Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 350902 Determination Page 1 of 13
Case number: 350902 2 3 January 2015
1 Overview
1.1 Dispute
This is a claim under the Applicant’s P ersonal Insurance policy for damage
sustained to the Applicant’s home as a result of a broken or burst water pipe.
This dispute arises from the FSP’s decision to only accept partial liability for the
damage sustained to the property. The Applicant maintains that the FSP should
also be liable to cover the damage to the foundations and mould.
1.2 Issues and key findings
Has the Applicant established a prima facie claim?
The Applicant has established a prima facie claim because:
the policy includes cover for insured events of storm and/or rain and broken
and burst water pipe
the water pipe that burst in 2011, caused damage to the foundations of the
property and mould
the damage falls under the scope of cover.
Has the FSP established the application of an exclusion under the terms of
the policy?
The FSP has not established the application of a relevant exclusion because:
the evidence indicates the 2011 leak is the proximate cause of the upward
movement of the centre of the house
the proximate cause of the mould was the burst pipe.
Is the Applicant required to lodge a separate claim with respect to the burst
pipe in February 2014?
The Applicant is not required to lodge a separate claim because:
the FSP has had the opportunity of determining whether further damage has
been sustained to the property
good industry practice would have seen the FSP deal with any further damage
arising from this incident as part of the overall claim.
Is the FSP’s settlement offer reasonable?
The FSP’s cash settlement offer is not reasonable because:
the offer to cash settle by way of three instalments is not consistent with the
terms of the policy
Case No: 350902 Determination Page 2 of 13
the offer is not sufficient to cover the full extent of the damage sustained as a
result of the 2011 incident
the offer is not sufficient to cover the cost of any damage sustained as a result
of the further incident in February 2014.
1.3 Determination
This Determination is partially in favour of the Applicant.
The FSP is to cash settle the Applicant for the cost of the mould treatment in
accordance with the terms and conditions of the policy and subject to the
Applicant providing the FSP with invoices to substantiate the cost incurred.
The FSP is to pay the Applicant the cost of temporary accommodation from 26
April 2014 until such time the Applicant was able to return to the property
subject to the Applicant providing the FSP with invoices to substantiate the
expense incurred.
The FSP is to meet the cost of repacking the stumps to the Applicant’s
property and should obtain a further quotation to cover the outstanding scope
of works.
The FSP is to obtain a further assessment from an independent engineer to
determine whether the external walls require underpinning.
The FSP is then entitled to cash settle this aspect of the Applicant’s claim in
accordance with the terms of the policy.
Case No: 350902 Determination Page 3 of 13
2 Reasons for Determination
There has been a full exchange of material between the parties and each party
has had the opportunity to address the issues that arise from the material
exchanged.
This Determination is based on what is fair in all the circumstances, having regard
to the information exchanged, relevant legal principles, terms of the policy, good
industry practise and where applicable prior Determinations.
2.1 Has the Applicant established a prima facie claim?
The policy is an accidental damage policy that includes cover for Insured events.
Insured Events include storm and/or rain as well as the bursting or leaking or
discharging of liquid from fixed pipes.
The policy provides that the FSP will pay for the reasonable cost of locating the
cause and re-instating the damaged property. It also provides cover for temporary
accommodation if the home cannot be lived in.
There is no dispute that a water pipe burst at the Applicant’s property in 2011 .
There is no dispute that as a result of the burst water pipe the property sustained
damage.
The Applicant notified the FSP that there was a second water leak at the property
on 3 February 2014. That leak was repaired with no apparent additional physical
damage to the property although mould was identified one week later.
Although no formal claim was lodged with respect to the second leak, the FSP
has inspected the Applicant’s property since that incident and had the opportunity
of determining the extent of any additional damage.
I am satisfied given the information exchanged that the Applicant has established
a prima facie claim under the terms of the policy and the onus is therefore on the
FSP to establish the application of any relevant exclusion.
2.2 Has the FSP established the application of a relevant exclusion to
limit its liability?
Whilst the FSP accepts liability with respect to the damage sustained as a result
of the burst water pipe, it has sought to limit its liability relying upon exclusions
contained within the policy.
Underpinning
The FSP disputes that the underpinning of the insured property is necessary.
