Alleged misrepresentation on loan expiry date extension and legal costs charged to loan account
Text of the determination
Determination
Credit - Business Finance - Business Loans - Charges - Incorrect fees/ costs
Determination
Case No: 354684 Determination Page 1 of 11
Case number : 354684 19 May 2015
1 Overview
1.1 Dispute
On 22 October 2011, the Applicant company signed commercial bill facility
contract with the Financial Services Provider (the FSP) with the loan amount of
$7.6 million for the purpose of funding the construction of an aged care unit
development (the Construction Loan). The FSP held various securities to secure
the Construction Loan. The Construction Loan terms stated that the Construction
Loan facility was to expire on 30 June 2012. The drawdown of funds commenced
in November 2011.
On 23 August 2012, the Applicant executed a second commercial bill facility
contract with the FSP. This document provided a revised facility expiry date of
30 September 2012 (the Amended Construction Loan).
The Amended Construction Loan was not repaid in accordance with the stated
expiry date of 30 September 2012. The FSP incurred legal costs and expenses
amounting to $115,826.33 by a firm located in Sydney and also a further
$7,398.60 by a firm in Canberra associated with loan facilities.
This dispute is about:
whether the Applicant was misled by the FSP in relation to whether the expiry
date of the Construction Loan would be extended, and if so, whether the
Applicant changed its position and suffered a loss.
whether the legal costs were charged to the Applicant‟s account appropriately.
1.2 Issues and key findings
Did the FSP mislead the Applicant by representing the expiry date of the
Constructing Loan would be extended?
The available information support a finding that the FSP did not mislead the
Applicant.
Were the legal costs were charged to the Applicant’s account
appropriately?
Under the Construction Loan and the Amended Construction Loan contracts,
the FSP was entitled to recoup legal costs from the Applicant.
Except for a charge the solicitor‟s rendered to view the construction site, t he
legal costs were reasonable. The FSP must refund $295.20 to the Applicant.
Case No: 354684 Determination Page 2 of 11
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP did not mislead the Applicant.
The legal costs incurred by the FSP were reasonable and properly charged to
the Construction Loan account except for a time attendance charged to view
the construction works. Should the Applicant accept this Determination within
30 days of its date, the FSP must refund the Applicant an amount of $295.20
within 14 days of this Determination being accepted.
Case No: 354684 Determination Page 3 of 11
2 Reasons for Determination
2.1 Did the FSP mislead the Applicant by representing the expiry date
of the Constructing Loan would be extended?
The Construction Loan stipulated an expiry date of 30 June 2012
The FSP approved the Construction Loan for funding of $7.6 million. The facility
had an expiry date of 30 June 2012. This is the date the Construction Loan
stipulated that the debt was required to be repaid by the Applicant. The FSP says
that drawdown of the funds commenced in November 2011.
The Applicant says that the FSP represented that the expiry date would be
extended.
Prior to the Applicant signing the Construction Loan contract, the Applicant says
that it understood that expiry date of 30 June 2012 set out in the terms and
conditions was the date the loan needed to be repaid in full. However, the
Applicants says that the FSP represented that the expiry date would be extended
“as necessary ”.
The representations alleged by the Applicant were said to have occurred in
meetings with the FSP‟s staff . The Applicant ‟s director says it can recall one
meeting prior to the Applicant executing the Construction Loan contract in about
early October 2012. The Applicant says the following conversation took place.
Applicant ‟s director :
“I am not comfortable signing the contract as it contains the impossible condition
of loan repayment by 30 June 2012. While 30 June 2012 is the completion date
in the Builder‟s Contract, it is expressly subject to extensions of time due to
inclement weather and other reasons. We would need some flexibility in the
completion date and sale of units after that.”
FSP:
“… [the FSP] has funded many construction contracts. We are fully aware that
the loan repayments are to be made after building completion and from the sales
of the units. The facility‟s approved limit contains contingencies for construction
delays and we will work with you to extend the loan and adjust the repayment
timetable in those circumstances as necessary.”
