Home / Financial Firm (Unknown - Insurer) / Determination 354293
Determination 354293
Denial of external wall damage claim on commercially tenanted property
Summary
The applicant sought about $200,000 to repair an external wall he said storm runoff had damaged, and the FSP declined the claim. The Panel accepted the FSP's engineer that the wall was undamaged and serviceable and ordered nothing.
Under the policy the insured must prove an actual loss or damage, and the engineering evidence showed no damage to the wall.
Issues
- Claim denial primary · not upheld“The Applicant has not discharged the onus on him to establish a valid claim under the terms of the policy.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of claim
Determination
Case No: 354293 Determination Page 1 of 4
Case number : 354293 2 1 August 2014
1 Overview
1.1 Dispute
The Applicant holds a commercial insurance policy with the Financial Services
Provider (FSP). The policy covers a commercially tenanted property for which the
Applicant lodged a claim on 1 October 2013, for damage to an external wall.
The FSP declined the claim on the basis that there was no damage to the wall
and no event which was covered by the policy had occurred. The Applicant
disputes that decision.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
The FSP was entitled to decline the claim because:
the Applicant has not established a valid claim under the terms of the policy
the expert evidence does not support the Applicant's contention that the wall
has suffered any damage.
1.3 Determination
This Determination is in favour of the FSP.
The Applicant has not discharged the onus on him to establish a valid claim under
the terms of the policy.
This decision has been made by a Panel consisting of an Ombudsman and two
representatives with consumer and insurance experience.
Case No: 354293 Determination Page 2 of 4
2 Reasons for Determination
2.1 Was the FSP entitled to decline the claim?
The Applicant has not established a valid claim under the terms of the
policy
The policy provides cover for accidental loss or damage to the building, subject to
any exclusions. It is accepted insurance law that the Applicant carries the onus of
proving that an insurable event has occurred. This is known as a prima facie
claim.
Once the Applicant has established a prima facie claim, the onus shifts to the FSP
if it wishes to deny the claim on the basis of an exclusion under the policy or on
some other basis.
The Applicant asserts the western wall of the property has been damaged during
a storm event, where rainwater runoff has penetrated between the inner and outer
layers of brickwork, causing deflection to the outside wall. The Applicant seeks
approximately $200,000 to repair the wall.
The FSP says there is no damage to the wall. As the policy only responds where
there is loss or damage suffered, the Applicant has not established he has
suffered an actual loss or one to which the policy would respond. Whilst there is
potential for an issue to arise in future with the wall if appropriate maintenance is
not undertaken, this is not a loss which would be covered by the policy terms.
The policy does not define the term 'damage' and accordingly the Panel will
ascribe its ordinary meaning to the term. The Macquarie Dictionary defines
damage as injury or harm that reduces value or usefulness.
The Applicant's claim is not supported by the expert evidence
Engineering firm "M" inspected the wall and concluded that the structural integrity
of the wall was not compromised nor was it in imminent danger of collapsing.
M considered the wall was functioning as intended, that is, any movement was
evident at the expansion joints which were installed for this very purpose. M noted
that the pallets and forklifts would nudge and impact the building, leading to
pronounced flex at the expansion joints, however, this had been occurring for an
extended period of time.
The Panel accepts that M is appropriately qualified and experienced to comment
in this matter and in the absence of any conflicting information, considers the FSP
is entitled to rely on his statements.
The Panel acknowledges the Applicant has provided quotations and brief reports
from two builders in support of his case.
However, the evidence supplied by M is given greater weight considering an
engineer's expertise relating to building and structural matters.
Case No: 354293 Determination Page 3 of 4
On balance, the Panel accepts M’s recommendations that the wall is not suffering
the duress as outlined by the Applicant and remains in serviceable condition.
Accordingly, as there is no damage to the wall, the Panel therefore considers the
Applicant has not brought his claim within the terms of the policy.
3 Supporting information
3.1 Expert report
Record Key points
FSP’s expert ( M )
Engineer's Report
10 Dec 2013
the property is a single story office/warehouse supporting a
steel sheeted klip lock roof
the wareh ouse portion of the premises consists of a steel
portal frame structure constructed on a concrete slab
including infill external concrete besser block walls
the block wall appeared to be solid 200mm thick
construction without the provision or necessity for a cavity
or second skin as suggested
there are no weep holes within the block work perpends
which indicates there is no cavity
movement was exhibited at the vertical expansion joints
within the blockwork, this was consistent with such joint
function
the block walls were not laterally restrained and have been
constructed above masonry walls
the roof framing is supported by steel posts in a portal
frame construction
the block wall is an infill between steel support posts and
does not offer any support to th e roof framing
storage racks are placed hard up and adjacent to the
western wall and would be subject to nudges and impacts
from pallets and forklift operations
the roof sheeting is showing signs of long term rusting and
corrosion
previous repairs were evi dent with corrugated sheeting
used in places to replace the klip lock sheeting
the roof guttering was clear and operational however the
size was not compliant with the current standard
should the guttering overflow, backflow would flow directly
into the pr emises over the window louvres and not into the
brickwork
given the connection detail of the guttering and brickwork,
there is no clear tangible passage for water to track into the
brickwork should there possibly be a cavity
the structural integrity of the wall is not compromised nor in
imminent danger of collapse
the wall is a solid concrete block besser block wall without
a cavity
movement about the expansion joins is consistent with the
Case No: 354293 Determination Page 4 of 4
intended function of the joints
extensive movement at the joint has occurred given the
unrestrained nature of construction
the wall condition is poor relative to upkeep, as is the
remainder of the building, with maintenance issues evident
the exhibited lateral movement of the eastern block wall
has occurred over an extend ed period of time
the insured's suggestion that water is tracking into the
cavity would be impossible given the construction of the
building