Home / Financial Firm (Unknown - Insurer) / Determination 352257

Determination 352257

Denial of storm roof and internal water damage claim under faulty design, workmanship and deterioration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2014-11-28
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owners of two strata units claimed for roof and internal water damage after ex-tropical cyclone Oswald. AFCA found the proximate cause was excluded faulty design, workmanship and gradual deterioration, and the insurer was not liable.

The insurer discharged its onus of showing the exclusions applied, and section 46 of the Insurance Contracts Act 1984 did not apply because those exclusions operate irrespective of when the defects arose.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building – Home Contents – Service - FSP Decision – Delay in Complaint Handling - Denial of Claim - Exclusion/Condition Determination Case No: 352257 Determination Page 1 of 10 Case number : 352257 2 7 November 2014 1 Overview 1.1 Dispute The Applicants are the owners of two units which make up a duplex and are insured under a strata title insurance policy held by the body corporate with the Financial Services Provider (FSP). The Applicants lodged a claim under the policy for damage to the roof of the units (and resulting internal water damage), due to the effects of ex-tropical cyclone Oswald in January 2013. The FSP denied the Applicants’ claim on the basis that the damage was not caused by the severe weather events but by matters which were excluded under the policy, such as faulty design and faulty workmanship, gradual deterioration and wear and tear. 1.2 Issues and key findings Is the FSP liable for the damage to the property? The available information (including the engineers’ reports ) establishes that, on the balance of probabilities, the proximate cause of the internal water damage to the property was the faulty design and installation of the metal tile roof. Damage caused in this manner is not covered under the policy. The lifting of the roof tiles was not caused by the cyclone, as this damage was already present in 2010. Section 46 of the Insurance Contracts Act 1984 (the Act) does not assist the Applicants, as the application of the policy exclusions relied on by the FSP does not depend on the defects in the roof having existed before the date the policy was taken out. 1.3 Determination This Determination is in favour of the FSP. The FSP is not liable for the Applicants’ claim. Case No: 352257 Determination Page 2 of 10 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the property? Application of policy depends on cause of damage The strata title policy provides cover for accidental damage to the Applicants’ property, subject to the conditions and exclusions set out in the policy. In this context , the courts have interpreted “accidental” to mean “unintended and unexpected.” The policy contains exclusions for accidental damage caused by:  a defect in an item, faulty workmanship, structural defects or faulty design or  rust, corrosion, gradual deterioration, wear or tear, wet or dry rot. The Applicants say that the damage to the roof at their property (and the resulting internal water damage) occurred when a number of the metal roof tiles were dislodged during the severe storm events in January 2013. However, the FSP says that the damage to the roof was not caused by the storms but was due to faulty design and workmanship during the construction of the roof and/or gradual deterioration over time. The FSP says that it was the existing condition of the roof at the time of the storm which allowed water to enter the property. Accordingly, it is necessary to determine the proximate cause of the damage to the roof of the Applicants’ units (that is, the real, effective or predominant cause). As the FSP is seeking to rely on a policy exclusion to deny the Applicants’ claim, it bears the onus of establishing that, on the balance of probabilities, the relevant exclusion applies. Water entry was caused by factors excluded under the policy The Panel has been provided with a number of reports from various builders and engineers engaged by the parties to determine the cause of the internal water damage to the Applicants’ property. Having reviewed the reports provided, the Panel is satisfied that, on the balance of probabilities, the proximate cause of the water entry to the Applicants’ property was the incorrect installation of the metal roofing tiles and, in particular, the inadequate measures undertaken by the installer to ensure that the roof was watertight. Both of the engineers appointed by the FSP and the Applicants (SW and JH) concluded that water entry had been occurring through the roof over an extended period of time. Both engineers identified several aspects of the design and installation which were deficient and/or non-compliant with the manufacturer’ s specifications at the time of construction. In particular, the manner in which the lead flashing was installed at the juncture of the gable walls was considered to be ineffective to prevent water entry in this area and had also resulted in the flashing deteriorating over time. Case No: 352257 Determination Page 3 of 10 SW and JH are appropriately qualified to determine the cause of the water entry and the Panel considers that their reports set out a logical and reasonable basis for their conclusions, which is consistent