The Applicant also says that there were at least four other meetings in October
and November 2012 where the Applicant‟s director repeatedly told the FSP that it
was not comfortable with the “ impossible condition ” in the contract. In one such
meeting the Applicant says the following conversation occurred.
The Applicant ‟s director:
“Will [the FSP] drop me in the middle of the ocean if the loan is not paid by
30 June 2012?”
Case No: 354684 Determination Page 4 of 11
The FSP
“… I can fully understand your concerns, but as I have said before, we know it is a
construction contract. That‟s why the interest rate is higher. We will extend the
loan as necessary”.
The Applicant says it executed the Construction Loan contract o n 22 October
2011 after relying on these representations.
The FSP denies that it misled the Applicant
The FSP denies that any of its staff made representations to the effect that the
FSP would agree to finance the project to completion without regard to t he stated
expiry date set out in the Construction Loan contract. The FSP says that it
advanced funds to the Applicant which were sufficient to complete the
development with the expectation that the works would be completed and the loan
repaid or largely repaid by the 30 June 2012 expiry date.
The FSP agreed to extend the expiry date
The Applicant says that the FSP was kept fully informed about the progress of the
construction works and the delays that had taken place via communications from
the Applicant and also via the FSP‟s quantity surveyor who was providing reports
to the FSP. The Applicant says that the FSP did not raise any concerns about the
repayment of the loan until the FSP‟s banker called him on 15 July 2012, where
the banker told the Applicant that the Construction Loan facility expired on 30
June 2012, and that the FSP is preparing documents to extend the loan term.
The Applicant says that further representation were made by FSP staff leading up
to the Amended Construction Loan contract being signed by the Applicant. The
Applicant says that it told the FSP that it was clear that the construction would not
be completed by 30 September 2012. The Applicant alleges that the FSP‟s staff
made the following representation: “We know that the loan re payments are to be
made out of the sales proceeds. We will work with you to extend the expiry
date.”.
The Applicant says that it signed the Amended Construction Loan contract in
reliance on this representation.
However, the Applicant allegation that it was clear that the works would not be
completed by 30 September 2012 is inconsistent with its letter to the FSP‟s CEO
dated 4 July 2013. In this letter , the Applicant‟s position was as follows:
“Due to inclement weather and other reasons, the „practical completion‟ date for
the works was extended to 4 July 2012, and with anticipated project completion by
30 September 2012. The Bank extended the facility to 30 September 2012
without any application by us. At the time, expected completion date was 30
September 2012.”
It is apparent from the Applicant‟s position set out in its letter to the FSP‟s CEO
that it did expect the works to be completed by 30 September 2012 when it
agreed to be bound by the Amended Construction Loan.
Case No: 354684 Determination Page 5 of 11
The Applicant and the builder were in dispute.
It is clear from the information that there were delays with the building works. The
Applicant says that this was the builder‟s fault. The Applicant says that the
construction works were not completed by the expiry of the Construction Loan
facility. It is also clear that the Applicant and the builder were in serious dispute
leading up to this time. The Applicant says it refused to make progress payments
from October 2012.
On 7 December 2012, the Applicant issued a “show cause notice”. Under the
building contract, a “show cause notice” was a step required to be taken by the
Applicant before the building contract with the builder could be terminated.
I note for completeness that a search of the public record discloses that there
were three separate court proceedings involving the Applicant and the builder
which resulted from this project.
Ultimately, the builder was terminated and the Applicant engaged another builder
in about March 2013 who completed the remaining works (which were,
comparatively, not substantial) using the Applicant‟s own funds.
The Applicant has stated that it repaid the debt under the Amended Construction
Loan in February 2014.
The Applicant was not misled
The Applicant‟s claim, in summary, is that although the Construction Loan
contract specified an expiry date for repayment of 30 June 2012, the FSP
represented that it would agree to extend the date for repayment in any
circumstances for an indefinite period. The only time the debt would become
payable would be after the project had been completed and units sold so that the
loan could be repaid from the sale proceeds – even though this might be more
than 20 months after the initial expiry date set out in the Construction Contract.
