Construction loan declined late despite valuation held by FSP
Summary
The Applicants bought land for a development and incurred architect, deposit and other costs before the FSP declined their construction loan. AFCA found the FSP had held a valuation showing the security was incomplete and ordered reimbursement of costs with interest and $1,500 each for stress.
The FSP already held information showing the guarantor security was unacceptable and failed to act on it or warn the Applicants in time, so it must reimburse the avoidable expenditure.
Issues
- Delay primary · upheld
“The FSP failed to take into account the valuation until it was too late; it had knowledge of the guarantor property's unacceptability from June 2013 but declined the loan in November 2013.”
- Poor communication secondary · upheld
“At no stage did the FSP inform the Applicants that they were running a risk, and it failed to communicate the valuation issue to them in a timely manner.”
Subjects and remedies
pay compensationpay interestpay non financial loss
Text of the determination
Determination
Case No: 348746 Determination Page 1 of 5
Case number : 348746 1 5 Ju ly 2014
1 Overview
1.1 Dispute
The Applicants had pre-approved finance from the FSP and signed contracts of
sale for 3 vacant blocks of land, 2 of which were adjoining. They sought loans to
buy the blocks, plus a building loan to build on the standalone block and a pre-
approved building loan to build on the 2 adjoining blocks together. The building
loans were to be secured by a guarantee from the father of one of the Applicants,
supported by his residential property (the guarantor property).
The FSP represented to the Applicants that they required a building contract
before construction finance could be approved. To this end, the Applicants
incurred architect and other associated costs in relation to all 3 properties.
After one of the 2 adjoining properties had already settled, the FSP declined the
construction loan on the basis that the guarantor property was incomplete. The
Applicants cancelled settlement of the remaining 2 properties and now claim the
costs they incurred with a view to obtaining the construction finance for all 3
properties.
1.2 Issues and key findings
Was the FSP’s conduct in declining the loan applications an error that
caused the Applicants loss?
The FSP had a valuation of the guarantor property on its files from June 2013. It
therefore knew that the property was incomplete. The Applicants incurred costs
which could have been averted by the FSP acting on the information it already
held. As a result, the FSP is liable for those costs.
1.3 Determination
This Determination is in favour of the Applicants.
The FSP is to compensate the Applicants as follows:
the sum of $24,109.43 being $23,238 plus interest of $871.43 calculated at
the rate of 5% per annum from 1 October 2013 to 1 July 2014. Interest
continues to accrue at the rate of $3.18 per day.
$1,5 00 to each Applicant for the stress and inconvenience the FSP’s conduct
caused them.
within 14 days of the Applicants’ acceptance of this Determination, pa yable as the
Applicants direct.
Case No: 348746 Determination Page 2 of 5
2 Reasons for Determination
2.1 Was the FSP’s conduct in declining the construction loan
application an error that caused the Applicants loss?
The FSP erred in failing to review the valuation of the guarantor property
until after one of the 2 adjoining properties had settled
The FSP had a valuation of the guarantor property on its file dated June 2013.
The valuation was clear in its references to the guarantor property being
incomplete and also included photographs of where there was unfinished work.
While I accept that the valuation had been obtained for a purpose other than the
Applicants’ lending, nonetheless the FSP had corporate knowledge of the
contents of the valuation. Therefore the FSP already knew that there were issues
with the suitability of the guarantor’s property from June 2013.
On 20 August 2013 the FSP interviewed the Applicant’s father by phone about
becoming a guarantor for the loans, some 3 months prior to the construction loan
application being declined for his property being incomplete. By this time the
Applicants had commenced instructing the architect for plans for the standalone
property. However, t he Applicants’ construction loan was not declined until
November 2013.
The FSP failed to take into account the valuation until it was too late.
In the meantime the Applicants incurred avoidable expenditure as a result of
the FSP’s error
The FSP failed to act on the information contained in the valuation even after it
had spoken to the Applic ant’s father. It could have declined the lending at that
time and the Applicants would not have gone ahead with the rest of their
expenditure.
Equally, the only issue with the lending was the state of the guarantor property.
The FSP accepts that had the guarantor property been acceptable, the lending
would have been approved, and again the Applicants would not have suffered a
loss. In other words, the only hurdle to the lending was information that the FSP
already knew about but the Applicants did not.
Nonetheless there is an argument that the Applicants , by incurring the architects
fees and other costs that they did prior to the finance being unconditionally
approved, did so at the risk that it could still be declined. That is, the Applicants
decided to incur the costs without certainty that construction finance would be
provided. Therefore the FSP ought not be held liable for those costs incurred.
I have considered this argument. I have reviewed all of the substantial email
correspondence between the Applicants and the FSP from July to October 2013.
