Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Claim Amount
Determination
Case No: 354754 Determination Page 1 of 7
Case number: 354754 3 September 2014
1 Overview
1.1 Dispute
The Applicant is a beneficiary of a residential strata title policy between an
owners’ corporation and the Financial Services Provider (FSP). The Applicant
lodged a claim for storm damage.
The FSP accepted the claim and recently made a settlement offer of $21,600 for
the repair of the damaged unit plus an amount for temporary accommodation
limited to four weeks.
The Applicant considers the offer is insufficient to cover the repair costs. He also
seeks compensation for financial and non-financial loss as well as cover for
additional costs.
1.2 Issues and key findings
Is the FSP’s settlement offer adequate?
The FSP’s settlement offer does not provide for the replacement of the kitchen
ceiling and the repair of the paling fence, which should be included in the
settlement of the claim.
Is the Applicant entitled to additional costs?
It is not disputed the Applicant is entitled to temporary accommodation, which
should be in accordance with the terms and conditions of the policy.
The Applicant is entitled to be reimbursed for the cost of the report from his
builder (P) because this has assisted in supporting his position.
The Applicant is not entitled to the cost of pest control because there is
insufficient evidence to establish these costs have been or will be incurred.
Is the Applicant entitled to compensation for financial or non-financial loss?
The Applicant is not entitled to compensation for either financial or non-financial
loss.
1.3 Determination
This Determination is partially in favour of the Applicant.
Within 15 days of notification of the Applicant’s acceptance o f this decision,
the FSP is to obtain a new and current quotation for the repairs, including an
allowance for the replacement of the kitchen ceiling, the repair of the paling
Case No: 354754 Determination Page 2 of 7
fence, as well as the previously quoted costs for making the roof watertight,
the plumber’s inspection and the electrician’s safety check.
Within 30 days of notification of the Applicant’s acceptance of this decision,
the FSP is to settle the claim based on its new quotation, in accordance with
the terms and conditions of the policy.
If the FSP opts for authorising an FSP’s agent to carry out the repairs but the
Applicant refuses this option, the FSP is entitled to cash settle the Applicant
based on its new quotation.
The FSP is to pay the Applicant the benefit of temporary accommodation at a
rate of $120 per day, in accordance with the terms and conditions of the
policy, subject to the Applicant providing the FSP with adequate proof of the
expenses incurred.
The FSP is to reimburse the Applicant the cost he incurred in obtaining P’s
report, subject to the Applicant providing the FSP with a copy of the relevant
invoice.
The Applicant is not entitled to costs related to pest control.
The Applicant is not entitled to compensation for consequential financial loss
or for non-financial loss.
On the basis that the FSP obtains a new current quotation for repairs, the FSP
is not required to pay interest in respect to the amount of the quotation. In
regard to any temporary accommodation amount and/or the cost of the report
from P, to be refunded by the FSP in accordance with this Determination, the
FSP is to pay interest on the amount paid, on receipt of the proof of payment,
in accordance with the Insurance Contracts Act 1984, from the date paid by
the Applicant, to the date of refund.
Case No: 354754 Determination Page 3 of 7
2 Reasons for Determination
2.1 Is the FSP’s proposed settlement offer adequate?
The FSP’s settlement offer should include the replacement of the kitchen
ceiling and the repair of the paling fence
The parties initially disputed the method of repair of the plaster walls. This issue
was overcome when the FSP made a settlement offer which considered the
replacement of the plaster walls. The issue in dispute now is whether the amount
in offer is adequate to carry out the claim related repairs.
The parties have provided quotations and scopes of works from the FSP’s
repairer (S) and P for the repair of the unit. A review of the quotations indicates
that S’s quotation may be less descriptive but is more comprehensive because it
includes the treatment of mould and black spores as well as the replacement of
insulation.
However, there are some points that are unclear from the evidence provided. The
following findings are made regarding those points:
Unclear point Key observations and findings
Kitchen ceiling The Applicant ’s repairer (B) first said it perhaps did not require
replacement. S’s scope of works is more recent and provides a
similar view.
S’s report (which is contained in the same document as its scope of
works) contradicts this by saying the lounge/kitchen/dinin g area has
warped ceilings, which are in poor state .
Considering the reported state of the kitchen ceiling , it is considered it
should also be replaced.
Laundry
ceiling
S considers it possib ly does not require replacement and P makes no
mention of it .
In the absence of evidence to the contrary , it is considered this ceiling
does not require replacement .
Paling fence The FSP’s other repairer (J) who initially quoted for the repair of the
unit made an allowance for the fence damaged by the SES. P has
also i ncluded it in its quotation.