Further, the FSP maintains that whilst the water damage caused by the burst
water pipe may have exacerbated the upward movement of the centre of the
house, the proximate cause of the movement is due to general settleme nt and
shrinkage.
Case No: 350902 Determination Page 4 of 13
The FSP relies upon the exclusion relating to:
“s ettling, shrinkage or expansion in buildings, foundations, walls or pavements”
to deny the Applicant’s claim for the cost of the underpinning of the property.
I do not accept the FSP’s argument as to the proximate cause. The evidence as
presented including the evidence from the FSP’s engineer and building consultant
supports a finding that the proximate cause of movement of the centre of the
house was a burst pipe. The reports concede that the water damage had greatly
exacerbated the upward movement of the centre of the house.
The Applicant’s engineer Y T has also identified that the water leaking from the
broken pipe had contributed to the building wall sinking and cracking significantly.
He considered that the leak which lasted for about three months, has affected the
whole house and the underpinning of the external walls.
In the circumstances, I am satisfied that the weight of the evidence supports a
finding that the water damage has caused damage to the foundations. I am not
satisfied that the FSP has established the application of the relevant exclusion.
There is conflicting evidence as to whether repair of the underpinning of the
property is necessary or not. The current evidence does not allow me to
determine this aspect of the dispute.
In order to resolve this issue, it is fair in the circumstances that the FSP obtain a
further assessment from an independent qualified engineer to determine whether
the external walls of the property require repair of the underpinning. In the event
that the independent engineer determines that underpinning is required, then the
FSP is to obtain a quotation with respect to the costs of those repairs.
In the event that it is considered that the underpinning of the property is not
necessary, then I determine that the FSP is not liable to meet the costs of the
underpinning.
Restumping
The FSP maintains that there was no damage to the stumps as a result of the
2011 claim and as such the claim related repairs do not include restumping.
There is evidence that the stumps had previously been repacked. The issue in the
current dispute is whether there has been further damage requiring either
restumping or re-levelling of the property as a result of the burst water pipe.
The engineering report provided by the FSP following an inspection of the
property on 25 March 2014 confirms that the breakage of the water pipe
underneath the kitchen caused the earth under most of the house to become wet.
The report notes that most of the damage to the external walls appears to have
been caused by parts of the wall hea ving upwards in response to increases in the
moisture content of the earth around the footings. The report indicates that the
movement of the stumps had been greatly exaggerated by the broken pipe under
the kitchen.
Case No: 350902 Determination Page 5 of 13
The report confirms that as a result of the movement of the stumps, they now
require repacking and re-levelling.
In the circumstances, I am satisfied that the proximate cause of the damage to the
stumps is the burst water pipe.
I am satisfied that the FSP is liable to meet the costs of the repacking and re-
levelling of the stumps.
Mould
The FSP agreed to remove the mould caused as a result of the 2011 water leak.
The FSP maintains this is not withstanding the application of an exclusion under
the policy for damage caused by mould.
The policy provides under the home and contents section that the following:
“We will not pay for loss or damage: … to resulting from or caused by:
Fungus, mildew, mould, algae, atmospheric or climatic conditions (other than
storm).”
The mould is not responsible for the damage nor does the damage result from the
mould. The mould was caused as a result of the leaking pipe.
The proximate cause of the mould is the burst or leaking pipe and as such, the
FSP is liable to meet the cost to eradicate the mould.
I am satisfied the evidence establishes on the balance of probabilities that the
mould had not been properly eradicated following the 2011 event.
The FSP obtained a report from B following a thorough inspection of the property.
B identified the mould in the sub floor at elevated levels which he considered may
be associated with the February 2014 event. This opinion is not conclusive as it
states it is likely that a number of spores from the previous moisture event
remained viable.
B considered the process adopted by the FSP’s company S in treating the mould
following the 2011 event. Whilst S used Microban, B noted that it is not being
conclusively demonstrated that the use of Microban is of any real effect. B noted
that S did not have an independent environmental professional perform pre
medication assessment nor obtain a post medication assessment.
According to B without the additional data, it is difficult to support the claim that
the sub floor soil was dry as at March 2012 and at the end of 2013.
