Determination 349392

Responsible lending on construction loan, delay, loan term expiry and financial difficulty handling

FirmFinancial Firm (Unknown - Credit)
Decided2015-07-21
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$6,000
Amount claimed—
SourceAFCA PDF

Summary

The applicants complained about the approval and management of construction and portfolio loans, including delay and financial difficulty handling. AFCA rejected the responsible lending and delay claims but ordered non-financial loss payments for complaint handling and financial difficulty failures.

A lender's approval is assessed by the standard at the time, and FOS cannot review a firm's credit risk decisions, so the non-financial loss awards rest on the failures to respond to complaints and hardship requests.

Issues

Subjects and remedies

financial hardshippay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 349392 Determination Page 1 of 1 Determination Case No: 349392 Determination Page 1 of 13 Case number : 349392 17 June 2015 1 Overview 1.1 Dispute In July 2007, the Applicants obtained loan account from the FSP for $435,000 to purchase a vacant block of land on which to build two units (Land Loan). In February 2008, the same Applicants obtained a loan for $1,165,000 (Construction Loan) to pay out the Land Loan and build two units on the land (Bchm Properties). Details of the facilities and properties relevant to this dispute are set out in sections 3.2 and 3.3 below. This dispute is about whether the FSP:  acted responsibly in advancing the Construction Loan  caused the construction of the Bchm Properties to be unreasonably delayed  otherwise erred in its dealings with the Construction Loan, and  responded appropriately to the Applicants’ financial d ifficulty. 1.2 Issues and key findings Did the FSP act responsibly in advancing the Construction Loan? The FSP acted appropriately in relying on the value of the Bchm Properties and not the Applicants ’ incomes in assessing and approving the Construction Loan. Did the FSP cause the Construction to be unreasonably delayed? The FSP took approximately 10 weeks to process the Construction Loan which was not unreasonable given the complex nature of the transaction. Did the FSP otherwise err in its dealings with the Construction Loan? The FSP failed to follow its usual process when the Construction Loan term expired, however the Applicants did not suffer loss as a result. The FSP failed to respond appropriately to the Applicants’ complaint in December 2010 and is required to pay each Applicant $500 ($2,000 in total) as a result. Did the FSP respond appropriately to the Applicants’ financial difficulty? The FSP failed to respond appropriately to the Applicants’ request for financial difficulty assistance with the Construction Loan and is required to pay each Applicant $750 ($3,000 in total) as a result. Case No: 349392 Determination Page 2 of 13 The FSP also failed to offer financial difficulty assistance to Mr and Mrs L in relation to the Portfolio Loans and required to pay them $500 each ($1,000 in total) as a result. 1.3 Determination This Determination is substantially in favour of the FSP. Within 14 days of the Applicants ’ acceptance of this Determination the FSP is required to:  reduce the balance of the Construction Loan by $5,000 comprising the Applicants’ awar d for non-financial loss in this dispute, and  reduce the balance of Loan 3 by $1,000, comprising Mr L and Mrs L’s award for non-financial loss in this dispute. Going forward, the parties should work together in the manner set out in section 2.5 below. Case No: 349392 Determination Page 3 of 13 2 Reasons for Determination 2.1 Did the FSP act responsibly in advancing the Construction Loan ? The law and the Code of Banking Practice (CBP) set the standard A financial services provider has obligations to exercise the care and skill of a diligent and prudent banker in assessing whether a customer has the ability to repay a loan. These obligations exist because of the law and the CBP. Generally, as part of a standard loan assessment process, a financial services provider should:  request documentation to support the loan application  make further inquiries where there are obvious inconsistencies in the information, and  ensure there is sufficient information and supporting documentation provided to demonstrate capacity to service the loan. The FSP’s advance of th e Construction Loan was appropriate The Applicants say that the FSP failed to act responsibly when it assessed and approved the Construction Loan because:  the purpose of the Construction Loan was a commercial venture and not residential  the FSP failed to make any enquires about their financial position at that