Home / Financial Firm (Unknown - Credit) / Determination 354684

Determination 354684

Alleged misrepresentation on loan expiry date extension and legal costs charged to loan account

FirmFinancial Firm (Unknown - Credit)
Decided2015-06-24
ProductCredit · Business lending
OutcomeFor the complainant in part
Amount awarded$295
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The company claimed the FSP misled it into signing a construction loan by promising to extend the expiry date, and disputed about $123,000 of legal costs charged to the loan. AFCA found no misrepresentation and allowed legal costs except for one solicitor attendance, ordering a refund of $295.20.

The contract and the company's own conduct showed it expected completion by the extended date, so no misrepresentation was established; legal costs were recoverable under the loan terms except for a site-viewing attendance that was not reasonably incurred.

Issues

Subjects and remedies

small businessrefund fees or charges

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Credit - Business Finance - Business Loans - Charges - Incorrect fees/ costs Determination Case No: 354684 Determination Page 1 of 11 Case number : 354684 19 May 2015 1 Overview 1.1 Dispute On 22 October 2011, the Applicant company signed commercial bill facility contract with the Financial Services Provider (the FSP) with the loan amount of $7.6 million for the purpose of funding the construction of an aged care unit development (the Construction Loan). The FSP held various securities to secure the Construction Loan. The Construction Loan terms stated that the Construction Loan facility was to expire on 30 June 2012. The drawdown of funds commenced in November 2011. On 23 August 2012, the Applicant executed a second commercial bill facility contract with the FSP. This document provided a revised facility expiry date of 30 September 2012 (the Amended Construction Loan). The Amended Construction Loan was not repaid in accordance with the stated expiry date of 30 September 2012. The FSP incurred legal costs and expenses amounting to $115,826.33 by a firm located in Sydney and also a further $7,398.60 by a firm in Canberra associated with loan facilities. This dispute is about:  whether the Applicant was misled by the FSP in relation to whether the expiry date of the Construction Loan would be extended, and if so, whether the Applicant changed its position and suffered a loss.  whether the legal costs were charged to the Applicant‟s account appropriately. 1.2 Issues and key findings Did the FSP mislead the Applicant by representing the expiry date of the Constructing Loan would be extended? The available information support a finding that the FSP did not mislead the Applicant. Were the legal costs were charged to the Applicant’s account appropriately?  Under the Construction Loan and the Amended Construction Loan contracts, the FSP was entitled to recoup legal costs from the Applicant.  Except for a charge the solicitor‟s rendered to view the construction site, t he legal costs were reasonable. The FSP must refund $295.20 to the Applicant. Case No: 354684 Determination Page 2 of 11 1.3 Determination This Determination is substantially in favour of the FSP.  The FSP did not mislead the Applicant.  The legal costs incurred by the FSP were reasonable and properly charged to the Construction Loan account except for a time attendance charged to view the construction works. Should the Applicant accept this Determination within 30 days of its date, the FSP must refund the Applicant an amount of $295.20 within 14 days of this Determination being accepted. Case No: 354684 Determination Page 3 of 11 2 Reasons for Determination 2.1 Did the FSP mislead the Applicant by representing the expiry date of the Constructing Loan would be extended? The Construction Loan stipulated an expiry date of 30 June 2012 The FSP approved the Construction Loan for funding of $7.6 million. The facility had an expiry date of 30 June 2012. This is the date the Construction Loan stipulated that the debt was required to be repaid by the Applicant. The FSP says that drawdown of the funds commenced in November 2011. The Applicant says that the FSP represented that the expiry date would be extended. Prior to the Applicant signing the Construction Loan contract, the Applicant says that it understood that expiry date of 30 June 2012 set out in the terms and conditions was the date the loan needed to be repaid in full. However, the Applicants says that the FSP represented that the expiry date would be extended “as necessary ”. The representations alleged by the Applicant were said to have occurred in meetings with the FSP‟s staff . The Applicant ‟s director says it can recall one meeting prior to the Applicant executing the Construction Loan contract in about early October 2012. The Applicant says the following conversation took place. Applicant ‟s director : “I