Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 352851 Determination Page 1 of 9
Case number : 3 3 52851 17 September 2014
1 Overview
1.1 Dispute
The Applicants held a home building insurance policy with the Financial Services
Provider (FSP) under which they lodged a claim for water damage to their
property following a storm on 25 February 2013.
The FSP denied liability for the claim on the grounds the loss was caused by
faulty design or workmanship in respect of a water tank, for which cover is
excluded under the policy.
The Applicants dispute the FSP‟s deni al of the claim.
1.2 Issues and key findings
Have the Applicants established a prima facie claim under the policy?
The Applicants have established a prima facie claim under the policy because the
damage to the property was caused by events insured under the policy, namely
escape of water from a water tank and storm.
Was the FSP entitled to deny the Applicants’ claim?
The FSP was not entitled to deny the claim because it has failed to establish the
damage to the property was a result of faulty design or workmanship of the water
tank or any other policy exclusion referred by it.
Can the Applicants appoint their preferred builder to conduct repairs?
The FSP initially chose to undertake repairs by its own appointed builders, but
later withdrew its builders from the home and informed the Applicants that it would
now cash settle the claim. Before the claim could be settled the FSP advised the
Applicants that it refused to indemnify them for the damage.
In view of the FSP‟s lack of consistency towards acceptance and s ettlement of the
claim, the Applicants can elect to either i) have their claim cash settled and
appoint their own builder, or ii) require the FSP to undertake repairs. If they elect
a cash settlement, quantum of settlement will be based on the cost for which the
FSP could reasonably undertake repairs.
Case No: 352851 Determination Page 2 of 9
1.3 Determination
This Determination is in favour of the Applicants.
The FSP is to indemnify the Applicants for the loss in accordance with the terms
and conditions of the policy. The settlement should be based on a fresh scope of
works to rectify all of the damage arising from the escaping water, the stormwater
damage and damage arising from the leaking make-safe tarping. Indemnity will
also extend to any necessary temporary accommodation costs and other benefits
which may be payable under the terms of the policy.
The FSP is also required to reimburse the Applicants‟ costs for W up to a limit of
$1,500.
The FSP is to pay the Applicants $2,000, by way of non-financial compensation
for the distress and loss of enjoyment of their property.
Case No: 352851 Determination Page 3 of 9
2 Reasons for Determination
2.1 Have the Applicants established a prima facie claim under the
policy?
The Applicants have established a prima facie claim under the policy
The onus of proof rests on the Applicants to establish, on the balance of
probabilities, they have suffered a loss caused by an insured risk. This is called a
prima facie claim. Once the Applicants have established a prima facie claim under
the policy, the onus then shifts to the FSP to show, on the balance of probabilities,
the loss falls within an exclusion clause of the policy or is otherwise not covered.
The damage sustained to the Applicants‟ property resulted from inundation of the
ground caused by escape of water from a pipe/tank. This is an event for which
cover is provided under the policy. Damage was also caused by a storm which
resulted in water entering the property. This is also an event covered under the
policy.
As such, the Applicants have established a prima facie claim under the policy.
2.2 Was the FSP entit led to deny the Applicants’ claim?
The onus now shifts to the FSP to establish its exclusions in denying liability for
the claim.
After the claim was lodged with the FSP, the Applicants‟ property has been
subjected to various expert investigations as listed in Section 3.1 below.
The FSP‟s initial investigations revealed the damage to the flooring was caused
by the leaking tank. The FSP‟s appointed expert IL was of the view the issue of
water entry into the property, via the roof, was not related to the issue with the
water tank.
However, building consultant AA‟s investigations indicated the movement of the
property, which had occurred as a result of excessive water entering the
foundations of the property, had caused the metal trimdeck roof to level, resulting
in stormwater overflowing into the property.
The material presented by the parties indicates there is no dispute the damage to
the insured property was caused by a movement in the tank which resulted in the
stormwater pipe being dislodged from the tank. As a result, a large amount of
stormwater was discharged into the ground which in turn saturated the foundation
causing severe damage to the property.
