1 Overview
1.1 Dispute
The Applicant lodged a water damage claim on 31 December 2007, under her
home insurance policy with the Financial Services Provider (FSP). The damage
was to the downstairs basement accommodation area where the carpet was
exceptionally wet, the timber cladding of the walls bowed out and a power point
was exposed.
Upon investigating the claim, the FSP considered the cause was due to building
and drainage defects, predominantly caused by her neighbour who built the
property when subdividing the land. Therefore, it declined to rectify these issues
but accepted liability for the resultant water damage.
The claim became protracted. The FSP ultimately attempted to cash settle the
resultant water damage for $6,939.42 , on or around 3 January 2013.
The Applicant has since stated there is continued damage and is seeking the FSP
to investigate the cause and pursue her neighbour. In particular, she believes her
current situation is due to the FSP’s negligence in the manner it has handled the
claim, including the fact it initially engaged solicitors to assist her and then
withdrew their assistance.
1.2 Issues and key findings
Does the FSP have any further liability towards the Applicant’s water
ingress claim?
The FSP has no further liability because the available evidence establishes the
damage was caused by an event excluded by the policy, namely inherent defects
as described by exclusion clause 1g of the policy.
Therefore, the FSP was not liable for any of the damage, including the resultant
damage it accepted. It follows it is also not liable for any additional damage that
may have resulted, due to either the defects not being addressed or the resultant
damage not being repaired.
Did the FSP’s decision to en gage solicitors entitle the Applicant to any
remedy?
It does not because:
the FSP was not liable to provide this assistance under the policy, and
the Applicant cannot establish any prejudice as a result of the FSP’s decision
to engage solicitors and withdraw them.
Case No: 353041 Determination Page 2 of 9
Did the FSP’s handling of the claim warrant an award of compensation for
non-financial loss under paragraph 9.3(b) of the Terms of Reference?
The FSP should pay $500 for non-financial loss because:
the Applicant experienced an unusual degree of inconvenience as a result of
the FSP’s decision to engage solicitors and then withdraw same; and
the engagement of the latest loss adjuster contributed to the Applicant’s
negative experience. This was due to the FSP’s failure to properly brief him
and the loss adjuster coming to different conclusions as to how the defects
should be rectified compared to the adjusters and experts previously engaged.
1.3 Determination
This Determination is substantively in favour of the FSP.
I determine the dispute should be fully and finally resolved in the following
manner:
The FSP is not liable to pay any further amount towards the Applicant’s claim.
The FSP is to pay $500 towards the Applicant for non-financial loss pursuant
to paragraph 9.3(b) of the Terms of Reference.
Case No: 353041 Determination Page 3 of 9
2 Reasons for Determination
2.1 Does the FSP have any further liability towards the Applicant’s
water ingress claim?
The Applicant must establish an insured event caused the loss
It is accepted insurance law that the Applicant has the onus to establish, on the
balance of probability that the policy responds to her loss.
In a policy that only responds when certain events have occurred (i.e. insured
events), the policyholder must generally establish that the insured event was the
cause of the loss.
Only if the Applicant establishes that the loss arose from an event covered by the
terms of the policy, is the FSP required to establish, on the balance of probability
that the loss is subject to an exclusion within the policy.
Based on the available expert evidence, the damage was caused by factors
excluded under the policy (inherent defects)
The substantive expert opinions have been provided by the FSP. These experts
are an engineer (HCE) and a plumber (SS). In essence, their conclusions were
that water was penetrating the damaged area due to a lack of waterproofing of the
west boundary wall. This lack of waterproofing was due to a number of factors
identified by SS in the report dated 4 June 2008. This report accompanied HCE’s
report dated 6 June 2008.
The reasoning and conclusions of both reports is logical, plausible and consistent
with the evidence available. For instance, water testing was done on various
areas whereby water penetration was identified. The tests conducted led to the
conclusion of inadequate waterproofing.
In addition, the Applicant has not provided any contradictory expert evidence.
Although she is seeking further investigation to be undertaken as a result of
additional water ingress and developments since the original assessment was
concluded, there is no evidence to indicate HCE’s and SS’s conclusions , as to the
cause of the water penetration, are incorrect.
