Home / Financial Firm (Unknown - Insurer) / Determination 348142

Determination 348142

Settlement amounts for storm, theft and motor claims; defective storm repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-10
ProductGeneral Insurance · Motor
OutcomeFor the complainant in part
Amount awarded$31,789
Non-financial loss$3,000
Amount claimed$166,236
SourceAFCA PDF

Summary

The applicant disputed the FSP's settlement of storm, theft, contractor-damage and motor claims, and the substandard repairs left after the storms. AFCA ordered further repairs, a $15,000 contents payment with interest and $3,000 for distress, and upheld the FSP's motor vehicle valuations as fair.

The FSP must make good defective repairs and pay a reasonable contents loss on the balance of probabilities, while motor settlements based on market value using accepted methods were fair.

Issues

Subjects and remedies

home or building damagemental healthmotor vehicle collisionnatural disastertheft or burglarypay claimpay interestpay non financial lossreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount General Insurance - Domestic Insurance - Motor Vehicle- Comprehensive - FSP Decision - Claim amount Determination Case No: 348142 Determination Page 1 of 14 Case number : 348142 11 December 2014 1 Overview 1.1 Dispute The Applicant lodged the following claims under her home insurance policy and motor vehicle insurance policies held with the Financial Services Provider (FSP).  2010 storm damage to the home and contents  2012 storm damage to the home and contents  2012 theft of contents  contents damaged by tradesmen  2011 impact damage to sleepers and gate  2013 motor vehicle claim for Holden Rodeo  Motor vehicle claim for Toyota LandCruiser The FSP accepted liability for each of these claims as follows:  repairs in relation to the storm damage claims in the sum of $16,849.20  settled the contents claims by payments in the sums of $5,000, $7,200 and $6,885.45  damage to sleepers – paid $308  damage to gate – paid $1,245  offered $4,195 in settlement of the Holder Rodeo claim  offered $13,500 in settlement of the Toyota LandCruiser claim. The Applicant maintains the FSP‟s offer does not allow her to engage contractors to carry out the remedial works which she estimates at $65,450. Further, her contents loss is $93,786. She is seeking $7,000 for the Holden Rodeo. This dispute has not been the subject of a Financial Ombudsman Service (FOS) Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. 1.2 Issues and key findings Were the original building works done to the home unsatisfactory? The initial building works were unsatisfactory as reported by the loss adjuster. Has the FSP accepted responsibility for the poor standard of the initial remedial works? The FSP accepted the cost of remedial works determined by the loss adjuster. Case No: 348142 Determination Page 2 of 14 Has the Applicant established her loss in relation to the damaged, missing/stolen contents? The Applicant has established her contents loss is in excess of the FSP‟s offer . Has the FSP discharged its obligations in relation to the impact damage to the gate and sleepers? The FSP has paid the Applicant for the damage to the gate and sleepers. Is the FSP’s settlement offer for the Holden Rodeo fair? The FSP‟s offer is fair as it is based on an accepted procedure. Is the FSP’s settlement offer for the Toyota Prado fair? The FSP‟s offer is fair as it is based on an accepted procedure. Is the FSP’s settlement offer for the Toyota LandCruiser fair? The FSP‟s settlement offer is fai r as it is based on an accepted procedure. Is the Applicant entitled to compensation? The Applicant is entitled to compensation as she was emotionally and psychologically impacted by the ongoing experience with her claim. 1.3 Determination This Determination is partially in the Applicant‟s favour. Building damage  The FSP‟s responsibility for the r oof is limited to the scope of works and quotation in the sum of $7,536 submitted by building contractor LBG.  The FSP‟s responsibility for the i nsulation is limited to the scope of works and quotation in the sum of $6,215 submitted by LBG.  The FSP is responsible for painting the lounge room, stained timber architraves, master bedroom and daughter‟s bedroom in addition to the scope of works submitted by LBG.  The FSP‟s responsibility for the locks is limited to the scope of works submitted by LBG in the sum of $497.20.  The FSP is to arrange for the non-compliant electrical works to be rectified; provide the Applicant with the appropriate certificate of compliance; return the lighting back to LED lights and reinstate the original switching.  The FSP is not responsible for carpets, roof/wall air conditioners, pergola roof, and outdoor table/chairs. However, as there is evidence of dust damage, the FSP should assess the cause of damage to the air conditioners and rectify as necessary.  