The FSP denies that it represented it would agree to finance the project to
completion without regard to the stated expiry date set out in the Construction
Loan contract
I am not satisfied on the weight of the available information that the FSP made
representations as alleged by the Applicant. I will set out my reasons for reaching
this conclusion below.
It would be very unlikely that the FSP‟s staff would make representations as
alleged by the Applicant. Putting the Applicant‟s case at its highest, the FSP may
have indicated to the Applicant that it would be prepared to be flexible in the event
that there was a delay in repayment. However, this is exactly what occurred
when the FSP offered, and the Applicant accepted, the Amended Construction
Loan contract in August 2012 which extended the expiry of the facility to 30
September 2012.
It is apparent that at the time the Applicant entered into the Amended
Construction Loan - that it did expect the works to be completed by 30 September
2012.
Case No: 354684 Determination Page 6 of 11
I note also, that the FSP prepared a Deed of forbearance which provided
additional time to repay the Amended Construction Loan debt. The Applicant did
not consider the Deed to be acceptable, and so declined to execute it.
Importantly, however, by at least October 2012, the position had changed. The
Applicant and the builder were is serious dispute. Works had ground to a near
standstill, if not ceased entirely. The consequence was that, together with
substantial difficulties with selling the units, the debt owed to the FSP was not
paid until February 2014.
In my view, it is unlikely that the FSP would have represented to the Applicant that
it would, in effect, agree to extend the facility indefinitely until the Applicant was
able to repay the debt from the sale of the completed units in any circumstances.
Accordingly, the available information shows that the Applicant was not misled by
the FSP when it entered into the Construction Loan.
In my view, this conclusion is reinforced by reason that the Applicant has not been
able to produce any contemporaneous document or communication confirming
that the clear contractual provision setting out the date for repayment would be
ignored by the FSP, and the expiry date extended “as necessary” . This is despite
the Applicant‟s position that he was so concerned about the “impossible condition”
that he raised his concerns no less than on five separate occasions.
The Applicant‟s director is a very experienced business person. He was well
aware that there was an expiry date set out in the Construction Loan contract. He
knew that the terms of the loan agreement required repayment by 30 June 2012.
He knew that the representations as alleged, would constitute a significant and
material departure to the written terms of the Construction Loan.
In my view, it would be more likely than not that had the representations being
made as alleged by the Applicant, in the face of the expiry date being set out in
the agreement and his apparent concern about the “impossible condition”, then
some attempt to renegotiate the expiry date would have been made, or at the very
least, some confirming email or documentary notation would have been made in
order to protect the Applicant‟s position. As I have mentioned above, I have not
been provided with any contempora neous documents to support the Applicant‟s
stated position.
2.2 Were the legal costs were charged to the Applicant’s account
reasonable and incurred appropriately
The Construction Loan terms and conditions allow the FSP to recoup legal
costs from the Applicant
The letter of offer from the FSP to the Applicant dated 23 September 2011, which
was signed by the Applicant, provides that the FSP‟s General Standard Terms
(11/2010 version) apply to the Construction Loan facility (the Terms).
Clause 72 of the Terms de fine, amongst other things, that “costs” include legal
costs on a full indemnity basis or solicitor and own client basis, whichever is
higher. I have set out the definition of “costs” in full in section 3.1 below.
Case No: 354684 Determination Page 7 of 11
Clause 50 of the Terms provides, relevantly, that the Applicant must pay the FSP
for any “costs” it incurs in relation to the Construction Loan facility. I have set out
the relevant parts of clause 50 in section 3.1 below.
In light of the contractual provisions above, I am satisfied that the App licant
agreed to pay the FSP for, relevantly, any legal costs incurred in relation to the
Construction Loan facility.
Importantly, the Applicant‟s liability to pay the FSP‟s legal costs does not arise
only when there has been a default. Rather, the provisions contained in the
Terms make it clear that the parties had agreed that “advisor‟s” fees could be
debited to the Construction Loan account even if the Applicant was not in default
under the facility.