The evidence is sufficient to establish that the Applicant’s property is still impacted
by mould and that most likely this is as a result of both the 2011 and 2014 events.
In my view, as there is mould as a result of what are insurable events, then it is
fair and reasonable that the FSP attend to the treatment of the mould in
accordance with the terms of the policy and to cover the temporary
accommodation costs incurred by the Applicant whilst the mould is treated.
Case No: 350902 Determination Page 6 of 13
2.3 Is the Applicant required to lodge a further claim for the 2014
incident?
The Applicant notified the FSP that they had suffered a further pipe leakage in
February 2014 which they had rectified. They did not believe there was any
significant structural damage from this but it had exacerbated the issues with the
mould. The FSP maintains the Applicant was advised to lodge a new claim
regarding the extent of damage, but the Applicant had not done so.
I note the advice of the member in their IDR letter is that they had requested that
E lodge a claim for this new event as a matter of urgency and investigate the
circumstances. The Applicant’s policy is with E and is issued by E but
underwritten by the FSP.
The FSP have attended the Applicant’s property and had their experts inspect the
Applicant’s property following the event. They are aware of the circumstances of
there being a burst pipe under the property and the pipe being repaired.
The policy covers loss or damage caused by the burst pipe subject to the various
exclusions.
There is no evidence that the FSP has been prejudiced in its ability to assess the
claim and in fact the FSP appears to assess the resultant mould as being
associated with this event.
In view of my determination that the mould was due to a combination of both the
2011 and 2014 events, I believe it is fair in the circumstances that the FSP meet
the cost of eradicating the mould and any temporary accommodatio n costs in
accordance with the terms of the policy.
2.4 Is the FSP’s offer of settlement adequate?
I do not accept that the FSP’s offer of settlement of the claim in the total sum of
$62,517 is adequate to cover the damage sustained to the Applicant’s property .
The FSP offered to settle the Applicant’s claim by way of three instalments
subject to the confirmation of completion of the claim related repairs. Presumably
the FSP considered the Applicant would incur these costs and then seek
reimbursement from the FSP.
Under Section 1 of the policy headed Home and Contents, the policy provides the
FSP the option to either repair, replace or pay the reasonable cost of the repair or
replacement for the property.
It does not provide in the event of determining to cash settle the claim, that it will
only do so upon evidence of completion of the repairs.
If the FSP requires the property to be repaired before payment then the FSP
should authorise the repair and accept liability on that basis.
If the FSP determines not to repair but to cash settle the claim, then it is only fair
in the circumstances that the FSP make the cash settlement payment by way of a
lump sum payment to allow the Applicant to meet the cost of the repairs.
Case No: 350902 Determination Page 7 of 13
I also note that the Applicant’s original cl aim was lodged in December 2011. The
FSP did not determine to settle the claim until May 2013. The FSP has not been
able to explain why it took such an extended time to determine the matter.
In order to settle this claim, I determine that the FSP obtain a further Scope of
Works as to the cost of repair to the Applicant’s property including the costs
associated with any required underpinning, repacking or re-levelling of the
Applicant’s property from a suitably qualified builder who is prepared to conduct
the relevant repairs based on the quotation provided.
Any cash settlement is to be made as a lump sum payment subject to the FSP
being entitled to deduct from that payment any payments already made for the
repairs quoted.
In addition, the FSP is to meet the costs incurred by the Applicant with respect to
the treatment of the mould together with any temporary accommodation costs
incurred subject to the Applicant providing suitable receipts to cover those costs.
Case No: 350902 Determination Page 8 of 13
3 Supporting information
3.1 Key points on relevant materials/statements
Record Key points
FSP’s repairer
(S)
Letter
31 Mar 2012
On 16 February 2012, due to lack of space in the subfloor space, S
installed two air movers. Moisture readings were taken from the
external brick walls and subfloor soil, returning high levels of
moisture.
On 6 March 2012, readings returned high levels of moisture.
On 23 March 2012, the readings had fallen to within acceptable
boundaries.
On 28 March 2012, S attended the site again to remove the drying
equipment and to spray directly through all external air vents an
application of a biocide treatment (Microban) to minimise bacterial
growth, limit odours and cross contamination.