time. Had the FSP made enquiries, it would not have approved the Construction Loan as the Applicants were unable to service it without experiencing financial difficulty, and  the FSP engaged in asset lending when it advanced the Construction Loan as the FSP relied on the property value of the Bchm Properties, as a means to repay the Construction Loan, which is contrary to the CBP. In circumstances such as the current dispute where the finance obtained was for a short-term commercial purpose, it not unusual for the FSP to rely on the sale of the Bchm Properties as the source of repayment for the Construction Loan and not the Applicants ’ ability to meet monthly payments. It is clear from the available information that the FSP processed the Land Loan and the Construction Loan on the understanding that the purpose of each was to build and, upon completion, sell the Bchm Properties. As such the FSP:  based its approval of the Construction Loan on the valuation of the Bchm Properties and the other proposed security and the likelihood of the sale of those assets at that time  capitalised interest on the Land Loan which meant only one payment was required on the expiration of the Land Loan term - there was never an intention for the Applicants to meet monthly payments, and  capitalised interest on the Construction Loan until the expiration of the Construction Loan term, again demonstrating there was never an intention for the Applicants to be required to meet monthly payments. Case No: 349392 Determination Page 4 of 13 The Applicants’ circumstances and the property market changed after the advance of the Construction Loan. However to establish a claim that the FSP ought not to have approved the Construction Loan, the Applicants would need to establish the FSP erred at the time it assessed and approved the Construction Loan. Based on the reasons outlined above, I consider the FSP’s approval of both the Land Loan and the Construction Loan was appropriate in the circumstances at that time. 2.2 Did the FSP cause the construction to be unreasonably delayed? The FSP did not cause the construction to be unreasonably delayed The Applicants say that the FSP unreasonably delayed approving the Construction Loan between September 2007 (when they purchased the land for the Construction) and March 2008. As a result the Applicants say they:  “suffered the effects of the Global Financial Crisis”, and  incurred interest on the Land Loan (which was subsequently refinanced by the Construction Loan). A timeline of events relevant to the Applicants’ claim in this regard is set out at section 3.4 below. In relation to those event I make the following observations:  The FSP’s lending policy required that before it could obtain valuations or approve the Construction Loan it required council approved plans and specifications for the Bchm Properties and a signed building contract.  The Applicants signed the building contract on 17 December 2007, approximately three months after the Applicants purchased the Land. The FSP is therefore not accountable for any alleged delay caused to the Construction Loan transaction process prior to 17 December 2007.  It took the FSP approximately 10 weeks from the date of the signed building contract to approve and generate the Construction Loan and supporting documents for signing.  While 10 weeks may seems a long timeframe (given that ordinarily a settlement of this nature may take between 4 to 8 weeks to process and approve), in this case it was not unreasonable because: o the Construction Loan was a complex transaction involving guarantees, multiple security properties and multiple parties – including family trusts plus the refinance of the Land Loan, and o the application and approval process occurred over the Christmas and New Year period.  It is apparent that the Applicants caused a delay between 27 February 2008 and 27 March 2008 when they returned incorrectly executed documents to the FSP.  After the FSP received all the necessary documents the FSP advanced the first instalment under the Construction Loan on 2 April 2008. Despite this, the Applicants say they did not commence construction until June 2008, some two months later. Case No: 349392 Determination Page 5 of 13 On balance having regard to the factors identified above, it has not been shown that the FSP caused the construction to be unreasonably delayed. I consider that the 10 week period was not only reasonable in the circumstances but was caused at least in part by the actions of the Applicants. It is therefore not necessary to consider the Applicants’ claims fo r loss in this regard. 