The issue between the parties remains as to what was the cause of the
movement of the tank.
The Applicants rely on their expert W‟s fin dings that the issue with the tank arose
as a result of ground movement. W‟s investigations of the soil under the tank
revealed the soil was free from rocks, stones or objects that could damage the
Case No: 352851 Determination Page 4 of 9
base of the tank and that there was some evidence of imported sand material. W
confirmed the tank was originally installed on an adequately stable level surface.
The FSP agreed with two of W‟s findings that some joints in the PVC overflow
pipe had not been joined with cleaning fluid and solvent cement and that there
was a clip missing from the overflow pipe. The Applicants have responded that
these issues relate to the temporary repairs conducted after the loss event and
not the condition of the tank or its pipes prior to the loss event.
The FSP relies on its building consultant PG ‟s findings that the tank had sunk in a
north-easterly direction as a result of incorrect installation of the tank. PG
concluded the failure to place a concrete slab or a compacted rock base to stop
the tank from sinking into the ground when it was full of water and the stormwater
pipe not being connected to the tank with metal fasteners (which may have held it
in place), had resulted in the dislodgment of the pipe.
The PG report indicates the installation of the tank did not comply with the current
installation standards (report dated 4 October 2013).
In order to show that the installation of the tank did not comply with the applicable
standards, it was necessary for PG and the FSP to provide evidence of standards
that were applicable in 2007.
The Applicants have presented a copy of the installation guide for their water
tank. However, this is dated 15 June 2012 and does not represent the
manufacturer‟s installation instructions that were applicable in 2007.
The FSP has not provided any information on the installation instructions that
would have been applicable to the subject water tank in 2007, to establish the
installation of the subject water tank was faulty, as implied by PG‟s report.
It is noted the Applicants had commenced the installation of the tank, but the final
installation was completed by a registered plumber.
The Applicants have presented a compliance certificate from the plumber as
below:
“Plumbing Industry Commission
Compliance Certificate
...
Date of completion
20-12-07
...
Installation Details (including Scope of Work)
Installed 3000LT Water tank in backyard
New colourbond ... + 2/A downpipes on mouth
...
I certify that the above plumbing work complies with all respects with the pl umbing laws (inc.
Passed all required tests) as defined in Part 12A of the Building Act 1993.”
Considering the above and in the absence of any evidence from the FSP that the
installation of the tank was faulty, the FSP has failed to establish its policy
exclusion.
Case No: 352851 Determination Page 5 of 9
The FSP has made reference to several other general policy exclusions such as
rust, corrosion, gradual deterioration, depreciation, wear and tears, structural
failure of an item, settling shrinkage or expansion of foundations, etc.
Nevertheless, it has not presented expert evidence to support its position that the
damage to the property was caused by any of the above events.
The fact remains the property had not sustained extensive damage after the
installation of the tank until the storm events in 2013. Further, PG‟s report
intimates the weight of the water in the tank had caused it to sink and not that the
tank had sunk as a result of „settling shrinkage or expansion of the foundations‟.
As the FSP has failed to establish the application of its policy exclusions, it should
indemnify the Applicant for their loss in accordance with the terms and conditions
of the policy.
Given the Applicants‟ home initially subsided as a result of the escape of water
from the water tank (an insured event) and was subsequently damaged by
ingress of storm water resulting from the stumps subsiding (resulting from the
water escaping), the damage to their home from both causes is covered under the
policy.
Further, after the initial report of the claim, the FSP arranged for its repairer to
install tarps over the roof to stop further water ingress. Unfortunately the evidence
shows that the installation was less than ideal and further water ingress occurred
until the roof was subsequently re-tarped. Given the installation was carried out by
the FSP‟s repairer, any further damage resulting from this should also be repaired
at the cost of the FSP.
In order to establish the extent of the damage and cost of repairs resulting from
this dispute and in view of the lapse of time since the initial scope of works for
repairs to the damaged property, the FSP should prepare a fresh scope of works
for repair of the damage sustained to the property, together with an appropriate
costing.