The FSP is responsible for temporary accommodation for the Applicant and her daughters for the period of time taken to carry out the remedial works. Case No: 348142 Determination Page 3 of 14 In the event the remedial works cannot be carried out at the costs quoted, the FSP is to pay the additional costs which may be incurred to carry out these works subject to compliance with LBG‟s scope of works. Contents missing/stolen/damaged The FSP is to pay the Applicant the additional sum of $15,000 in settlement of the contents claim. The FSP is to pay interest on this sum from 14 November 2011, being the date the FSP offered settlement of this element of the claim, until the date of payment to the Applicant. Gate/sleepers The FSP‟s responsibil ity is limited to the sums of $1,245 and $308 respectively for these items. Holder Rodeo The FSP‟s responsibility for the Holder Rodeo is limited to $4,450. The FSP is not required to pay the cost of removing the vehicle f rom the Applicant‟s home. Toyota Prado and Toyota LandCruiser The FSP‟s responsibility for these claims is limited to $8,775.65 and $12,440 respectively. Compensation The FSP is to pay the Applicant $3,000 compensation in accordance with the FOS Terms of Reference. Case No: 348142 Determination Page 4 of 14 2 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There are claims in respect of a number of incidents supported by documentary evidence to varying degrees. I have taken into account all the material submitted by the parties. This matter has been ongoing for some considerable time and is having a serious detrimental effect on the Applicant‟s health and wellbeing. For this reason it is appropriate to bring the matter to finality. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. 2.1 Were the original building works to the home unsatisfactory? The original building works were unsatisfactory The Applicant expressed dissatisfaction in relation to the building repairs involving the roof, insulation, electrical work, replacement of halogen lights, plaster works, painted surfaces, locks and the house cleaned of building materials. A roofing contractor IL (report 11/7/12) following inspection of the roof concluded, apart from a tile which was replaced, all other fractured tiles were caused by poor workmanship during restoration process and general service life of the roof. L oss adjuster “ C ” was commissioned to investigate the Applicant‟s complaints in relation to defective storm damage repair works and damage to her building and contents caused by builders. The inspection took place on 11 February 2014 in company with the Applicant, her friends “R” and LBG. Following the inspection it was decided:  a roofing contractor be appointed to report on the roof issues  an electrical contractor to check and report on the electrical issues, and  that a scope of works be prepared by the building contractor for rectifying the unsatisfactory internal painting. 2.2 Has the FSP accepted responsibility for the poor standard of the initial remedial works? The FSP has accepted responsibility for most of the poor standard of the initial works I have listed and itemised various aspects of work which require remedying . Roof Following the inspection of the Applicant‟s home by the loss adjuster C and others, a report was received from roofing contractor RC. RC, in his detailed and Case No: 348142 Determination Page 5 of 14 comprehensive report, concluded the extent of unsatisfactory workmanship previously carried out to the roof to rectify the storm damage was limited to:  installing new bedding and pointing to replace the two areas worked on as part of the storm damage repairs  repositioning all replacement tiles to the least visible site of the roof  apply matching paint to replacement tiles to achieve best aesthetic outcome. The building contractor LBG provided a Property Repair Quotation including a scope of works to make good the previously poor workmanship as follows:  Roof tiles – $7,536 The works included: - re-bed and re-point all ridge capping and valleys - replace about 45 broken tiles - wash and de-moss entire roof - paint roof. I am satisfied the scope of works includes the cost of making good the poor workmanship previously carried out to the roof. The roofing contractor identified a number of other problems with the roof which were ongoing maintenance matters as listed in section 3 of this Determination. Those listed items are the result of gradual deterioration and ongoing wear unrelated to the storms in 2010 and 2012. Accordingly, the FSP is not responsible for the cost of rectifying these items or replacing the roof. Insulation The Adjuster C arranged for LBG to check the ceiling cavity and advise of any problems. LBG provided a scope of works to install about 100m2 of insulation bats and quoted $6,215 for this work. The Applicant‟s claim for this item has therefore been satisfied and should be met by the FSP. Painting Loss adjuster C reported the standard of painting was poor in the lounge room with insufficient coverage and lack of protection with masking tape. The master bedroom was the worst affected by poor standard painting. Stained timber architraves had white paint marks . One of the daughter‟s bedroom s had a nail visible with no stopping. The room had a feature wall which had been painted over. A Property Repair Quotation and scope of works prepared by LBG included repainting of feature wall in bedroom 3. However, the scope of works did not include rectification of the substandard painting referred to by the adjuster C. As it is clear painting in other areas of the home has been identified as poor, the FSP is to include the substandard works noted by loss adjuster C in a revised scope of works and quotation. These are:  lounge room Case No: 348142 Determination Page 6 of 14  stained timber architraves  master bedroom  d aughter‟s bedroom . The cost of all the repainting then will be met by the FSP. Entry Locks The contractor LBG has also quoted to change