Defective repairs by FSP-approved builder and delay in settling fire and storm claims

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$625
Non-financial loss$1,750
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was damaged by fire and then a storm after a builder approved by the FSP did defective patio repairs. AFCA found the FSP liable for the builder's work and the delay, ordered inspection and rectification, rent and remote control costs, and $1,750 compensation, while refusing the fence, phone and utility claims.

Because the FSP dealt with and paid the builder directly, the builder acted with the FSP's approval and the FSP is liable for the defective repairs and resulting delay.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling Determination Case No: 356045 Determination Page 1 of 5 Case number : 356045 9 February 2015 1 Overview 1.1 Dispute Th is is a dispute as to extent of cover provided under the terms of the Applicant’s policy and the time taken to repair the Applicant’s home following a house fire on 11 March 2013 and subsequent storm damage to the property on 8 January 2014. The FSP considers that the claim has been appropriately settled. It says the policy limit for contents has been exhausted under the fire claim. The Recommendation was substantially in favour of the Applicant. A copy of the Recommendation is attached. 1.2 Issues and Key findings Has the FSP settled the dispute appropriately? The FSP was responsible for the work conducted by the repairer and there are several outstanding issues for which the Applicant should be settled. These are listed under section 1.3. Additional issues raised in rejection of Recommendation In rejecting the Recommendation, the Applicant advised that the patio roof is again leaking. The FSP has agreed to arrange for an assessor to attend on the site to assess the damage. 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is liable to arrange for an assessor to attend the Applicant’s property to assess the extent of the damage and problems associated with the concrete and timber flooring and to arrange for rectification of the same. The FSP is to arrange for the inspection and if necessary to cover the costs associated with damage and/or cleaning costs relevant to the Applicant’s jewellery. The FSP is to pay the Applicant three weeks rent at $180 per week (total $540). The FSP is to cover the cost of replacement of the remote controls as claimed by the Applicant. Case No: 356045 Determination Page 2 of 5 The FSP is to assess and if necessary repair the patio area as a result of the ongoing leak. The FSP is otherwise not liable with respect to the Applicant’s claim f or the fence, replacement of the mobile phone or reimbursement of the electricity and water accounts. The FSP is to pay compensation pursuant to paragraph 9.3 of the Terms of Reference in the sum of $1,750. Case No: 356045 Determination Page 3 of 5 2 Reasons for Determination 2.1 Were the findings in the Recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager’s Recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. Following rejection of the Recommendation, the Applicant has provided a number of photographs and has also identified that there was further damage sustained as a result of the patio roof leaking. The Applicant has otherwise not made any further submissions in relation to the dispute. I had the opportunity of discussing these issues with the Applicant and I am satisfied that the outstanding issues in the dispute involve the Applicant’s claim for reimbursement of the water and electricity bills, rectification work to the fence, concreting and garden edges, three weeks rental accommodation in the sum of $540 and the costs of replacement of the remote controls and a mobile phone. Insofar as the Applicant has raised the issue with the continual leaking of the patio roof, I accept that the FSP are in the process of dealing with that and accept the FSP’s appointment of an assessor to determine the cause of the leak and extent of the damage is reasonable. Replacement mobile phone The Applicant claims to have lost a mobile phone whilst cleaning out a stormwater pit. The Applicant has sought to claim this as part of the storm damage claim. The Applicant’s policy is an insured events policy. It does not provide cover for accidental damage or loss. In my view, the loss of the mobile phone in the circumstances as described by the Applicant would not be covered under the storm damage. I am satisfied that the FSP is entitled to refuse payment with respect to the mobile phone. Cost to repair the fence The Applicant has claimed that the fence was damaged in the storm. No evidence has been provided to establish there was damage sustained to the fence as a result of the storm nor is there evidence to show that the damage to the fence was as a result of the fire. Case No: 356045 Determination Page 4 of 5 In the circumstances, I am satisfied that most likely, the damage to the fence was due to wear and tear and/or deterioration and that the FSP is entitled to refuse payment for the costs of the repair to the fence. Electricity and water accounts The Applicant has claimed for the costs of electricity and water used by the builders employed by the Applicant in repairing the property following the fire. In my view, the policy does not cover