Determination 350902

FSP Decision - Claim Amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed the FSP should cover underpinning, restumping and mould damage from a burst water pipe, and the FSP's $62,517 settlement offer was disputed. AFCA found the burst pipe was the proximate cause of the stump and mould damage and ordered mould treatment, temporary accommodation and restumping costs, plus an independent scope of works for any underpinning.

The FSP did not establish that the settling or mould exclusions applied, because the burst pipe was the proximate cause of the damage.

Issues

Subjects and remedies

home or building damagepay claimreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount Determination Case No: 350902 Determination Page 1 of 13 Case number: 350902 2 3 January 2015 1 Overview 1.1 Dispute This is a claim under the Applicant’s P ersonal Insurance policy for damage sustained to the Applicant’s home as a result of a broken or burst water pipe. This dispute arises from the FSP’s decision to only accept partial liability for the damage sustained to the property. The Applicant maintains that the FSP should also be liable to cover the damage to the foundations and mould. 1.2 Issues and key findings Has the Applicant established a prima facie claim? The Applicant has established a prima facie claim because:  the policy includes cover for insured events of storm and/or rain and broken and burst water pipe  the water pipe that burst in 2011, caused damage to the foundations of the property and mould  the damage falls under the scope of cover. Has the FSP established the application of an exclusion under the terms of the policy? The FSP has not established the application of a relevant exclusion because:  the evidence indicates the 2011 leak is the proximate cause of the upward movement of the centre of the house  the proximate cause of the mould was the burst pipe. Is the Applicant required to lodge a separate claim with respect to the burst pipe in February 2014? The Applicant is not required to lodge a separate claim because:  the FSP has had the opportunity of determining whether further damage has been sustained to the property  good industry practice would have seen the FSP deal with any further damage arising from this incident as part of the overall claim. Is the FSP’s settlement offer reasonable? The FSP’s cash settlement offer is not reasonable because:  the offer to cash settle by way of three instalments is not consistent with the terms of the policy Case No: 350902 Determination Page 2 of 13  the offer is not sufficient to cover the full extent of the damage sustained as a result of the 2011 incident  the offer is not sufficient to cover the cost of any damage sustained as a result of the further incident in February 2014. 1.3 Determination This Determination is partially in favour of the Applicant.  The FSP is to cash settle the Applicant for the cost of the mould treatment in accordance with the terms and conditions of the policy and subject to the Applicant providing the FSP with invoices to substantiate the cost incurred.  The FSP is to pay the Applicant the cost of temporary accommodation from 26 April 2014 until such time the Applicant was able to return to the property subject to the Applicant providing the FSP with invoices to substantiate the expense incurred.  The FSP is to meet the cost of repacking the stumps to the Applicant’s property and should obtain a further quotation to cover the outstanding scope of works.  The FSP is to obtain a further assessment from an independent engineer to determine whether the external walls require underpinning.  The FSP is then entitled to cash settle this aspect of the Applicant’s claim in accordance with the terms of the policy. Case No: 350902 Determination Page 3 of 13 2 Reasons for Determination There has been a full exchange of material between the parties and each party has had the opportunity to address the issues that arise from the material exchanged. This Determination is based on what is fair in all the circumstances, having regard to the information exchanged, relevant legal principles, terms of the policy, good industry practise and where applicable prior Determinations. 2.1 Has the Applicant established a prima facie claim? The policy is an accidental damage policy that includes cover for Insured events. Insured Events include storm and/or rain as well as the bursting or leaking or discharging of liquid from fixed pipes. The policy provides that the FSP will pay for the reasonable cost of locating the cause and re-instating the damaged property. It also provides cover for temporary accommodation if the home cannot be lived in. There is no dispute that a water pipe burst at the Applicant’s property in 2011 . There is no dispute that as a result of the burst water pipe the property sustained damage. The Applicant notified the FSP that there was a second water leak at the property on 3 February 2014. That leak was repaired with no apparent additional physical damage to the property although mould was identified one week later. Although no formal claim was lodged with respect to the second leak, the FSP has inspected the Applicant’s property since that incident and had the opportunity of determining the extent of any additional damage. I am satisfied given the information exchanged that the Applicant has established a prima facie claim under the terms of the policy and the onus is therefore on the FSP to establish the application of any relevant exclusion. 