with the available information. In particular, the Panel notes that:  the areas in which water entry was observed correspond with the areas where the engineers have identified deficiencies in the design and installation of the roof  the photographs included in the engineers’ reports show clear evidence of prior water damage in these areas, as well as signs of previous repairs intended to prevent further water entry (including the extensive use of expandable filler foam and silicone sealant). The Applicants have confirmed that they did not undertake these repairs. Accordingly, it appears that the water entry issues pre- existed the Applicants’ purchase of the property approximately four years ago. The Applicants dispute the findings of SW and JH and have provided reports from their roofing specialist (VT) and their builder (CB) in support of their position. However, while VT and CB conclude that the storm resulted in eight of the metal roof tiles being dislodged, they do not explain how the damage to these tiles correlates to the areas of water damage observed at the property. Further, CB refers to the possibility that at least some of the damage has been caused by leaking flashings and sealants, but does not explain how these leaks have been caused by the storm (rather than having occurred as a result of the design and construction issues identified by SW and JH). For the reasons outlined above, the Panel is satisfied that the internal water damage to the Applicants’ property has been caused by factors excluded under the policy, namely faulty design and workmanship and gradual deterioration. Loose roof tiles were pre-existing damage The various consultants engaged by the parties have provided differing views as to the cause of the eight or so roof tiles lifting. SW concluded that this damage was caused by pre-existing corrosion of the tiles, which made them vulnerable to the excessive winds experienced during the storm. However, JH disputed that the relevant roof tiles were corroded and considered that they had lifted due to the extraction of the nails affixing them to the battens (presumably due to the force of the winds). However, the Google street view of the property taken in January 2010 shows that the roof tiles were already dislodged at this time. JH has confirmed that the dislodged tiles observed during his inspection were in the same area as the tiles shown in the photograph from January 2010. On this basis, the Panel is satisfied that the damage to the roof tiles was not caused by the effects of ex-tropical cyclone Oswald in January 2013. Accordingly, the FSP is not liable for this aspect of the claimed damage. Case No: 352257 Determination Page 4 of 10 Section 46 of the Act does not apply The Applicants say that section 46 of the Act operates to prevent the FSP from denying their claim. Section 46 of the Act prevents an insurer from relying on a policy exclusion which operates by reference to a defect in a thing which existed before the policy was taken out, in circumstances where the insured was not aware (and a reasonable person in the circumstances could not be expected to have been aware) of the defect at the time the policy was taken out. However, the courts have confirmed that section 46 of the Act only applies where the exclusion relied on by the insurer operates by reference to the time at which the relevant defect arose. The exclusions relied upon by the FSP in the present case apply to damage which was caused by faulty design and workmanship and/or gradual deterioration, irrespective of when these issues arose. As these exclusions do not expressly refer to the relevant defect having been present before the policy was taken out, section 46 of the Act does not operate to assist the Applicants. Case No: 352257 Determination Page 5 of 10 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Accidental damage cover We will cover your buildings, y our common contents and your common property for any accidental damage or accidental loss … Exclusions We will not cover your buildings and your common contents and your common property for accidental damage or accidental loss caused by:  Rust, corrosion, gradual deterioration, wear or tear, wet or dry rot …  A defect in an item, faulty workmanship, structural defects or faulty design 3.3 Reports Report Key points FSP’s building consultant (EP) Report - 14 Aug ust 2013  The water entry to the units was due to a number of maintenance related issues and was not the resul t of a single or a recent storm .  The pre - existing raised roof tiles (as evident in the Google street view from January 2010) had resulted in other roof tiles becoming raised over time.  Wa ter had be en entering over time through cracks in the roof flashings and fibre cement cladding and dented roof tiles . Case No: 352257 Determination Page 6 of 10 Report Key points FSP’s engineer (SW) Initial report - 17 October 2013  The Applicants had advised that the property was built in the 1980s and they had owned both units for around four years.  There was evidence of water entry in various locations in both units .  T he timber battens were in good condition for the age of the roof .  A number of the roof tiles had previously been replaced , apparently prior to the Applicant s purchasing the property .  F iller foam s were present in several areas where water had entered through the roof, indicating that this had occurred previously.  