Home / Financial Firm (Unknown - Insurer) / Determination 355654

Determination 355654

Extent of cover for collapsed driveway and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-17
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$60,850
Non-financial loss—
Amount claimed$231,213
SourceAFCA PDF

Summary

Business owners claimed the insurer's offer of $57,850 for a collapsed industrial driveway was inadequate and sought about $194,000 in repairs plus professional fees. AFCA accepted the insurer's cash settlement with interest and ordered a $3,000 contribution to professional costs, rejecting the larger repair method and fees.

The insured's reinstatement entitlement is to a when-new condition, the gradual deterioration exclusion applies to the fill settlement, and the insurer's quantity surveyor quote is the fair cost.

Issues

Subjects and remedies

home or building damagesmall businesspay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim Determination Case No: 355654 Determination Page 1 of 8 Case number : 355654 30 December 2014 1 Overview 1.1 Dispute The Applicants lodged a claim under their business insurance policy with the Financial Services Provider (FSP) after the collapse of a driveway at their industrial property. The FSP ultimately accepted partial liability for the damage to the concrete slab of the driveway and the stormwater drainage system. The FSP offered to cash settle the Applicants for $57,850, being the estimated cost of repairing this damage. The Applicants say that the amount offered is inadequate to repair all of the claimed damage. 1.2 Issues and key findings What is the extent of the FSP’s liability ? The FSP is liable for the damage to the concrete driveway and drainage system as this is resultant damage arising from the settlement of the fill material under the driveway. However, the FSP is not liable for the settlement itself as this was caused by gradual deterioration and therefore is excluded under the policy. How should the claim be settled? The quote provided by the FSP’s quantity surveyor (AC) represents the fair and reasonable cost of reinstating the damage for which the FSP is liable under the policy. The claim should be cash settled on this basis. Are the Applicants entitled to reimbursement of costs incurred? The work undertaken by the Applicants’ contractors have assisted in clarifying the cause of damage and the extent of the FSP’s liability for the ir claim (which was initially denied). Accordingly, it is appropriate that the FSP be required to contribute an amount of $3,000, in accordance with the FOS Terms of Reference. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is required to cash settle the Applicants for $57,850 (plus interest calculated in accordance with section 2.2 below). The FSP is to pay the Applicants an additional $3,000 for reimbursement of professional costs. Case No: 355654 Determination Page 2 of 8 2 Reasons for Determination 2.1 What is the extent of the FSP’s liability ? Policy provides cover for insured events and accidental damage The Applicants’ policy provides cover for loss or damage to the premises caused by certain events which are listed in the policy, subject to the exclusions set out in the policy. The events for which cover is provided include:  the bursting, leaking, discharging or overflowing of fixed apparatus, fixed tanks, fixed appliances, fixed pipes or other systems used to hold or carry liquid and  storm, tempest, rainwater, snow, sleet, wind and hail (subject to an exclusion for erosion, subsidence, collapse or any other earth movement). The policy also provides cover for accidental loss or damage, other than damage caused by any of the listed events. In this context, “accidental” means damage which is unintended and unexpected. The cover for accidental damage cover is also subject to various exclusions. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. Claimed damage falls within accidental damage cover The engineers engaged by the Applicants and the FSP both concluded that there had been consolidation of the fill material at the property over an extended period of time. Further, the FSP has acknowledged that the collapse of the driveway and the associated damage was caused by the uncompacted soil immediately underneath the driveway being washed away, creating a void which caused the slab to collapse suddenly in mid-2010. The Applicants originally believed that the settlement at their property had been caused by leaks from the stormwater drainage system. However, these leaks were subsequently shown to have minimal effect. The Applicants then engaged an engineer (N), who advised that the consolidation of the fill material and subsequent settlement had occurred as a result of water collecting in a depression in a nearby road and migrating into the soil between the kerb and the boundary of t he Applicants’ property. The Applicants say that damage caused in this manner falls within the insured event of “bursting, leaking, discharging or overflowing”, on the basis that the kerb is a system “used to hold or carry water” and the damage has occur red as the result of a leak in that system. Case No: 355654 Determination Page 3 of 8 The Panel notes that the FSP’s engineer (F) rejected the explanation put forward by N as to the cause of the damage. F considered that the damage had occurred as a result of the gradual consolidation of the uncompacted fill material over time, exacerbated by the resulting damage to the stormwater drainage system. However, even if N’s explanation as to the cause of damage is accepted, the Panel does not consider that the claimed damage falls within the insured event of “bursting, leaking, discharging or overflowing”. The Panel does not accept that water entering the soil between the kerb and the Applicants’ property is properly characterised as “leaking” from a “system used to hold or carry water”, in accordance with the ordinary meaning to be given those expressions. The Panel notes that the general reference to “other systems” should be interpreted in the context in which it appears and having regard to the specific examples provided (that is, fixed apparatus, tanks, appliances and pipes). The Applicants have acknowledged that the claimed damage has not been caused by the insured event of “storm, tempest, rainwater, snow, sleet, wind