In view of this conclusion, the Panel will not addres s the Applicants‟ reliance on
Section 46 of the Act.
Was the FSP obliged to allow the Applicants’ builder to conduct repairs?
The Applicants have requested their own builder be appointed to conduct repairs
considering the delays. Although the policy allows the FSP to choose to reinstate
the damaged property, which it initially did, however, it later decided it would
prefer to cash settle the property damage claim. The FSP subsequently refused to
provide indemnity at all.
The Panel notes that this claim was reported to the FSP in February 2013; the
FSP and the Applicants undertook a number of steps to resolve the claim over the
following months. The FSP verbally accepted the claim (at least parts of it) and
commenced planning for the repairs, including appro val for the house to be re-
stumped (which commenced in June 2013).
Case No: 352851 Determination Page 6 of 9
Following the FSP‟s indications of acceptance and its election to undertake
repairs, the FSP was bound to that election, despite its later rejection of the claim.
It therefore was not entitled to later elect to cash settle in August 2013, at least
not without the Applicants‟ agreement. When, in November 2013, it decided to
reject the claim, this caused the Applicants some distress, given the previous
settlement assurances.
In the Panel‟s vie w, by changing its position, the FSP has acted contrary to
established insurance law. Given its several positions, the Panel is of the view it
would now be fair in all the circumstances to allow the Applicants to elect the
method of settlement, given they have lost confidence in the FSP‟s preferred
repairer.
For the sake of clarity, the Applicants may elect to have the FSP undertake the
repairs. However, if the Applicants elect to cash settle their claim and have their
own builder undertake repairs, quantum of settlement will be based on the cost for
which the FSP could reasonably undertake repairs.
If the parties are unable to agree on a final outcome, in regard to the costing of
the FSP‟s scope of works, they may refer the matter back to the Panel for furt her
determination.
Are the Applicants entitled to reimbursement for their professional fees and
other costs?
The Applicants have requested this Service reimburse the cost of W‟s report and
the services of their public loss adjustor.
Despite references to t he Applicants‟ public loss adjustor‟s presence during
investigations by the FSP‟s experts, her findings were not made available to this
Service or the FSP. As such, the FSP is not required to reimburse this cost.
However, W‟s findings have been reviewed an d have assisted the Panel in
assessing this dispute and it is fair in the circumstances the FSP reimburses W‟s
charge for his services, up to an amount of $1,500, subject to provision of a
receipt of costs incurred.
The Applicants have also sought reimbursement of other unspecified
miscellaneous expenses. There is no general entitlement to such costs. However,
it is clear to the Panel that the FSP‟s handling of the dispute has been less than
ideal and the FSP‟s changes of position and inconsistent and inapp ropriate
management of the matter, has caused the Applicants significant distress, time
and effort. In view of this, the Panel awards the Applicants the additional sum of
$2,000 (out of a total figure available under its remit, of $3,000; thus the figure of
$2,000 is at the higher end of seriousness in this regard ; Terms of Reference 9.3)
for non-financial loss.
Finally, as the new scope of works and costing will be based on current day costs,
if the Applicants elect to be cash settled, the FSP will not be required to pay
interest on this agreed settlement amount.
Case No: 352851 Determination Page 7 of 9
3 Supporting information
3.1 Expert Evidence
Record Key points
Builder PP’s Report
Site attended on
28/02/2013
[Applicants] informed water has entered through the roof
causing water staining to the dining room ceiling.
The roof is part of an extension built on to the original
home.
[Applicants] informed the rear of the property was moving
which has caused water to flow into the property.
Floor level movement local to dining and lounge was due
to wat er overflow from pipe servicing rainwater tank.
Internal water damage was due to water inflow from roof
cavity.
Builder PP’s Report
Reinspection on
20/03/2013
Floor in the living room is out of level almost throughout the
entire room.
The water tank is close to one end of the room.