2.2 Has the FSP established the application of a relevant exclusion to limit its liability? Whilst the FSP accepts liability with respect to the damage sustained as a result of the burst water pipe, it has sought to limit its liability relying upon exclusions contained within the policy. Underpinning The FSP disputes that the underpinning of the insured property is necessary. Further, the FSP maintains that whilst the water damage caused by the burst water pipe may have exacerbated the upward movement of the centre of the house, the proximate cause of the movement is due to general settleme nt and shrinkage. Case No: 350902 Determination Page 4 of 13 The FSP relies upon the exclusion relating to: “s ettling, shrinkage or expansion in buildings, foundations, walls or pavements” to deny the Applicant’s claim for the cost of the underpinning of the property. I do not accept the FSP’s argument as to the proximate cause. The evidence as presented including the evidence from the FSP’s engineer and building consultant supports a finding that the proximate cause of movement of the centre of the house was a burst pipe. The reports concede that the water damage had greatly exacerbated the upward movement of the centre of the house. The Applicant’s engineer Y T has also identified that the water leaking from the broken pipe had contributed to the building wall sinking and cracking significantly. He considered that the leak which lasted for about three months, has affected the whole house and the underpinning of the external walls. In the circumstances, I am satisfied that the weight of the evidence supports a finding that the water damage has caused damage to the foundations. I am not satisfied that the FSP has established the application of the relevant exclusion. There is conflicting evidence as to whether repair of the underpinning of the property is necessary or not. The current evidence does not allow me to determine this aspect of the dispute. In order to resolve this issue, it is fair in the circumstances that the FSP obtain a further assessment from an independent qualified engineer to determine whether the external walls of the property require repair of the underpinning. In the event that the independent engineer determines that underpinning is required, then the FSP is to obtain a quotation with respect to the costs of those repairs. In the event that it is considered that the underpinning of the property is not necessary, then I determine that the FSP is not liable to meet the costs of the underpinning. Restumping The FSP maintains that there was no damage to the stumps as a result of the 2011 claim and as such the claim related repairs do not include restumping. There is evidence that the stumps had previously been repacked. The issue in the current dispute is whether there has been further damage requiring either restumping or re-levelling of the property as a result of the burst water pipe. The engineering report provided by the FSP following an inspection of the property on 25 March 2014 confirms that the breakage of the water pipe underneath the kitchen caused the earth under most of the house to become wet. The report notes that most of the damage to the external walls appears to have been caused by parts of the wall hea ving upwards in response to increases in the moisture content of the earth around the footings. The report indicates that the movement of the stumps had been greatly exaggerated by the broken pipe under the kitchen. Case No: 350902 Determination Page 5 of 13 The report confirms that as a result of the movement of the stumps, they now require repacking and re-levelling. In the circumstances, I am satisfied that the proximate cause of the damage to the stumps is the burst water pipe. I am satisfied that the FSP is liable to meet the costs of the repacking and re- levelling of the stumps. Mould The FSP agreed to remove the mould caused as a result of the 2011 water leak. The FSP maintains this is not withstanding the application of an exclusion under the policy for damage caused by mould. The policy provides under the home and contents section that the following: “We will not pay for loss or damage: … to resulting from or caused by:  Fungus, mildew, mould, algae, atmospheric or climatic conditions (other than storm).” The mould is not responsible for the damage nor does the damage result from the mould. The mould was caused as a result of the leaking pipe. The proximate cause of the mould is the burst or leaking pipe and as such, the FSP is liable to meet the cost to eradicate the mould. I am satisfied the evidence establishes on the balance of probabilities that the mould had not been properly eradicated following the 2011 event. The FSP obtained a report from B following a thorough inspection of the property. B identified the mould in the sub floor at elevated levels which he considered may be associated with the