As a result, I am satisfied that the damage that led to the claim on 31 December
2007, was caused directly or indirectly by inherent defects, faulty design,
structural defects or poor workmanship. This falls within the following policy
exclusion clause:
“ 1. The policy does not cover loss, liability, injury or damage:
…
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design,
structural defects or poor workmanship.”
Case No: 353041 Determination Page 4 of 9
The FSP’s decision to accept the resultant damage led to the Applicant
receiving a benefit beyond that allowed under the policy
Despite the cause of the damage being clearly excluded, the FSP elected to
accept liability for the resultant damage. It did so on the basis it accepted the
Applicant was unaware of the defects.
The policy does not specifically provide such an exception. Therefore, the FSP’s
decision resulted in the Applicant receiving a benefit beyond that allowed under
the terms of the policy, namely a cash payment in the sum of $6,939.42. Further,
the Applicant has not provided any evidence to refute that the amount fairly
reflected the scope of the damage sustained.
On the other hand, given that the FSP had decided, seemingly with legal advice,
to accept that aspect of the claim and given the circumstances of this dispute, it
would not be appropriate or fair that the FSP seek reimbursement of the
settlement amount.
Having said that, I do note that there is no suggestion or indication that the FSP
intended to seek reimbursement. The point is made, simply for clarity.
There is insufficient evidence to establish that any additional damage that
may have occurred is covered by the policy
The Applicant has not provided any evidence to establish the extent of the new
damage or the likely cause for that new damage. If the cause of the additional
damage is due to similar reasons that occurred previously, then such damage is
excluded under the policy for reasons already explained.
Further, the fact the FSP elected to accept the resultant damage from the first
incident does not bind the FSP for any additional damage that occurred. There is
no principle that would support such a finding, particularly given the absence of
the FSP providing any assurance or representation in that regard.
Therefore, I do not accept the Applicant has provided sufficient evidence to
establish that the FSP has any responsibility to indemnify her for additional water
damage that may have occurred since the cash settlement was made.
2.2 Did the FSP’s decision to engage solicitors entitle the Applicant
to any remedy under the policy?
Even accepting the FSP did engage solicitors to pursue the neighbour, this
does not assist the Applicant
One of the substantive matters raised by the Applicant was the FSP’s decision to
engage solicitors for this claim and then inexplicably withdraw its instructions to
those solicitors. In particular, the Applicant believed the engagement of the
solicitors was to pursue the neighbour for the rectification of the defects identified.
The FSP has refuted this.
Case No: 353041 Determination Page 5 of 9
However, even if I was to accept the Applicant’s position on this point, I do not
believe it assists her position for the following reasons:
The FSP had no liability under the policy to provide this benefit
First, the FSP had no liability under the policy to engage solicitors to pursue the
neighbour on the Applicant’s behalf. Although the Applicant has referred to a
policy additional benefit set out under “Removal of debris, professional fees and
extra costs”, these benefits are only payable when they relate directly to the
damaged part of the building. It would not extend to the Applicant engaging
solicitors to seek recovery for losses excluded by the policy.
The FSP could withdraw its solicitors support in circumstances when it was
not a benefit under the policy and the Applicant sustained no monetary loss
as a result of this decision
Second, even if the FSP did decide to engage solicitors to support the Applicant,
there is nothing to refute the fact it could withdraw that support in circumstances
when it had no liability under the policy to offer such assistance and its withdrawal
did not prejudice the Applicant’s rights.
In this regard, I note the Applicant believed the solicitors were engaged to handle
the conduct of the litigation in or around June 2009. By 24 December 2009, the
solicitor who was handling the file had discussed the matter with the Applicant
whereby the Applicant first became aware that the solicitor would not be
proceeding with the matter. This was confirmed in correspondence from the FSP
dated 24 February 2010 (but apparently received by the Applicant on 15 March
2010).
Even accepting it was 9 months between the time the Applicant first became
aware the solicitors were engaged and the time they were withdrawn, I am not
satisfied the Applicant is able to establish any prejudice by the withdrawal of this
assistance, beyond the inconvenience such a process would have entailed.
