Determination 350351

Denial of sub-floor storm damage claim: cause excluded (subsidence, settling or faulty workmanship)

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for sub-floor damage they said was caused by storm water after a void appeared in June 2013. The FSP denied the claim as the damage was caused by excluded sub-soil water and backfill issues, and the determination found in favour of the FSP.

On the balance of probabilities the damage was caused by sub-soil water acting on previously backfilled material, which is not an insured storm or flood event and falls within the policy exclusions.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition Determination Case No: 350351 Determination Page 1 of 5 Case number : 350351 6 August 2014 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for damage to the sub-floor of their home, after a large void appeared following heavy storms in late June 2013. The FSP denied the Applicants’ claim on the basis that the damage was not caused by storms, floods or any other event insured under the policy, but by factors which are excluded under the policy (such as subsidence, settling or shrinkage of foundations or faulty design or workmanship). The Applicants dispute the FSP’s decision. They say that the damage to the sub - floor was caused by surface water from heavy storms in the area, which ran into the sub-floor area. 1.2 Issues and key findings Is the damage covered under the policy? The damage to the roof was caused by the caused by the effects of sub -soil water on the backfill material in the relevant area, rather than by rainwater run-off or floodwater following the storms in late June 2013. Under the terms of the policy, the FSP is not liable for this damage, as it was not caused by an insured event. 1.3 Determination This Determination is in favour of the FSP. The FSP is not re quired to pay the Applicants’ claim . Case No: 350351 Determination Page 2 of 5 2 Reasons for Determination 2.1 Is the damage covered under the policy? Application of policy depends on cause of damage The Applicants ’ policy is a defined events policy, which provides cover for damage caused by certain specified events (including the insured events of “storm” and “flood”), subject to the conditions and exclusions set out in the policy. The policy excludes cover for damage arising from:  landslide or subsidence (unless caused by an earthquake or explosion);  settling, shrinkage or expansion in buildings, foundations, walls or pavements ; or  faulty design or workmanship. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. Accordingly, the Applicants must establish that, on the balance of probabilities, the damage was caused by a storm or flood. If they are able to do so, then the onus shifts to the FSP to establish, on the balance of probabilities, that the damage was caused by one or more of the factors set out above. Damage was caused by effects of sub-surface water on previously backfilled area The available information establishes that, on the balance of probabilities, the damage to the sub-floor of the Applicants ’ property was caused by the effects of sub-surface water, which caused a previously backfilled area of the sub-floor soil to collapse. While the engineer initially appointed by the FSP (“PT”) was unable to definitively identify the cause of the damage, he concluded that the most logical explanation was that it had been caused by the effects of sub-soil water flow over a long period of time, which had destabilised an area of the sub-floor which had been backfilled with a loose clay/soil mixture at a time before the house was built. PT’s findings as to the most likely cause of the damage were later confirmed by a specialist geotechnical engineer (“SG”) appointed by the FSP. SG confirmed that the ongoing seepage of water through the backfilled soil had caused a progressive loss of the fine sandy material used as backfill. SG noted that the original backfilled feature may have been significantly smaller and the zone of weakness may have progressively increased in size by erosion due to subsurface seepage, possibly exacerbated by the construction of subsoil drains in the surrounding area. Case No: 350351 Determination Page 3 of 5 The Applicants dispute the findings of the FSP’s engineers as to the cause of the damage. They say that the soil under the sub -floor was washed away by rainwater run-off and/or flood water which entered the sub-floor area following heavy storms. They say that their neighbour witnessed stormwater running down the side of their property and other nearby houses had their ground floors flooded. However, the Applicants’ position that the sub -floor soil was washed away by stormwater run-off or floodwater is inconsistent with the observations of the various experts who inspected the property. In particular, neither the FSP’s loss assessor (who attended the property one week after the claim was lodged) nor the Applicants’ building inspector (who attended two weeks later) identified any signs of surface run-off in the relevant area . Further, the loss assessor’s report indicates that the male Applicant advised him that the stormwater drains installed at the property had been operating effectively. Both of the engineers appointed by the FSP identified evidence of sub-soil water and considered that the damage to the sub -floor had occurred over a prolonged period of time. This is consistent with the comment by the Applicants’ building inspector that he found no sign of the sub-floor soil which had been washed away (as might be expected if the damage had been caused by a recent storm). I consider that the engineers appointed by the FSP are appropriately qualified to determine the cause of the damage to the sub-f loor of the Applicants’ property. The reports prepared by the engineers provide a logical, reasonable and consistent explanation as to how this damage occurred. I note that:  the Applicants have provided a brief statement by a plumber who subsequently installed a stormwater drain at the property