I note that there were similar terms incorporated i nto the Amended Construction
Loan.
The FSP is able to pass on reasonable legal costs to the Applicant
The guiding principle which FOS employs when considering disputes about the
reasonableness of a financial services provider‟s enforcement costs is that where
the legal fees/enforcement costs are sought to be passed on pursuant to a
provision in a contract (such as the case here), there is a necessarily implied
qualification that the provision only applies to costs, charges and expenses or
payments properly incurred – that is, reasonably and in good faith (see Elders
Trustees & Executor Co Ltd v Eagle Star Nominees Ltd (1986) 4 BPR 9205 see
also Re Shanahan (1941) 58 WN (NSW) 132).
FSPs are entitled to claim a Reduced Input Tax Credit (RITC) on legal
services
Under GST legislation, financial services providers are entitled to claim RITC on
legal services for recovery/enforcement action. The RITC is 75% of the GST
which the financial services provider has paid on tax invoices rendered by its own
supplier of legal services.
FOS will make no comment about a financial services provider‟s practice in
accounting to the ATO for any RITC to which it is entitled. This is a matter for
each financial services provider to decide taking into consideration accounting,
taxation and compliance advice. However, even if a financial services provider
elects not to claim a RITC to which it is entitled, this office expects the financial
services provider acting reasonably and prudently to account to its customer for
any RITC entitlement. The financial services provider should only seek to recover
from its customer those costs that are net of any RITC entitlement.
The FSP passed on the benefit it was entitled to claim for the RITC
I have set out tables below for each of the invoices for legal costs debited to the
Applicant‟s account. The table includes the RITC adjusted amount for e ach
invoice. It is apparent that the FSP only debited the Construction Loan account
Case No: 354684 Determination Page 8 of 11
for the RITC adjusted amount. Accordingly, the FSP passed on the benefit it was
entitled to claim in accordance with FOS‟s approach.
The FSP incurred legal costs in rela tion to the loan facilities from two legal
firms
The FSP has provided a copy of an invoice from a Canberra based firm as
follows:
Invoice Date Amount GST Total RITC Adjusted
19/12/2012 $6,726 $672.60 $7,398.60 $6,894.00
In addition the FSP has provided copies of the following invoices issued by a
Sydney legal firm:
Invoice Date Amount GST Total RITC Adjusted
30/01/2013 $4,058.80 $405.88 $4,464.68 $4,160.27
27/02/2013 $36,053.00 $3,605.30 $39,658.30 $36,954.33
28/03/2013 $18,868.00 $1,886.80 $20,754.80 $19,339.70
30/04/2013 $23,472.40 $2,344.94 $25,817.34 $24,058.64
31/05/2013 $3,789.00 $378.90 $4,167.90 $3,883.73
27/06/2013 $7,294.50 $729.45 $8,023.95 $7,476.86
31/07/2013 $5,211.64 $519.58 $5,731.22 $5,341.54
29/08/2013 $4,050.00 $400.00 $4,450.00 $4,150.00
26/09/2013 $554.60 $55.46 $610.06 $568.47
30/01/2014 $1,952.80 $195.28 $2,148.08 $2,001.62
Total $105,304.74 $10,521.59 $115,826.33 $107,935.14
The Canberra firm’s legal costs were not reasonable.
I have reviewed the invoice rendered by the Canberra legal firm and also a
printout of the firm‟s time leger. It is apparent that most of the legal work
consisted of providing advice to the FSP, reading and responding to
correspondence and drafting documents associated with protecting the FSP‟s
position after the expiry of the 30 June 2012 expiry date set out in the
Construction Loan.
Case No: 354684 Determination Page 9 of 11
I have carefully reviewed the time attendances and the associated fees c harged. I
am satisfied that, save for one time attendance which is discussed below, all of
the legal fees were reasonably and properly incurred.