2.3 Did the FSP otherwise err in its dealings with the Construction Loan? The FSP failed to follow its usual process when the loan term expired The Applicants say that:  although the Construction Loan had a credit limit of $1.165 million, the FSP allowed the debt to increase to $1.3 million by 2010 when the loan term expired, and  the FSP failed to contact them upon the expiry of the Construction Loan term, or when the limit increased above the agreed amount. As a result, the Applicants were not aware of the status of the Construction Loan account. The FSP says that where, as in the current dispute, a fixed term loan was not discharged at the end of its term, it would usually consider that account was in default and refer the account to its Collections Department to work with the customers to bring the account to a resolution. This did not happen in the current dispute. A timeline of relevant events is set out at section 3.5 below. On the basis of that timeline, and the FSP’s response t o this issue it is clear that the FSP failed to follow its usual procedures and refer the Construction Loan to its Collections Department in 2009. The Applicants did not suffer any loss The Applicants say the amount of the Construction Loan was $1,165,000 and the FSP erred in allowing the debt to increase to nearly $1,300,000. However, the Construction Loan agreement provided that the capitalised debt to be repaid upon the expiration of the Construction Loan term was $1,274,663.12. There is nothing to show the Applicants’ position would have been improved if the FSP had followed its policy and called in the Construction Loan earlier. In particular the Applicants would have:  been required to sell the Bchm Properties or the FSP would have taken legal action to recover possession and sell them  been unable to finish the Bchm Properties  incurred further fees for the sales (and potentially default interest) in the interim  been required to find alternate accommodation and incurred the associated costs, and Case No: 349392 Determination Page 6 of 13  possibly been left with a shortfall debt, given that the Applicants ’ prior attempt to sell the Bchm Properties had been unsuccessful and they had repeatedly indicated the local market was not strong. Further, despite being able to charge default interest under the terms and conditions of the Construction Loan from April 2009, to date the FSP has not applied any default interest to this account. Based on the above reasoning, although the FSP failed to refer the Construction Loan to its Collections Department in a timely fashion, it has not been shown that this failure caused the Applicants to suffer any loss. The FSP did not owe a fiduciary duty to the Applicants The Applicants say that the FSP: never once offered any financial advice in how best to deal with all outstanding loans [after the Construction] was completed; and the auction held provided no interest The FSP did not owe a fiduciary duty, or a duty to act in good faith for the benefit of another person, to the Applicants. A fiduciary responsibility arises only where the financial services provider’s role is seen to extend beyond that of finance provider and into the area of advice. This happens if the financial services provider provides advice or otherwise causes the customer to reasonably believe that the financial services provider has assumed that responsibility. The financial services provider is otherwise in a position of lender, not advisor. There is nothing in the available information to show the FSP was anything other than a lender in its dealings with the Applicants. It was not required to, and it would have been inappropriate for it to, have provided the Applicants with financial advice in the circumstances. FOS cannot review the FSP’s credit risk decisions The Applicants have said that: The principle (sic) complaint is that had the [FSP] discussed with [them] in 2009/2010 how best to solve the problem of writing new loans (as the debt already existed as it sat between the two trusts) then the situations we are in today would never exist. In fact we believe all that had to happen was the transfer of debt out of the trusts split between [them ]. It would appear that the Applicants’ complaint is that the FSP failed to agree to write new loans to allow the Applicants to transfer the debt from the trusts and replace it with new residential loans. It is clear from the available information that at the expiration of the Construction Loan term the Applicants no longer satisfied the FSP’s interna l policies to enable it to “re - write the loans”. The Financial Ombudsman Service (FOS) cannot consider a dispute that relates solely to a financial services provider’s assessment of a borrower’s credit risk or the security to be required for a loan. Accordingly I cannot require the