Home / Financial Firm (Unknown - Insurer) / Determination 352913

Determination 352913

Denial of claim for water leakage, mould and cupping damage

FirmFinancial Firm (Unknown - Insurer)
Decided2014-11-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed under their home insurance for water, mould and cupping damage after the FSP denied the claim. AFCA found the damage was caused by concurrent excluded causes, including ventilation and floor construction, and that the FSP's conduct was not unsatisfactory.

Under the Wayne Tank principle, where an excluded cause operates concurrently with a covered cause, the exclusion prevails and defeats the claim.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision - Denial of Claim Determination Case No: 352913 Determination Page 1 of 16 Case number: 352913 1 7 November 2014 Overview Dispute In January 2011 the Applicants made a claim under their home building and contents insurance policy, which was issued by the Financial Services Provider (FSP). They claim water from broken stormwater pipes pooled under their home, resulting in damage to the home and contents and the spread of mould within the home. They claim the mould has damaged the building and contents, as well as ad versely impacted the Applicants‟ health. The FSP denied the claim as it says the damage was caused by poor ventilation and poor workmanship. As the Applicants contend the damage has resulted from water leakage which is an insured event, they seek a revi ew of the FSP‟s decision. They also contend the FSP‟s claims management is inadequate and has led to delays which caused deterioration of the building and caused the mould to worsen which adversely affected the Applicants‟ health. Issues and key findings Is the FSP entitled to deny the Applicants’ claim? The FSP is entitled to deny the Applicants‟ claim as they have not established the loss and damage was caused only by the leaking pipes. Rather the information provided establishes on the balance of probabilities that the loss and damage was caused by causes which are excluded from cover. The loss or damage was due to a lack of ventilation under the house which meant that mould developed because of damp conditions within the home structure. The cupping of the floor was caused by this cause and by poor workmanship when the floor was installed. Was the FSP’s conduct unsatisfactory? The material provided does not support the Applicants‟ allegations that the FSP‟s conduct was unsatisfactory. Determination The Determination is in favour of the FSP. The FSP is entitled to deny the claim and need take no further action. Case No: 352913 Determination Page 2 of 16 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. 2.1 Is the FSP entitled to deny the Applicants’ claim? The Applicants must establish that the proximate cause of the damage was water leaking from storm water pipes The Applicants lodged a claim on 21 January 2011, because water from an unknown source was pooling under their home. They observed cupping and mould/mildew developing in the home and on the contents. They say the mould also adversely impacted on the Applicants‟ health. The Applicants have the onus of establishing the loss or damage to the property was caused by an event covered by the policy. Once the Applicants ha ve done so, the onus then reverts to the FSP to establish the loss or damage is not covered because of the application of a policy condition or exclusion. The Applicants contend the claim relates to an insured event, namely, water leakage from storm water pipes. In support of their contentions the Applicants have provided considerable material and have challenged the various reports obtained by the FSP, in addition to criticising the FSP‟s submissions based on those reports. The parties have obtained a number of reports from various experts The FSP‟s assessor, a building services company (TB) assessed the property on 2 February 2011 and 8 June 2011. The assessor saw the mould and cupping in the floor. He noted mildew was present in one of the bedrooms, low moisture levels in the flooring, and no mildew was detected on the carpet but it was seen on the second visit. TB said the areas of damaged floating floor appeared to be related to the damp conditions. TB also said: “An inspection under the house indicated water pooling in several low lying areas but no indication of a water leak from the visible pipe work or sewerage pipe.” TB suggested a leak specialist be engaged but instead the Applicants had already engaged a plumber. R also inspected the house on 1 March 2011 and said there is not a lot of mould and suggested it was from rising damp under the house and condensation from the shower. However the latter cause was eliminated as new fans did not alleviate the mould. Case No: 352913 Determination Page 3 of 16 R