am not comfortable signing the contract as it contains the impossible condition of loan repayment by 30 June 2012. While 30 June 2012 is the completion date in the Builder‟s Contract, it is expressly subject to extensions of time due to inclement weather and other reasons. We would need some flexibility in the completion date and sale of units after that.” FSP: “… [the FSP] has funded many construction contracts. We are fully aware that the loan repayments are to be made after building completion and from the sales of the units. The facility‟s approved limit contains contingencies for construction delays and we will work with you to extend the loan and adjust the repayment timetable in those circumstances as necessary.” The Applicant also says that there were at least four other meetings in October and November 2012 where the Applicant‟s director repeatedly told the FSP that it was not comfortable with the “ impossible condition ” in the contract. In one such meeting the Applicant says the following conversation occurred. The Applicant ‟s director: “Will [the FSP] drop me in the middle of the ocean if the loan is not paid by 30 June 2012?” Case No: 354684 Determination Page 4 of 11 The FSP “… I can fully understand your concerns, but as I have said before, we know it is a construction contract. That‟s why the interest rate is higher. We will extend the loan as necessary”. The Applicant says it executed the Construction Loan contract o n 22 October 2011 after relying on these representations. The FSP denies that it misled the Applicant The FSP denies that any of its staff made representations to the effect that the FSP would agree to finance the project to completion without regard to t he stated expiry date set out in the Construction Loan contract. The FSP says that it advanced funds to the Applicant which were sufficient to complete the development with the expectation that the works would be completed and the loan repaid or largely repaid by the 30 June 2012 expiry date. The FSP agreed to extend the expiry date The Applicant says that the FSP was kept fully informed about the progress of the construction works and the delays that had taken place via communications from the Applicant and also via the FSP‟s quantity surveyor who was providing reports to the FSP. The Applicant says that the FSP did not raise any concerns about the repayment of the loan until the FSP‟s banker called him on 15 July 2012, where the banker told the Applicant that the Construction Loan facility expired on 30 June 2012, and that the FSP is preparing documents to extend the loan term. The Applicant says that further representation were made by FSP staff leading up to the Amended Construction Loan contract being signed by the Applicant. The Applicant says that it told the FSP that it was clear that the construction would not be completed by 30 September 2012. The Applicant alleges that the FSP‟s staff made the following representation: “We know that the loan re payments are to be made out of the sales proceeds. We will work with you to extend the expiry date.”. The Applicant says that it signed the Amended Construction Loan contract in reliance on this representation. However, the Applicant allegation that it was clear that the works would not be completed by 30 September 2012 is inconsistent with its letter to the FSP‟s CEO dated 4 July 2013. In this letter , the Applicant‟s position was as follows: “Due to inclement weather and other reasons, the „practical completion‟ date for the works was extended to 4 July 2012, and with anticipated project completion by 30 September 2012. The Bank extended the facility to 30 September 2012 without any application by us. At the time, expected completion date was 30 September 2012.” It is apparent from the Applicant‟s position set out in its letter to the FSP‟s CEO that it did expect the works to be completed by 30 September 2012 when it agreed to be bound by the Amended Construction Loan. Case No: 354684 Determination Page 5 of 11 The Applicant and the builder were in dispute. It is clear from the information that there were delays with the building works. The Applicant says that this was the builder‟s fault. The Applicant says that the construction works were not completed by the expiry of the Construction Loan facility. It is also clear that the Applicant and the builder were in serious dispute leading up to this time. The Applicant says it refused to make progress payments from October 2012. On 7 December 2012, the Applicant issued a “show cause notice”. Under the building contract, a “show cause notice” was a step required to be taken by the Applicant before the building contract with the builder could be terminated. I note for completeness that a search of the public record discloses that there were three separate court proceedings involving the Applicant and the builder which resulted from this project. Ultimately, the builder was terminated