Home / Financial Firm (Unknown - Insurer) / Determination 355096
Determination 355096
Cyclone Yasi claim for rust, corrosion and mould declined
Summary
The applicants claimed that Cyclone Yasi caused rust, corrosion and mould to their home, and rejected the insurer's cash settlement offer of $31,075.06 for the other storm damage. AFCA found the applicants had not shown the rust and corrosion was caused by the cyclone, and ordered nothing.
The applicants did not establish on the balance of probabilities that the corrosion was caused by Yasi, and the policy excludes rust, corrosion, gradual deterioration and wear or tear.
Subjects and remedies
natural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 355096 Determination Page 1 of 5
Case number : 355096 4 February 2015
1 Overview
1.1 Dispute
The Applicants insured their home building for $143,000 against damage from
defined events including storm. Their home is approximately 26 years old. On or
about 2 February 2011, Tropical Cyclone „Yasi‟ (Yasi) , caused damage to their
property.
The Financial Services Provider (FSP) accepted liability for some of the wind/
storm damage and has offered to cash settle this claim and loss of food, for the
amount of $31,075.06, including GST.
The Applicants have not accepted the offer as they submit that Yasi also caused
rusting and corrosion to develop i n some areas of their buildings and mould on
the ceiling of the laundry and bathroom, which they submit should be rectified by
the FSP.
The FSP has denied liability on the grounds that the rust and corrosion was pre-
existing Yasi and the mould in the laundry and bathroom was the result of lack of
ventilation. It also relied upon policy exclusions in respect to rust and mould to
reject the Applicants‟ claim.
1.2 Issues and key findings
Have the Applicants established that the rust, corrosion and mould to their
buildings was the result of Cyclone Yasi?
The Applicants have not established that, on the balance of probabilities, the
corrosive damage to their buildings was caused by Yasi, because:
although there are differing opinions as to the timing of the rust and corrosion
damage to the Applicants‟ property, the FSP‟s experts‟ opinions in respect to
the pre-existing rust and corrosion are more persuasive, and
the policy of insurance excludes damage caused by rust, corrosion, gradual
deterioration, wear or tear.
1.3 Determination
The FSP is entitled to deny liability for the Applicants ‟ claim in respect to rust,
corrosion, gradual deterioration and/or wear or tear damage to their buildings.
Case No: 355096 Determination Page 2 of 5
2 Reasons for Determination
2.1 Have the Applicants established that the rust, corrosion and
mould to their buildings was the result of Cyclone Yasi?
The FSP’s liability depends on the cause of the damage.
The Applicants‟ policy is an insured events policy, which provides cover for
damage caused by certain events listed in the policy, subject to conditions and
exclusions set out in the policy.
The events insured under the policy include loss or damage caused by storm
including cyclone. However, the cover provided under this insured event is subject
to exclusions for damage caused directly or indirectly by erosion, rust, corrosion,
gradual deterioration, depreciation, wear or tear.
In early February 2011, the Applicants ‟ location suffered damage caused by
Tropical Cyclone Yasi (Yasi). The Applicants submit that salt laden wind and
rainwater has caused severe rust to develop throughout the interior and exterior
of their buildings and to a stainless steel refrigerator. The Applicants also
submitted a claim for loss of food in the amount of $200.
The FSP accepted liability for physical damage to the Applicants‟ property other
than rust and corrosion damage. It has offered to cash settle the Applicants as
follows:
Cost of repairs $31,325.06
Food loss $ 200.00
Total $31,325.06
Less policy excess $ 250.00
Total payable $31,075.06
The Applicants have rejected t he FSP‟s offer.
The FSP rejected the claim for rust and corrosion damage on the grounds that the
rust and corrosion pre-existed Yasi and had occurred over a period of time.
It is an accepted principle of general insurance law that an insured bears the
onus of establishing that, on the balance of probabilities, they have suffered a loss
caused by a risk insured under the policy. Accordingly, the Applicants are
required to show that, on the balance of probabilities, the damage to their property
was caused by an insured event under the policy. If they are able to do so, the
onus shifts to the FSP to establish that, on the balance of probabilities, the
damage falls within a policy exclusion.
Was the damage caused by Yasi?
The Applicants submit that the rust and corrosion developed over a short period
of time after Yasi and is widespread and severe in various sections of their
buildings. They contend that their property was free of rust and corrosion prior to
Yasi.