existing entry locks with keyed alike keying system to front door, security door, rear sliding door and rear security sliding door. The quotation for this work was $497.20. I find that the Applicant‟s claim for this item has therefore been satisfied and should be met by the FSP. Electrical Loss Adjuster C noted two areas of concern:  the home was experiencing problems with short circuiting  LED lights had been replaced with halogen down lights with altered switching. The Applicant maintains these lights are inferior to the original lights. A report provided by Energysafe Victoria noted a report received from LBG identified several non-compliances in the electrical installation work performed by contractors. Energysafe Victoria required these and any other non-compliance works to be rectified promptly. I have not been provided with any evidence to show these works have been carried out or the Applicant‟s complaints in relation to the new lighting have been resolved. If this is the case, the FSP is to:  arrange for the non-compliant electrical works to be rectified  have the lighting returned to that which was in place prior to the damage, being LED lights with appropriate switching. Carpets, roof air conditioner, wall air conditioner, pergola roof, outdoor table/chairs The Applicant says:  The carpets which were replaced following the 2010 storm were again saturated during the 2012 storm.  The air conditioner was contaminated with plaster dust and the wall air conditioner has not operated since the 2012 storm.  The pergola roof was damaged in the 2010 storm. Adjuster C‟s report makes no mention of these items following his site vis it on 11 February 2014. In the absence of any independent evidence to establish these items fall within the cover provided by the policy, I am unable to include them in any award to the Case No: 348142 Determination Page 7 of 14 Applicant. However, there is evidence of considerable dust damage to the home and contents and the FSP should assess the cause of the damage to the air conditioners and rectify, if required. Temporary Accommodation LBG estimated the total days required to complete the works according to the Property Repair Quotations was 10 working days. The FSP agreed to pay the Applicant $1,500 for temporary accommodation costs during the 10 day period required to complete these works. The Applicant has two daughters living with her. In the event suitable temporary accommodation cannot be found at the rate offered by the FSP, or the remedial works take longer than 10 days, the FSP is to make up the difference in the cost. Accommodation should be suitable for the Applicant and her two daughters to live in circumstances similar to that enjoyed in her home during this period. Summary The FSP accepted the scope of works for roofing, insulation, painting and locks and offered payment in the sum of $16,759.20. In addition to this sum, the FSP is to obtain quotations for the additional works set out in this Determination for painting and electrical and, subject to assessment, for cost of rectifying the air conditioners. Furthermore, these quotations were prepared in March 2014. Any increase due to inflation or cost of labour and material in the interim is to be included in the settlement to the Applicant so that she is not disadvantaged. 2.3 Has the Applicant established her loss in relation to the damaged, missing/stolen contents? The Applicant has established her contents loss is in excess of the FSP’s offer The Applicant ‟s household contents claim involves contents allegedly damaged during the storm, damaged by tradesmen whilst at her home or were stolen. The Applicant has made a substantial claim in this regard. The FSP accepted responsibility for the claim and offered settlement by payment of $6,885.45 for stolen items notwithstanding proof of ownership had not been provided. Payments of $5,000 and $7,200 respectively for storm damaged goods and tradesmen damaged goods were made although the goods had been restored to their pre-loss condition. Disputes such as this involving loss of a large quantity of household goods which cannot be fully established by documentary evidence from the policyholder are often difficult matters to determine. The onus of proof here rests with the Applicant to establish her loss on the balance of probabilities. Case No: 348142 Determination Page 8 of 14 The standard of proof required does not require all of the factual issues in dispute to be established with precision. However, the standard is not satisfied on the basis of a possibility an event occurred and a loss was suffered. It requires a degree of certainty that the issue in dispute has occurred as alleged. I must be then satisfied that it is more probable than not that the claimed loss was suffered. Common sense must be applied. The Applicant is in the position of many people who have had household contents stolen or missing. They usually do not have an inventory of their possessions or documentary evidence of every item of property that has been acquired whilst living in their homes. In determining such claims, the extent of the material that has been produced as proof, the endeavours made by claimants to obtain evidence of the goods lost and their value, and evidence from friends and neighbours must be taken into account. Moreover, one must take into account the circumstances of the loss and the likelihood of what the Applicant and her two dependent children