For instance, there is no monetary loss she has sustained. Further, she has not
been able to identify any right she had against the neighbour which was
prejudiced by this delay. Although the Applicant has provided submissions this
has occurred, she has not been able to specify how this occurred and on the face
of it, I am not satisfied this delay could have had such an effect.
The Applicant has also referred to the fact the withdrawal of solicitors was a
failure to act in utmost good faith. Even if that was the case, it does not entitle her
to the remedy sought due to her inability to establish any loss or prejudice by this
failure.
Therefore, the Applicant is not entitled to any remedy with respect to her
insurance claim as a result of the FSP’s decision to withdraw its solicitors’
assistance.
Case No: 353041 Determination Page 6 of 9
2.3 Does the FSP’s handling of the claim warrant compensation for
non-financial loss under paragraph 9.3(b) of the Terms of
Reference?
The Applicant experienced an unusual degree of inconvenience as a result
of the FSP’s decision to engage solicitors and then withdraw those
solicitors
I did not accept the engagement of the solicitors gave rise to any entitlements with
respect to the Applicant’s claim. However, I d o accept that the confusion and
delays experienced in this regard were such that the Applicant suffered an
unusual degree of physical inconvenience, time taken to resolve the situation
and/or interference with her peace of mind.
Although the FSP states the solicitors were only engaged to advise them as to
indemnity and how the policy should respond, the available information lends
greater support to the Applicant’s positio n. This is due to the following:
First, there is no indication the FSP’s position rega rding liability was in any doubt.
The only expert opinions available to the FSP supported its position. As a result,
the FSP accepted liability for the resultant damage, but not for the cause. Further,
the Applicant did not appear to be disputing this. Instead, the issues that arose
were the difficulties the Applicant was experiencing with the neighbour, in
rectifying the defects, to enable the resultant damage to be repaired.
Second and of most substance, is the fact the FSP’s materials lend greater
support to the Applicant’s position. This is evident from the following:
The FSP’s 10 th loss adjuster report dated 18 June 2009 – The adjuster
recommended that solicitors be engaged to enforce the neighbour’s
compliance. Shortly afterwards, solicitors were engaged.
The FSP ’ s file note dated 19 June 2009, which stated the following:
“Approval of appointment of solicitors in this regard – [Law firm name], due to the necessity
to have T P repairs done prior to insured;’s rectification works – TP is not complying.”
A claim note dated 3 August 2012, where the file was reviewed by SL. This
stated the following of relevance:
“… TP did not repair the damage for a long time and we even appointe d Sols [Law firm
name] to pursue TP.”
Therefore, when considering the whole of the available evidence, I am satisfied
the engagement of solicitors was more consistent with the argument that they
were to assist the Applicant to pursue the neighbour for the rectification of the
identified defects.
The engagement of the latest loss adjuster contributed to the Applicant’s
negative experience
There has been at least one other instance where the FSP’s claims handling has
contributed to the Applicant’s negative ex perience. This was the latest
appointment of the loss adjuster (BP), where I note the following:
Case No: 353041 Determination Page 7 of 9
BP did not appear to be properly briefed as he acknowledged in his report that
he was not aware the Applicant had been cash settled for the resultant
damage.
B P indicated the rectification was within the Applicant’s control to address.
This was contradictory to the advice and information she had been receiving
from the FSP prior to this.
The Applicant has raised other serious allegations about BP ’ s conduct,
particularly when he came to inspect the damage. However, I am not satisfied that
these allegations are established in the absence of more evidence in support,
such as a witness statement.
The substantive delays were not caused by the FSP
The Applicant has also stated that all of the delays were due to the FSP’s claims
handling. However, I am not satisfied by this.
There have been instances when the FSP was awaiting the outcome of the
Applicant’s pursuit against the builder. For instance, prior to the solicitors being
engaged in June 2009, one and a half years had passed whilst the FSP awaited
the outcome of the Applicant’s pursuit.
Following the withdrawal of the solicitors, the FSP then sought to cash settle the
resultant damage in an effort to resolve this long outstanding matter. It appeared
that from this point until a cash settlement was provided, substantive delays were
experienced. These were predominantly due to the following:
The Applicant’s inability to obtain building quotes. The re was a substantive
period of time that lapsed whilst the FSP awaited provision of this.
