Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of Claim
Determination
Case No: 355654 Determination Page 1 of 8
Case number : 355654 30 December 2014
1 Overview
1.1 Dispute
The Applicants lodged a claim under their business insurance policy with the
Financial Services Provider (FSP) after the collapse of a driveway at their
industrial property.
The FSP ultimately accepted partial liability for the damage to the concrete slab of
the driveway and the stormwater drainage system. The FSP offered to cash settle
the Applicants for $57,850, being the estimated cost of repairing this damage.
The Applicants say that the amount offered is inadequate to repair all of the
claimed damage.
1.2 Issues and key findings
What is the extent of the FSP’s liability ?
The FSP is liable for the damage to the concrete driveway and drainage system
as this is resultant damage arising from the settlement of the fill material under the
driveway. However, the FSP is not liable for the settlement itself as this was
caused by gradual deterioration and therefore is excluded under the policy.
How should the claim be settled?
The quote provided by the FSP’s quantity surveyor (AC) represents the fair and
reasonable cost of reinstating the damage for which the FSP is liable under the
policy. The claim should be cash settled on this basis.
Are the Applicants entitled to reimbursement of costs incurred?
The work undertaken by the Applicants’ contractors have assisted in clarifying the
cause of damage and the extent of the FSP’s liability for the ir claim (which was
initially denied). Accordingly, it is appropriate that the FSP be required to
contribute an amount of $3,000, in accordance with the FOS Terms of Reference.
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP is required to cash settle the Applicants for $57,850 (plus interest
calculated in accordance with section 2.2 below). The FSP is to pay the
Applicants an additional $3,000 for reimbursement of professional costs.
Case No: 355654 Determination Page 2 of 8
2 Reasons for Determination
2.1 What is the extent of the FSP’s liability ?
Policy provides cover for insured events and accidental damage
The Applicants’ policy provides cover for loss or damage to the premises caused
by certain events which are listed in the policy, subject to the exclusions set out in
the policy.
The events for which cover is provided include:
the bursting, leaking, discharging or overflowing of fixed apparatus, fixed
tanks, fixed appliances, fixed pipes or other systems used to hold or carry
liquid and
storm, tempest, rainwater, snow, sleet, wind and hail (subject to an exclusion
for erosion, subsidence, collapse or any other earth movement).
The policy also provides cover for accidental loss or damage, other than damage
caused by any of the listed events. In this context, “accidental” means damage
which is unintended and unexpected. The cover for accidental damage cover is
also subject to various exclusions.
It is an accepted principle of general insurance law that an insured bears the onus
of establishing that, on the balance of probabilities, they have suffered a loss
caused by a risk insured under the policy. This is known as a prima facie claim. If
the insured is able to establish a prima facie claim, the onus then shifts to the
insurer to show that, on the balance of probabilities, the loss falls within an
exclusion clause under the policy or that it is otherwise entitled to deny liability.
Claimed damage falls within accidental damage cover
The engineers engaged by the Applicants and the FSP both concluded that there
had been consolidation of the fill material at the property over an extended period
of time. Further, the FSP has acknowledged that the collapse of the driveway and
the associated damage was caused by the uncompacted soil immediately
underneath the driveway being washed away, creating a void which caused the
slab to collapse suddenly in mid-2010.
The Applicants originally believed that the settlement at their property had been
caused by leaks from the stormwater drainage system. However, these leaks
were subsequently shown to have minimal effect.
The Applicants then engaged an engineer (N), who advised that the consolidation
of the fill material and subsequent settlement had occurred as a result of water
collecting in a depression in a nearby road and migrating into the soil between the
kerb and the boundary of t he Applicants’ property.
The Applicants say that damage caused in this manner falls within the insured
event of “bursting, leaking, discharging or overflowing”, on the basis that the kerb
is a system “used to hold or carry water” and the damage has occur red as the
result of a leak in that system.
Case No: 355654 Determination Page 3 of 8
The Panel notes that the FSP’s engineer (F) rejected the explanation put forward
by N as to the cause of the damage. F considered that the damage had occurred
as a result of the gradual consolidation of the uncompacted fill material over time,
exacerbated by the resulting damage to the stormwater drainage system.
However, even if N’s explanation as to the cause of damage is accepted, the
Panel does not consider that the claimed damage falls within the insured event of
“bursting, leaking, discharging or overflowing”.
The Panel does not accept that water entering the soil between the kerb and the
Applicants’ property is properly characterised as “leaking” from a “system used to
hold or carry water”, in accordance with the ordinary meaning to be given those
expressions. The Panel notes that the general reference to “other systems”
should be interpreted in the context in which it appears and having regard to the
specific examples provided (that is, fixed apparatus, tanks, appliances and pipes).
The Applicants have acknowledged that the claimed damage has not been
caused by the insured event of “storm, tempest, rainwater, snow, sleet, wind and
hail”. Given the manner in which the damage is said to have occurred , the Panel
is of the same view.