Case No: 355096 Determination Page 3 of 5
The Applicants have submitted photographs of the rust damage and letters from
two contractors in support of their contention.
A carpenter, T, stated he last carried out maintenance work for the Applicants in
approximately March 2010, when the buildings were in good basic structural
condition with no obvious signs of rust.
T inspected the property on the 18 August 2011, reporting that he was surprised
to see the amount of rust that had appeared since Cyclone Yasi and that the
majority of the rust was on the internal surfaces. In particular, he mounted a new
galvanised bracket in about March 2010, which showed signs of rust in August
2011.
A steel fabricator, K, also reported in a letter dated 20 April 2012, that he
inspected the Applicants‟ property and found significant rusting to the roof
cladding under the ridge cap and oxidisation mid-span of the battens, not
consistent with normal condensation.
K also stated that the damage indicated that the moisture delivered was
aggressive, probably due to salt content.
The Applicants also submitted examples of properties in their location that they
allege had also suffered rust damage as a result of Yasi. However, in the absence
of the history of these properties, the examples provided are unhelpful.
The Applicants have also referred to a report CTS Technical Report No 57 April
2011 , prepared by the James Cook University Cyclone Testing Station, in support
of their case. Although the report is in respect to “Tropical Cyclone Yasi Structural
damage to buildings” , it includes section 3.2.8.2, that is in respect to „Corrosion of
steel elements‟.
The section mentions corrosion of cladding and purlins in rural sheds and coastal
properties. In paragraph four, the report states:
„In coastal locations, sea spray is contained in the wind stream from the tropical
cyclone, so salt can be blown well into the structure including the roof space. This
salt remains even though the structural elements dry out.‟
The Applicants‟ property is located approximately 15 kilometres from the coast
and could not be con sidered to be in a „coastal location‟. Webster‟s International
Dictionary defines „coast‟ as „The seashore; or land near it‟; and „coastal‟ as „Of or
pertaining to a coast‟.
The FSP has denied the Applicants‟ claim on the grounds that the rust and
corrosion was well established and existed prior to the Yasi event.
The FSP engaged two building consultants, S, and MCS, to inspect and report on
the rust damage to the Applicants ‟ buildings. Both consultants submitted reports,
supported with photographs, stating that the rust and corrosion was well
established and existed prior to the Yasi event.
Building consultant S, sought the opinion of a Technical Manager, „W‟, who was
employed by a steel producer and importer. S informed W of the extent of the
corrosion within the Zincalume roofing sheets and metal roof structure. S also
Case No: 355096 Determination Page 4 of 5
provided W with photographs of the corroded Zincalume roofing sheets and the
white corrosive product that had manifested on the surface of the metal trusses.
W informed S that the extent of corrosion could not have been caused by a single
storm event within a period of 6 to 8 months, but had occurred over a longer
period of time.
The available information does not establish that the rust damage was caused
through a single event resulting from Yasi. The evidence submitted supports the
proposition the damage has occurred over a long period of time. This is also
supported by a replacement section of zincalume roofing, which was installed in
2006 after Cyclone Larry and does not display any advanced corrosion.
Therefore, the Applicants have not established that, on the balance of
probabilities, the damage was the result of the insured event „storm rainwater or
wind‟.
In addition, it is to be noted that the policy contains a specific exclusion for
damage caused by rust, corrosion, gradual deterioration, wear and tear.
Experts’ reports as to the cause of the rust and mould
Record Key points
FSP’s building
consultant (S )
Report
15 September 2011
corrosion of roof sheets and oxidisation of roof trusses is
pre - existing Yasi
damage is not the result of a single cyclone event
mould in bathroom due to lack of ventilation
FSP’s building
consultant (M)
Report
25 April 2012
Applicant s ’ carpenter
(T )
Report
25 January 2012
Applicants’ steel
fabricat or (K)
Report
20 April 2012
there is well advanced rusting and corrosion caused by
normal weathering and exposure and lack of maintenance
since Cyclone Yasi there is extensive rust and
oxidisation throughout the buildings
bathroom is black with mould
there is degradation to sheeting and flashings
there is rust to roof cladding under the ridge cap
moisture delivered was aggressive probably due to
salt content
Case No: 355096 Determination Page 5 of 5
3 Supporting information
3.1 Information relied upon
submissions of the Applicants and the FSP;
the Applicants counter arguments to the report provided by building consultant
M;
the FSP‟s building consultants‟ reports;
reports provided by T and K for the Applicants; and
evidence provided by W.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.