inspected the house again on 8 June 2011 and noted mould in the bedroom but not in the carpet and said the moisture reading in the floor was at the high end of normal. R said the condensation in the house is due to no ventilation. The FSP inspected the house this day too and noted the bedside was mouldy as was a suitcase under the bed. C also inspected the house in June and didn‟t identify any visible mould or smell although C did no formal testing. C did note the state on the western side of the house and said this impacted on moisture levels and rising damp. The Applicants‟ plumber (SB) inspected the property and made a report on 7 March 2011. He concluded the joints in the eastern pipe appeared to have failed as a result of movement. This was the cause of the reports by the Applicants of constant wetness under the house - puddles of water and a muddy subfloor. However on the day of inspection the plumber found the subfloor dry on both the east and west side of the house save for rings of moist ground at the joints of the east pipe. He tested both the east and west pipes and only replaced the east pipe in April 2011 as he saw no water pooling on the west side. The inspection of the west side was visual only. SB later confirmed the eastern storm water earthenware pipe with cement mortar joints was severely damaged at the majority of joints. IC says the damage is caused by poor sub floor ventilation and unsuitable installation of the new floor A building consultant was engaged by the FSP. (IC) inspected the house on 10 June 2011, and read the report from the plumber. He saw moisture (not saturation) on the east side of the subfloor of the house, and moisture staining to brick piers. He noted high humidity levels in the boards outside the main bedroom. He said there was “virtually no sub floor ve ntilation” on the north, west and south sides of the house and dead airspace in 50% of the subfloor. IC reported on 17 June 2011:  there are issues with site drainage and sub -floor ventilation which causes the cupping of the timber floor as the original floor absorbs moisture while the top floor has air  the timber floor should not have been laid this way  a lack of ventilation has not allowed for the reasonable drying of the soil in the sub-floor region, irrespective of the cause of the leaks  if the floor is always wet then there is not just a problem with the pipes but run off seepage too. IC emailed the FSP on 18 July 2011 about the testing of the western stormwater line and concluded it was leaking too and water ran to the eastern side of the house so the repair of the eastern pipe only had not alleviated water under the house if it rained. IC notes that the water from the pipes did not come into contact with the upper or lower floor or the bearers or joists. He essentially repeats his opinion that the floor Case No: 352913 Determination Page 4 of 16 would not have cupped if the new floor had not been overlaid the old floor and if there was better ventilation in the subfloor. IC inspected again on 14 September 2011 and noted:  the western line had been replaced with PVC a week earlier  there was dampness and increase in mould growth especially on the west side of the house  he agrees there is damp in the subfloor causing mould but says even if the western pipe had been leaking and was associated with moisture in the sub - floor he reiterates this is compounded by a lack of sub-floor ventilation. The Applicants continued to be concerned that the mould in their home was causing health issues. As a result, the Applicants obtained a mould assessment report from an expert on the topic (M). M provided a report dated 26 September 2011, which included a mould analytical report from “ML”, also dated 26 September 2011. M says there is mould in the home and points out it is worse where the ventilation is worse M saw mould in the bedroom and lounge but also commented that there was no mould on the eastern side of the house indicative of high ventilation under that side of the house. ML concluded the levels of identified mould in the home were high to very high and therefore it constituted a health risk. M provided a further report dated 25 October 2011 concerning the further testing and remedial work needed which he said nay cost $20,000. M subsequently provided another report, dated 10 July 2014, as a result of the Applicants asking for comment on the inspections M carried out in 2011, three years earlier. M said under the house was dry when M attended on 19 September 2011, but there was evidence of where the water had been running previously. M noted the damaged western pipe was repaired in August 2011. M said the physical damage to the Applicants‟ property was not due to a lack of ventilation (although M conceded the lack of ventilation was less than optimum) but due to