and hail”. Given the manner in which the damage is said to have occurred , the Panel is of the same view. The FSP accepted liability for t he Applicants’ claim for damage to the concrete driveway and stormwater system, under the accidental damage cover provided under the policy. The Panel agrees that the information provided by the Applicants was sufficient to establish a prima facie in this respect, given the opinions expressed by the various experts and the broad cover for accidental damage provided. Accordingly, the FSP is liable for this damage However, the FSP says that its liability is limited to the damage to the driveway and drainage system which resulted from the settlement of the fill material, and it is not liable for the underlying damage itself. Exclusion for gradual deterioration applies The policy contains a general exclusion for damage caused by gradual deterioration. However, the exclusion does not apply to subsequent loss or damage to the business property caused by a peril (not otherwise excluded) which results from gradual deterioration. The available information (including the reports prepared by both parties’ engineers) establishes that the consolidation of the fill material underneath the driveway occurred as the result of a continuing process over an extended period of time. This is the case regardless of which engineer’s view as to the underlying cause of damage is preferred. On this basis, the Panel is satisfied that the loss of volume and bearing capacity of the fill material was caused by gradual deterioration and therefore is excluded from cover under the policy. Case No: 355654 Determination Page 4 of 8 2.2 How should the claim be settled? FSP has proposed settlement cash based on approved scope of works The Applicants’ policy schedule confirms that they had selected “reinstatement or replacement value” cover under the policy. In these circumstances, the FSP is required to pay the Applicants the cost of repairing the damaged part of the property to the same condition as when new. For the reasons outlined above, the Panel considers that the damage for which the FSP is liable is limited to the damage to the concrete slab of the driveway and the stormwater system incorporated therein. The FSP has provided a copy of an estimate of $58,000 from its quantity surveyor (AC) for the repair of the damage, based on a scope of works prepared by the FSP’s engineer (MP). In or around March 2014, t he FSP offered to settle the claim for $57,850 (being the amount of the quote less the applicable policy excess), but this offer was rejected by the Applicants. Scope of works prepared by FSP’s engineer includes all necessary repairs The Applicants say that the repair method set out in the scope of works prepared by the FSP’s engineer ( MP) is inadequate. They have provided an alternative quote for $194,000 from their builder (S), which is based on the repair method recommended by their engineer (N). The Applicants say that, in order to properly reinstate the property, the works proposed by N need to be undertaken. These include:  driving concrete piers into the fill material to a depth of nine metres, in order to support the replacement concrete slab  relaying the stormwater pipes along the length of the driveway and relevelling the driveway so that the relaid pipes slope downwards from the western end of the driveway (which leads to the property) to the eastern end (which leads to the street). The existing driveway was not previously supported by concrete piers and therefore the FSP’s obligation under the policy to reinstate the driveway to its condition when new does not extend to installing concrete piers. The information provided by the Applicants does not establish that they will be unable to obtain council approval for the works proposed by MP (who has indicated that, due to the nature of the works, approval will not be required). The Applicants say that the relevelling of the driveway and the relaying of the stormwater pipes is necessary because the consolidation of the fill material has caused the western end of the driveway (which leads to the property) to fall to a level which is lower than the eastern end (which leads to the street). However, MP’s report confirms th at the western end of the driveway has always been lower than the eastern (street end). MP notes that the design of the stormwater system is commonly used in flatter areas of the city and relies on a build-up of pressure head in the stormwater pipes and pits to force the water to the street gutter, rather than relying on the gradient of the stormwater pipes. MP Case No: 355654 Determination Page 5 of 8 has confirmed that he has been unable to locate any provision in the relevant Australian Standard which specifies a minimum gradient for stormwater drains (and the Applicants’ engineer has not referred to any such provision) . The Applicants also say that MP’s scope of works is inadequate because it provides for a replacement concrete slab with a thick ness of 150 millimetres, which is less than the original slab. However, MP has confirmed that core samples taken from the existing driveway slab showed that the thickness of the concrete ranged from 120 to 180 millimetres. The Applicants have not provided any independent information to support their position that the original slab was significantly thicker. Further, MP’s scope of work provides for reinforcement of the slab to a standard which is two grades higher than the original slab (as shown by the core samples). For the reasons outlined above , the Panel is satisfied that MP’s scope of works provides for the replacement of the driveway concrete slab and the damaged stormwater system to a standard which is equivalent to their condition when new. Accordingly, MP’s scope of works provides an appropriate basis for settlement of the claim. Additional works are not required in order to comply with statutory provisions The Applicants’ policy provides for the payment of an a dditional benefit where extra reinstatement costs are incurred in order to comply with applicable legislation or municipal by-laws. The Applicants say that N’s scope of works is based on a repair method which complies with the National Construction Code and relevant Australian Standards, and therefore they should be entitled to the additional policy benefit