FSP to accept the Applicants’ proposals to write new loans. Case No: 349392 Determination Page 7 of 13 The FSP failed to respond appropriately to the Applicants’ complaint The CBP provides that a subscribing bank, such as the FSP, will generally within 21 days of becoming aware of a dispute, complete its investigation and inform its customer of the outcome of that investigation. The timeline in section 3.5 below shows that although the Applicants did not make a formal complaint to the relevant FSP department, their email of 2 December 2010 should have been treated as a complaint. As such, the FSP should have either directed the Applicants to its complaints department and/or provided them with a formal written response. While the FSP ultimately approved the sale of the H Property, it did not address any of the other matters raised by the Applicants in the 2 December email. Nor does it appear that the FSP respond to the Applicants’ email in writing. I accept that in the circumstances of this dispute the FSP’s failure to respond to the Applicants’ complaint caused them unreasonable stress and inconvenience. The Applicants were already in a state of anxiety about how to resolve their financial issues with the Construction Loan and that anxiety was heightened by the FSP’s non -responsiveness. Accordingly, I consider it fair that the FSP compensate each Applicant $500 ($2,000 in total) by way of debt reduction to the Construction Loan. 2.4 Did the FSP respond appropriately to the Applicants’ financial difficulty The FSP has obligations to customers in financial difficulty Under the CBP the FSP should genuinely consider a request for assistance from a customer in financial difficulty. The customer should also be willing to work with the FSP and propose a realistic repayment plan that will repay the debt within a reasonable timeframe. The FSP failed to assist the Applicants with the Construction Loan It is clear from the timeline in section 3.6 below that the Applicants requested options and assistance with the Construction Loan from the FSP in their emails to Mr R dated 16 November and 2 December 2010. Although the Applicants ’ email stated “our financials clearly indicated our ability to service the debt”, it is apparent from the FSP’s own assessment with a view to “re - writing loans” that this was not correct. The FSP’s internal email of 3 December 2010 noted that “the file must be referred to Collections for management”. However it appears this did not occur until 23 January 2014 when this dispute was lodged with FOS. Case No: 349392 Determination Page 8 of 13 The Applicants suffered unreasonable stress and inconvenience In the circumstances of this dispute I accept that the FSP’s failure to respond to the Applicants’ requests for assistance created stress and inconvenience. As the Applicants stated they felt they were left in “limbo”. Accordingly I consider it fair that the FSP compensate each Applicant $750 ($3,000 in total) by way of debt reduction to the Construction Loan. The FSP failed to respond to Mr and Mrs L’s financial difficulty with the Portfolio Loans Mr and Mrs L have not raised a complaint with FOS in relation to the FSP’s response to their financial difficulty with the Portfolio Loans. However it is clear from the available information that these were the sole accounts about which financial difficulty assistance was discussed between the parties. The FSP has provided a copy of its collections department’s records but none from its assistance department – with whom certainly Mr L spoke with on a number of occasions. Although Mr L and Mrs L were required to work with the FSP to enable it to provide them with financial difficulty assistance, it is clear that the FSP was on notice in October 2010 that they were experiencing financial difficulty (when advised Mr L was unemployed) and it took no steps to obtain information from them to enable it to give genuine consideration to their circumstances until February 2011. On that basis the FSP has not shown it responded appropriately to Mr and Mrs L’s financial difficulty with the Portfolio Loans. The delayed response by the FSP to Mr and Mrs L in relation to the Portfolio Loans would have added increased anxiety at a time where they were already anxious about the Construction Loan. I therefore consider it fair that the FSP compensate Mr and Mrs L for the stress they suffered as a result by paying each of them $500 ($1,000 in total) non-financial loss to reduce the outstanding balance of Loan 3. 