works set out by S, then the FSP is liable to pay for six more weeks of alternative accommodation from that date. This is based on allowing the Applicant two weeks to engage the builder and four weeks for the builder to complete the works. In the event additional costs are incurred that are claim related and this also increases the time taken to complete the repairs, then the FSP is to pay for additional alternative accommodation to account for this extra time. Case No: 357375 Determination Page 8 of 16 2.2 How should the Applicant’s contents claim be settled? The substantive issue in dispute is the items RS maintains can be restored The Applicant has raised concerns about the contents to be returned to her and the fact she will not accept anything that was affected by the mould or is unusable. There are numerous lists and reports provided by the parties regarding the contents aspect of the claim. Although minimal information has been provided about the current status of the contents claim. However, the following does not appear in dispute between the parties:  Anything deemed to be non-salvageable by RS ought to be reimbursed by the FSP. Therefore, if it has not done so already, the FSP is to ensure the Applicant is adequately compensated for the replacement of any of these items.  All costs charged by RS to clean or remediate the contents items is payable by the FSP – based on the available information, it appears this has always been the case. It appears the substantive issue is the items RS maintains can be restored. The Applicant has reservations about this, although it is unclear the extent of items that fall within this category. There are insufficient reasons to discredit RS’s i nvolvement The Applicant has suggested that an independent company be engaged to manage this process moving forwards. This is predominantly due to her lack of trust in RS and the fact that, in her view, remedial measures have failed in the home. In the abs ence of any expert or other evidence to contradict RS’s assessment, I do not accept the Applicant’s position. RS clearly has the appropriate expertise to assess whether items that were to be restored have successfully been done so. Further, I do not accept there is sufficient evidence to discredit RS’s involvement given the following:  The failure of remedial measures to the home appears to be due to continued moisture ingress rather than RS’s involvement. This has been corroborated by JL and JWS and not contradicted by any other expert opinion.  RS has been prepared to declare items non-salvageable when appropriate.  RS’s analysis of the potential mould hazard and moisture ingress appears to be well considered. This is evident in its last report which was supported by a mycologist and building biologist.  Engaging a new expert will prolong this matter substantively given they will need to be briefed on all the relevant information. Case No: 357375 Determination Page 9 of 16 To ensure items are appropriately categorised before being returned, RS should review all of the items currently in storage I am conscious, however, that there should be a process to ensure that prior to the items being returned to the Applicant, they have been assessed as being properly remediated or in a suitable condition at the time. It is unclear when the last assessment was undertaken. In my opi nion, given the potential hazard involved in returning clothing with mould and the historical fact that numerous items were identified as non-salvageable, it is fair in all the circumstances that RS:  review all of the items, and  provide a report about their suitability following this Determination and prior to their return. In the event items are identified as non-salvageable or require further remediation, then the FSP is to pay for the cost to dispose and replace same. The FSP should not be given further opportunities to remediate items if they are still in an unsuitable condition There is an argument that the FSP be given an opportunity to address those items that require further remediation. However, I cannot accept it is fair in all the circumstances to allow this due to the following:  the length of this claim  the desire by the parties to achieve finality, and  the fact the FSP has had substantive opportunities to ensure all remedial activities have been completed by this time. To simply prolong the claim further to enable the FSP to reduce its costs is not, in my opinion, an appropriate outcome in the context of the particular circumstances of this case. The FSP may be required to pay for additional storage costs following RS’s review Until all of the items have been catalogued and reviewed, it is fair in all the circumstances that the FSP pay the cost of storage. Once the review is completed, the FSP is to pay for additional storage costs. This is conditional on six weeks not having passed since the FSP confirmed that a cash settlement for the building repairs was based on a builder prepared to do the works privately for the Applicant. Once this six week period has lapsed or the review is completed, whichever is later, the FSP is able to cease paying for storage costs. Case No: 357375 Determination Page 10 of 16 2.3 Should the FSP pay an amount for non-financial loss? Due to the substantive levels of inconvenience sustained, the Applicant would normally be entitled to the maximum amount Under paragraph 9.3(b)(i) of FOS’s Terms of Reference, I can award up to $3,000 per claim for non-financial loss if the Applicant has suffered an unusual degree or extent of:  physical inconvenience  time taken to resolve the situation, or  interference with the Applicant’s expectation of enjoyment or peace of mind. Due to the largely protracted nature of the claim, the poor initial repairs conducted by the FSP and the fact she has been in alternative accommodation for years, it is clear the Applicant has satisfied these thresholds. It is also clear that due to the substantive levels of inconvenience sustained, the Applicant would normally be entitled to the maximum amount. The amount the FSP has contributed to non-financial loss is $2,066.75 The FSP has submitted that it provided a number of benefits that are technically beyond the terms of the policy and should be accounted for under this head of damage. These are:  installation of an agricultural drain – $3,033.69, and  