high water activity. M said the damage was due to water ingress under the home and M referred to the mould and swelling on a particular piece of furniture in support of this contention that the water level must have been high. DE does not comment on the cause of damage An engineer DE also inspected the property at the Applicants‟ request i n March 2014 and said the Applicants had controlled the stormwater from the house. DE took photographs of the subsoil which was now severely cracked. He said the soil was highly reactive to moisture. On balance the material supports that inadequate ventilation and poor construction of the floor were the cause of the mould and cupping From the information available the following chronology is noted: Case No: 352913 Determination Page 5 of 16  2005 house purchased and was bricked in (see Applicants‟ photographs) .  Approx 2006/7 new floor put in (Applicant s‟ chronology) and JB noted newspaper under floor was dry (JB letter 17 February 2014).  2009 - no mould before then (see M report 10 July 2014).  Approx June 2009 water noticed under house (see FSP file note 8 June 2011).  Approx June 2009 cupping started (see IC report 17 June 2011)  Cupping began about the same time as front path jack hammered near western line.  Approx June 2009 mould noted (see IC report 17 June 2011).  Approx 2009 symptoms of environmental allergies began (Dr A‟s report) .  Beginning 2011 discovered sub floor damage and reported it to FSP (letter to FSP 15 July 2011).  February 2011 cupping noted by assessor and some mould.  4 March 2011 plumber under house and it is dry save for ri ngs near joints in eastern pipe.  March/April 2011 eastern storm water pipe replaced.  May 2011 subfloor dry until rain (letter to FSP 15 July 2011).  May to August 2011 44 days of rain (BOM records provided by Applicants).  June 2011 FSP noted mould.  June 2011 IC measured high moisture levels where there was mould. Soil moist.  June 2011 fans made no difference (letter to FSP 15 July 2011).  I July 2011 male Applicant tests with IC and works out western line leaking too.  15 July 2011 male Applicant says house now dry (see FSP file note) (and letter to FSP 15 July 2011).  August/ September 2011 western line replaced with PVC.  14 September 2011 IC inspected again and noted dampness and mould worse on west of house.  19 September 2011 M identifies high level of mould in the west of the house Noted it was dry under the house.  4 March 2014 DE photographs subfloor cracked. Despite the Applicants having repaired the eastern storm water pipe in or about April 2011 and the western pipe in or about August/September 2011, mould within the house and in the contents still remai ned a problem. IC‟s two reports have fully examined the possible causes for the growth of mould and if the Applicants‟ identified cause is fixed (the leaking pipes) then the possibility of another cause must be explored. I accept that IC did not go under the entire house but the photographs he took indicate he went under the eastern side of the house. He is a building consultant and is qualified to comment on the issues in dispute. IC‟s reports provide an in depth analysis of the problem, and the findings on this issue are therefore highly persuasive. IC‟s findings indicated the way the floor was built and the lack of ventilation under the floor were largely the reason for the cupping and the growth of mould. These causes are excluded from cover. Case No: 352913 Determination Page 6 of 16 R also comments on the cause and agree it is because of the lack of ventilation under the house. Further, there is no evidence that the floor or area under the floor was actually touched by water at any time. When M carried out an assessment of the Applicants‟ pro perty, the objective was to determine the extent of fungal damage and ML‟s report‟s objective was to identify the mould and bacterial growth. This is the main extent of M‟s expertise. However even M identifies the lack of mould on the east side of the house and says it is because the east side is better ventilated. He later says that the lack of ventilation would not cause the moisture issues identified although he still concedes “ the ventilation on the high side of the block is less than I would like to s ee.” On balance I prefer the expert opinion of IC as he has the expertise to comment and has been consistent all along in his view. M‟s expertise is in mould remediation and there is ambivalence when one compares the first report with the second about the cause of damage. DE does not comment on the cause of the damage. The Applicants’ criticism of IC does not derogate from his opinion The Applicants say the FSP‟s consultants have provided inaccurate information and have been instructed to intentionally mislead. The Applicants say the damage is not limited