February 2014 event. This opinion is not conclusive as it states it is likely that a number of spores from the previous moisture event remained viable. B considered the process adopted by the FSP’s company S in treating the mould following the 2011 event. Whilst S used Microban, B noted that it is not being conclusively demonstrated that the use of Microban is of any real effect. B noted that S did not have an independent environmental professional perform pre medication assessment nor obtain a post medication assessment. According to B without the additional data, it is difficult to support the claim that the sub floor soil was dry as at March 2012 and at the end of 2013. The evidence is sufficient to establish that the Applicant’s property is still impacted by mould and that most likely this is as a result of both the 2011 and 2014 events. In my view, as there is mould as a result of what are insurable events, then it is fair and reasonable that the FSP attend to the treatment of the mould in accordance with the terms of the policy and to cover the temporary accommodation costs incurred by the Applicant whilst the mould is treated. Case No: 350902 Determination Page 6 of 13 2.3 Is the Applicant required to lodge a further claim for the 2014 incident? The Applicant notified the FSP that they had suffered a further pipe leakage in February 2014 which they had rectified. They did not believe there was any significant structural damage from this but it had exacerbated the issues with the mould. The FSP maintains the Applicant was advised to lodge a new claim regarding the extent of damage, but the Applicant had not done so. I note the advice of the member in their IDR letter is that they had requested that E lodge a claim for this new event as a matter of urgency and investigate the circumstances. The Applicant’s policy is with E and is issued by E but underwritten by the FSP. The FSP have attended the Applicant’s property and had their experts inspect the Applicant’s property following the event. They are aware of the circumstances of there being a burst pipe under the property and the pipe being repaired. The policy covers loss or damage caused by the burst pipe subject to the various exclusions. There is no evidence that the FSP has been prejudiced in its ability to assess the claim and in fact the FSP appears to assess the resultant mould as being associated with this event. In view of my determination that the mould was due to a combination of both the 2011 and 2014 events, I believe it is fair in the circumstances that the FSP meet the cost of eradicating the mould and any temporary accommodatio n costs in accordance with the terms of the policy. 2.4 Is the FSP’s offer of settlement adequate? I do not accept that the FSP’s offer of settlement of the claim in the total sum of $62,517 is adequate to cover the damage sustained to the Applicant’s property . The FSP offered to settle the Applicant’s claim by way of three instalments subject to the confirmation of completion of the claim related repairs. Presumably the FSP considered the Applicant would incur these costs and then seek reimbursement from the FSP. Under Section 1 of the policy headed Home and Contents, the policy provides the FSP the option to either repair, replace or pay the reasonable cost of the repair or replacement for the property. It does not provide in the event of determining to cash settle the claim, that it will only do so upon evidence of completion of the repairs. If the FSP requires the property to be repaired before payment then the FSP should authorise the repair and accept liability on that basis. If the FSP determines not to repair but to cash settle the claim, then it is only fair in the circumstances that the FSP make the cash settlement payment by way of a lump sum payment to allow the Applicant to meet the cost of the repairs. Case No: 350902 Determination Page 7 of 13 I also note that the Applicant’s original cl aim was lodged in December 2011. The FSP did not determine to settle the claim until May 2013. The FSP has not been able to explain why it took such an extended time to determine the matter. In order to settle this claim, I determine that the FSP obtain a further Scope of Works as to the cost of repair to the Applicant’s property including the costs associated with any required underpinning, repacking or re-levelling of the Applicant’s property from a suitably qualified builder who is prepared to conduct the relevant repairs based on the quotation provided. Any cash settlement is to be made as a lump sum payment subject to the FSP being entitled to deduct from that payment any payments already made for the repairs quoted. In addition, the FSP is to meet the costs incurred by the Applicant with respect to the treatment of the mould together with any temporary accommodation costs incurred subject to the Applicant providing suitable receipts to cover those costs. Case No: 350902 Determination Page 8 of 13 3 Supporting information 3.1 Key points on relevant materials/statements Record Key points FSP’s repairer (S) Letter 31 Mar 2012  On 16 February 2012, due to lack of space in the subfloor space, S installed two air movers. Moisture readings were taken from the external brick walls and subfloor soil, returning high levels of moisture.  