Determination 350897

Adequacy of cash settlement for fire building repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-12-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$37,850
Non-financial loss—
Amount claimed$353,751
SourceAFCA PDF

Summary

The applicants disputed a $335,933 cash settlement for fire repairs and sought a further $224,067 plus about $130,000 in claim costs. AFCA increased the settlement by $35,000 and ordered $2,850 in building consultant fees reimbursed, rejecting the remaining claims.

The insurer must pay the reasonable cost of repairs, so additional damage caused by delay for which it is responsible is payable, while unapproved professional fees, rent and unsupported quotes are not.

Issues

Subjects and remedies

home or building damagelanguage or cultural barrierpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 350897 Determination Page 1 of 11 Case number : 350897 3 December 2014 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for fire damage to their home in November 2011. The FSP accepted the Applicants’ claim and provided them with a cash settlement totalling $335,933 for the building repairs. However, the Applicants say that the cash settlement amount is not sufficient, as the scope of works on which it is based does not include all of the required repairs. The Applicants seek a further sum of $224,067 for the building repairs, as well as an additional amount of approximately $130,000 as compensation for costs incurred during the claim process. 1.2 Issues and key findings Is the cash settlement for the building repairs sufficient? The cash settlement amount does not include all of the additional damage identified by the FSP’s building consultant as having arisen due to the fire and the claim delays. The claim records do not suggest that the Applicants were responsible for these delays. What is an appropriate cash settlement amount? The cash settlement amount should be increased by $35,000 to reflect the additional damage to the building which has not been provided for to date. Are the Applicants entitled to any additional amounts? The Applicants are entitled to reimbursement of fees of $2,850 paid to their building consultant (GC) as his report assisted in identifying additional damage to the property. The Applicants are not entitled to any additional amounts. 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is to pay the Applicants the amount of $37,850 in full and final settlement of this dispute. Case No: 350897 Determination Page 2 of 11 2 Reasons for Determination 2.1 Is the cash settlement for the building repairs sufficient? Key issue in dispute concerns adequacy of additional variations to scope of works Since the FSP accepted liability for the Applicants’ claim on 23 February 2012, the parties have been engaged in a protracted dispute about the scope of works for the repair of the fire damage to the building. The scope of works for the repairs was initially prepared by the FSP’s building consultant (IC), following which the FSP obtained quotes from three builders to undertake the works. However, the Applicants disputed the scope of works and engaged their own building consultant (GC) who inspected the damage to the property and advised that IC’s scope of works was inaccurate and out of date . The Applicants then engaged a claims consultant (LM) to represent them. LM appointed another building consultant (PM), who reviewed IC’s scope of works and provided a lengthy and detailed analysis that identified a number of alleged deficiencies. PM’s report prompted a simil arly detailed rebuttal from IC. At one stage during this process, the FSP appointed the builder who had provided the lowest quote (EC) to carry out the repairs. However, the repairs did not proceed when the Applicants rejected the building contract put forward by EC and sought to propose their own terms. In early 2013, the Applicants engaged one of the other builders who had quoted for the repairs (JL) to carry out the demolition works specified in IC’s scope of works. Both parties were of the view that it would be easier to identify any additional damage and assess any required variations to the scope of works once the demolition works had been completed. After carrying out the demolition works, JL identified additional variations to the original scope of works with a total cost of $36,320. The FSP has accepted the variations proposed by JL, less the costs ($500) for obtaining a hazardous materials report, which the FSP considered was not required given JL had confirmed that there was no asbestos present. The FSP also engaged IC to prepare a further report identifying any additional works required. During the course of the claim, the FSP has cash settled the Applicants for a total of $335,933 for the cost of the building repairs. This amount is made up of:  the amount of $288,874 quoted by EC in April 2012, based on IC’s original scope of works;  an amount of $9,787.80, reflecting the costs of ensuring that the works complied with the requirements of applicable environmental sustainability regulations (approved by the FSP in October 2012);  an amount of $1,452 for the cost of replacing anti-ponding boards and an upstairs bathroom mirror (approved by the FSP in October 2012); and  an amount of $35,820, being the costs of the additional variations identified by JL in May 2013. Case No: 350897 Determination Page 3 of 11 The FSP says that the cash settlement amount fully discharges its obligations under the policy. The FSP considers that it has in fact