to the western side but their own expert M says the damage is worse on the western side. That is highly relevant due to the state of the sub floor on the western side as commented on by M. The Applicants say that all timber floors cupped but this is also due to the way it was laid. They criticise the conclusions of IC as IC didn‟t go under house but only looked under the house from the eastern side only. They contend therefore he misunderstands the subfloor layout. The Applicants have produced photographs and submit they show there is ventilation on the northern side, a vent in the laundry and the rear southern vent shows an unobstructed path through the northern openings I have considered those photographs. However I have also carefully considered the photographs taken by IC and his reports in totality and on balance I accept his opinion as he is independent and I am satisfied that he has the expertise to comment that the sub floor is badly ventilated and that the floor should not have been built in the way that it was. I accept that IC does not mention the testing of the western line in his reports but I have considered his email to the FSP about the testing and do not accept that he has provided inaccurate information when one considers the totality of his reports and emails. I also accept that the sub floor was not always damp and that the newspaper was dry when inspected by JB in or about 2006/7 but this does not establish that the sub floor is not properly ventilated. It merely establishes the sub floor may have Case No: 352913 Determination Page 7 of 16 been dry at that time as the pipes were not damaged then or if they were damaged that it had not been raining. The principle in Wayne Tank applies to defeat the claim Both parties have commented on the rule in the Wayne Tank legal decision. This decision provides that where there are two concurrent contributing causes and one is excluded from cover under the policy, the exclusion prevails and the FSP is entitled to deny the claim. The FSP therefore argues that even if it is accepted that the leaking pipes were a cause of the loss as the mould and inadequate ventilation were also proximate causes of the loss and these are excluded under the terms of the policy, then the exclusions apply to defeat the Applicants ‟ claim. The Applicants rely on M who said concurrent events were not operating as there was no mould or cupping until 2009. I accept the damage was not noted then but the most probable explanation is that the pipes were not leaking at that time. The Applicants do not complain of the damage until 2011. The question arises as to what was the proximate cause of the damage then. If it was the leaking pipes then this caused the mould and the policy responds. But I am persuaded that the expert material establishes that when pipes leaked, there were other causes of the damage operating at the same time – the inadequate ventilation under the house and the way the floor was constructed. I also accept that these causes are excluded from cover as they represent faulty design and workmanship that the Applicants knew about or should have reasonably known about as they were responsible for the floor construction and other work done to the house. Accordingly I accept that the principle in Wayne Tank operates to defeat the claim. The FSP is entitled to deny the claim as the damage was caused by events excluded from cover The Applicants have not established on the balance of probabilities that the sole cause of the loss or damage was the leaking pipes. Rather from the material provided and for the reasons stated I am satisfied on the balance of probabilities that the damage was caused by causes operating concurrently which causes are excluded from cover under the policy. Accordingly, the FSP was entitled to deny the claim. Was the FSP’s conduct unsatisfactory? The material provided does not support the Applicants’ allegations The Applicants have made a number of adverse comments about the FSP. They say the FSP used delaying tactics; its consultants have written misleading reports; its consultants have not diligently inspected the house and damage; and the FSP is holding the Applicants “to ransom in a toxic environment under severe duress”. The Applicants further allege the FSP has only released selective information that suits its position and hid the balance of information or influenced the outcome or Case No: 352913 Determination Page 8 of 16 instructed their consultants to intentionally mislead prior to visiting the house. They say this is a pattern of behaviour relying on a website detailing anot her claim by another insured against the FSP. They say the mismanagement has led to an unnecessary prolongation of the case and has increased their loss and damage and adversely affected their health. The FSP says