on this basis. However, the Applicants have not identified any legislative provisions which require that the reinstatement of the driveway be undertake n in the manner recommended by N or that the method proposed by the FSP’s engineer (MP) does not comply with all applicable requirements . On this basis, the Panel is not satisfied that the Applicants are entitled to any additional payments under the policy benefit for “extra reinstatement costs”. Claim should be settled based on AC’s quote (plus interest) After the Applicants rejected FSP’ s settlement offer of $57,850, the FSP obtained a quotation for $31,405 from another builder (C) to carry out the necessary repairs. The Panel has carefully reviewed the quotes obtained by the FSP and considers that AC’s quote more accurately reflects the likely cost to the Applicants of reinstating the driveway and stormwater system to its condition when new. The Panel notes that:  unlike C’s quote, AC’s quote provides a detailed and itemise d costing of the works required Case No: 355654 Determination Page 6 of 8  AC’s quote includes an allowance for contingencies, whereas it is unclear whether C’s quote in cludes an equivalent allowance  It is not clear whether C’s q uote takes into account any discounts or rebates available to the FSP and  in its submissions to FOS, the FSP has confirmed that it is prepared to settle the claim based on the quote provided by AC. The Applicants say that AC’s quote does not include any allowance for the disposal of debris during the course of the repairs. However, the Panel notes that AC’s quote includes a specific item for the break out and removal (including disposal) of concrete. Accordingly, the Panel is satisfied that no additional allowance is required. For the reasons outlined above, the Panel is satisfied that the quote for $58,000 provided by the FSP’s quantity surveyor (AC) represents the fair and reasonable cost of reinstating the concrete driveway and the associated stormwater system. Accordingly, the FSP should cash settle the Applicants for $57,850, together with interest calculated in accordance with section 57 of the Ins urance Contracts Act 1984 (Cth). In the circumstances, the Panel considers that the FSP should pay interest on this amount from 21 June 2013 (being the date of the FSP’s amended denial letter) until 1 March 2014. It is not appropriate that the FSP be required to pay interest for the period after the settlement offer was made. 2.3 Are the Applicants entitled to reimbursement of costs incurred? Applicants are not entitled to policy benefit for claim preparation costs The policy provides that the FSP will pay for up to $25,000 in costs necessarily and reasonably incurred by the Applicants for the purposes of preparing a claim which the FSP ultimately agrees to cover under the policy. The Applicants seek reimbursement of costs of approximately $31,763 paid to their loss adjuster (IA). They say that they engaged IA after they had spent many months trying to negotiate an appropriate outcome with the FSP. The Applicants consider that they acted reasonably in seeking the assistance of a loss adjuster in November 2011, given that their claim remains unresolved more than three years later. However, the policy only provides for reimbursement for claim preparation costs where the FSP’s prior written approval has been obtained before the relevant costs are incurred. As the Applicants did not obtain the FSP’s prior written approval, they are not entitled to payment of the additional benefit for claim preparation costs. Further, the Panel considers that the loss adjuster’s fees cannot properly be regarded as claim preparation costs, as they were incurred for the purposes of pursuing the Applicants’ dispute with the FSP (rather than preparing their claim). Case No: 355654 Determination Page 7 of 8 Applicants are not entitled to recover other costs under policy The Applicants also seek reimbursement for total fees of approximately $5,450 paid to their plumbers and engineers during the claim process. The Applicants say that they should be entitled to these costs as the policy provides cover for reasonable professional fees incurred to repair the property. However, the Panel does not accept that the fees incurred by the Applicants were incurred for the purpose of repairing the property. The bulk of these fees were incurred by the Applicants for the purpose of identifying the cause of damage to the property, in order to challenge the FSP’s initial denial of their claim. The remainder of the fees were incurred for the p urpose of seeking to establish that the FSP’s proposed settlement offer was inadequate. FSP is required to cont ribute to Applicants’ costs Under paragraph 9.4 of the FOS Terms of Reference, a financial services provider may be required to contribute to professional costs incurred by an applicant in the course of their dispute. However, unless exceptional circumstances apply, the financial services provider will not be required to contribute more than $3,000 to these costs. It is not entirely clear from the available information what triggered the FSP’s decision to alter its position and accept liability for the resulting damage to the concrete slab and the stormwater drainage system. Further, the Panel is not satisfied that the nature of the claim was such as to require the services of a professional loss adjuster over an extended period of time. However, the Panel is satisfied that the reports provided by the Applicants’ engineer (N) and the submissions made by their loss adjuster (IA) did provide additional information which was relevant in identifying the cause of the damage and clarifying the extent of the FSP’s liability for the claim. In these circumstances, the Panel considers it appropriate that the FSP be required to contribute $3,000 towards the professional fees paid by the Applicants. The Panel does not consider that the circumstances of the claim justify any greater contribution by the FSP. Case No: 355654 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Applicants have been represented by a claims adjuster for the purposes of this dispute. Any submissions made by the Applicants’ loss adjuster have been treated as having been made by the Applicants themselves, for the purposes of this Determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.