Determination 353786
Flood exclusion used to deny home building claim after Queensland 2011 weather events
Summary
The applicants claimed for water damage to their home during the January 2011 Queensland floods, which the FSP denied as excluded flood. AFCA found that part of the inundation was covered flash flood, required the FSP to meet damage up to 7m AHD, and ordered interest from the date of denial; the quantum is to be settled after a scope of works.
Cover for flash flood applies where the sudden flood was caused by heavy rain within 24 hours, so damage occurring before 4.00am on 12 January 2011 is covered while later damage above 7m AHD is excluded.
Issues
- Claim denial primary · upheld
“The FSP is liable to meet the claim for any damage caused to the insured property up to a level of 7m AHD, subject to the limitations contained within the policy.”
- Delay secondary · upheld
“it was unreasonable for the FSP to have withheld payment from the time of its initial decision”
- Product terms interpretation secondary · upheld
“the evidence on balance establishes the inundation was in part due to flash flood which is an event covered by the policy.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim-Exclusion/ condition
Determination
Case No: 353786 Determination Page 1 of 5
Case number : 3 3 53786 26 June 2014
1 Overview
1.1 Dispute
The Applicants held a home buildings and contents insurance policy with the
Financial Services Provider (FSP), with the relevant period of insurance operating
for twelve months beginning from 18 February 2010.
On 15 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation to their property in Graceville, following severe
weather events in Queensland.
The FSP denied the claim on the basis the damage was due to “flood”, which is
specifically excluded from cover under the policy. The Applicants have disputed
this.
On 20 June 2014 the Panel Chair Ombudsman attended on site where he met
with the Applicants and a representative of the FSP.
1.2 Issues and key findings
Was the damage claimed due to an insured event?
Part of the damage claimed was due to an insured event because the evidence
on balance establishes the inundation was in part due to “flash flood” which is an
event covered by the policy.
Is the FSP liable to pay interest upon the final settlement amount?
The FSP is liable to pay interest upon the final settlement amount because it was
unreasonable for the FSP to have withheld payment from the time of its initial
decision.
1.3 Determination
This Determination is partially in favour of the Applicants.
The FSP is liable to meet the claim for any damage caused to the insured
property up to a level of 7m AHD, subject to the limitations contained within
the policy.
Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
10 March 2011 (being the date of denial of the claim) to date of payment of
the claim.
Case No: 353786 Determination Page 2 of 5
2 Reasons for Determination
2.1 Was the damage claimed due to an insured event?
The evidence on balance establishes the inundation was in part due to flash
flood
The Financial Ombudsman Service (FOS) formed the view, after considerable
review of all material available in previous disputes, that the heavy rainfall
commencing around 4.00am on 11 January 2011 was a proximate or effective
cause of the inundation of many properties downstream from the Wivenhoe Dam.
Although each dispute is determined on its merits and in this dispute, detailed
submissions have been made by the parties (in particular the FSP), none of the
evidence provided substantially changes the position adopted in earlier disputes.
In order for the Applicants to be entitled to cover for flash flood under the policy, it
must be established:
there was a sudden flood
there was heavy rain that occurred within 24 hours prior to that flood
the sudden flood was caused by that heavy rain.
The evidence on balance is generally consistent in that the Applicants’ property
was likely to have been first inundated in the afternoon of 11 January 2011, wi th
the water level rising within the property through the early hours of 12 January
2011. The inundation reached its peak in the evening of 12 January 2011.
The parties disagree on various points but mainly on the cause of inundation, with
the Applicants saying it was stormwater runoff/flash flood and the FSP saying it
was floodwaters from the rising water levels of the Brisbane River (the river).
Considering the policy cover for flash flood, the Applicants’ entitlement for
indemnity would be the same irrespective of whether the loss was caused by
localised stormwater runoff or flash flood, as long as it occurred within 24 hours of
the causative heavy rain.
The FSP’s hydrologist (SC) indicates the water levels of the river were likely to
have caused an inundation at the property at around 5.24pm on 11 January 2011,
reaching a level of 2.1m above benchmark level by 4.00am on 12 January 2011.
SC has defined the benchmark level as “...the lowest point of the structure of the
house (or other relevant structure) on the land .” Further, SC’s key conclusions
make the comment in relation to the approximate benchmark level, “Elevated
(possible storage areas) ” .
Having attended on site and viewed SC’s photographs, the Panel is satisfied that
SC is mistaken and the nominated benchmark level in this case, is an area of
grass at the height of the tiles around the pool.
On the other hand, there is no evidence to challenge SC’s conclusion that at
4.00am on 12 January 2011 the river level would have been at 7m AHD.