that the Applicants have misunderstood the terms of the policy and what has been communicated to them in relation to the claim. The FSP says it has acted in good faith at all times, investigated and kept them informed and even though the cover is outside the policy have made offers for part of the claim which offer was not accepted. Having carefully read the information provided, I am unable to accept the Applicants‟ assertions. Rather, I am persuaded that the material provided establishes the FSP responded in a timely manner when the Applicants lodged their claim. Further, from the information provided I do not accept that the FSP acted unreasonably or in a misleading manner in its approach to the claim and the dispute. Case No: 352913 Determination Page 9 of 16 Supporting information 3.1 Policy Provisions “ The events we cover … Water and oil leaks If loss or damage is caused by water or oil leaking or escaping from an item shown in this section. Covered ► water leaking or escaping from: - house gutters, drainpipes or pipes … General exclusions The exclusions shown in this section apply to all cover under your policy. We don’t cover Loss, damage, injury or death arising from: … ► mould … ► atmospheric conditions or extreme temperature … Maintaining and occupying your home We don‟t cover loss, damage, injury or death arising from: … ► faulty design or workmanship that you knew about or should have reasonably known about …” 3.2 Various reports/documentation – Report Dr A 17 October 2011  Dr A is the male Applicant‟s GP .  The male Applicant has symptoms (symptoms for the last 2 years) which indicate “environmental allergy” most likely caused by exposure to mould in his old house .  Recent blood test ruled out allergy . Report Dr B 29 September 2014  The home situation is leading to significant illness .  Photograph of affected toe nails . Case No: 352913 Determination Page 10 of 16 FSP’s assessor’s reports Various  Inspected property 2 February 2011 and 8 June 2011 to confirm cause of damage and cost to repair .  Investigated why water pooling under Applicants‟ house Applicants unsure why water pooling and home and contents have mould .  Applicants thought next door neighbors‟ storm water pipe may be the cause .  Observed flooring cupping in various rooms due to moisture .  Cupping consistent throughout house and appears to be related to damp conditions .  Some mould seen and low level moisture levels detected in flooring .  Appears to be related to damp conditions .  No undue accumulation of moisture in grassed area soil .  Inspected under house – noted water pooling in certain low lying areas but no indication of water leak from visible pipes; and no sign of cracked pipes in earthenware pipes along west side of house .  Because of the concreting and the position of pipes, did not believe next door‟s piping related to problem .  No leaks from water pipes or any excess water usage .  Leak detection speciali st to be engaged to investigate pipes .  Estimated cost of repairs $24,909 .  On inspection 8 June 2011 noted mildew in listed contents, no mildew detected in carpet, low moisture level detected in flooring . FSP file note 1 March 2011  R attended for FSP that day. FSP‟s notes say:  There is not a lot of mould/not toxic/ no health risk .  Humidity inside 12% higher than outside .  Mildew on sills not on glass .  Caused by condensation from shower and rising damp under house . FSP file note 9 March 2011  Read plumb er‟s report and will fix damage from pipe but not pipe itself . FSP file note 10 May 2011  Repairs to pipe completed but still a lot of water under house and need to wait for sub floor to dry out before tenders are obtained. FSP file note 1 June 2011  On e pipe fixed but other leaking but he can‟t afford to fix it and there is still water under house .  Male Applicant says house making him sick .  Must mitigate loss so mould won‟t grow .  Will inspect and cash settle so pipe can be fixed . FSP file note 8 June 2011  FSP attended house and west pipe still not fixed .  Was told noticed water under the house about 2 years ago .  Inspected and noted floating floors, bedside mouldy, suitcase under bed mouldy .  Inspected and measured floor and carpet and agreed to send out R again . FSP file note  R said there is mould in the bedroom but no mould in the carpet . Case No: 352913 Determination Page 11 of 16 8 June 2011  Moisture reading in floor is 10% (5 - 10% is normal) .  R believes condensation in house due to no ve ntilation and house sitting low.  Arranged IC and C to at tend .  Told Applicant s to mitigate loss by repairing pipe, removing suitcase and cleaning mould . FSP’s building consultant’s (IC’s) report 17 June 2011  IC is a building consultant who inspected 10 June 2011 .  He inspected all internal rooms, the perimeter of the house and a small section of the subfloor on the eastern side .  