and the Applicant engaged another builder in about March 2013 who completed the remaining works (which were, comparatively, not substantial) using the Applicant‟s own funds. The Applicant has stated that it repaid the debt under the Amended Construction Loan in February 2014. The Applicant was not misled The Applicant‟s claim, in summary, is that although the Construction Loan contract specified an expiry date for repayment of 30 June 2012, the FSP represented that it would agree to extend the date for repayment in any circumstances for an indefinite period. The only time the debt would become payable would be after the project had been completed and units sold so that the loan could be repaid from the sale proceeds – even though this might be more than 20 months after the initial expiry date set out in the Construction Contract. The FSP denies that it represented it would agree to finance the project to completion without regard to the stated expiry date set out in the Construction Loan contract I am not satisfied on the weight of the available information that the FSP made representations as alleged by the Applicant. I will set out my reasons for reaching this conclusion below. It would be very unlikely that the FSP‟s staff would make representations as alleged by the Applicant. Putting the Applicant‟s case at its highest, the FSP may have indicated to the Applicant that it would be prepared to be flexible in the event that there was a delay in repayment. However, this is exactly what occurred when the FSP offered, and the Applicant accepted, the Amended Construction Loan contract in August 2012 which extended the expiry of the facility to 30 September 2012. It is apparent that at the time the Applicant entered into the Amended Construction Loan - that it did expect the works to be completed by 30 September 2012. Case No: 354684 Determination Page 6 of 11 I note also, that the FSP prepared a Deed of forbearance which provided additional time to repay the Amended Construction Loan debt. The Applicant did not consider the Deed to be acceptable, and so declined to execute it. Importantly, however, by at least October 2012, the position had changed. The Applicant and the builder were is serious dispute. Works had ground to a near standstill, if not ceased entirely. The consequence was that, together with substantial difficulties with selling the units, the debt owed to the FSP was not paid until February 2014. In my view, it is unlikely that the FSP would have represented to the Applicant that it would, in effect, agree to extend the facility indefinitely until the Applicant was able to repay the debt from the sale of the completed units in any circumstances. Accordingly, the available information shows that the Applicant was not misled by the FSP when it entered into the Construction Loan. In my view, this conclusion is reinforced by reason that the Applicant has not been able to produce any contemporaneous document or communication confirming that the clear contractual provision setting out the date for repayment would be ignored by the FSP, and the expiry date extended “as necessary” . This is despite the Applicant‟s position that he was so concerned about the “impossible condition” that he raised his concerns no less than on five separate occasions. The Applicant‟s director is a very experienced business person. He was well aware that there was an expiry date set out in the Construction Loan contract. He knew that the terms of the loan agreement required repayment by 30 June 2012. He knew that the representations as alleged, would constitute a significant and material departure to the written terms of the Construction Loan. In my view, it would be more likely than not that had the representations being made as alleged by the Applicant, in the face of the expiry date being set out in the agreement and his apparent concern about the “impossible condition”, then some attempt to renegotiate the expiry date would have been made, or at the very least, some confirming email or documentary notation would have been made in order to protect the Applicant‟s position. As I have mentioned above, I have not been provided with any contempora neous documents to support the Applicant‟s stated position. 