On 6 March 2012, readings returned high levels of moisture.  On 23 March 2012, the readings had fallen to within acceptable boundaries.  On 28 March 2012, S attended the site again to remove the drying equipment and to spray directly through all external air vents an application of a biocide treatment (Microban) to minimise bacterial growth, limit odours and cross contamination. FSP’s engineer (H) Report 1 Feb 2012  The cracking and movement of the front section is typic al of problems caused by differential movement of footings due to changes in moisture levels (as a result of a drought period finishing) and pest damage of the timber subfloor framing.  It is possible the water escaping from the burst pipe has contributed to the cracking and movement of the rear section of the residence.  The cracking and movement at the rear section is due to differential movement of the stumps due moisture changes of th e foundation soil, continued by water escaping from the burst pipe and subsequent drying out currently underway of the saturated foundation soil. This has been contributed by pest damage.  It is recommended to urgently dry the foundation soil and replace th e severely water damaged subfloor framing and affected flooring.  The minor water damaged subflooring and flooring may be repaired by removing the mould and treating the framing and flooring to prevent further mould growth.  Pest damage needs to be addressed but is not related to water escaping from the burst pipe.  The timber subfloor framing needs bearers to be jacked and packing done between stumps and bearers to re - level the floor. Once this is done, the cracks can be repaired. FSP’s engineer (H) Email 7 Nov 2012  The cracks at the front porch and in the main bedroom at the front southeast corner are well away from the burst water pipe. For this reason, they are not related to the leaking pipe.  The pipe burst occurred in the central area below the kitchen/l aundry and would not have reached below the concrete paving where movement has occurred.  It is unusual for recent roof pointing to crack as it should be flexible. It may be due to poor workmanship.  Cracks of the plaster ceiling and ceiling cornices around the kitchen cupboard should be included as part of the claim.  Packing and re - levelling of the floor as a result of the leaking pipe is Case No: 350902 Determination Page 9 of 13 adequate. FSP’s engineer (H) Letter 8 Oct 2013  The fall of the floor indicates underpinning the perimeter walls of the l aundry and kitchen is not required. Instead, doing this would increase the out of level of the floor in the kitchen.  The tiled area of the hallway, leading to the bathroom, WC and back bedrooms are fairly levelled.  The overall condition of the brickwork is fairly plumb and does not warrant underpinning works to be carried out.  The out of plumb that has occurred is typical of differential movement of the footings due to seasonal changes in moisture content of foundation soil from the long drought and tree ro ot drying.  The out of plumb brickwork is occurring mostly at the rear northeast corner and the front southwest corner, which are areas well away from where the leaking pipe occurred below the kitchen floor.  Any works to the perimeter brickwork are not rela ted to the leaking pipe, except for the reinstatement of the external sliding door of the kitchen and meals area, which is included in the scope of works. FSP’s builder (D) Quotations 6 Oct 2012 6 Jan 2013  Concrete paths have been built up higher than the natural ground level and slope towards the subfloor of the house.  Due to the flatness of the block and the highly reactive clay soil, it is possible water pools under the house in heavy rain.  There appears to be an ongoing drainage issue around the perime ter of the house. It is advised ground level around the perimeter of the house has a fall of 1:100 connected to stormwater to keep water out of subfloor area.  This house has had previous repacking of bearers and joists which indicates restumping may be nee ded. FSP’s builder (D) Emails 11 Mar 2014 13 Mar 2014  The ongoing drainage issues are the levels of the concrete around the perimeter of the house being higher than the natural ground level under the house.  The area near the kitchen has subsided and falls towards the house.  The condition is pre - existing due to the packers. The only damage caused by the water leak is in the kitchen area. Applicant’s engineer (YT) Letters 5 Jun 2013 8 Jul 2013  The water leaking from the broken pipe under the kitchen sink could infiltrate into the ground and flow through the silt layer, causing perched water to build up above the clay layer.  This water could first cause swell of the clay and later decrease its bearing capacity. The footing then would sink and walls would cr ack.  The water leaking from the broken pipe has contributed to the building wall sinking and cracking significantly.  Due to the leak lasting for about three months, it has affected the whole house and all the pinning area. Applicant’s mould cleaner (M) Re port  S treated the subfloor area with Microban, but M’s mycologist tested it for killing mould and it does not have any effect whatsoever.  