2.5 Actions required if the Applicants accept this Determination If the Applicants accept this Determination and continue to experience financial difficulty in meeting payments to the Facilities, they should each provide a statement of financial position and a reasonable repayment proposal the FSP. In turn the FSP is to give any such proposal genuine consideration. Should the Applicants not accept this Determination then the FSP is not required to pay them any compensation for their non-financial loss arising from this dispute. If the Applicants accept this Determination but are unable to put forward a repayment proposal for the Facilities acceptable to the FSP, or they fail to meet their obligations to the FSP under the Facilities, then the FSP is entitled to commence collection activity. Case No: 349392 Determination Page 9 of 13 3 Supporting information 3.1 FOS approach As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a Recommendation and has proceeded directly to Determination. I have considered all the material submitted by the parties in order to reach my decision. I am satisfied that the material relied upon in reaching my findings has been exchanged between the parties. I am required to do what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance as to practice, good industry practice and previous relevant decisions of FOS or its predecessors (though I am not bound by these). 3.2 The Applicants’ FSP facilities The Applicants variously obtained the following facilities from the FSP (collectively referred to as the Facilities ). Loans 1 to 3 ( the Portfolio Loans ) already existed at the time of the Construction Loan application: Loan Details Security O utstanding Balance at 13 Jan 2015 Mr and Mrs L’s Portfolio Loan a/c no. ending 6469 ( Loan 1 ) The Blm Property (Mrs L was the sole owner of this property) $130,483.30 Mr and Mrs L’s Portfolio Loan a/c no. ending 4563 ( Loan 2 ) The Blm Property $177,069.65 Mrs L’s Portfolio Loan a/c ending 8601 ( Loan 3 ) The Blm Property A guarantee from Mr L $508,168.38 The Trust and the M Trust a/c ending 3500 ( the Construction Loan ) The Bchm Properties , 2 nd mortgage over t he V Prope rty The Blm Property and a guarantee from each of Mr and Mrs L and Mr and Mrs M $1,247,206.43 Case No: 349392 Determination Page 10 of 13 3.3 The Applicants’ properties Property Status at May 2015 The H Property (Mr and Mrs L’s former residence) The Applicants sold this in late 2010 and applied the funds to reduce the Construction Loan The Blm Property Currently tenanted by a third party The B Property Repossessed by the FSP in April 2012 and sold The V Property Mr and Mr’s M’s home The Bchm Properties  One unit has been occupied by Mr and Mrs L since December 2010 when they sold the H Property  The other unit is tenanted 3.4 Timeline of Events relevant to the unreasonable delay claim Date Event Time elapsed between events September 2007 The Applicants purchased the Bchm property by obtaining a loan from the FSP. N/a 17 December 2007 (Monday) The Applicants signed the Building Contract Approximately 3 months 22 & 23 January 2008 (Tuesday & Wednesday) The FSP obtained the necessary valuations 5 weeks (over the Xmas and New Year period) 6 February 2008 (Wednesday) The FSP completed its “Facilities Worksheet” in support of its internal referral of the application for approval 2 weeks 10 February 2008 (Monday) The FSP referred the application i nternally to the appropriate department for approval 2 working days 11 February 2008 – 14 February 2008 The FSP generated documents in support of the application 1 – 3 working days 15 February 2008 (Friday) The first entry appeared in the FSP’s credit “e lectronic “loans diary” 1 working day 19 February 2008 (Tuesday) The FSP approved the Construction Loan and generated the Loan documents 1 working day 20 February 2008 (Wednesday) The FSP sought internal clarification about the titleholders of the Bchm Property 1 working day 25 February 2008 (Monday) The FSP sent the Guarantee documents to the guarantors 2 working days Case No: 349392 Determination Page 11 of 13 27 February 2008 (Wednesday) The Applicants signed the Construction Loan agreement 2 working days 13 March 2008 (Thursday) The FSP internal solicitors received the signed Guarantee and supporting documents from the Applicants. However these were incomplete and it returned these to the Applicants for correct execution 2 weeks 20 March 2008 (Thursday) The FSP received incomplete guara ntee documents. Requested completed documents 1 week 27 March 2008 (Thursday) The FSP received the returned correctly executed documents and referred the matter internally for approval 1 week 2 April 2008 (Wednesday) The Construction Loan settled 3 working days June 2008 The Applicants say construction commenced and was completed in 2009 Approximately 2 months 3.5 Relevant timeline of events The following timeline of events was compiled from all the available