these additional costs. The policy does not provide cover for consequential loss associated with the damage sustained. The Applicant chose to have the property repaired by her own builder. There is information on file that the builder had agreed to reimburse the Applicant with respect to the electricity and water costs, although there is no evidence as to whether the Applicant has received this money from the builder. Remote Controls It is unclear from the information exchanged whether the Applicant had recovered the remote controls from the builders. It would appear that although the Applicant may have signed a document acknowledging receipt of these remote controls , it has not established that the remote controls were ever actually replaced. Based on the information exchanged, I accept that the cost to replace the remote controls is an item that is covered under the terms of the policy. I accept that the FSP is liable to either replace the remote controls or indemnify the Applicant for the cost of the same. Ongoing Damage The Applicant maintains there is ongoing damage caused by the continual leaking of the patio roof and rainwater to the concrete and timber flooring. Insofar as there may be ongoing damage, I accept the Case Manager’s Recommendation that the FSP should arrange to attend the Applicant’s home and review the claimed damage and problems with the concrete and timber flooring. In the event that additional damage is identified, the FSP should arrange for the damage to be repaired or otherwise arrange for a cash settlement of the Applicant’s claim with respect to that damage. Jewellery claim The Applicant maintains that as a result of the fire, certain pieces of jewellery were damaged or required cleaning. The policy does not list jewellery as part of the general contents. The Applicant had nominated specified jewellery items totalling $6,000 under the policy. Case No: 356045 Determination Page 5 of 5 If there is evidence of the jewellery being damaged or requiring cleaning, then it is reasonable that the costs of this be met under the terms of the policy. Rent The Applicant has claimed three weeks rent totalling $540 for a period she was forced to move out of the property. The Applicant has not provided any evidence of payment of this rent. The policy provides for alternative accommodation costs and there i s no dispute that the Applicant was forced to move out of the property and reside with friends for the three week period as the home could have been rented for a sum of up to $180 per week then it is reasonable in the circumstances that the FSP meet the Ap plicant’s claim for rental costs in the total sum of $540. Compensation Paragraph 9.3 of the Terms of Reference provides that the Service may award up to $3,000 compensation in the circumstances where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with an Applicant’s expectation of enjoyment or peace of mind. There is no doubt, based on the information exchanged, that there has been considerable delays, not only in the repair process but also in the FSP’s response to the Applicant’s ongoing concerns. In submissions following the Applicant’s rejection of the Recommendation , the FSP has sought to offset a $1,400 ex gratia payment made by offer to the Applicant on 31 December 2013 against any compensation. The ex gratia payment was with respect to aspects of the Applicant’s claim were initially denied. The payment was not an acknowledgement of the issues associated with the ongoing delays or conduct of the FSP towards the Applicant. In these circumstances, I do not consider it appropriate to offset the ex gratia against any compensation payable under paragraph 9.3 of the Terms of Reference. I accept that there has been considerable delay and that the repairs to the Applicant’s property has been unsatisfactory. In the circumstances, I am satisfied with the Recommendation and that the FSP should pay the Applicant compensation pursuant to paragraph 9.3 of the Terms of Reference of $1,750. Recommendation General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling - Dispute Over Extent of Settlement Recommendation Case No: 356045 Recommendation Page 1 of 8 Case number : 356045 11 December 2014 1 Overview 1.1 Dispute The Applicant claimed for a house fire on 11 March 2013, with his home later storm damaged on 8 January 2014. She is unhappy about the cover provided by the Financial Services Provider (FSP) and the time taken to repair her home. The FSP considers that the claim has been appropriately settled. It says the policy limit for contents has been exhausted under the fire claim. 1.2 Issues and key findings Has the FSP settled the dispute appropriately? The FSP was responsible for the work conducted by the repairer and there are several outstanding issues for which the Applicant should be settled. These are listed under section 1.3. Is the Applicant entitled to compensation? The handling of the claim has fallen short of expectations and been stressful for the Applicant. I am satisfied the FSP should pay compensation of $1,750. 