FSP’s engineer
(H)
Report
1 Feb 2012
The cracking and movement of the front section is typic al of
problems caused by differential movement of footings due to
changes in moisture levels (as a result of a drought period finishing)
and pest damage of the timber subfloor framing.
It is possible the water escaping from the burst pipe has contributed
to the cracking and movement of the rear section of the residence.
The cracking and movement at the rear section is due to differential
movement of the stumps due moisture changes of th e foundation
soil, continued by water escaping from the burst pipe and
subsequent drying out currently underway of the saturated
foundation soil. This has been contributed by pest damage.
It is recommended to urgently dry the foundation soil and replace
th e severely water damaged subfloor framing and affected flooring.
The minor water damaged subflooring and flooring may be repaired
by removing the mould and treating the framing and flooring to
prevent further mould growth.
Pest damage needs to be addressed but is not related to water
escaping from the burst pipe.
The timber subfloor framing needs bearers to be jacked and
packing done between stumps and bearers to re - level the floor.
Once this is done, the cracks can be repaired.
FSP’s engineer
(H)
Email
7 Nov 2012
The cracks at the front porch and in the main bedroom at the front
southeast corner are well away from the burst water pipe. For this
reason, they are not related to the leaking pipe.
The pipe burst occurred in the central area below the
kitchen/l aundry and would not have reached below the concrete
paving where movement has occurred.
It is unusual for recent roof pointing to crack as it should be flexible.
It may be due to poor workmanship.
Cracks of the plaster ceiling and ceiling cornices around the kitchen
cupboard should be included as part of the claim.
Packing and re - levelling of the floor as a result of the leaking pipe is
Case No: 350902 Determination Page 9 of 13
adequate.
FSP’s engineer
(H)
Letter
8 Oct 2013
The fall of the floor indicates underpinning the perimeter walls of the
l aundry and kitchen is not required. Instead, doing this would
increase the out of level of the floor in the kitchen.
The tiled area of the hallway, leading to the bathroom, WC and back
bedrooms are fairly levelled.
The overall condition of the brickwork is fairly plumb and does not
warrant underpinning works to be carried out.
The out of plumb that has occurred is typical of differential
movement of the footings due to seasonal changes in moisture
content of foundation soil from the long drought and tree ro ot drying.
The out of plumb brickwork is occurring mostly at the rear northeast
corner and the front southwest corner, which are areas well away
from where the leaking pipe occurred below the kitchen floor.
Any works to the perimeter brickwork are not rela ted to the leaking
pipe, except for the reinstatement of the external sliding door of the
kitchen and meals area, which is included in the scope of works.
FSP’s builder
(D)
Quotations
6 Oct 2012
6 Jan 2013
Concrete paths have been built up higher than the natural ground
level and slope towards the subfloor of the house.
Due to the flatness of the block and the highly reactive clay soil, it is
possible water pools under the house in heavy rain.
There appears to be an ongoing drainage issue around the
perime ter of the house. It is advised ground level around the
perimeter of the house has a fall of 1:100 connected to stormwater
to keep water out of subfloor area.
This house has had previous repacking of bearers and joists which
indicates restumping may be nee ded.
FSP’s builder
(D)
Emails
11 Mar 2014
13 Mar 2014
The ongoing drainage issues are the levels of the concrete around
the perimeter of the house being higher than the natural ground
level under the house.
The area near the kitchen has subsided and falls towards the
house.
The condition is pre - existing due to the packers. The only damage
caused by the water leak is in the kitchen area.
Applicant’s
engineer (YT)
Letters
5 Jun 2013
8 Jul 2013
The water leaking from the broken pipe under the kitchen sink could
infiltrate into the ground and flow through the silt layer, causing
perched water to build up above the clay layer.
This water could first cause swell of the clay and later decrease its
bearing capacity. The footing then would sink and walls would
cr ack.
The water leaking from the broken pipe has contributed to the
building wall sinking and cracking significantly.
Due to the leak lasting for about three months, it has affected the
whole house and all the pinning area.
Applicant’s
mould cleaner
(M)
Re port
S treated the subfloor area with Microban, but M’s mycologist tested
it for killing mould and it does not have any effect whatsoever.
There is visible mould contamination in the subfloor area and
brickwork.