The FSP accepted liability for t he Applicants’ claim for damage to the concrete
driveway and stormwater system, under the accidental damage cover provided
under the policy. The Panel agrees that the information provided by the
Applicants was sufficient to establish a prima facie in this respect, given the
opinions expressed by the various experts and the broad cover for accidental
damage provided. Accordingly, the FSP is liable for this damage
However, the FSP says that its liability is limited to the damage to the driveway
and drainage system which resulted from the settlement of the fill material, and it
is not liable for the underlying damage itself.
Exclusion for gradual deterioration applies
The policy contains a general exclusion for damage caused by gradual
deterioration. However, the exclusion does not apply to subsequent loss or
damage to the business property caused by a peril (not otherwise excluded)
which results from gradual deterioration.
The available information (including the reports prepared by both parties’
engineers) establishes that the consolidation of the fill material underneath the
driveway occurred as the result of a continuing process over an extended period
of time. This is the case regardless of which engineer’s view as to the underlying
cause of damage is preferred.
On this basis, the Panel is satisfied that the loss of volume and bearing capacity
of the fill material was caused by gradual deterioration and therefore is excluded
from cover under the policy.
Case No: 355654 Determination Page 4 of 8
2.2 How should the claim be settled?
FSP has proposed settlement cash based on approved scope of works
The Applicants’ policy schedule confirms that they had selected “reinstatement or
replacement value” cover under the policy. In these circumstances, the FSP is
required to pay the Applicants the cost of repairing the damaged part of the
property to the same condition as when new.
For the reasons outlined above, the Panel considers that the damage for which
the FSP is liable is limited to the damage to the concrete slab of the driveway and
the stormwater system incorporated therein.
The FSP has provided a copy of an estimate of $58,000 from its quantity surveyor
(AC) for the repair of the damage, based on a scope of works prepared by the
FSP’s engineer (MP). In or around March 2014, t he FSP offered to settle the
claim for $57,850 (being the amount of the quote less the applicable policy
excess), but this offer was rejected by the Applicants.
Scope of works prepared by FSP’s engineer includes all necessary repairs
The Applicants say that the repair method set out in the scope of works prepared
by the FSP’s engineer ( MP) is inadequate. They have provided an alternative
quote for $194,000 from their builder (S), which is based on the repair method
recommended by their engineer (N).
The Applicants say that, in order to properly reinstate the property, the works
proposed by N need to be undertaken. These include:
driving concrete piers into the fill material to a depth of nine metres, in order to
support the replacement concrete slab
relaying the stormwater pipes along the length of the driveway and relevelling
the driveway so that the relaid pipes slope downwards from the western end
of the driveway (which leads to the property) to the eastern end (which leads
to the street).
The existing driveway was not previously supported by concrete piers and
therefore the FSP’s obligation under the policy to reinstate the driveway to its
condition when new does not extend to installing concrete piers. The information
provided by the Applicants does not establish that they will be unable to obtain
council approval for the works proposed by MP (who has indicated that, due to
the nature of the works, approval will not be required).
The Applicants say that the relevelling of the driveway and the relaying of the
stormwater pipes is necessary because the consolidation of the fill material has
caused the western end of the driveway (which leads to the property) to fall to a
level which is lower than the eastern end (which leads to the street).
However, MP’s report confirms th at the western end of the driveway has always
been lower than the eastern (street end). MP notes that the design of the
stormwater system is commonly used in flatter areas of the city and relies on a
build-up of pressure head in the stormwater pipes and pits to force the water to
the street gutter, rather than relying on the gradient of the stormwater pipes. MP
Case No: 355654 Determination Page 5 of 8
has confirmed that he has been unable to locate any provision in the relevant
Australian Standard which specifies a minimum gradient for stormwater drains
(and the Applicants’ engineer has not referred to any such provision) .
The Applicants also say that MP’s scope of works is inadequate because it
provides for a replacement concrete slab with a thick ness of 150 millimetres,
which is less than the original slab.
However, MP has confirmed that core samples taken from the existing driveway
slab showed that the thickness of the concrete ranged from 120 to 180
millimetres. The Applicants have not provided any independent information to
support their position that the original slab was significantly thicker.
Further, MP’s scope of work provides for reinforcement of the slab to a standard
which is two grades higher than the original slab (as shown by the core samples).
For the reasons outlined above , the Panel is satisfied that MP’s scope of works
provides for the replacement of the driveway concrete slab and the damaged
stormwater system to a standard which is equivalent to their condition when new.
Accordingly, MP’s scope of works provides an appropriate basis for settlement of
the claim.
Additional works are not required in order to comply with statutory
provisions
The Applicants’ policy provides for the payment of an a dditional benefit where
extra reinstatement costs are incurred in order to comply with applicable
legislation or municipal by-laws.
The Applicants say that N’s scope of works is based on a repair method which
complies with the National Construction Code and relevant Australian Standards,
and therefore they should be entitled to the additional policy benefit on this basis.
However, the Applicants have not identified any legislative provisions which
require that the reinstatement of the driveway be undertake n in the manner
recommended by N or that the method proposed by the FSP’s engineer (MP)
does not comply with all applicable requirements .