overpaid the Applicants by $25,000 because the cash settlement amount includes allowances for works which were not ultimately undertaken. However, the FSP has not sought to recover this amount. The Applicants disagree that the cash settlement amount of $335,933 paid to date is sufficient to repair the property. They say that this amount should be increased by a further $224,067 (such that the total amount paid would equal the building sum insured of $560,000). In particular, the Applicants say that:  based on a report prepared by their building consultant (PM) dated 1 May 2013 , JL’s assessment of the additional variations to the scope of works is incomplete;  the quotations on which the FSP has based the cash settlement significantly underestimate the actual cost of the repairs; and  the cash settlement does not take into account the additional works required as a result of the further deterioration of the property during the course of the claim. IC’s further report identifies additional fire damage After reviewing the additional variations proposed by JL as set out in his letter dated 16 May 2013, the FSP appointed IC to carry out a further inspection of the property in order to identify:  any additional works required to the building as a direct result of the fire;  any additional works which had become necessary due to progressive deterioration of the property as a result of the protracted delay in resolving the claim; and  any aspects of the above works which were already included within the scope of works. IC prepared a report dated 19 June 2013 which set out his conclusions in relation to each of the above matters. There are aspects of IC’s report which are not entirely clear, particularly the extent to which he took into account the additional variations proposed by JL in identifying any further works required. Accordingly, it is necessary to carefully consider each of the additional items identified by IC to determine whether or not they have been accounted for in the cash settlement paid to date. The Panel has reviewed each of the additional items of damage which IC identified as having been caused by the fire and comments as follows: Item Panel comments Mirror within the level 3 bathroom  This item was not identified in IC’s original scope of works, but was included as part of the additional settlement amount approved by the FSP in October 2012 . Accordingly, no additional allowance is required. Case No: 350897 Determination Page 4 of 11 Item Panel comments Four floor joists on level 3  The additional v ariations proposed by JL include the replacement of three joists on level 2 and two joists on level 3, at a total cost of $2,070. Accordingly, allowance should be made for the replacement of two further floor joists (at a cost of approximately $8 0 0). Lev el 3 floor linings  The replacement of the l evel 3 floor linings was not included in IC’s original scope of works (which assumed that the floor linings could be retained and restored). However, the replacement of the l evel 3 timber flooring has been includ ed in the additional variations proposed by JL. Accordingly, no further allowance is required. Level 2 floor linings  IC report specifies that the replacement of the l evel 2 floor linings as an additional item of damage. This item was not identified in JL’s additional variations nor was it specifically identified in IC’s original scope of works (although the scope does refer to the sanding and polishing of “new timber f loor linings”). Accordingly, it is unclear whether the cash settlement takes this item into account.  In these circumstances, the Panel considers that an additional allowance should be made for the replacement of the l evel 2 floor linings. Given the areas o f l evel 2 which had timber flooring and the e stimated cost of replacing the l evel 3 floor linings, the Panel considers that an additional allowance of $8,2 00 is appropriate.  In determining this amount, the Panel has taken into account that the original sc ope of works included the sanding and polishing of the floor linings for both l evels 2 and 3. FSP should be liable for additional damage arising from claim delays In his report dated 19 June 2013, IC identified additional damage to the building which had arisen as a result of the protracted delays in resolving the claim. The FSP says that it should not be liable for the costs of repairing this damage as the claim delays were caused by the Applicants . In particular, the FSP says that the Applicants failed to provide information requested by the FSP for the purposes of investigating the claim and refused to enter into a contract with the FSP’s appointed builder (EC) so that repairs could commence. IC’s report con firms that it was not possible to effectively cover the building to prevent further damage until after the demolition works had been completed. IC states that therefore the delay in carrying out the demolition works resulted in considerable additional water damage as a result of the building remaining exposed to the elements. Case No: 350897 Determination Page 5 of 11 The Applicant’s builder (GC) who inspected the property in April 2012 noted that, by that time, the property had already sustained extensive additional water damage as a result of not having been protected from the elements. In these circumstances, the Panel considers that it is reasonable to assume that the initial delay of approximately five months between the date of the fire and GC ’ s inspection was sufficient in itself to cause the additional damage