information and documents in this dispute: Date Event 2 April 2008 The first instalment under the Construction Loan was advanced 2 April 2009 The Construction Loan term expired. The Construction Loan agreement stated that the loan term ended 12 months from the settlement date (being the first date funds were advanced under the Construction Loan). On or about 25 May 2009 Practical completion of the Construction occurred August – September 2009 Additional superficial works were carried out at the Bchm Properties such as landsc aping etc Between September 2009 and May 2010 There are no entries in the FSP’s electronic Construction Loan diary during this eight month period Late 2009 The Applicants say they auctioned the Bchm Properties but they failed to sell 16 November 2010 The Applicants emailed the FSP raising a number of issues including:  why the FSP “didn’t call in the loan when due”  the sale of Property “H”  other options moving forward Case No: 349392 Determination Page 12 of 13 17 November 2010 The Applicants met with the FSP to discuss options including the sal e of security properties and the “re - writing” of the Construction Loan 2 December 2010 The Applicants emailed the FSP requesting a response and assistance and raised the following issues:  they had not heard anything from the FSP and settlement of [the H P roperty] was to occur the following Tuesday  why the FSP had not acted earlier and allowed interest to grow. The FSP should have “called in the loan 18 months ago”.  their financials clearly indicate they could service the debt  they had moved into one of the Bchm Properties  it was not their fault the property market had turned out they way it did The FSP referred the matter internally the same day, noting that the “most annoying part is that no one will call him” and noting the Applicants had made a “complaint”. 3 December 2010 The FSP approved the sale of the H Property and internally confirmed the matter was to be referred to its Collections Department. However this did not occur Between 13 December 2010 and 27 June 2011 The Loans Diary contains n o entries during this six month period 28 June 2011 The FSP’s Loan diary show the Applicants contacted it to “discuss the development project” which it understands to be the Construction Loan. It told the Applicants to speak with their local FSP branch. I t is unsure if they did so 3.6 The Portfolio Loans financial difficulty timeline The following timeline has been taken from the FSP’s collections departments’ electronic records for the Applicants: Date Event March 2010 There were a couple of missed payments on Loan 2 about which the FSP spoke with Mr L who confirmed the reason was an “oversight” 2 October 2010 The FSP spoke with Mrs L about Loan 2 and she confirmed Mr L was unemployed but could not talk further as she was busy 15 February 2011 The FSP sent a letter to the Applicants requesting they contact its financial difficulty department in relation to Loan 2 12 March 2011 The FSP spoke with Mrs L and she said they had applied for assistance. Case No: 349392 Determination Page 13 of 13 19 May 2011 The FSP received an email from the Applicants requesting assistance in relation to Loan 2 and Loan 3 24 May 2011 The FSP sent a letter to the Applicants requesting it contact it about the request for assistance 1 June 2011 The FSP declined the Applicants request for assistance as they h ad failed to contact it 3 June 2011 The FSP sent a letter to the Applicants confirming it had declined their request for assistance 25 June 2011 The FSP telephoned Mrs L and:  she confirmed during this call that Mr L had been dealing with its financial di fficulty department and “had meant to call” and that “the business was not doing as good and [they] had a low income and financial problems”.  it told her there were no arrangements in place and to contact its financial difficulty assistance department as soon as possible. 28 June 2011 The FSP’s financial difficulty department spoke with Mr L about the arrears on Loan 2 and Loan 3 and he requested to speak to someone about the Construction Loan and the FSP referred him to the local branch 27 July 2011 The FSP received an email from the Applicants requesting that someone contact them to discuss the Bchm Properties and the Construction Loan. The FSP responded the same day providing them with is financial difficulty department’s contact details 28 July 2 011 Mr L contacted the financial difficulty department and requested to “sit down and discuss strategy with him”. The FSP responded by providing its assistance department’s details 23 November 2014 The Construction Loan first entered the FSP’s collections systems

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.