On this basis, the Panel is not satisfied that the Applicants are entitled to any
additional payments under the policy benefit for “extra reinstatement costs”.
Claim should be settled based on AC’s quote (plus interest)
After the Applicants rejected FSP’ s settlement offer of $57,850, the FSP obtained
a quotation for $31,405 from another builder (C) to carry out the necessary
repairs.
The Panel has carefully reviewed the quotes obtained by the FSP and considers
that AC’s quote more accurately reflects the likely cost to the Applicants of
reinstating the driveway and stormwater system to its condition when new. The
Panel notes that:
unlike C’s quote, AC’s quote provides a detailed and itemise d costing of the
works required
Case No: 355654 Determination Page 6 of 8
AC’s quote includes an allowance for contingencies, whereas it is unclear
whether C’s quote in cludes an equivalent allowance
It is not clear whether C’s q uote takes into account any discounts or rebates
available to the FSP and
in its submissions to FOS, the FSP has confirmed that it is prepared to settle
the claim based on the quote provided by AC.
The Applicants say that AC’s quote does not include any allowance for the
disposal of debris during the course of the repairs. However, the Panel notes that
AC’s quote includes a specific item for the break out and removal (including
disposal) of concrete. Accordingly, the Panel is satisfied that no additional
allowance is required.
For the reasons outlined above, the Panel is satisfied that the quote for $58,000
provided by the FSP’s quantity surveyor (AC) represents the fair and reasonable
cost of reinstating the concrete driveway and the associated stormwater system.
Accordingly, the FSP should cash settle the Applicants for $57,850, together with
interest calculated in accordance with section 57 of the Ins urance Contracts Act
1984 (Cth).
In the circumstances, the Panel considers that the FSP should pay interest on this
amount from 21 June 2013 (being the date of the FSP’s amended denial letter)
until 1 March 2014. It is not appropriate that the FSP be required to pay interest
for the period after the settlement offer was made.
2.3 Are the Applicants entitled to reimbursement of costs incurred?
Applicants are not entitled to policy benefit for claim preparation costs
The policy provides that the FSP will pay for up to $25,000 in costs necessarily
and reasonably incurred by the Applicants for the purposes of preparing a claim
which the FSP ultimately agrees to cover under the policy.
The Applicants seek reimbursement of costs of approximately $31,763 paid to
their loss adjuster (IA). They say that they engaged IA after they had spent many
months trying to negotiate an appropriate outcome with the FSP. The Applicants
consider that they acted reasonably in seeking the assistance of a loss adjuster in
November 2011, given that their claim remains unresolved more than three years
later.
However, the policy only provides for reimbursement for claim preparation costs
where the FSP’s prior written approval has been obtained before the relevant
costs are incurred. As the Applicants did not obtain the FSP’s prior written
approval, they are not entitled to payment of the additional benefit for claim
preparation costs.
Further, the Panel considers that the loss adjuster’s fees cannot properly be
regarded as claim preparation costs, as they were incurred for the purposes of
pursuing the Applicants’ dispute with the FSP (rather than preparing their claim).
Case No: 355654 Determination Page 7 of 8
Applicants are not entitled to recover other costs under policy
The Applicants also seek reimbursement for total fees of approximately $5,450
paid to their plumbers and engineers during the claim process. The Applicants
say that they should be entitled to these costs as the policy provides cover for
reasonable professional fees incurred to repair the property.
However, the Panel does not accept that the fees incurred by the Applicants were
incurred for the purpose of repairing the property. The bulk of these fees were
incurred by the Applicants for the purpose of identifying the cause of damage to
the property, in order to challenge the FSP’s initial denial of their claim. The
remainder of the fees were incurred for the p urpose of seeking to establish that
the FSP’s proposed settlement offer was inadequate.
FSP is required to cont ribute to Applicants’ costs
Under paragraph 9.4 of the FOS Terms of Reference, a financial services
provider may be required to contribute to professional costs incurred by an
applicant in the course of their dispute. However, unless exceptional
circumstances apply, the financial services provider will not be required to
contribute more than $3,000 to these costs.
It is not entirely clear from the available information what triggered the FSP’s
decision to alter its position and accept liability for the resulting damage to the
concrete slab and the stormwater drainage system. Further, the Panel is not
satisfied that the nature of the claim was such as to require the services of a
professional loss adjuster over an extended period of time.
However, the Panel is satisfied that the reports provided by the Applicants’
engineer (N) and the submissions made by their loss adjuster (IA) did provide
additional information which was relevant in identifying the cause of the damage
and clarifying the extent of the FSP’s liability for the claim.
In these circumstances, the Panel considers it appropriate that the FSP be
required to contribute $3,000 towards the professional fees paid by the
Applicants. The Panel does not consider that the circumstances of the claim
justify any greater contribution by the FSP.
Case No: 355654 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
The Applicants have been represented by a claims adjuster for the purposes of
this dispute. Any submissions made by the Applicants’ loss adjuster have been
treated as having been made by the Applicants themselves, for the purposes of
this Determination.