He was told the new timber floor was put in about 5/6 years earlier and attached to original boards .  IC notes the Applicants said they first started to notice a rear section of floor s tarted to cup about 2 - 3 years ago. IC said this indicative of differing moisture content between the underside of the board and the upper surface. The moisture from the subfloor is absorbed into the original timber floor because of insufficient cross flow ventilation and dead air spaces and the upper floor dries because of airflow from open doors and windows in the house .  T he Applicants said first noticed mould problem within house around 2 - 3 years ago and considers there is mould on the underside of floori ng.  P lumber replaced storm water line on eastern side after testing in March 2011 and his report was reviewed .  M oisture content readings of the boards were taken and highest readings were noted outside bedroom 1 where mould was note on contents items - des cribes the readings as high humidity levels .  IC noted “virtually no sub floor ventilation” on north, west and south sides of house .  O n south side and east side of house, brick course laid to stop rainwater runoff .  S outhwest corner bricked in stopping venti lation .  I nspected under the floor on the east side up to where the new pipe laid - the subfloor soil is set below the outside path and water would tend to pool here – saw moisture but not saturation .  S aw daylight coming through opening on the north side bu t some shrubs there too .  A ll soil he could see was moist not just near pipe .  M oisture staining to brick piers .  I ntersection walls tend to restrict airflow and dead airspace in 50% of sub floor .  T here are issues with site drainage and sub floor ventilation  T he storm water line on eastern side may have been problematic at time of inspection by plumber in early March 2011 and had been recently replaced .  A s the Applicant s said the soil is constantly wet, this constant dampness not indicative of just a problem when it rains with the leaking pipe but there is run off seepage too which contributes to the moist atmosphere in the subfloor . Case No: 352913 Determination Page 12 of 16  L ack of ventilation has not allowed for the reasonable drying of sub - floor soil – this is irrespective of cause of leaks and thi s damp environment has transferred into hardwood flooring substrate and into „new‟ boards .  T imber floors should not be laid over moist subfloor spaces .  P hotos provided in support . FSP file note 22 June 2011  Applicant s advised he has blocked western pipe and it is now like a lake under the house . FSP file note 15 July 2011  Applicant s advised the house is now dry as no recent rain – the west pipe is causing the damage . Applicant letter to FSP 15 July 2011  Beginning 2 011 discovered sub floor damage .  Cupping in floor had been evident for 2 years .  April 2011 replaced eastern line .  May 2011 subfloor dry until period of rain .  June 2011 fans replaced in bathroom yet moisture readings the same.  1 July 2011 IC attends and the Applicant s and he plug up the high storm water line and it empties quickly. Under the house water oozing out onto subfloor soil.  Cupping occurs at about the same time as front path was jack hammered up and re - laid near the west line .  14 July 2011 subsoil dry as no rain so ventilation working .  He has gone under house as has the plumber and IC .  Remains concerned to repair west line because of claim ramifications. FSP’s building consultant’s (IC’s) email 18 July 2011  He was at testing with the Applicant s and says there is a problem wi th the western storm water line.  Water escaped at some unknown point .  The water percolated through and first appeared toward to eastern side of the subfloor (midway) and formed shallow pools on this low side .  He did not see w ater on the west side .  The water would run like this in heavy rain .  He thinks the problem with the western line was there for some time and the eastern line masked it .  The water leaking from either pipe has not come into direct contact with the new timber flooring the original floor below it or the bearers or joists .  The only way the moisture can get there is by hygroscopic action – that is the timber absorbs air borne moisture from a sub floor with very high humidity .  The high humidity in combination with the restricted evaporation effect of the new flooring being laid over the original has created an environment where the cupping can occur – differential moisture contents between the top and bottom surfaces – the top surface remains dry .  The moisture is tr apped between the old and new floor and keeps this area damp.  