the sum of $2,066.75 that it classed as non-financial loss in its latest settlement sum. I do not consider the installation of an agricultural drain should be considered. The reason is that the cost to install an agricultural drain is, by its apparent nature, a financial loss. Therefore, the only amount that appears to have been provided to the Applicant that can be associated with non-financial loss is $2,066.75. Given that I accept the Applicant should be entitled to the maximum amount, I direct the FSP to pay an additional $933.25. This would bring the total amount paid to the Applicant at $3,000, being the maximum available under the Terms of Reference. I cannot partition her claims as it was the totality of her experience that led to the maximum amount, not a discrete portion of it In her submissions, the Applicant has attempted to state there are multiple claims she wants FOS to consider. This includes claims against the builder that conducted the poor repairs initially as well as JL, RS and the FSP. I do not accept her claim can be partitioned in such a manner. The reasons are twofold:  All of her exper iences are associated with the FSP’s failure to properly discharge its obligations under the policy when repairing the damage initially. Case No: 357375 Determination Page 11 of 16 The contractors the Applicant identified were clear ly the FSP’s agent during this.  In awarding the maximum amount for non-financial loss, I considered the totality of her experience. Therefore, I do not accept she is entitled to more than the amount already awarded based on the limitations of the Terms of Reference. This includes her seeking $200,000 for every year her claim has remained ongoing. The Applicant should receive an apology but I will not compel the FSP to do this given it would substantively undermine its value The Applicant has sought an apology for her claims experience. Given her experience, this would be appropriate. However, to compel a party to apologise for their conduct would, in my view, undermine its value and purpose. Accordingly, I would suggest the FSP consider doing so given it is clear that the Applicant’s experience fell far below what a custom er should have expected in these circumstances. 2.4 Should the FSP pay an amount towards professional costs or consequential financial loss? As there is an indication that solicitors added limited value to the dispute, I will award $500 in this regard The Applicant seeks reimbursement of the following professional costs:  legal costs; and  the cost to obtain an independent medical report to assess the impact she sustained as a result of this claim – particularly the potential health hazard in her home. Under paragraph 9.4 of the Terms of Reference, FOS can award legal or other professional costs incurred by the Applicant during the course of the dispute. There is minimal evidence of the costs she incurred and the extent of any solicitors’ involvement in this dis pute. For instance, no submissions prepared by solicitors have been provided to FOS. There has been some communication with the FSP by solicitors engaged by the Applicant. However, part of it appears to have been associated with a potential recovery action against the vehicle driver’s insurer. There is an indication that solicitors engaged by the Applicant added some, but limited, value to the process. In such a context, I accept there is a sufficient basis to award legal costs under paragraph 9.4 in the amount of $500. Case No: 357375 Determination Page 12 of 16 The FSP is not required to pay for an independent medical report as there is nothing to indicate it is necessary or would support the Applicant’s position I do not accept the FSP is required to pay for an independent medical report for the following reasons:  First, it is not a benefit under the policy.  Second, it is not a cost she incurred.  Third, and in the alternative to the reasons above, there is minimal evidence to substantiate the Applicant’s physical health has been adversely affected by the moisture ingress and, if so, to what extent. Given this, I do not accept the FSP should incur the costs of a medical report that may ultimately not be necessary or support the Applicant’s position. Mortgage repayments are not a loss given they are a contractual requirement that was in place before the claim The Applicant has sought reimbursement of her mortgage repayments during the course of this dispute. I cannot accept this is a loss. This was a liability she incurred prior to the claim. Further, her obligations to repay the loan remained unchanged regardless of her dispute. She has argued that the loss is due to the fact it is secured to a liability rather than an asset. I cannot accept that. The loan is secured on both the land and the home. It is clear the land has substantive value even if the home does not. Therefore, as a whole, it would be considered an asset. Due to the protracted claim, the Applicant has likely incurred consequential financial losses of up to $3,000 The Applicant has likely incurred consequential financial losses as a result of this claim. This would include her medical expenses and other expenses associated with this long, protracted claim. In regards to medical expenses, she has presented a number of invoices that she says were incurred due to incidents surrounding this long and protracted claim. She has also provided a letter from a consultant psychiatrist, Dr SM, dated 18 June 2012 which stated the following: “I am the treating psychiatrist for [Applicant]. She has rec ently had an admission to The [G] Clinic from the 4 th June – 11 th June 2012. This was in context of acute stress associated with further damage to her home.” Although there may have been pre-existing issues at play, it is clear the stress and inconvenience associated with this claim has exacerbated those. In regards to expenses associated with this claim, this would include:  making her property available  contacting numerous parties, such as the FSP, experts, builders and electricity provider, and Case No: 357375 Determination Page 13 of 16  providing copious photographs of the damage. To a certain extent, these costs would be associated with the normal claims process. In this case, however, it is reasonable to conclude that the amount of efforts undertaken by the Applicant way exceeded