There is no indication this damage was not accidental or that it
should be excluded from cover .
S did not factor this cost into its quotation but it should be.
Bathroom tiles S has not made an allowance for them but P has.
In an email of 11 March 2014, the Applicant told the FSP the tile and
shower damage were not as a result of the storm.
J’s report of 8 February 2014 , indicated the damage to the shower
tiles and bath hob tiles has occurred over a period of time and is
likely due to the adhesive giving way.
This would be considered gradual deterioration and wear and tear,
which are not covered by the policy. For this reason, the repair of the
tiles is not considered part of the claim related repairs.
Case No: 354754 Determination Page 4 of 7
The FSP should provide a further up to date quotation for all items previously
allowed plus a further allowance for the replacement of the kitchen ceiling and the
repair of the paling fence.
The further current quotation should include an estimate of the time required to
undertake the quoted repairs.
2.2 Is the Applicant entitled to additional costs?
The Applicant is entitled to temporary accommodation in accordance with
the terms and conditions of the policy
For the benefit of temporary accommodation to be activated, the unit needs to be
“uninhabitable”. On 17 July 2014, S reported the unit was uninhabitable.
Accordingly, the FSP offered to pay this benefit at a rate of $120 per night.
A further disagreement occurred as the Applicant sought this benefit to be paid in
advance and to cover for:
accommodation costs allegedly incurred to date as he and his wife live
alternatively 3 days per week outside of the property
accommodation until the end of the dispute
accommodation while undertaking repairs.
As there is no dispute on the Applicant’s entitlement to this benefit, the FSP is
liable for the payment of temporary accommodation, in accordance with the terms
of the policy, from the time S deemed the property uninhabitable (17 Jul 2014)
until the unit “becomes fit for occupation”.
These payments are subject to the policy limits for the period of the benefit (a
maximum of 24 months) and the amount of the benefit (a maximum of 15% of the
building sum insured).
Recent available information indicates the FSP considers $120 per night as a
reasonable rate for temporary accommodation. The Applicant has not disputed
this rate. Accordingly, it is accepted this rate is reasonable.
In principle, even if the benefit is payable, the FSP is not obliged to pay for costs
that have not been or will not be incurred.
For this reason, it is reasonable for the FSP to reimburse the Applicant for the
accommodation costs he has incurred or will have incurred, subject to the
Applicant providing the FSP with the corresponding invoices for these expenses.
In the event the FSP cash settles the claim in regard to the quoted repairs, the
further up to date quotations estimate of the time to undertake the quoted repairs,
shall be used for the calculation of the temporary accommodation.
As P’s quotation and report have assisted the Applicant’s position, he is
entitled to be reimbursed for this cost
The Applicant has provided a quotation and subsequent report from an
independent builder (P). It is considered this has assisted the Applicant in
establishing the scope of works required to address the claimed damage.
Case No: 354754 Determination Page 5 of 7
Accordingly, it is a reasonable for these costs to be reimbursed by the FSP as
part of its claims handling costs, subject to the Applicant providing the FSP with
the corresponding tax invoices.
There is insufficient evidence to establish the Applicant is entitled to the
cost of pest control
The Applicant says that due to the prolonged period the property has remained
unrepaired, there is now vermin that needs to be eradicated. However, other than
his statement, there is no evidence that supports the Applicant’s position or
warrants additional expenses for pest control.
In the absence of evidence to support the need for pest control, it is not accepted
the Applicant has established this cost is required. Accordingly, the Applicant is
not entitled for the cost of pest control.
2.3 Is the Applicant entitled to compensation?
The evidence to hand is insufficient to establish any entitlement for
compensation for financial or non-financial loss
Under the Financial Ombudsman’s (FOS’s) Terms of Reference, FOS may
consider the awarding of consequential financial loss and non-financial loss.
The Applicant argues he is entitled to consequential financial loss because he has
incurred expenses for his wife’s medical treatment as a result of her reportedly
developing an allergic condition to the mould growing in the unit as a result of the
storm damage.
The FOS’s Terms of Reference do not provide any jurisdiction for FOS to require
the payment of medical treatment costs in these circumstances. FOS is unable to
make the order the Applicant seeks with regard to medical treatment expenses.
The Applicant also argues he is entitled to non-financial loss compensation
because of his wife’s condition and because of them being forced by the FSP to
live in a property in such a state of disrepair.
FOS can consider compensation for non- financial loss where “an unusual degree
or extent of physical inconvenience, time taken to resolve the situation or
interference with the Applicant’s expectation of enjoyment or peace of mind has
occurred”.