I dismiss this argument for the following reasons:
At no stage did the FSP lead the Applicants to believe that there could be any
difficulty with the construction loan application or the guarantor property, until
its credit department declined the loan application in November 2013.
Case No: 348746 Determination Page 3 of 5
The FSP told the Applicants that a builders contract was required before a
construction loan could be provided. This was even though the construction
loan was to be secured by the existing equity in the blocks of land plus the
guarantor property, and not by any equity in the proposed building.
The Applicants were in constant contact with the FSP and made it aware at
the relevant times that they were incurring the expenditure for which they are
now out of pocket. The Applicants communicated their concern about the
expenditure they were incurring to the FSP, but at no stage did the FSP inform
the Applicants that they were running a risk.
The FSP already had knowledge that the guarantor property was
unacceptable security but failed to communicate this to the Applicants in a
timely manner.
In all the circumstances, the FSP must reimburse the Applicants for their
expenditure incurred as a result of the FSP’s error.
Additionally I accept that the Applicants experienced significant stress and
inconvenience as a result of the FSP ’s conduct in declining the ir loan application
so late in the piece. It resulted in the Applicants cancelling settlement of the other
2 properties as well as being left with only one out of the 2 blocks of adjoining
land. The plans that had been developed for the 2 blocks together were rendered
useless.
Accordingly I award the Applicants $1,500 each as compensation for their stress
and inconvenience.
3 Supporting information
3.1 Background – further detail
The Applicants were granted pre-approved finance by the FSP in July 2013 of
$515,000.
On 24 July 2013 the Applicants signed a contract of sale to purchase a vacant
block for $125,000, subject to finance.
The Applicants signed contracts of sale on 18 September 2013 for one of the
adjoining properties for $102,500 and on 25 September for the other adjoining
property for $90,000. The Applicants planned to build town house dwellings
complimentary to and dependent on each other on both properties.
On 18 September 2013, the FSP commenced formal consideration of the
Applicants’ loan appli cations which included an application for a building loan to
build on the stand alone property plus preapproved finance for building town
houses on the adjoining properties. The building loan was to be supported by a
guarantee from the father of one of the Applicants, with the guarantee secured by
the guarantor property. The FSP had obtained a valuation of the guarantor
property dated 20 June 2013.
Case No: 348746 Determination Page 4 of 5
The FSP offered the Applicant a loan of $95,000 to purchase the first adjoining
property on 10 October 2013. Settlement for that property was completed on 25
October 2013. The FSP also approved loans to purchase the other two blocks,
subject to finance.
However, on 12 November 2013, before the other adjoining property and the
stand alone property had settled, the FSP declined finance for the construction
loan for the stand alone property on the basis that the guarantor security was
incomplete. The FSP accepts that but for the guarantor property being
incomplete, it would have approved the lending.
The Applicants therefore decided to cancel settlement on the other two properties
in an attempt to recoup funds outlaid. They had the FSP decline the loans as the
contracts of sale were conditional on finance. However, the Applicants were left
out of pocket as a result.
3.2 Costs claimed
The Applicants paid deposits and incurred costs including architects fees, council
fees and survey fees, on the understanding that this e xpenditure was necessary
in order to obtain the building loan as well as pre-approved finance for the other
building loan. This was because the FSP required a building contract to be in
place before it would approve a building loan.
The Applicants were also left unable to use any of the plans that the architect had
developed, for the standalone property (settlement cancelled) and for the
adjoining properties (settlement cancelled on one of them). I have awarded them
all of these costs as they would not ha ve been incurred, but for the FSP’s failure
to act on the valuation in a timely manner.
The Applicants claimed $3,000 in travel costs but have not provided supporting
documentation. They say they paid for these in cash. I accept that some travel
expenses were incurred but as they cannot be substantiated at the level of
$3,000, I have awarded $1,000.
The Applicants claimed lenders mortgage insurance of $2,345. However, this has
been appropriately incurred on the loan that the Applicants drew down which is
secured by the property that they did purchase .
The Applicants claimed land survey fees of $757 but have been unable to
substantiate these. Accordingly I have not awarded these.
The Applicants claimed $8,500 for a Housing Construction Grant that they would
have been eligible for, had they signed a building contract prior to 31 December
2013. However their claim for this grant fails, on the basis that had the FSP
declined the lending in a timely fashion, the Applicants would not have qualified
for the grant in any event.
Case No: 348746 Determination Page 5 of 5
3.3 Costs awarded
Costs awarded Amount
Standalone property lost deposit $525
Adjoining property lost deposit $2,230
Architect costs standalone property $1 ,971.20
Architect costs adjoining properties $16,264.25
Council fees adjoining properties $1,247
Travel costs $1,000
TOTAL $ 23, 23 8
I also award the Applicants $1,500 each for the stress and inconvenience the
FSP’s conduct caused them.