The one exception is a time attendance which occurred on 6 July 2012, where it is
apparent that a solicitor charged $288 excluding GST for time to view the
construction site. In my view, it is not reasonable for a FSP‟s solicitor to attend
the construction works to view its progress, or otherwise. This is particularly the
case where the FSP would be in possession of adequate other documentary
information, including reports from the FSP‟s quantity surveyor, which was
available to the solicitors. I note that the invoice contained large amounts of time
for reviewing and considering documents and other correspondence.
Accordingly, the information shows that the time attendance for viewing the
construction works as not reasonably incurred. The FSP must refund $288, plus
the RITC adjusted GST of $7.20 associated with this time attendance.
The Sydney firm’s legal costs were reasonable
I have reviewed the invoices rendered by the Sydney legal firm which total
$115,826.33. Despite the considerable amount of the legal fees charged, I am
satisfied that the legal costs were reasonably and properly incurred and passed
on to the Applicant.
I have reached this conclusion because the loan facility was for a significant loan
amount approaching $7.6 million. In addition, the date of 30 June 2012, and then
the extended date of 30 September 2012, had expired with no indication that
payment was imminent. Indeed, the Applicant‟s debt to the FSP was not finally
repaid until February 2014. Further, from at least October 2012, the Applicant
and the builder were in serious and ongoing dispute.
This dispute led to the Applicant issuing a “show cause notice” on 7 December
2012. It did so without first consulting the FSP which the FSP says it was
required to do. It appears that the FSP‟s solicitors incurred fees associate d with
attempting to negotiate a resolution of the dispute between the builder and the
Applicant in order to have the project completed over an extended period of time.
In my view, it was reasonable for the FSP to seek advice in order to protect its
interests. It is apparent that, given the delay in the project because of the
problems with the builder as well as the much slower than expected sales of the
units, the re was a prospect that the FSP‟s position would be put at risk and that it
was possible that it would take enforcement action under the Construction Loan
facility. There were various options available, included appointing a Receiver to
the Applicant or taking possession of an incomplete development project. It was
reasonable for the FSP to obtain advice about these issues and its options going
forward.
In addition, the Sydney lawyers also rendered fees for negotiating various issues
with the Applicant. A Deed of Forbearance was drafted. Deeds of Undertaking
were drafted. Negotiations between the Applicant‟s solicitors ensu ed. It is
Case No: 354684 Determination Page 10 of 11
apparent from the information provided by both parties that the Applicant resisted
many of the FSP‟s positions. Legal fees were incurred all during this process.
Ultimately, it appears that despite the significant legal fees that were incurred, the
FSP took no active steps to enforce its security options. It did not take
possession of any security properties and it did not appoint a Receiver. I note that
the Applicant did not finally repay its obligations under the Amended Construction
Loan until February 2014.
However, no enforcement action took place. It is clear that with the benefit of
hindsight, Applicant‟s debts owed to the FSP were repaid in full – albeit some 20
months after the initial date for repayment. However, it was not unreasonable for
the FSP to engage the Sydney firm and incur the legal costs because at the time
the fees were incurred, there would have been a significant prospect that
enforcement action would ensue.
The Applicant’s further submissions regarding its claims that the legal
costs were not reasonable are not persuasive
The Applicant has made numerous submissions setting out what it considers to
show that the legal costs were not reasonable. I have carefully considered all of
the Applicant‟s submissions. In my view, these submissions do not assist the
Applicant in light of my comments above.
The available information in this dispute supports a finding that, save for the one
time attendance by the Canberra firm I have referred to above, the legal costs
incurred by the FSP and passed on to the Applicant were reasonable and
properly incurred.
Case No: 354684 Determination Page 11 of 11
3 Supporting information
3.1 General Standard Terms (11/2010 version)
Definition of “costs”
Costs includes charges and expenses; and costs, charges and expenses in
connection with advisers (in the case of legal advisers, on a full indem nity basis or
solicitor and own client basis, whichever is higher).
Clause 50 – Other Costs and indemnities
50 You must indemnify us against, and you must therefore pay us on demand for,
liability, loss or costs we suffer or incur:
…
(d) in connection with any arrangement with us or any secured property ;
[ arrangement with us is defined in the Terms include the Construction Loan
facility.]