Having considered the evidence presented and the actions of the parties in
respect of this dispute, it is not considered that an award of compensation is
appropriate in this matter.
3 Supporting information
3.1 FOS Approach to this Dispute
Case No: 354754 Determination Page 6 of 7
As advised to the parties, due to the nature of the dispute, FOS has considered it
appropriate to expedite the dispute to Determination in accordance with the
Operational Guidelines to the FOS Terms of Reference.
A full exchange of relevant information has taken place between the parties and
each party has had the opportunity to address the issues raised.
3.2 Key points on relevant materials
Record Key points
FSP’s
repairer (J )
Report
8 Feb 2014
upon performing a pressure test on the bathroom plumbing, J’s
plumber found no evident sign of leak
the problem with the shower tiling (drumminess) and the bath hob
tiling have occurred over a period of time and are likely to be due to
the adhesive giving way
Applicant’s
repairer (B)
Letter
Undated
the damage has been caused by water coming through the roof as a
direct result of storm damage
all roof cappings need removal and repointing as do the four gable
edges, a number of broken tiles need replacement
once plaster is wet, it is not advisable to re - nail and patch
there are areas where the ceilings are bowing and where nails have
popped
all ceilings, except possibly the kitchen, need to be removed and new
plaster hung, a new cornice and electrical work is included
replacement of insulation is allowed in part because an inspection of
the roof cavity showed wet and smelly insulation
the entire bathroom requires new plaster, involving removal of tiling
and fittings, along with general c arpentry work
scraping of all flaking paint, filling where required and painting of all
new plaster hung
Applicant’s
builder (P)
Report
Undated
there is extensive water damage to most ceilings (lounge, dining,
kitchen, bathroom, master bedroom, bedroom, storeroom and front
entry) with visible mould growing and spreading
there is a large area of daylight coming through the roof space, this is
through ridge capping tiles and a few tiles on the pitch of the roof
in these areas, the insulation is damp and a m ould smell is evident
the extra weight of the damp insulation is causing plaster to sag,
crack, have water stains and screws/nails to pop
water is also coming from behind the ceiling cornice in the lounge,
dining, kitchen and bathroom areas, which is conce rning because the
walls below wet cornice were evidence of water coming through
plasterboard joints
the bathroom is the worst affected room, with water clearly coming
through the ceiling and down behind the plaster walls, shower tiles
are popping due to wa ter behind the waterproofing causing the tile
adhesive to fail, ceiling is very damp and extensive mould is growing
on it, the vanity has started to delaminate due to moisture
the bathroom timber stud walls will have to be investigated further for
inspection due to the amount of water exposure over the last nine
Case No: 354754 Determination Page 7 of 7
months
all damaged plastered areas mentioned earlier need to be replaced
as water damage cannot be brought back to ori ginal conditions
FSP’s
repairer (S)
Report
17 Jul 2014
the unit has suffered damage from a storm, which caused ridge cap
tiles to blow off the roof
a tradesperson at some point came to repair the ridge tiles but the
Applicant’s wife had not been informed of this and thus did not allow
them entry
after this, no attempt or effort has been made to make the roof
watertight and mitigate the loss
the roof needs to be repaired as soon as possible, also the property
needs a plumbing inspection of the heater and an electrical check to
ensure lighting circuits and electrics are to standard
there is severe evidence of water saturation to the rear area of the
house with large areas of flaking paint from the ceilings and presence
of mould build up
the ceilings are warpe d and in poor state throughout the bedrooms,
bathroom, toilet, hallway and open plan lounge/dining/kitchen area
the property is now uninhabitable due to health risk issues, there is
also dampness and potential collapse of ceilings if additional further
dam pness occurs
S’s estimate cost of repair is $19,800 plus $1,800 for making the roof
watertight, a plumber’s inspection and an electrician’s safety check
3.3 Other relevant information relied upon
The Product Disclosure document dated 1 December 2012.
The Policy Schedule for the period 1 March 2013 - 1 March 2014.
The claim forms dated 6 November 2013 and 12 December 2013.
A plasterer’s tax invoice dated 17 October 2013.
An electrician’s undated tax invoice.
A roofer’s contract of work dated 6 December 2013.
J’s quotation dated 8 February 2014.
A tax invoice from a repairer (T) dated 27 February 2014.
P’s quotation dated 19 March 2013.
The first, second and third reports from the FSP’s loss assessor.
The allergy serology report dated 14 July 2014.
The Applican t’s breakdown of costs for the repair of the property.
The parties’ submissions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.