There were a few areas of minor separations of up to 2mm between the timber battens and the roof trusses . However, these were localised and were due to the geometry of the high pitched roof during installation and timber shrinkage. Other minor instances of separation were not considered to constitute batten uplift.  There was significant rust and dete rioration at the lap of the top tile and the lower tile. In some areas, this deterioration was significant enough to result in the nail fixing becomi ng inadequate so that the tile could move freely.  The front areas of the roof were in good condition with m inimal denting and deterioration of the roof tiles .  However, the rear was in poor condition with the majority of the roof tiles dented and the protective coating worn away in a number of the lower sections (where access was available).  There were a number of fixing nails missing leaving holes in the tiles, allowing direct water entry . The tiles showed evidence of previous silicon use, indicating prior water entry.  The f ront dividing wall had a flashing installed between the wall and the roof tiles. The edge tiles had not been turned up into the flashing to prevent water entry. There was n o parapet flashing on the top of the dividing wall .  In the area above the living wall of unit 2 where water entry had occurred, the metal tiles were not turned up into the flashing correctly and the flashing exceeded the maximum allowed length and had cracked, allowing water entry.  The lead flashing at the rear of unit 1 had previously been cut and glued down onto the metal tiles with evidence of previous repairs using s ilicon filling .  A number of metal tiles had separated from the timber battens over the entire roof due to prolonged corrosion at the connection point which had weakened the fixing, making it vulnerable to lifting during excessive winds .  No flashing had be en used on the storeroom window in unit 2 which ha d allowed water to seep through the frame.  None of the damage was due to the storm and was the result of issues which had been d eveloping since completion of construction. Case No: 352257 Determination Page 7 of 10 Report Key points  Where metal roof tiles are used, the roof top needs to be correctly installed and waterproofed to reduce the risk of water entry. The installation at the Applicants’ property was deficient in a number of respects. FSP’s engineer (SW) First supplementary report – 28 October 2013  The proximate cause of water entry during the January 2013 storms was defective workmanship of the roof. Had there been no issues with the roof at the time of the storms, no further damage would have occurred.  The evidence of previous repairs to the roof indi cated that water entry had been occurring for a n extended period of time.  The storm had not caused any externa l structural damage . The l ifting of the roof tiles was die to gradual deterioration and/or lack of maintenance. FSP’s engineer (SW) Second suppl ementary report 19 December 2013  The w ater entry during the storms did not caused ad ditional damage as water entry had been occurring over a prolonged period of time. There is no damage that could be attributed to the storm event alone.  The presence of ro tting timber indicated that there had been persistent water entry over a prolonged period of time.  The Applicants would have been aware of the water entry during the four years since they purchased the property.  His earlier comments about the need for a b ox barge were based on the manufacturer’s specifications.  The water stains directly underneath the filler foam indicate that it was installed to prevent water entry, not vermin.  He observed corrosion on all of the lifted roof tiles. The corrosion was significant and not at an early stage. Applicant’s builder (CB) Report – July 2013  The Applicants’ unit required re - roofing as there were panels that had lifted and could be blown off in the event of future high winds. Water was entering through these areas causing further damage.  The timber trims, external cladding and eave lining had become wet and damaged and were leaking due to water entering through the roof. These items would require replacement.  Water was possibly being blown in around the window s because the flashings and/or sealants were leaking. Applicant’s roofing contractor (VT) Report - undated  He inspected the roof on 23 May 2013 and again on 8 October 2013 .  His i nternal inspection revealed the roof to b e in good condition for its age, oth er than eight metal roof tiles which had been lifted during the storm.  He disagrees with the FSP’s contractors that the flashing has been poorly designed and notes that b ox barge flashing could not be used due to the fact that the external wall for the upper level intersec ts with the roof cladding at right angles . The installation of a lead apron flashing at this junction was standard practice at the time the units were built .  The roof tiles in the area of the dividing wall between the units Case No: 352257 Determination Page 8 of 10 Report Key points we re not re quired to be turned up , as the high point of the roof tile acts as the turn up . The lead overlaps the high point, preventing water from entering the ceiling cavity. Th is design is widely used for tiled roofs of this type .  