1.3 Recommendation This Recommendation is substantially in favour of the Applicant. Should the parties accept this Recommendation, I am satisfied the FSP should:  attend the home and review the claimed damage/problems with the concrete and timber flooring to evaluate whether further work is required  replace the remote controls or indemnify the Applicant for the cost of same  pay three weeks rent at $180 per week (total $540)  inspect and, if necessary, cover any damage or cleaning costs (arising from the fire) relevant to the Applicant’s jewellery, and  pay compensation of $1,750. The FSP is not liable for the repair of the fence, the replacement of the mobile phone, reimbursement for the electricity or water accounts. Insofar as any payment is to be made, the FSP must include interest at the statutory amount (except for compensation) from 17 March 2014 until the date of payment. Case No: 356045 Recommendation Page 2 of 8 2 Reasons for Recommendation 2.1 Has the FSP settled the dispute appropriately? Majority of the claim has now been settled Whilst the Applicant has raised numerous issues in relation to the FSP’s handling of the matter, its delays in reaching an acceptable resolution and the process undertaken to reach this resolution, it is common ground that many of these issues have now been resolved. I will therefore restrict the commentary in this Recommendation to the issues that remain unresolved. Chief amongst these, the Applicant seeks cover for:  the replacement of the garage remote control  the cost of a replacement mobile phone whic h was lost by the Applicant whilst cleaning out a stormwater pit  cover for three weeks of rent ($540) the Applicant says she incurred whilst staying with friends and relatives  rectification work to fences/concreting/garden edges  reimbursement for water/electricity bills and the usage of these services by tradesmen at the property, and  jewellery cleaning bills. It is not in dispute that the Applicant had a genuine claim under the policy or that she was entitled to cover. The FSP claims that the above items are outside of the cover provided under the policy or for issues which the FSP is not liable for. On 8 October 2014, the FSP made an offer to the Applicant for $1,600 to resolve the issue with the retaining wall. This was accepted by the Applicant. Two claims accepted by the FSP The initial claim for fire damage had largely (but not completely) been addressed by the FSP at the time of the second claim for storm damage on 8 January 2014. This second claim involved the collapse of a patio balcony which had been repaired as part of the first claim, by the Applicant’s preferred builder, “KP”. An investigation into the damage by “HB” revealed that the prior work to the patio roof was not in accordance with manufacturing standards. The roof “failed primarily due t o it being laid with insufficient fall to drain rainwater”. A build -up of rainwater during the storm overloaded the roof sheeting and caused a collapse. The FSP arranged to address the problem and repair the patio. The builder was working as an agent of the FSP The Applicant preferred to use builder KP to attend to the work at the home. The FSP agreed with this decision and made payment to KP direct for the work which was done. Case No: 356045 Recommendation Page 3 of 8 It is the FSP’s contention that it “cash settled” KP direct. KP was not associat ed with the FSP in any way and was chosen by the Applicant. No form of release for this payment was used. As the FSP dealt with the builder direct, I am satisfied that KP was working with the FSP’s approval. Regardless of whether KP was on the FSP’s approved list or not, if the FSP saw fit to liaise with and issue payment to the builder, it is implied in such an arrangement that KP was working with the FSP’s approval. It is the FSP’s contention that the building contract for the work done at the property was signed between the Applicant and KP. This is not disputed by the Applicant. Whilst the FSP has allegedly attempted to contact KP to resolve outstanding issues for the Applicant and has received no response, this does not discharge its obligations. It was reasonable for the Applicant to form the view (and KP for that matter) that it was working at the request and the direction of the FSP. If the FSP was not inclined to accept the work of KP, it could and should have quoted the repairs required and arranged a cash settlement and appropriate documentation for the Applicant to complete. Instead, it appears to have worked with KP, through its loss adjuster “CL”, and paid the builder directly. This is not consistent with a “cash settlement” arrangement. T here is also no evidence the FSP objected to the retention of KP to do the job. The FSP considers that the “facts plainly state that the claim was mismanaged by [KP]” and that it has done all it can to rectify this. I disagree. It is irrelevant that the FSP does not have an existing commercial relationship with KP. In my view, KP worked at the FSP’s discretion and the FSP is liable for the work conducted and any deficiencies in same. Suggested rectification work needs to be reviewed by the FSP The FSP acknowledges that the Applicant has raised issues with the timber flooring at the home, suggesting it had swollen and leaked due to a leaking roof. No evidence of this damage has been supplied. The FSP has stated that it would arrange for an assessor to attend, although the Applicant has not indicated whether she would accept this. I accept that the FSP should not be obliged to simply cover this aspect of the Applicant’s claim, without