identified by IC in his report. Having reviewed the claim history, the Panel does not consider that the Applicants were responsible for the five month delay during this period. The available information establishes that there was an initial delay of approximately three months while the FSP investigated the claim, before accepting liability in late February 2012. The FSP requested extensive information from the Applicants for the purposes of its investigations including telephone and financial records and travel details for the Applicants and their two children, and receipts for repairs to the property. Accordingly, there was some delay while the Applicants sought this information from third party service providers, which was most likely exacerbated by the Christmas/New Year holiday period. However, the FSP was also unable to complete its investigations until it received reports from the police and fire brigade in relation to the fire. The claim records indicate that this information was not received until at least late January 2012 and the FSP’s investigator did not provide his report until 13 February 2012. The FSP did not advise the Applicants of the outcome of its investigation until on or around 27 February 2012. After the FSP accepted liability for the claim, there was a further period of approximately two months while the FSP obtained a scope of works and three quotations for the building repairs. There is no information to suggest that the Applicants were in any way responsible fo r the time taken to complete this process. For the reasons outlined above, the Panel considers that the FSP should be responsible for the cost of repairing any additional damage which occurred during the five month period between November 2011 and April 2012. Given the views expressed by the Applicants’ building consultant (GC) in April 2012, it is reasonable to assume that the bulk of the additional damage to the building had already occurred during this period. Cash settlement should be increased to cover damage resulting from delays The Panel has reviewed each of the items which IC identified as additional damage resulting from the delays and comments as follows: Item Panel comments All the timber wall frameworks and associated bracing and wall - tie el ements  The replacement of the timber wall frameworks for levels 2 and 3 (to the extent not included in IC’s orig i nal scope of works) were included in the Case No: 350897 Determination Page 6 of 11 Item Panel comments additional variations proposed by JL , at a cost of $23,6 50 .  However, the replacement of the level 1 wall frameworks were not included in JL’s additional variations or IC’s original scope of works (which assumed that the level 1 wall frameworks remained undamaged).  Accordingly, the Panel considers that an additional allowance should be made for the replac ement of the level 1 wall frameworks. Given the estimated cost of replacing the level 2 and level 3 wall frameworks, the Panel considers that an additional allowance of $10,000 is appropriate. Wall linings, tiles, waterproofing, fixtures and fittings in the level 1 laundry and adjoining bathroom  These items were not included in the original scope of works as it appears that they were not damaged by the fire. However, neither were they included in JL’s additional variations.  Accordingly, the Panel conside rs that an additional allowance should be made for these items. In the circumstances, the Panel considers that an additional allowance of $10,000 is appropriate. Level 1 doors  Most of the doors on level 1 were considered to be salvageable following the fi re and therefore were not included in IC’s original scope of works. However, neither were they included in JL’s additional variations.  Accordingly, the Panel considers that an additional allowance should be made for these items. In the circumstances, the P anel considers that an additional allowance of $1,000 is appropriate. The Panel is comfortable that the above analysis takes into account the extent to which each of the items identified were already allowed for in the cash settlement paid by the FSP (whi ch the FSP has referred to as a “credit”). Accordingly, no further adjustment on this basis is required. Items identified in PM’s report have largely been accounted for In his report dated 1 May 2013, PM identified 33 separate items which he described as major variations to the original scope of works prepared by IC . Having carefully reviewed each of these items, the Panel is comfortable that the bulk of them have been allowed for in the cash settlement amount paid by the FSP (or the additional allowances outlined above) or do not justify any additional allowance being made. The Panel notes that both IC and JL have provided a detailed and reasonable explanation of how many of the items identified by PM were adequately addressed in IC’s original scope of wo rks. Further items (such as the replacement Case No: 350897 Determination Page 7 of 11 of the timber wall frameworks) were addressed in the additional variations proposed by JL. The Panel is satisfied that the information provided by PM In relation to the bulk of the remaining items is not sufficient to establish the need for any further variations to the scope of works. For example, PM has referred to the need for the replacement of all of the existing brickwork due to the potentially corrosive effects of effluent due to the fire. However, IC and JL have confirmed that the original scope of works provided for cleaning of the brickwork, consistent with