would reasonably be expected to have in their home. The loss of contents claimed The Applicant has provided a substantial list of property she claims was damaged or missing during the repair process at her home. She estimated her losses in the region of $100,000. These include items stolen whilst contractors were working on her home. However, the Applicant acknowledged it was difficult for her to list all the missing items as the contractors or she did not prepare an inventory. The Applicant‟s claim covers a large number of items including but not limited to electrical items, children‟s trophies, bedding, linen, clothing, furnishings, jewellery, BBQ, lounge, rugs, washing machine/dryer and refrigerator. In support of her claim the Applicant has provided a number of receipts for items purchased, including confirmation by Sony of purchases made in the sum of $6,819 on 2 September 2009 and declarations from friends of long standing confirming the purchase of household goods. These provide proof of ownership. The FSP, however, says the Applicant has never previously mentioned passports, private documents, iPads, linen or dancing gear and had only discussed the items included in the settlement offer made by letter dated 23 July 2012. This would not be unexpected in a situation in which the Applicant has been through stressful incidents which could impact on her concentration to detail. It is not unusual for insureds whose homes have been burgled to discover certain items to be missing months after the event. The Applicant has highlighted the many tradesperson who had been through the home, the number of site inspections and the enormity of the events that had impacted upon the life of her children and her. It is not in dispute contractors were working in the Applicant‟s home while she was temporarily accommodated elsewhere. Further, the FSP‟s s enior home insurance Case No: 348142 Determination Page 9 of 14 assessor, following his site inspection on 3 July 2012, noted full restoration of the Applicant‟s contents was needed. A cleaning and restoration contractor was commissioned to complete dust cleaning and decontamination of the buildin g and contents. The contractor‟s scope of works included cleaning and decontamination of furniture and general contents throughout the home. As such, it is clear an endeavour had been undertaken to clean the household contents and return them to their pre-damage condition. However, there would have been clothes and other items that would have been damaged by such dust. Claims for theft of property involving substantial sums, in some cases, may be supported by reports of the loss lodged with police. The Applicant says although she found people going through her personal property and private papers, she was assured there was no need to notify police. On the other hand, the FSP says it did not advise the Applicant to not contact police. As such, there is no substantive proof to show the items which the Applicant claimed were stolen. A family of three that included two children would have accumulated considerable goods to meet their leisure needs and other activities. I am satisfied the Applicant has provided evidence of ownership of a significant quantity of household contents which may be attractive to thieves which would be reasonable to have in a home. It is also clear her furnishings sustai ned damaged during the works in progress. However, it is difficult to accept that some items claimed, including informal clothing such as gymnastics/swimming, school uniforms, underwear, shoes and coats, would be the target of thieves. In my view and having regard to what is fair in all the circumstances, I consider in addition to the $19,082.52 offered to date, the Applicant is to be compensated for an additional sum of the $15,000 for contents damaged, missing/stolen as this would be consistent with the contents of such a family home . The FSP is to pay interest on this sum from 14 November 2011 to the date of payment to the Applicant in accordance with section 57 of the Insurance Contracts Act 1984 . 2.4 Has the FSP discharged its obligations in relation to the impact damage to the gate and sleepers? Gate The FSP has paid for the cost of repairing the gate A quote in the sum of $1,245 was obtained for the supply and installation of steel double sided gate which had been bent beyond repair when impacted by a vehicle. A payment of $850 was made to the Applicant. This was increased by a further payment of $365, making in total the sum of $1,215. No explanation has been provided for the shortfall of $30 between the total p ayments and the contractor‟s Case No: 348142 Determination Page 10 of 14 quotation. In this case, I consider the Applicant is entitled to a further payment of $30. Sleepers The FSP confirmed a payment of $308 has been made to the Applicant. 