The area retains an above recommended moisture content which is greater than the top surface and so it cups. Case No: 352913 Determination Page 13 of 16  The cupping would not have occurred if the new floor had not been overlaid or if ther e was better ventilation or lower humidity in the subfloor environment . FSP file note 18 July 2011  Decision made to cash settle the claim because there is damage resulting from an insured event but the ventilation issues may mean the cupping would occur again and can‟t warrant repairs .  R to re - inspect re contents damage . FSP file note 25 July 2011  Assessed damage to contents as listed and floor. Recommended offer of $21,000 plus 3 weeks accommodation . FSP file note 29 July 2011  Offer discussed - sco pe of works, time to repair and whether house livable or not while under repair .  Told holes in floor preexisting and FSP not liable .  Written offer made - re contents, Applicant s to supply quotes to replace items listed . FSP file note 11 August 2011  Called to discuss .  Insured on holidays and will review when return on 21 August . FSP file note and email from C 30 August 2011  FSP called C as had no report.  C advised he had attended in June and did not identify any visible mould or smell of mould .  C concluded mould was non toxic and will dry when sub floor dries .  Problems claimed in master bedroom (on western side) and C noted concrete floor had been built up on the western edge so ground level higher than floor level of house .  This will impact on moi sture levels and rising damp within the house .  No sub floor ventilation would contribute to mould growth .  C says his inspection preliminary and he would need to take samples to rule out pathogenic mould and bacteria . FSP’s building consultant’s (IC’s) rep ort 16 September 2011  14 September 2011 re inspection of dampness in TV cupboard in bedroom 1 and mould growth on west side of house.  IC noted dampness and increase in mould growth e specially on west side of house.  Harwood flooring laid on top of pine floo ring and Applicants were concerned mould in the layer between .  Storm water line on west of house had breaks and was recently r eplaced with PVC.  IC agrees there is a damp environment in sub floor and this is causing mould .  Prior to the new PVC water may have been infiltrating the soil during heavy rainfall but the inadequate ventilation combined to maintain the moist environment .  50% of the subfloor ventilation is inadequate to the west .  N eeds to be a significant increase in ventilation and air movement u nder western area to allow soil and timbers to dry and this would help create environment less susceptible to fungal growth .  T he problem with the floor is unknown until the floor is Case No: 352913 Determination Page 14 of 16 removed at least in part .  H e agrees there is mould and it is associated wi th moisture in the sub floor and this is compounded by lack of subfloor ventilation . FSP file note 19 September 2011  Discussion with IC .  IC says mould growth because there is no ventilation .  Applicant told IC repairs are $50,000 to $150,000 and or that house might have to be knocked down . BOM Extracts  Shows 44 days of rain in May – August 2011 . Applicants’ plumber’s (SB’s) report 7 March 2011  SB inspected under the house 4 March 2011 .  The male Applicant told him that under the house it is constantly wet with large pools of water and sloppy mud .  SB says the water service is sound .  He went under the house from the eastern driveway which was tight as there is only 350mm crawl space .  At 2 meters in found an old earthenware storm water pipe laid on the gr ound .  It collects the roof water for more than half the house .  Visual evidence that the sand cement joints in earthenware storm water pipe no longer water tight .  When under the house he noted the sub - floor was dry and firm. Rings of moist ground evident about half a meter diameter radiating from all the cement joints of the pipe .  The subfloor fell away from the pipe and the subfloor on the other side of the pipe was moist but appeared fairly firm and he couldn‟t see puddles or mud .  The only way to the oth er side of the house was to squeeze over the pipe – the crawl space is tight and the pipe subject to movement when crossing it .  Kitchen and bathroom sewer services – no visible evidence of leaking joints – domestic water services sound .  The storm water pip e on the west side had limited visual inspection points. He ran a hose in the gutter for about 15 minutes and water ran to the kerb and no water seen pooling on subfloor on west side .  On the east side the hose in the gutter lead to a large pool of water ga thering in a short time and when hose turned off the water entered the kerb .  This pipe fails after rain .  The joints and pipe have appeared to have failed as a result of movement because of limited access to the other side of the house - by persons inspecti ng or installing a service under the house .  