having an opportunity to inspect the damage. Similarly, issues have been raised with the concreting, although this has not been assessed by the FSP. Should the Applicant wish to have the matters considered, she must consent to an inspection of the damage. After this, a decision can be made about any work required. The damaged fence was excluded from the claim by the FSP as its loss adjuster took the view that it was “rotten” and “unrelated” to the two claims. The Applicant obtained a replacement quote for $5,471.69 from “BS”. The provided photos Case No: 356045 Recommendation Page 4 of 8 suggest the fence was at least functional but perhaps not in ideal condition. There is no evidence before me to suggest it was damaged in a storm and/or fire event. In the absence of such evidence, I consider that the FSP should not be liable for the fence damage. No evidence the mobile phone was damaged through an insured event The Applicant seeks cover for a mobile phone that was dropped and damaged in or about the time of the storm. She says she was cleaning a stormwater pit at the time. I do not consider this loss to be related to either of the two claimed events. It was not caused by either the fire or the storm. The Applicant had not selected an “accidental damage” cover option under the policy and there is no event under the policy that appears to account for this damage. I am satisfied that the FSP is not obliged to cover her for this loss. FSP should cover the costs of the remote control The Applicant seeks reimbursement or the replacement of two remote controls for the property, valued at $85. The FSP does not dispute her entitlement to this loss. The FSP is of the belief that these items were provided by KP, although the Applicant says they were not received. The FSP has attempted to contact KP to confirm this and received no response. It believes that the Applicant signed documents for the receipt of these items with KP but has been unable to obtain confirmation. In the absence of evidence that the Applicant received these items, the FSP is liable for their replacement. Prospective rent costs provided for under the policy During a period of repairs at the home, the Applicant says she was forced to move out and reside with friends/relatives for three weeks. She returned her son to his father during this period and seeks cover of $180 per week ($540 total). No evidence has been supplied in support of any payment made by the Applicant. The FSP’s policy provides for alternative accommodation costs. These costs are not required under the policy to be quantified. They are based on the “amount [the home] could have been rented for… from the ti me the building is unable to be lived in as a result of the damage and while it is being repaired”. On the basis that the insured home could be rented for a sum of up to $180 per week and that it was unliveable for a period of three weeks, the Applicant should be entitled to cover. I consider that the FSP should indemnify the Applicant for $540. Case No: 356045 Recommendation Page 5 of 8 No evidence of loss with the water/electricity bills The FSP’s policy excludes cover for consequential loss and it considers that it is not liable for the Applicant’s claim to reimburse her for water and electricity bills incurred during the period of repair. CL agrees that the Applicant might have an argument for reimbursement of these funds, although contends that KP should be liable. An email from KP to the Applicant, dated 24 December 2013, acknowledges that water and electricity were used at the premises in the course of attending to the work. KP rejects that the contractors did anything untoward or beyond what would be normal and noted the Applicant still had use of these facilities at this time. Even allowing for the FSP being responsible for KP’s work, I see no persuasive reason why the FSP should be liable for reimbursing the water or electricity costs. It is not unreasonable to expect some usage of facilities through the period of repair and this would, in normal circumstances, be required. As the Applicant had access to the home through this period as well, there is no way to determine the extent of use by the repairer/contractors and the Applicant. KP reportedly was prepared to consider a claim from the Applicant. This does not oblige the FSP to meet any responsibility for such reimbursement on KP’s behalf. On balance, I am not persuaded that the Applicant has established any actual loss regarding these services and therefore do not consider the FSP liable for the accounts. Jewellery cleaning The Applicant claims for jewellery items which were fire damaged in the first claim. The FSP suggests that the jewellery in question was not damaged in the fire, only that it required cleaning as a result. It also considers that its limits under the policy have been reached for contents through the payout of the claim. The policy has a general contents limit of $34,539 and a specified contents limit (for items of jewellery) of $6,000. Information was sought from the FSP regarding payments made in relation to these losses. An assessment of contents loss at the property was estimated to be $82,594. Based on this, the FSP agreed to settle the Applicant for the general contents limit, less the policy excess. The Applicant does not dispute receiving the