Case No: 350902 Determination Page 10 of 13
23 Apr 2014 Moisture readings were above normal. The conditions inside the
house are ideal for active mould growth.
Mould remediation is needed as soon as possible and the property
should not be occupied until this process is completed.
Applicant’s
drying and
ventilation
expert (DA)
Report s
26 A pr 2014
6 Aug 2014
There is significant subfloor dampness, mould contamination and
excess mould readings internally.
Despite the subfloor being dried, there has been no long term plan
to eradicate moisture from the subfloor and there has been no
mould reme diation provided at the property to date. For this reason,
the premises are uninhabitable.
The existing mould present was caused by the initial water damage
issue.
The existing mould was never treated correctly and as a result, it is
still present both on the soil under the substrate from the kitchen
area as well as on the underside of the substrate where the repaired
pipe is located.
The second water leak was at the other end of the dwelling and
could not have possible caused this mould issue.
The initial mould treatment involving the use of Microban was a
waste and could never remove mould from any affected area.
Applicant’s
drying and
ventilation
expert (DA)
Email received
18 Aug 2014
The mould treatment the Applicant described was totally
inadequate. M icroban does not solve mould issues. This can only
be solved by vacuuming or hand cleaning.
Subfloor drying can take months and even years if no permanent
ventilation is installed following subfloor drying. The only way to
adequately dry a subfloor after t his type of event is for initial drying
to take place for a set period and then a permanent subfloor
ventilation system installed to continue to remove moisture.
The most recent burst pipe was on the southern end of the dwelling,
downhill from the kitchen area , where the mould is still present .
Water from the second leak would have flowed directly out of the
subfloor entry point on the southeast corner, away from the mould
affected area.
No causal link is possible between the second burst pipe and mould
gro wth under the kitchen. The only possible explanation is that the
mould was caused by the leak directly under the kitchen.
The soil type in the area does not drain easily or particularly
effectively but it still drains.
The mould issue in the dwelling has been caused by the untreated
mould growth in the subfloor of the house under the kitchen due to
the first burst pipe.
FSP’s
environmental
assessor (B)
Report
25 Mar 2014
The mould allegedly on the brickwork and mortar is most likely
mineral efflorescence.
Elevated numbers of mould ( Penicillium ) were found airborne in the
living room and subfloor.
The significant moisture problem in the subfloor area is likely to
actively support the growth of moulds such as Penicillium .
The bottom of floorboards and other timbers within the subfloor
space were “dry”, buy may have been marginally able to support the
Case No: 350902 Determination Page 11 of 13
growth of Penicillium in places.
The fact the spores are viable suggests recent growth rather than
old spores given that Penicillium spores deactivate naturally over
time, with a half - life in the order of 6 - 12 months.
It is unlikely the pipe burst of 2011 would not have dried since then,
especially given documents from S reported the soil was dry at the
end of March 2012.
However, a number of spores from a previo us moisture ingress
event within the last couple of years could have remained viable,
raising the number of spores above the natural background number.
The proximate cause of the dampness and humidity in the subfloor
area and the growth of mould is most li kely the more recent pipe
burst in 2014, but may have been exacerbated by drainage issues.
It could be possible there was mould growing within the hollow
bases of the kitchen cabinetry when the pipe burst in 2011 until the
subfloor was dried in March 2012. As that occurred two years
earlier, it is unlikely there will be significant spread of viable spores
unless the kitchen cabinets were torn out or disturbed.
The mould in the living room is likely caused by direct entry of
mould spores blown up from the su bfloor area, moisture ingress to
the living room through the floor and subsequent growth there of
similar type of Penicillium mould or other source of moisture
unrelated to the subfloor.
There is no visible evidence of mould damage within the house.
S treated the mould in a timely and appropriate manner. S sprayed
the subfloor with Microban, which is not conclusively demonstrated
to be of any real effect against the types of mould commonly found.
S did not have an independent environmental professional (IEP) to
assess the mould issue and did not obtain a valid clearance
certificate. This means S is unable to demonstrate its efforts were
necessary and if so effective.
Without additional data from an IEP, it is difficult for S to support its
claims the sub floor soil was dry at the end of March 2012. With the
current data it is difficult to demonstrate the subfloor was or was not
dry between March 2012 and the end of 2013.