Following this report the Applicants replaced the storm water line on the eastern side of the property . Quote 24 August 2011  To lift and replace carpet $2,850 . Applicants’ mould assessor’s (M’s) report and mould  P roperty assessed 19 September 2011 to de termine extent of fungal damage.  I dentified mould and bacterial growth on contents in bedroom Case No: 352913 Determination Page 15 of 16 laboratory analytical reports Both dated 26 September 2011 and on co ntents and lounge suite in living room .  T he particle board under the loun ge room was not fit for purpose.  B edrooms on the other side of the house had no mould indicative of high ventilation under that side of the house .  L evels of mould in pier under house, particle board, lounge suite, wall hangings and carpet in main bedroom high to very high and constitute a health risk .  P remises requires mould remediation and he described scope of works . Applicants’ mould assessor’s (M’s) report 25 October 2011  T he ( w estern) d amaged storm water pipe would be expected to create greater vapor levels in the main bedroom side of the house as the drying there would be less due to lower levels of ventilation .  The (eastern) storm water pipe more open and flooding from that pi pe would dry quicker with less water vapor intrusion into the house .  Because of financial considerations testing limited to areas of main concern of odor and the main bedroom .  Further sampling and remediation may cost around $20,000 . Applicants’ plumber’s (SB’s) report 18 February 2014  C larification of 2011 report .  T he 100mm storm water pipe with cement mortar joints on the east side of the house was “severely” damaged at a majority of joints .  T he clearance of 350mm was from the top of the pipe to the underside of the floor . Applicants’ engineer’s (DE’s) report 4 March 2014  DE inspected the property as Applicants say mould has continued to increase .  DE agrees that there had been a serious drainage issue resulting from the damaged sto rm water lines which have been subsequently replaced with PVC pipes.  Applicants were concerned about drainage after purchase in 2005 and undertook improvements including a concrete path, replacing earthenware pipes with PVC pipes and installing grated tren ch drains along the west path .  From observation DE says the Applicants have controlled storm water generated from their property by directing it away from the house towards the street .  DE took photographs of the subsoil under the dwelling and says it show s severe cracking of soils indicating sub - soils are highly reactive to moisture variations. They shrink and swell depending on moisture.  The photo graphs support this observation.  DE was therefore concerned about long term structural stability of building w orks constructed on these soils . Applicants’ mould assessor’s (M’s) report 10 July 2014  C ommented on 2011 report .  C ommented on Wayne Tank principle and said there were not concurrent events as there was no microbial issues before 2009 and the fungi found was that normally found in water damaged building. Case No: 352913 Determination Page 16 of 16  I nspection in 2011 was carried out in dry weather and the lack of ventilation although less than optimum would not cause the phys ical moisture issues documented.  T he cupping was only noted in 2009/10 not occurred in the previous 4 years .  T he western pipe was repaired in August 2011 .  W hen he inspected under the house in 2011 it was dry but there was evidence of where water had been running previously .  D amage is due to water ingress under house as can be seen from mould and swelling on a photograph of a piece of furniture - the water mark on the back of the furniture in dicates there must be a huge amount of water under the house .  T he fungi found is “water loving” and react to high water activity .  T his fungi found in skirting boards, carpets in bedroom and on pier under house and does not occur without high water activity . DVD of western storm water line  Shows inspection of storm water on right hand side of house pathway . Photographs  H ouse when purchased in 2005 – north face bricked in and now opened up .  M ould damage to various contents .  V entilation on the northern side and a vent in the laundry and the rear southern vent is described as showing an unobstructed path through the northern openings . 2013 Edition of Health and Amenity  Minimum height is 400mm .  Timber frame house the space can be 200mm .  Even good ventilation is of little value if ground wet because of poor drainage or seepage . Letter JB 17 February 2014  About 8 years ago, he saw newspaper under the floor covering which was not damaged by water .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.