maximum general contents payout under the policy, however the policy does not list jewellery as part of general contents. It has “special limit items” for which specifie d limits may be nominated. Jewellery is limited to $1,000 per item or $4,000 in total (unless otherwise specified). Case No: 356045 Recommendation Page 6 of 8 The Applicant nominated specified jewellery items of $6,000 under the policy. It is not clear if the items requiring cleaning were nominated or non-nominated items. Either way, I consider that the costs for this are to be considered over and above the total payout for general contents. As jewellery is not part of “general contents” the cleaning or repair of damaged items should not come withi n this ambit. Any such work falls within “special limit items” under the policy. Should it include the listed items, then the maximum amount recoverable is limited as per the amounts nominated in the certificate of insurance. If they are not the specified items, then the limits are as specified in the policy ($1,000 per item, up to $4,000 in total). No assessment has been done by the FSP to ascertain the extent of damage (if any) to the claimed items. This should be done. Whilst the FSP considers cleaning is not covered, this will depend on why the items need to be cleaned. If, for example, the items were soot stained or required cleaning as a result of the fire, I am satisfied that this is covered under the policy. The cause of any damage (or need for a clean) cannot be ascertained until an inspection of the items is done, however I am satisfied that the potential for cover exists under the policy. 2.2 Is the Applicant entitled to compensation? The handling of the matter was not to a standard that should be expected The Applicant says she was left “emotionally and mentally very upset” over the time taken to resolve the matter and the difficulties involved with the FSP and the repairer, KP. Having reviewed the submissions in detail, I accept that the FSP’s handli ng of the matter has been less than exemplary. The initial patio repairs were not of an acceptable standard and collapsed as a result. This put the Applicant at significant risk. Whilst I accept that the FSP might have had less input into the quality of KP ’s repairs that it might have normally, it should have reviewed the quality of the work after the job was complete. Numerous remaining issues were in dispute at the time the matter was brought to the Service. The Applicant should not have had to have waited so long. The Service has the power to award compensation in circumstances where “an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred ”. I have no doubt that this was the case here. I am satisfied that an award of compensation is appropriate. The Service is typically conservative in such circumstances and limited in the amounts that can be granted. Case No: 356045 Recommendation Page 7 of 8 In accordance with what is fair in all the circumstances, I am of the view that the FSP should pay the Applicant compensation of $1,750. 3 Supporting information 3.1 FOS approach to this dispute General A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions to the Service. For the purpose of this Recommendation, commentary is restricted to only those issues considered relevant to the outcome. Prima facie claim There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. This is known as a prima facie claim. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. To be entitled to cover from the FSP, the onus therefore rests with the Applicant /s to establish that her loss fits within the scope of what is covered by the FSP’s policy. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide blanket cover for all types of loss. 3.2 Relevant policy terms Page 27 of the Product Disclosure Statement (PDS) “ Contents cover Three categories of contents Your contents are divided into three categories: 1. general contents; 2. contents with a maximum limit; and 3. special limit items that you can choose to insure f or more than the limit.” 1. General contents General contents include:  furniture and household goods;  appliances and electrical items;  food; Case No: 356045 Recommendation Page 8 of 8  kitchen and tableware;  clothing, bedding, towels and other linens;  books, toys, sporting and recreation equipment;  gardening equipment and other tools;  licensed or registered firearms;  computers and computer hardware;  cameras and video equipment;  musical instruments;  indoor plants;  swimming pools which are pre-fabricated or above ground or which are freestanding; and  swimming pool accessories which are not permanently fixed, pool liners and removable covers …” Page 29 of the PDS “ 3. Special limit items – you can choose to insure for more Special limit items are contents items which have a limit on the amount we will pay, unless you choose to insure for a higher amount. You will need to list the item and the amount you want to insure it for. The item will then be listed on your policy schedule. It will be called a specified contents item. Unless you request a different amount, the most we will pay for the grouped special limit items below is: Item groups The most we will pay per claim for each group of items Jewellery and watches Up to $1,000 for each item, pair or set up to a maximum of $4,000 in total …”