While some rainwater may enter the subfloor from the driveway and
rear courtyard, it i s unlikely that much would be able to enter given
the large roof the large grated drain observed in that location.
The most likely scenario is the most recent pipe burst allowed a vast
amount of water enter the subfloor and this has spread over the
not - fre ely - draining clay soil under the house.
FSP’s building
consultant (R)
Report
28 Mar 2014
Despite H’s call for kitchen repairs, the kitchen is not damaged and
any repairs can be done under the floor.
The sections of mortar falling off would have been caused by weak
mortar affected by water percolating upwards from the ground.
Some of the damage to external walls has been caused by long
term shrinkage that has not been allowed for in the house design.
Most of the other damage to external walls appears t o have been
caused by walls heaving in response to increase in the moisture
content of the earth around the footings. This damage does not
Case No: 350902 Determination Page 12 of 13
justify underpinning.
Most of the internal cracks are located near the inner parts of the
house with very few of them occurring along external walls. This is
due to the centre of the house being pushed upwards relative to the
external walls, because the stumps are higher and in more sensitive
locations that the external wall footings.
In brick veneer houses like this one , footings under brick walls are
different to footings under the stumps. When soil expands or shrink,
the stumps move at a greater relative rate than the walls. When the
earth becomes moist and expands, the stumps push bearers
upwards whereas the walls do not move at the same extent.
After a long term drought followed by high rainfall periods, reactive
soil shrank in the region , which caused many buildings to settle. In
particular, stumps in brick - veneer buildings settled to a greater
extent than the wall footings, causing the floor bearers to separate.
In this building , packing was inserted into the gap between the
stumps and bearers.
This has been happening to this house, and it has been
exaggerated by the broken pipe under the kitch en. Being close to
the centre of the house, water has clearly spread over the whole
house area and the soil is still quite damp.
This upward movement can cause strain in pipes and other fittings.
It is possible damage to the pipes occurred as a result of t his effect.
The second pipe break was of a shorter duration and much more
localised. It may however have induced some cracking in the
adjacent wall, none of which is serious.
The upheaval of the timber frame may also have caused some
damage at the walls be cause the frame has moved relative to the
walls.
The house is vulnerable to water infiltration through the external
walls, which has caused the earth under the house to remain damp
years after the first pipe burst.
The pipe burst under the kitchen caused the earth under the house
to become wet, causing damage inside the house. However, the
continuing dampness under the house indicates there may be
further problems that do not appear to be related to the pipe burst
under the kitchen.
The dampness in the sub floor earth is too widespread to have been
caused by the more recent pipe breakage in the southeast corner.
The comparatively light damage to the external walls does not
justify underpinning.
The southeast corner water leak has not resulted in any damage.
There may be some minor cracking in brick joints nearby but it is
unlikely.
FSP’s loss
assessor (C)
Reports
18 Oct 2012
6 Feb 2013
6 Mar 2013
After review of H’s scope of work, all areas relate to the water leak
and therefore will b e covered under the policy.
Three of the areas of concern raised by the Applicant (lounge,
bedroom 2 and toilet) are located near the 2011 water leak and are
thus related to the claim.
H has outlined issues to be rectified by the Applicant, including
Case No: 350902 Determination Page 13 of 13
10 Apr 2013
5 Mar 2014
drainage issues and pest damage.
H has agreed to include works to the lounge room, laundry and
kitchen and D has allowed an additional of about $3,500 for th is .
Temporary accommodation should be covered and settled. For a
period of eight weeks, the Applica nt is seeking $2,320.
Around March 2014, S has attended again and sprayed a further
application of Microban on the underside of the floorboards. No
Microban treatment was carried out in the house itself.
S advises there is no point in applying Microban ins ide the house
without testing to identify the source or if indeed t here are airborne
mould spores.
S advises tests would need to be carried out to narrow down the
source to identify the sort of mould eradication procedure required.
3.2 Other relevant material relied upon
Product Disclosure Statement with effective date 16 May 2011.
Renewal schedule for the period 21 July 2011 to 21 July 2012.
Handwritten receipts for temporary accommodation with dates 14 March, 14
April, 14 May, 14 June and 14 July 2014.
The parties’ submissions.