confirming that he did not identify “any unusual ground problems” . However, this statement does not address the specific issues identified in the FSP’s engineers’ reports; and  the Applicants have also provided a copy of a surveyor’s report prepared prior to the construction of their house. However, other than a reference to a drainage trench which has been excavated into the property, this report does not provide any information about the characteristics of the soil or the particular features of the site. Based on the available information, I am satisfied that, on the balance of probabilities, the damage to the Applicants’ sub -floor was caused by the effects of sub-soil water on the backfill material in the relevant area, rather than by rainwater run-off or floodwater following the storms in late June 2013. Accordingly, under the terms of the policy the FSP is not required to indemnify the Applicants for the damage to the sub-floor of their property. Case No: 350351 Determination Page 4 of 5 3 Supporting information 3.1 Reports Report Key points FSP’s loss assessor Report – 9 July 2013  There wa s a large void under the house on the rear of the brick garage wall. It appears that the void has been washed out by water at some stage.  There was no sign of water damage to the surface of the soil under the house and it appears that there is an issue with sub - surface moisture .  The male Applicant advised that he only noticed the void aft er recent heavy rain but he had not been under the house for approximately three to four months before this. Accordingly, the void may have been present for some time.  The male Applicant advised that he had not noticed any water or moisture in the garage a t any stage.  There was no sign of any water run - off on the surface of the back yard of the Applicants’ property. The male Applicant advised that when there is heavy rain the water from the neig hbouring property run s onto the back yard, but a drain had been installed at the rear fence to stop water entering the yard , and this drain ( together with a rubble drain on the western side) appear ed to be operating without any problems.  The front yard of the Applicants’ hous e near the end of the driveway wa s still wet and the male Applicant advised that it didn’t dry out very often.  The void appears to have been caused by sub surface water as there is no indication of any surface run off. The damage may have been happening for a period of time. Applicants’ building inspector Report – 23 July 2013  Investigations of the uphill area and adjoining soil conditions did not reveal the cause of the collapse as the base of the hole was wet but there was no indication of running water or pooling water.  Accordingly, th e cause of the collapse (and where the soil from the hole had moved to) could not be determined. There was no evidence of water or washed soil in the downhill garage floor or walls or the lower area of the property. FSP’s engineer (“PT”) Report – 5 August 2013  The foundations are clay over a lower level shale substrate which the Applicants’ builder had confirmed is typical of the area.  Bureau of Meteorology records show that substantial rainfall was recorded in late June 2013 and the six months from Januar y to June 2013 had higher than average rainfall. However, no particular storm could be identified as the cause of the sub - floor damage.  The overland flow path for stormwater from the rear of the property was generally over well built paths and no eroded Case No: 350351 Determination Page 5 of 5 Report Key points ov erland water flow path was present.  The hole under the house consisted of a void of 0.5 metre s deep extending 1.5 to 2.0 metres below the crusty top layer of the soil, and then a soft damp clay/soil mix up to 1.5 metres deep above the shale or solid base . The lower levels of the clay/soil mix were water charged.  The clay/soil mix was not virgin material but was made up of loose unconsolidated backfill.  No direct stormwater flow could be identified which had caused the soil to collapse, resulting in the ho le.  While there is no clear and obvious cause of the hole, the most logical explanation is that there had been backfill of the area before the house was built (as indicated by the unconsolidated soil/clay mix in the area). T his material had subsequently be en destabilised by subsoil groundwater flow over the long term . FSP’s geotechnical engineer (SG) Report – 4 September 2013  A geotechnical assessment was carried out to assess the geotechnical factors which may be involved in the subsidence observed beneath the house.  The assessment included a walkover, manual drilling of a borehole and a dynamic cone penetrometer test to assess the nature and consistency of the natural soil profile .  The soil which had collapsed within the 3 metre long by 1 metre wide zone of subsidence exhibited layers and pockets of loamy sand amongst the clay loam and sandy clay, indicating that the area ha d been disturbed or filled in the past . Free water was present within the disturbed soil in the subsided area.  The surficial (su r face) silty sand and clay loam we re easily eroded and mobile in nature.  The subsidence had occurred within a localised backfilled feature , which was not recognised at the time of construction . The patchy nature and layering of the fill indicate d that it w a s more likely to have been done by a machine than to have occurred naturally.  The subsidence and collapse of the surface crust was triggered by the p rogressive loss of silty and fine sandy material with ongoing seepage through the disturbed soil.  The original backfilled feature may have been significantly smaller and the zone of weakness may have progressively increased in size by erosion, similar to tunnel gullying, arising from the presence of a concentrated line of subsurface seepage, which coul d have been exacerbated by the construction of subsoil drains using coarse granular material to provide drainage behind structural walls.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.