The Applicant disputing which experts the FSP ought to engage to review the
matter. For instance, she disputed the engagement of one expert (S) as she
was concerned they would not fairly assess the claim. Her concern arose after
she reviewed their website.
The Applicant being overseas for over 3 months.
Therefore, I am not satisfied these delays were caused by the FSP.
Further, a fair period of time passed between the cash settlement and the
Applicant restarting this claim. Based on the Applicant’s own correspondence, this
was 7 months, although according to the FSP’s claim notes, it was closer to 10
months (January 2013 to November 2013).
This cannot be attributed to the FSP.
Following her restarting the claim, the FSP engaged BP to assess the matter. For
reasons already explained, I am satisfied this engagement did contribute to the
Applicant’s negative claims experience.
An award of $500 is appropriate and fair in all the circumstances
Under paragraph 9.3(b)(i) of the Terms of Reference, I am empowered to award
compensation up to $3,000 for non-financial loss. However, I note that this
Case No: 353041 Determination Page 8 of 9
provision of the Terms of Reference is to be used sparingly as it is meant to
encompass extreme situations.
In this context and although I accept the Applicant has suffered an unusual
degree of inconvenience, time taken to resolve the situation and/or interference
with her peace of mind, I consider the following factors mitigate against a
substantive amount being awarded:
The substantive part of the delays not being attributed to the FSP.
The Applicant receiving a benefit under the policy she was technically not
entitled to by payment of the resultant damage.
Given all of the above and exercising my discretion under clause 9.3(b)(i) of the
Terms of Reference, I am of the opinion that compensation in the amount of $500
is fair in all of the circumstances.
3 Supporting information
3.1 Expert Evidence
Record Key points
FSP’s expert ( SS )
Report
6 Feb 2008
Water has entered through the brick wall clad in timber
paneling.
Inspection along the foundation line of the walls revealed
the foundation line on the eastern side appears dry whilst
the foundation line along the north is showing signs of
wate r or dampness.
The natural fall of the land in the adjoining allotment is
towards the south east.
It is our opinion that water run - off in the adjoining allotment
is damming up behind the brick wall/foundations and is
being directed towards the decking are a of the insured’s
dwelling.
There appears to be an old earthenware drain running to
the council pit located in the south west corner of the
adjoining allotment. It is possible that if this is an old drain
and it has not been sealed, water may have backed up into
this drain during storm conditions.
FSP’s expert (HCE )
Report
6 Jun 2008
Water ingress is occurring due to the lack of waterproofing
of the west boundary wall.
Testing of the west wall showed water ingress occurring at
the junction of the new retaining wall, from cracks above
the original door and window head, and possibly from
within the cavity. This last factor is due to inadequate
sealing of the 50mm diameter pipe penetration below the
timber decking.
Therefore the flooding of the storage room has resulted
from water ingress due to inadequate waterproofing of the
west wall.
Case No: 353041 Determination Page 9 of 9
FSP’s expert (SS)
Report
4 Jun 2008
Identified a number of issues that are contributing to the
water entry into the basement area.
First , the brick retaining wall divid ing the Applicant’s
property with the adjoining one is not correctly sealed and
is permitting water entry.
An attempt to waterproof the wall was done by painting.
However there is no effective seal between the red brick
retaining wall and the cream brick dividing wall and there is
no waterproofing of the cream brick dividing wall in
between the end of the retaining wall. Further, “foama fill”
and a black expansion joint material has been applied that
does not provide a waterproof seal.
Second , cracks are e vident in the cement mortar brick
courses where the opening for the glass doors were
bricked up. Hose testing of the wall resulted in water
penetration.
Third , a 50mm drain located through the timber decking is
flowing in the unsealed wall on the eastern s ide and finding
its way into the basement. This method of discharge is
questionable as water off one property should not be
discharging into another.
Fourth , the location of an agricultural drain in a small
garden bed is questionable.
3.2 Paragraph 9.3(b)(i) of the Terms of Reference
“Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant’s expectation of
enjoyment or peace of mind has occurred;”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.