Unable to determine the overflow from the water tank
caused the footings to be disturbed.
Recommended the appointment of an engineer.
Expert IL’s Report
Site attended on
15/04/2013
Damage to the dining room ceiling was first noticed by the
[Applicants] around one to two years ago.
The damage had exacerbated in the recent months
Concluded the floor movement in the dining and lounge
room was attributable to the escaped water from the
detached overflow pipe servicing the rainwate r tank.
Spirit level measurement confirmed heaving soil within the
vicinity of dining and lounge room areas.
Water damage to ceiling, wall and flooring was due to
intrusion of water from roof cavity.
There is no correlation between foundation movement and
water damage to dining area.
Insured has obtained plumbing advice which
recommended increasing the roof pitch.
Widened gap to the rear pavement was consistent with
seasonal soil movement and the Applicant mentioned it
was pre - existing but the gap had wide ned recently.
Roof system is to be investigated by a roofing specialist.
Building consultant
AA’s report
Site attended on
22/05/2013
Minor settlement was noted through the original home
except the south east bedroom which had heaved prior to
Applicants purchasing the property and rear laundry which
is close proximity to the leaked rainwater tank.
Evidence showed the rear extension area had significantly
heaved along the rear north and north east walls which
were close to the leaked rainwater tank.
Eviden ce showed heave to the rear north wall of the
Case No: 352851 Determination Page 8 of 9
extension resulted in the trimdeck roof being level,
invariably causing considerable rainwater entry along the
original north wall of the home.
Registered building
practitioner PG’s report
Attended site on
25/ 10/2013
The water tank installation did not comply with the current
installation standards.
The tank did not have a regulation base which would be
either a concrete slab, or a compacted crushed rock base
to stop the tank sinking into the ground when it is full of
water.
The photos presented as evidence before repairs were
undertaken show a sinking /settling effect the water tank.
The Applicant had commenced the installation of the
rainwater tank and a plumber had completed the
installation.
Leak from the tank is a building defect because the tank
did not have a compact base and the 90mm storm water
PVC pipe had disengaged itself from the tank flange
showed that there were no mechanical fasteners holding it
in place.
Due to not having a compact base, the ta nk with the weight
of water had sunk toward a north easterly direction and the
90mm PVC storm water overflow pipe due to not having
some type of mechanical fastener or cement gluing
compound has pulled out of the tank flange causing water
to spill from the overflow relief.
Plumber PC’s Report WCCTv survey of the sewer from the gully outside
bathroom on right driveway side found the sewer blocked
with tree roots with bath overflowing below house when
discharged
This affecting the adjacent toilet as well
The storm water drain along the right hand driveway side
of the house is made of pottery material and is in poor
condition and leakage is probable.
Hydraulic services
consultant W’s report
18 July 2014
The rainwater tank and adjacent hot water unit have
move d toward each other due to movement in the ground.
Excavation of a small hole beside the tank revealed the
soil under the tank was moist fine material apparently free
from rocks, stones or objects that could damage the base
of the tank. There was some evid ence of imported sand
material.
Satisfied the tank was originally installed on an adequately
stable level surface.
Some joints in the PVC overflow pipe have not been joined
with cleaning fluid and solvent cement which does not
comply with Plumbing Regulati ons and SAA HB39 - 1997
Section 5.7.6 (j)
There was a clip missing from the overflow pipe and this
does not comply with the manufacturer‟s requirements and
with SAA HB39 - 1997 Section 5.7.6 (b).
Case No: 352851 Determination Page 9 of 9
Observed evidence of minor ground movement around the
property.
Minor ground movement originally caused separation of
tank and overflow pipe which caused uncontrolled
discharge of stormwater water around the water tank and
building.
The increase in soil moisture locally exacerbated ground
movement, and this has caused subsidence to the water
tank and hot water unit, and more than likely contributed to
movement in the building.
Recommend that both hot water unit and water tank be
installed on a level base, such as a reinforced concrete
pad as this is the optimal solution where there is minor
ground movement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.