2.2 Were the legal costs were charged to the Applicant’s account reasonable and incurred appropriately The Construction Loan terms and conditions allow the FSP to recoup legal costs from the Applicant The letter of offer from the FSP to the Applicant dated 23 September 2011, which was signed by the Applicant, provides that the FSP‟s General Standard Terms (11/2010 version) apply to the Construction Loan facility (the Terms). Clause 72 of the Terms de fine, amongst other things, that “costs” include legal costs on a full indemnity basis or solicitor and own client basis, whichever is higher. I have set out the definition of “costs” in full in section 3.1 below. Case No: 354684 Determination Page 7 of 11 Clause 50 of the Terms provides, relevantly, that the Applicant must pay the FSP for any “costs” it incurs in relation to the Construction Loan facility. I have set out the relevant parts of clause 50 in section 3.1 below. In light of the contractual provisions above, I am satisfied that the App licant agreed to pay the FSP for, relevantly, any legal costs incurred in relation to the Construction Loan facility. Importantly, the Applicant‟s liability to pay the FSP‟s legal costs does not arise only when there has been a default. Rather, the provisions contained in the Terms make it clear that the parties had agreed that “advisor‟s” fees could be debited to the Construction Loan account even if the Applicant was not in default under the facility. I note that there were similar terms incorporated i nto the Amended Construction Loan. The FSP is able to pass on reasonable legal costs to the Applicant The guiding principle which FOS employs when considering disputes about the reasonableness of a financial services provider‟s enforcement costs is that where the legal fees/enforcement costs are sought to be passed on pursuant to a provision in a contract (such as the case here), there is a necessarily implied qualification that the provision only applies to costs, charges and expenses or payments properly incurred – that is, reasonably and in good faith (see Elders Trustees & Executor Co Ltd v Eagle Star Nominees Ltd (1986) 4 BPR 9205 see also Re Shanahan (1941) 58 WN (NSW) 132). FSPs are entitled to claim a Reduced Input Tax Credit (RITC) on legal services Under GST legislation, financial services providers are entitled to claim RITC on legal services for recovery/enforcement action. The RITC is 75% of the GST which the financial services provider has paid on tax invoices rendered by its own supplier of legal services. FOS will make no comment about a financial services provider‟s practice in accounting to the ATO for any RITC to which it is entitled. This is a matter for each financial services provider to decide taking into consideration accounting, taxation and compliance advice. However, even if a financial services provider elects not to claim a RITC to which it is entitled, this office expects the financial services provider acting reasonably and prudently to account to its customer for any RITC entitlement. The financial services provider should only seek to recover from its customer those costs that are net of any RITC entitlement. The FSP passed on the benefit it was entitled to claim for the RITC I have set out tables below for each of the invoices for legal costs debited to the Applicant‟s account. The table includes the RITC adjusted amount for e ach invoice. It is apparent that the FSP only debited the Construction Loan account Case No: 354684 Determination Page 8 of 11 for the RITC adjusted amount. Accordingly, the FSP passed on the benefit it was entitled to claim in accordance with FOS‟s approach. The FSP incurred legal costs in rela tion to the loan facilities from two legal firms The FSP has provided a copy of an invoice from a Canberra based firm as follows: Invoice Date Amount GST Total RITC Adjusted 19/12/2012 $6,726 $672.60 $7,398.60 $6,894.00 In addition the FSP has provided copies of the following invoices issued by a Sydney legal firm: Invoice Date Amount GST Total RITC Adjusted 30/01/2013 $4,058.80 $405.88 $4,464.68 $4,160.27 27/02/2013 $36,053.00 $3,605.30 $39,658.30 $36,954.33 28/03/2013 $18,868.00 $1,886.80 $20,754.80 $19,339.70 30/04/2013 $23,472.40 $2,344.94 $25,817.34 $24,058.64 31/05/2013 $3,789.00 $378.90 $4,167.90 $3,883.73 27/06/2013 $7,294.50 $729.45 $8,023.95 $7,476.86 31/07/2013 $5,211.64 $519.58 $5,731.22 $5,341.54 29/08/2013 $4,050.00 $400.00 $4,450.00 $4,150.00 26/09/2013 $554.60 $55.46 $610.06 $568.47 30/01/2014 $1,952.80 $195.28 $2,148.08 $2,001.62 Total $105,304.74 $10,521.59 $115,826.33 $107,935.14 The Canberra firm’s legal costs were not reasonable. I have reviewed the invoice rendered by the Canberra legal firm and also a printout of the firm‟s time leger. It is apparent that most of the legal work consisted of providing advice to the FSP, reading and responding to correspondence and drafting documents associated with protecting the FSP‟s position after the expiry of the 30 June 2012 expiry date set out in the Construction Loan. Case No: 354684 Determination Page 9 of 11 I have carefully reviewed the time attendances and the associated fees c harged. I am satisfied that, save for one time attendance which is discussed below, all of the legal fees were reasonably and properly incurred. The one exception is a time attendance which occurred on 6 July 2012, where it is apparent that a solicitor charged $288 excluding GST for time to view the construction site. In my view, it is not reasonable for a FSP‟s solicitor to attend the construction works to view its progress, or otherwise. This