that reasonably contemplated by the parties at the time the contract was entered into. This is reflected by the significant protracted nature and the substantive inconvenience incurred by the Applicant. In such a context, I accept it is plausible that the Applicant’s exp enses exceeded the $3,000 cap FOS is able to award in these circumstances. Therefore, I consider it is fair in all the circumstances that the Applicant receive $3,000 for consequential financial losses incurred during the course of this claim. Further, for similar reasons expressed above regarding the award for non- financial loss, I do not accept there is a basis to split her claims to enable multiple awards under this head of damage. Case No: 357375 Determination Page 14 of 16 3 Supporting information 3.1 Expert Reports These reports set out the current state of affairs that underpins this Determination: Record Key points FSP’s expert ( JWS ) Report 03 Jul 2012  The driver of the vehicle drove through the carport in the front yard of the residence and impacted the western section of the kitchen  The construction of the roof decking was found to be generally in a poor condition with the following defects found: - Poor installation of metal roof decking - Inadequate fall on gutters - Eaves gutters containing debris - Poor roof penetration detail at extractor vent  The distress is generally limited to the water ingress into the NW section of the house  No misalignment of the external walls were identified  The observed internal distress is consistent with moisture ingress from external areas, specifically the roof .  Mould contamination/growth was observed in bedrooms. It is likely the moisture ingress from the roof has contributed to the mould growth  The possible causes of the water ingress is the poor construction of the roof. This includes: - Roof plumbing system be ing in a very poor condition - Different types of roof sheets - Poor roof penetration  Without carrying out destructive testing, it is often very difficult to identify the precise location of water ingress  The distress caused by the vehicle impact is localised to the point of impact given the lack of foundation movement or misalignment FSP’s expert ( JWS ) Report 23 Nov 2012  The verandah located in the NE region has not been affected by the impact and no evidence of structural distress was identified  The observed timber rot / decay is consistent with long term moisture ingress via poorly installed and inadequately waterproofed roofing materials  It is evident that paintwork had been carried out to the already rotted / decayed timber members, which suggests this commenced prior to the vehicle impact  The likely moisture ingress of the building in the western elevation is due to the following: - Inadequate surface drainage (no spoon or AGI drains and the footing is not adequately protected) Case No: 357375 Determination Page 15 of 16 Record Key points - Ineffective waterproof memb rane under concrete slab (likely due to age) - Clay soils at the site  The overland surface stormwater may have been seeping under the concrete slab for a long period of time FSP’s expert (FM) Report 11 Nov 2013  0.2mm – 1.0mm wide cracking to concrete slab throughout the lounge and bedrooms  Distress to the house caused by the impact is localised to NW section of the house. The remainder of the house has not been effected.  Did not observe any structural damage as slab cracks were limited to Category 1. This is cosmetic only  It is consistent with typical concrete shrinkage movement, which is expected where there is insufficient control joints / reinforcement installed in a relatively large slab area  The cracks in the slab were present prior to the surface clea ning work as it was covered with floor finishes  Likely cause of moisture ingress the same as previous report FSP expert (RS) Report 28 Feb 2014  As the microbiologist found high moisture readings on the concrete slab/building materials, there is still a rising damp issue/capillary action  This is evident through the concrete slab in the laundry, daughter’s bedroom and the master bedroom  Recommended additional investigation to identify cause of moisture ingress  RS Project Manager will meet the builder onsit e and discuss the bottom plates that are non - salvageable and gave high readings when sampled  They will be treated, sealed and contained for the builder to remove  The tacking strips in place will be removed and an antimicrobial mist applied on the concrete slab underneath FSP expert (JL) Report 17 Apr 2014  Excavation was undertaken to a depth of 300m in the vicinity of the earlier installation of an agricultural drain some months earlier  Plumber found the ground to be drying out as excavation went deeper – indicative of the drainage being corrected  These factors could be increasing localised moisture levels: - The discharge line from the HWS was found to terminate on the ground of the SW sideway - Condensate line from the A/C unit terminates to the same area - Nei ghbouring property on the SW boundary is approximately 300mm higher so natural soil drainage may be contributing to higher moisture content Case No: 357375 Determination Page 16 of 16 Record Key points - Moisture barrier between slab and ground FSP’s expert (FM) Report 01 May 2014  Site drainage on the western elevation appears to have been addressed  However, the following factors are likely to cause the continuing high moisture levels: - Ineffective or absence of vapour barrier under concrete slab - Inadequate protection of the footing system - Reactive soils at the site  It is likely the overland surface stormwater may have been seeping under the concrete slab over a long period of time  Considering the age and construction, the water vapour transmission is not uncommon  The following remedial works should be undertaken: - The garden beds / unpaved areas located immediately adjacent to the building footprints shall be paved with 50mm fall over the first 1m away from the building - Thoroughly clean the existing slab surface utilising appropriate diamond grinding equ ipment - Flood coat the slab surface with epoxy based moisture barrier products - Apply a cement based underlay product - Apply preferred floor finishes according to the manufacturer’s recommendations

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.