There was m inor deterioration of the roof tiles at the rear of the property where the tiles overlapped, causing condensation to travel between the two pitches. This deterioration was to be expected considering the age of the building but was not present throughout th e entire roof.  The tiles had lifted as a result of nails being dislodged during the storm and not due to corrosion. Applicant’s e ngineer (JH) First report – 28 January 2014  His inspection of the roof tiles on the A frame section of the building was limit ed to a visual inspection from the top of a ladder, due to the extreme pitch of this section of the building.  His v isual inspection of the rear section of the roof revealed that the m ajority of the tiles were well anchored by nail fixings along the ir bott om edge.  There were o nly a couple of isolated areas toward the top of the roof where the bottom edge of a couple of sheets of tiles had been dislodged from their nail fixings . This is a direct result of the extreme wind pressure associated with ex - tropica l cyclone Oswald.  The tiles at the base of the roof near the gutter had slight rusting along their bottom edge, which was caused by electrolysis between the bottom of the tile and the gutter.  Due to their nature, the bottom row of tiles were “face - fixed” with a flat - head nail through the top face of the tile into the timber batten.  In several locations , the se nails were found to be loose and easily extracted by hand indicating the y had lost co nnection into the batten s (either because the batten was in the wrong position or due to wood rot ). As a result, the front edge of the bottom row of tiles was loose. This was a maintenance issue unrelated to the storm.  His inspection of the r oof tiles from inside the roof confirmed that they were in very good condition and free of any corrosion , especially at the side and bottom laps .  There were other isolated areas whe re the bottom edge of the tiles had been pulled away from their nail fixing. In one case , the loose tile edge could be separated from the timber batten by hand. The location of the old nail hole showed that the tile had originally been firmly fastened.  There was e vidence of serious water ingress in unit 1 in at least two places, both of which were due to poor and gaining lead flashings on top of the roof . In both locations, the metal tiles had been “flashed” against an adjacent external wall with long strips of lead, which had developed stress fractures at the turn - up from the roof tiles to th e wall face over the years.  Some roof maintenance ha d been undertaken to seal these Case No: 352257 Determination Page 9 of 10 Report Key points fractures using filler foam , which appeared to be working under normal rain con ditions. However, the severe weather conditions in January 2013 would have exceeded the capacity of the repaired flashings , allowing water to enter .  The lead flashing was not of the correct weight for the location and had been installed in too long a length. New lead flashing should be installed to provide a water tight seal.  There was n o evidence of any separation of the timber roof battens from the tops of the roof trusses , as a result of excessive wind force during the storms in January 2013 . Applicant’s engineer (JH) Second r eport – 31 March 2014 (prepared for the FSP)  He had re viewed his previous findings after considering EP’s and SW’s reports.  The a reas of internal water damage are located directly under the gable walls where they extend up past the pitch of the roof.  The c ause of the water leaks was poor installation of the flashing s , with the flashings not properly extended through the thickness of the wall and installed over too long a length. The storm event merely highlighted the inadequacy of the flashings.  The roof had been leaking in the same areas long before the storm event in Jan 2013. The installation of filler f oam under the flashings was undertaken by the previous owner and therefore the attempted repairs were at least 4 years old.  The s evere water stain s visible on the timber trusses and beams in these locations confirmed that the water leaks had been an ongoing problem for many years.  T he roof tiles had not been correctly installed at the gables , so as to prevent wind - driven rain from being blown sideways across the surface of the tile and spilling off the edge u nder the flashings .  The installation of the lead flashing was not undertaken in accordance with the manufacturer’s recommendations (as at the time of construction).  There was n o real evidence of any batten lift.  He disagrees with SW’s finding that corrosion was responsible for the lifting of tiles and considers that this was due to the extraction of the face - fitted nails holding the tiles to the timber batten.  He considers that the areas where corrosion was identified did not correspond with the lo cations of water entry.  However, this had not been caused by the storm in January 2013, given it was already apparent in the Google street view image from 2010. 3.4 Section 46 of the Insurance Contract Act 1984 Section 46 Pre-existing defect or imperfection 46 (1) This section applies where a claim under a contract of insurance (other than a contract of insurance that is included in a class of contracts declared by the Case No: 352257 Determination Page 10 of 10 regulations to be a class of contracts in relation to which this section does not apply) is made in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing. 46(2) Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.