is particularly the case where the FSP would be in possession of adequate other documentary information, including reports from the FSP‟s quantity surveyor, which was available to the solicitors. I note that the invoice contained large amounts of time for reviewing and considering documents and other correspondence. Accordingly, the information shows that the time attendance for viewing the construction works as not reasonably incurred. The FSP must refund $288, plus the RITC adjusted GST of $7.20 associated with this time attendance. The Sydney firm’s legal costs were reasonable I have reviewed the invoices rendered by the Sydney legal firm which total $115,826.33. Despite the considerable amount of the legal fees charged, I am satisfied that the legal costs were reasonably and properly incurred and passed on to the Applicant. I have reached this conclusion because the loan facility was for a significant loan amount approaching $7.6 million. In addition, the date of 30 June 2012, and then the extended date of 30 September 2012, had expired with no indication that payment was imminent. Indeed, the Applicant‟s debt to the FSP was not finally repaid until February 2014. Further, from at least October 2012, the Applicant and the builder were in serious and ongoing dispute. This dispute led to the Applicant issuing a “show cause notice” on 7 December 2012. It did so without first consulting the FSP which the FSP says it was required to do. It appears that the FSP‟s solicitors incurred fees associate d with attempting to negotiate a resolution of the dispute between the builder and the Applicant in order to have the project completed over an extended period of time. In my view, it was reasonable for the FSP to seek advice in order to protect its interests. It is apparent that, given the delay in the project because of the problems with the builder as well as the much slower than expected sales of the units, the re was a prospect that the FSP‟s position would be put at risk and that it was possible that it would take enforcement action under the Construction Loan facility. There were various options available, included appointing a Receiver to the Applicant or taking possession of an incomplete development project. It was reasonable for the FSP to obtain advice about these issues and its options going forward. In addition, the Sydney lawyers also rendered fees for negotiating various issues with the Applicant. A Deed of Forbearance was drafted. Deeds of Undertaking were drafted. Negotiations between the Applicant‟s solicitors ensu ed. It is Case No: 354684 Determination Page 10 of 11 apparent from the information provided by both parties that the Applicant resisted many of the FSP‟s positions. Legal fees were incurred all during this process. Ultimately, it appears that despite the significant legal fees that were incurred, the FSP took no active steps to enforce its security options. It did not take possession of any security properties and it did not appoint a Receiver. I note that the Applicant did not finally repay its obligations under the Amended Construction Loan until February 2014. However, no enforcement action took place. It is clear that with the benefit of hindsight, Applicant‟s debts owed to the FSP were repaid in full – albeit some 20 months after the initial date for repayment. However, it was not unreasonable for the FSP to engage the Sydney firm and incur the legal costs because at the time the fees were incurred, there would have been a significant prospect that enforcement action would ensue. The Applicant’s further submissions regarding its claims that the legal costs were not reasonable are not persuasive The Applicant has made numerous submissions setting out what it considers to show that the legal costs were not reasonable. I have carefully considered all of the Applicant‟s submissions. In my view, these submissions do not assist the Applicant in light of my comments above. The available information in this dispute supports a finding that, save for the one time attendance by the Canberra firm I have referred to above, the legal costs incurred by the FSP and passed on to the Applicant were reasonable and properly incurred. Case No: 354684 Determination Page 11 of 11 3 Supporting information 3.1 General Standard Terms (11/2010 version) Definition of “costs” Costs includes charges and expenses; and costs, charges and expenses in connection with advisers (in the case of legal advisers, on a full indem nity basis or solicitor and own client basis, whichever is higher). Clause 50 – Other Costs and indemnities 50 You must indemnify us against, and you must therefore pay us on demand for, liability, loss or costs we suffer or incur: … (d) in connection with any arrangement with us or any secured property ; [ arrangement with us is defined in the Terms include the Construction Loan facility.]

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.