There is visible mould contamination in the subfloor area and brickwork. Case No: 350902 Determination Page 10 of 13 23 Apr 2014  Moisture readings were above normal. The conditions inside the house are ideal for active mould growth.  Mould remediation is needed as soon as possible and the property should not be occupied until this process is completed. Applicant’s drying and ventilation expert (DA) Report s 26 A pr 2014 6 Aug 2014  There is significant subfloor dampness, mould contamination and excess mould readings internally.  Despite the subfloor being dried, there has been no long term plan to eradicate moisture from the subfloor and there has been no mould reme diation provided at the property to date. For this reason, the premises are uninhabitable.  The existing mould present was caused by the initial water damage issue.  The existing mould was never treated correctly and as a result, it is still present both on the soil under the substrate from the kitchen area as well as on the underside of the substrate where the repaired pipe is located.  The second water leak was at the other end of the dwelling and could not have possible caused this mould issue.  The initial mould treatment involving the use of Microban was a waste and could never remove mould from any affected area. Applicant’s drying and ventilation expert (DA) Email received 18 Aug 2014  The mould treatment the Applicant described was totally inadequate. M icroban does not solve mould issues. This can only be solved by vacuuming or hand cleaning.  Subfloor drying can take months and even years if no permanent ventilation is installed following subfloor drying. The only way to adequately dry a subfloor after t his type of event is for initial drying to take place for a set period and then a permanent subfloor ventilation system installed to continue to remove moisture.  The most recent burst pipe was on the southern end of the dwelling, downhill from the kitchen area , where the mould is still present . Water from the second leak would have flowed directly out of the subfloor entry point on the southeast corner, away from the mould affected area.  No causal link is possible between the second burst pipe and mould gro wth under the kitchen. The only possible explanation is that the mould was caused by the leak directly under the kitchen.  The soil type in the area does not drain easily or particularly effectively but it still drains.  The mould issue in the dwelling has been caused by the untreated mould growth in the subfloor of the house under the kitchen due to the first burst pipe. FSP’s environmental assessor (B) Report 25 Mar 2014  The mould allegedly on the brickwork and mortar is most likely mineral efflorescence.  Elevated numbers of mould ( Penicillium ) were found airborne in the living room and subfloor.  The significant moisture problem in the subfloor area is likely to actively support the growth of moulds such as Penicillium .  The bottom of floorboards and other timbers within the subfloor space were “dry”, buy may have been marginally able to support the Case No: 350902 Determination Page 11 of 13 growth of Penicillium in places.  The fact the spores are viable suggests recent growth rather than old spores given that Penicillium spores deactivate naturally over time, with a half - life in the order of 6 - 12 months.  It is unlikely the pipe burst of 2011 would not have dried since then, especially given documents from S reported the soil was dry at the end of March 2012.  However, a number of spores from a previo us moisture ingress event within the last couple of years could have remained viable, raising the number of spores above the natural background number.  The proximate cause of the dampness and humidity in the subfloor area and the growth of mould is most li kely the more recent pipe burst in 2014, but may have been exacerbated by drainage issues.  It could be possible there was mould growing within the hollow bases of the kitchen cabinetry when the pipe burst in 2011 until the subfloor was dried in March 2012. As that occurred two years earlier, it is unlikely there will be significant spread of viable spores unless the kitchen cabinets were torn out or disturbed.  The mould in the living room is likely caused by direct entry of mould spores blown up from the su bfloor area, moisture ingress to the living room through the floor and subsequent growth there of similar type of Penicillium mould or other source of moisture unrelated to the subfloor.  There is no visible evidence of mould damage within the house.  S treated the mould in a timely and appropriate manner. S sprayed the subfloor with Microban, which is not conclusively demonstrated to be of any real effect against the types of mould commonly found.  S did not have an independent environmental professional (IEP) to assess the mould issue and did not obtain a valid clearance certificate. This means S is unable to demonstrate its efforts were necessary and if so effective.  Without additional data from an IEP, it is difficult for S to support its claims the sub floor soil was dry at the end of March 2012. With the current data it is difficult to demonstrate the subfloor was or was not dry between March 2012 and the end of 2013.  