Case No: 353786 Determination Page 3 of 5
Whilst the Panel accepts that there would be some stormwater runoff, the Panel
also accepts it would largely have run to the rear of the property.
Having considered numerous disputes involving the 2011 Brisbane weather
events, the Panel is satisfied that given the topography of the area, it is
improbable that any stormwater runoff would exceed the level of 7m AHD.
However, given the presented evidence, the Panel is satisfied that the inundation
of the insured property occurred within the relevant 24 hour period of the
commencement of the heavy rainfall (4.00am on 11 January 2011), which results
in cover under the “flash flood” policy provision.
However, under the policy provisions, any water damage which occurred to a
level higher than 7m AHD and after 4.00am on 12 January 2011, would be
considered “flood” under the policy and thus, it would be excluded from cover.
As there is insufficient information to ascertain the quantum, the FSP should
organise a Scope of Works and the parties should work cooperatively to establis h
what the extent of the loss was. Following this, the FSP is to arrange claim
settlement bearing in mind the sums insured and policy limits.
2.2 Is the FSP liable to pay interest upon the final settlement
amount?
It was unreasonable for the FSP to have withheld payment from the time of
its initial decision
Section 57 of the Insurance Contracts Act 1984 (the Act) requires interest be paid
when it becomes “unreasonable for the insurer to have withheld payment”.
In this instance and following the reasoning of this decision, at the point the FSP
denied the Applicants’ claim it had undertaken an investigation into the loss and
made its decision on that basis. Accordingly, after assessing the claim it would
have been unreasonable to withhold payment.
Therefore, the FSP is liable to pay interest upon the final settlement amount from
the date the FSP determined to deny liability for this claim (10 March 2011) until
the date of payment of the claim.
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, FOS has considered it appropriate to proceed directly to Determination in
line with the Operational Guidelines to the FOS Terms of Reference.
This decision has been made by a Panel consisting of an Ombudsman and two
Panel members with extensive experience in insurance industry matters and
consumer claims.
Case No: 353786 Determination Page 4 of 5
There has been a full exchange of the relevant material between the parties and
each party has had the opportunity to address the issues raised.
3.2 Key points from relevant supporting material
SC’s report of 28 March 2014 and the Key Conclusions Statement
The available hydrology evidence establishes the following:
Minimum and maximum land level (insured property): RL 4.5-6.6m AHD.
Approximate benchmark level: RL 4.9mAHD - “Elevated (possible storage
areas).
Approximate time the effect of the W4 releases first reached the vicinity of the
property: 2.39pm on 11 January 2011.
Approximate time the river reached the approximate benchmark level: 5.24pm
on 11 January 2011.
Approximate river level at 4.00am on 12 January 2011: 7m AHD (2.1m above
the benchmark level).
Peak river level in the vicinity of the property: 9.2m AHD (4.3m above the
benchmark level, at 11.41pm on 12 January 2011).
The property is 108.9km from Wivenhoe Dam (measured along the river).
Certificate of Insurance
“ What optional covers are included and not included
Home Cont ents
…
Flood and storm surge not included not included…”
Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off or
overflowing from any origin or cause. This polic y does not cover flood
unless we have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwat er run - off A sudden flood caused by heavy rain that fell no more than 24 hours
prior to the flash flood or stormwater run - off.
…
Storm A violent disturbance of the atmosphere associated with strong winds
including a cyclone, lightning, heavy rain, hail or snow, but not
continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by weather…
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow after it has
reached the ground …
…
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood …
Case No: 353786 Determination Page 5 of 5
…
Your home
The most we will pay your for home claims
What is covered What is not covered
Flash flood and stormwater run - off
We will pay up to 50% of your home
sum insured or $25,000, whichever is
higher.
…
…
Your contents
The most we will pay you for contents claims
What is covered What is not covered
… …
Flash flood and stormwater run - off
We will pay up to 50% of your
contents sum insured or $25,000,
whichever is higher, but not exceeding
your contents sum insured.
…”
3.3 Other arguments
The Applicants have provided the following additional relevant arguments but
there is insufficient information to support or consider them:
A photograph of the pool, for which the timing is uncertain but seems to be
sometime in the early afternoon of 11 January 2011 allegedly supports the
fact the property was inundated by storm water runoff being unable to drain
away, prior to floodwaters reaching the property.
Given the inaccuracy of hydrology data and the inexact calculation through
extrapolation, the water levels at 4.00am on 12 January 2011 would have
been 8m AHD.
The benchmark level is disputed.