industry practice. PM has not provided any further information (such as test results) to support his position that the brickwork needs to be replaced because it is infused with thiols (organosulfur compounds). In the circumstances, the Panel is not satisfied that a specific additional allowance should be made for any of the items identified in PM’s report. Available information does not establish quotations provided are inaccurate The Applicants say that the builders’ quotations relied upon by the FSP for the purpose of determining the cash settlement amount significantly underestimate the cost of the repairs. In support of their position, the Applicants have provided a quotation provided by their building consultant (GC) for $554,533 and a quotation provided by a second builder (B) for $570,596. However, the fact that other builders have quoted significantly higher amounts for the repairs does not of itself establish that the quotations obtained by the FSP were inadequate. The FSP obtained quotes from three builders, who each quoted a very similar amount (with the difference between the highest and lowest quotes being less than 2% of the total costs). Further, the quotes were obtained on the basis that the builders would be prepared to undertake the repairs for the quoted amount. The only reason t his did not occur was because the Applicants and the FSP’s appointed builder (EC) were unable to agree on the terms of the contract for the repairs. In these circumstances, the Panel does not consider that the information provided by the Applicants is sufficient to establish that the quotations on which the FSP based the cash settlement amount were inadequate. 2.2 What is an appropriate cash settlement amount? Policy requires FSP to pay reasonable cost of repairs Under the terms of the Applicants’ policy , the FSP is required to repair their house, or to pay them the reasonable cost of the repairs. While the FSP originally elected to repair the house, it subsequently provided a cash settlement, due to the Applicants’ dissatisfaction with the terms of the buildin g contract offered. The Applicants have advised that the property has since been sold. In these circumstances, the only appropriate remedy is to require the FSP to increase the Case No: 350897 Determination Page 8 of 11 cash settlement amount to reflect the additional items identified above which have not been included in the cash settlement paid to date. The total additional allowance for these items is $30,000. In the circumstances, the Panel considers that, it is appropriate to allow an additional amount of $5,000 (approximately 15%) as a buffer, in the event that any of the amounts estimated by the Panel are insufficient and/or to cover any other minor items which have been omitted from the original scope of works or JL’s additional variations. The Panel is satisfied that the resulting increase of $35,000 to the settlement amount of $335,933 is fair in all the circumstances. In arriving at this amount, the Panel has taken into account the delays experienced during the course of the claim. Accordingly, the FSP is not required to pay interest on this amount. 2.3 Are the Applicants entitled to any additional amounts? Applicants seek reimbursement of significant additional costs The Applicants seek reimbursement of various costs incurred during the claim process. Although the Applicants’ dispute form re fers to a total of $126,840 in costs, it appears the correct figure is $129,683.97 (being the total of the individual items listed below). Item Amount Demolition costs charged by JL $ 26,000 Variation costs charged by JL $ 22,847 GC ’s fees (inspection and quotation) $ 2,850 LM ’s fees (3 invoices) $ 19,192.80 PM ’s fees $ 6,114.17 Rent - November 2012 to July 2013 $ 33,240 Rent – Further 9 months $ 19,240 Pool cleaner (maintenance) $ 200 TOTAL $ 129,683.97 Cash settlement amount includes demolition and variation costs The demolition costs of $26,000 and the variation costs of $22,847 which the Applicants have referred to are not consistent with the documentary information provided. The Applicants have provided a copy of an agreement with JL dated 12 March 2013 which provides for the demolition works to be undertaken at a cost of $22,847 (which is the amount the Applicants have referred to as a variation). It is not clear where the amount of $26,000 has been derived from. Case No: 350897 Determination Page 9 of 11 In any event, the Panel is satisfied that the cash settlement amount paid by the FSP included the costs of undertaking the demolitions works. The cash settlement amount was based on EC’s quotation which had been prepared based on ICs original scope of works, which included the demolition works later carried out by JL. As outlined above, the cash settlement amount paid to date included an amount of $35,820 in respect of the additional variations proposed by JL and approved by the FSP in May 2013. Accordingly, the Applicants are not entitled to any further payment for demolition and variation costs. Policy requires FSP’s approval before professional fees are incurred The Applicants’ policy entitles them to reimbursement of reasonable fees paid to architects, engineers and surveyors, where necessary to rebuild their home following an insured event. However, it is a condition of the policy that the FSP agree to any such fees before they are incurred. The Applicants did not obtain the FSP’s consent prior to engaging G C, LM or PM. Further, the fees were paid for the purpose of disputing the FSP’s settlement of the