Adequacy of cash settlement for hail damage repairs to roof, pavers and other items
Summary
The applicant disputed the $49,816 cash settlement for hail damage to her home, saying the roof and paver areas and other items were underestimated. AFCA found the settlement fair and that the FSP need make no further payment.
Under the policy the insurer must return the insured to the pre-loss position, and where it cash settles the amount must reflect local trade prices, which the complainant did not show was understated.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 353274 Determination Page 1 of 4
Case number : 353274 25 March 2015
1 Overview
1.1 Dispute
The Applicant held a home building insurance policy with the Financial Services
Provider (FSP) under which she lodged a claim for hail damage to her property.
The FSP accepted the claim and has cash settled the Applicant $49,816, this
being its assessment of the cost to repair the hail damage.
The Applicant says the amount paid is insufficient for various reasons. She
contends the amount allowed for the repair to the roof and pavers does not cover
the actual damaged area of the roof and pavers.
1.2 Issue and key findings
Is the amount paid sufficient to cover the cost of repairs?
The amount paid to the Applicant is fair in the circumstances because:
evidence from both the FSP and the Applicant is that the roof area is 230
square metres
the plans provided by the Applicant do not indicate the pitch or design of the
roof to allow for accurate calculations as to the area of the roof
the amount paid was it emized and calculated after a site visit by the FSP’s
assessor
the amount paid allows for local trade prices at the time of offer
the only quote from the Applicant was not itemized and the builder was not
prepared to undertake the work.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not required to make any further payment to the Applicant and has
met the extent of its liability under the terms of the policy.
Case No: 353274 Determination Page 2 of 4
2 Reasons for Determination
2.1 Is the amount paid sufficient to cover the cost of repairs?
FSP has to place the Applicant back in the same position prior to the loss
There is no dispute the damage to the Applicant’s property was an insured event
under the terms of the policy.
The FSP has a duty to return the Applicant to a position s he was in prior to the
loss. It can do this by repairing the damage or alternatively, cash settling her the
cost of repairs. The FSP has elected to cash settle the Applicant. The amount
offered is in dispute.
FSP’s assessor estimated the area of the roof
Following lodgement of the claim, the FSP appointed various tradesmen and
assessors to report on the extent and cause of the damage. The FSP’s appointed
assessor (BH) estimated the area of the roof to be 230m². He provided a detailed
scope of works to the FSP after inspecting the damage and discussing it with the
Applicant. The FSP’s cash settlement is based on this scope of works, which
includes calculations based upon local trade prices at the time of offer.
The FSP has chosen to estimate the area of the Applicant’s roof rather than have
an expert accurately measure same.
Applicant’s builder agrees with the FSP’s calculation of the roof area
The Applicant says a builder she engaged allowed an area of 260m2 for the roof
but that builder would not provide a report.
The Applicant appointed her own expert (W) to provide a scope of works and
costings for the repairs to her property. W provided a report in which he allowed
for an area of 230m² and provided a quotation for the replacement of the roof
based upon this area.
There is no evidence W did not accurately measure the area of the roof prior to
providing its scope of works and quotation. There is no material provided to me
that persuades me this measurement is incorrect. As such, I accept the area of
the damaged roof to be 230m² and accept settlement is properly based upon this
calculation.
Plans provided do not allow for an accurate calculation of the roof area
The Applicant has presented a copy of the floor/building plans of her property.
She says based upon this, the area of the roof should be 260m². However, the
plans do not detail the design nor pitch of the roof. Therefore, it is not possible to
accurately calculate the areas of the roof based upon these plans.
Case No: 353274 Determination Page 3 of 4
No evidence that damaged pavers exceed 46 m²
The Applicant also complains that the offer does not compensate her to replace
all of the damaged pavers. She says the offer is for pavers measuring 46 m²
whereas the damaged pavers covered an area of 60 m².
Although the Applicant has made this contention on a number of occasions there
is no supporting material to prove this contention. W’s quote simply states that
paving is to be replaced at the front and rear of the house but no measurement is
given by W.
T he material does not persuade me that the FSP’s assessor made an incorrect
measurement. Therefore, I accept the area of the damaged pavers is 46 m². I
agree settlement is properly based upon this calculation.
No evidence the FSP underquoted for replacement items
The Applicant says the FSP has offered an insufficient cash settlement amount
for other items, including the patio roof, a shade cloth, painting, screens and a
retractable clothesline. The FSP says the amount offered reflected prices at local
retailers at the time of calculating the amount due to the Applicant. The material
indicates therefore that the offer was made using 2014 prices at the local retailer.
I accept the FSP did not rely on 2013 prices.
It is to be noted, in relation to the shade cloth, the original assessor considered
settlement on 15m² of cloth to be reasonable. The FSP has in fact, offered
settlement based upon 30m² of cloth.
It is also to be noted that although the Applicant complained that only five fly
screens were offered that i n fact the scope of works upon which the offer was
made allowed for seven fly screens.
I acknowledge the quote from W is more than the amount offered by the FSP.
However, the quote from W is not itemised and I am unable to assess that quote
compared to the offer made by the FSP.
The Applicant has not provided any evidence the sums offered and subsequently
cash settled did not reflect the true cost of replacing the items locally. Without
such evidence, I accept the FSP has correctly settled the Applicant for these
items.
Amount paid in settlement of the claim is fair in the circumstances
Without any evidence to the contrary, the amount offered in settlement to the
Applicant is fair in the circumstances, as it has made allowance for rural trade
prices. Whilst acknowledging W quoted a higher figure than that given by the
FSP’s expert, W has refused to complete the work.
Case No: 353274 Determination Page 4 of 4
3 Supplementary information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to an Ombudsman, in line with
the Operational Guidelines to the FOS Terms of Reference.
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
I have reviewed and considered all of the material provided by the parties. While
the parties have raised a number of issues in their submissions, for the purposes
of this Determination, I have restricted commentary to those issues, which I
consider directly relevant to the outcome only.
3.2 Relevant policy provisions
The relevant policy provisions are set out in the Notice of Response. The Notice
has been exchanged with the Applicant.
3.3 Key documents
Applicant’s submissions.
FSP’s submissions.
FSP claims messages
Various assessor and expert reports
Various scopes of work and quotations
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.