While some rainwater may enter the subfloor from the driveway and rear courtyard, it i s unlikely that much would be able to enter given the large roof the large grated drain observed in that location.  The most likely scenario is the most recent pipe burst allowed a vast amount of water enter the subfloor and this has spread over the not - fre ely - draining clay soil under the house. FSP’s building consultant (R) Report 28 Mar 2014  Despite H’s call for kitchen repairs, the kitchen is not damaged and any repairs can be done under the floor.  The sections of mortar falling off would have been caused by weak mortar affected by water percolating upwards from the ground.  Some of the damage to external walls has been caused by long term shrinkage that has not been allowed for in the house design.  Most of the other damage to external walls appears t o have been caused by walls heaving in response to increase in the moisture content of the earth around the footings. This damage does not Case No: 350902 Determination Page 12 of 13 justify underpinning.  Most of the internal cracks are located near the inner parts of the house with very few of them occurring along external walls. This is due to the centre of the house being pushed upwards relative to the external walls, because the stumps are higher and in more sensitive locations that the external wall footings.  In brick veneer houses like this one , footings under brick walls are different to footings under the stumps. When soil expands or shrink, the stumps move at a greater relative rate than the walls. When the earth becomes moist and expands, the stumps push bearers upwards whereas the walls do not move at the same extent.  After a long term drought followed by high rainfall periods, reactive soil shrank in the region , which caused many buildings to settle. In particular, stumps in brick - veneer buildings settled to a greater extent than the wall footings, causing the floor bearers to separate.  In this building , packing was inserted into the gap between the stumps and bearers.  This has been happening to this house, and it has been exaggerated by the broken pipe under the kitch en. Being close to the centre of the house, water has clearly spread over the whole house area and the soil is still quite damp.  This upward movement can cause strain in pipes and other fittings. It is possible damage to the pipes occurred as a result of t his effect.  The second pipe break was of a shorter duration and much more localised. It may however have induced some cracking in the adjacent wall, none of which is serious.  The upheaval of the timber frame may also have caused some damage at the walls be cause the frame has moved relative to the walls.  The house is vulnerable to water infiltration through the external walls, which has caused the earth under the house to remain damp years after the first pipe burst.  The pipe burst under the kitchen caused the earth under the house to become wet, causing damage inside the house. However, the continuing dampness under the house indicates there may be further problems that do not appear to be related to the pipe burst under the kitchen.  The dampness in the sub floor earth is too widespread to have been caused by the more recent pipe breakage in the southeast corner.  The comparatively light damage to the external walls does not justify underpinning.  The southeast corner water leak has not resulted in any damage. There may be some minor cracking in brick joints nearby but it is unlikely. FSP’s loss assessor (C) Reports 18 Oct 2012 6 Feb 2013 6 Mar 2013  After review of H’s scope of work, all areas relate to the water leak and therefore will b e covered under the policy.  Three of the areas of concern raised by the Applicant (lounge, bedroom 2 and toilet) are located near the 2011 water leak and are thus related to the claim.  H has outlined issues to be rectified by the Applicant, including Case No: 350902 Determination Page 13 of 13 10 Apr 2013 5 Mar 2014 drainage issues and pest damage.  H has agreed to include works to the lounge room, laundry and kitchen and D has allowed an additional of about $3,500 for th is .  Temporary accommodation should be covered and settled. For a period of eight weeks, the Applica nt is seeking $2,320.  Around March 2014, S has attended again and sprayed a further application of Microban on the underside of the floorboards. No Microban treatment was carried out in the house itself.  S advises there is no point in applying Microban ins ide the house without testing to identify the source or if indeed t here are airborne mould spores.  S advises tests would need to be carried out to narrow down the source to identify the sort of mould eradication procedure required. 3.2 Other relevant material relied upon  Product Disclosure Statement with effective date 16 May 2011.  Renewal schedule for the period 21 July 2011 to 21 July 2012.  Handwritten receipts for temporary accommodation with dates 14 March, 14 April, 14 May, 14 June and 14 July 2014.  The parties’ submissions.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.