Applicants’ claim, rather than for the purpose of rebuilding the property. In these circumstances, the FSP is not obliged under the terms of the policy to reimburse the Applicants for the fees incurred. Applicants are entitled to partial reimbursement of fees only Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal or other professional costs incurred by an applicant in the course of their dispute. A financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. In the present circumstances, the Panel is satisfied that it was reasonable for the Applicants to obtain a report from their building consultant (GC) in April 2012 for the purpose of disputing the initial cash settlement offered by the FSP. GC identified that significant further damage had occurred as a result of the property remaining exposed to the elements. In circumstances where the Panel has found that the FSP is liable for this damage, it is appropriate that the FSP be required to reimburse the Applicants for GC’s fees (totalling $ 2,850). However, the Panel is not satisfied that it was necessary or appropriate for the Applicants to engage a claims manager (LM) to handle their claim. The nature of the FSP’s internal dispute resolution (IDR) process (and the FOS process) is such that it is generally unnecessary for app licants’ claims to be professionally managed. While the Applicants themselves were unable to speak English, they had the assistance of their son and daughter who represented them during the claim process. Case No: 350897 Determination Page 10 of 11 In these circumstances, the Applicants are not ent itled to reimbursement of LM’s expenses. The Panel considers that PM’s involvement was of little to no value in progressing the Applicants’ claim and appears in some respects to have escalated the current dispute. The extensive report prepared by PM in August 2012 outlined a large number of issues which had already been dealt with in IC’s scope of works. PM also identified a number of other matters which were already governed by applicable statutory requirements and therefore did not need to be specifically addressed in IC’s scope of works, or which were unnecessary in the context of repairs to a residential property. In these circumstances, the Applicants are not entitled to reimbursement of PM’s expenses. Applicants are not entitled to compensation for rental costs The rental costs claimed by the Applicants are in addition to the 12 months ’ worth of temporary accommodation benefits paid by the FSP, which is the maximum benefit available under the policy. This period expired in November 2012. As outlined above, the Panel considers that the FSP was responsible for the five month delay in progressing the Applicants’ claim between November 2011 and April 2012. However, the Panel is not satisfied that the FSP is responsible for any further delays following this period (during which the additional rental costs were incurred). These further delays occurred due to the Applicants’ reluctance to sign the building contract which would have allowed the FSP’s builder (EC) to commence the works in or around May 2012. The contract estimated that the works would take approximately 13 to 15 weeks. Accordingly, they should have been completed by November 2012 (even allowing time for any additional variations which were identified during the course of the works). The Panel accepts that the Applicants’ reluctance to sign the building contract proposed by the FSP’s builder (EC) was partly driven by concerns about the adequacy of IC’s scope of works (which the Panel has found were partly justified). However, the Panel co nsiders that the Applicants’ behaviour were also based on their concern that the FSP would not accept liability for any further variation works which were identified as required during the repair process. The Panel is not satisfied that the approach taken by the Applicants was reasonable, in circumstances where the FSP had explained that, under applicable legislation, the works could not commence until they signed the building contract. Further, the FSP had recognised (based on IC’s scope of works) that fur ther works might be required in the event that the preliminary demolition works revealed further fire damage to the building. The Applicants also had the comfort of the lifetime guarantee of the works provided by the FSP, in accordance with the terms of th e Applicants’ policy. Case No: 350897 Determination Page 11 of 11 In addition, the Panel notes that the alternative contractual terms offered by the Applicants were clearly inappropriate in the context of the works required. The terms of the Applicants’ contract required, among other things, the appointment of a superintendent and project manager (at the builder’s cost) In the circumstances, the Panel considers that the FSP is not responsible for the further delays which occurred after April 2012 . Accordingly, the FSP is not required to compensate the Applicants for additional rental costs incurred during this period. Applicants are not entitled to compensation for pool maintenance costs The costs of maintaining the swimming pool at the property is a cost associated with ordinary home maintenance, rather than a cost arising from the fire or the FSP’s management of the Applicants’ claim. Accordingly, the Applicants are not entitled to compensation for this amount. 3 Supporting information 3.1 FOS approach to this Determination This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference . The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.