2.5 Has the FSP discharged its obligations in relation to the motor claims? Settlement of the motor vehicle claims was based on the vehicles’ market values Holden Rodeo claim No xx215 The Applicant‟s Holden Rodeo was insured by the FSP under a Third Party Property damage policy. This class of contract indemnifies the policyholder for damage caused to other people‟s property when the policy holder is deemed responsible for that damage. It does not cover the vehicle for accidental damage. It is not in dispute the vehicle was involved in an accident with another vehicle. Coincidentally, the other vehicle was insured comprehensively with the FSP. The FSP deemed the driver of the other vehicle was at fault for the accident and as sessed that Applicant‟s vehicle as a write off . The FSP offered settlement of the Applicant‟s cla im against it in the sum of $4,195. The FSP advised it was unable to take responsibility for removal of the vehicle from the Applicant‟s premises . The settlement sum was based on the market value according to Glasses Guide of $4,700 plus an allowance of $950 for modifications less $1,200 for pre -existing damage and $255 salvage value. The Applicant says she will accept $7,000. The Applicant did not have a contract with the FSP in relation to damage caused to her vehicle. In this case, the FSP assessed the Applicant‟s claim as a third party involved in an accident with the insured vehicle. The FSP deemed the Applicant‟s vehicle a write off. In these circumstances the FSP‟s responsibility to the Applicant is to compensate her for her loss, being the pre-accident market value of her vehicle. The FSP‟s calculation of the market value of the Applicant‟s vehicle was based on Glasses Guide. Glasses Guide is a respected publication used extensively in the industry. The FSP has then made adjustments to the base figure to allow for modifications and old damage. This is acceptable practice in assessing the value of a damaged vehicle. No material has been presented to support the Applicant‟s claim for $ 7,000. In the absence of any acceptable alternative I consider t he FSP‟s offer was fair. As the vehicle was not insured comprehensively with the FSP and the Applicant‟s claim was paid out under the third party‟s policy, the damaged vehicle remains the property of the Applicant. As such the FSP is under no obligation to remove the vehicle from the Applicant‟s premises. Case No: 348142 Determination Page 11 of 14 Toyota Prado Claim No xxx160 The FSP deemed this vehicle a total loss and assessed the market value at $9,800. The FSP deducted $474.35 for unexpired registration and $550 policy excess. The final sum being $8,775.65. No information has been presented to show the FSP‟s assessment of the vehicle ‟ s pre-accident market value was not reasonable. I find that the FSP‟s assessment was fair. Toyota LandCruiser Claim No xxx160 The FSP deemed this vehicle to be a total loss and assessed the market value as $13,500. The FSP deducted $500.81 for unexpired registration and $550 policy excess. The final sum being $12,449.19. Examination of the Loss Management System report shows the vehicle base value was assessed according to Glasses Guide. In this case, I am satisfied the FSP‟s offer was fair. 2.6 Compensation The Operational Guidelines for FOS Terms of Reference provide FOS can award compensation for non-financial loss. FOS may decide an FSP should compensate the Applicant for such losses where there has been an unusual amount of interference with the Applicant‟s expectation of enjoyment or peace of mind. The Applicant complained her home had been left in a poor state by the contractors following repairs of the damage caused by the storms. The assessor, following a site visit on 3 July 2012, reported he had some serious concerns in the way the property had been left by the electricians. He stated the entire property and contents had been covered in plaster dust throughout every room where electrical work had been carried out. He confirmed a full restoration of the building and contents was required. The assessor also identified a number of other matters involving building work which required attention. A medical rep ort presented by the Applicant‟s psychologist confirms the Applicant has been emotionally distressed with the ongoing dispute concerning her claims. She has clearly expressed her views of the impact on her children, which she found distressing. In this case, I accept the condition of the home and the impact on her life following the initial repairs would interfere with the Applicant‟s peace of mind and consider she is to be awarded $3,000 compensation. Case No: 348142 Determination Page 12 of 14 3 Supporting information 3.1 Documents and statements relied on The following documents have been submitted and relied on in this Determination. Record Key points FSP’s loss Adjuster ( C ) Report 16/2/14  Roofing works performed were unattractive.  It was agreed with the Applicant and her associates „R‟ that a n independent ro ofing consultant “ RC ” comment on the repairs undertaken and whether there is pedestrian damage and/or maintenance issues.  A building contractor “ LBG” will check the ceiling cavity to check insulation in the ceiling.  An electrician will carry out a safety check and check the ceiling cavity to check lights comply with current regulations. A Certificate of Compliance will be required.  The standard of painting is poor. LBG have been asked to quote to rectify.  Damage to the bench top was not due t o water ingress.  LBG will quote for replacing a panel in the back of the sink affected by mould.  The instability in the freestanding carport is a maintenance issue. LBG agreed to rectify by additional screwing.  Disintegration of the front timber door was n ot storm related and was due to ongoing deterioration.  The Applicant advised builders had damaged contents and failed to protect her personal effect and furnishings when undertaking plastering and repainting works. It was agreed her associates R would ass ist her with this issue.  A roofing report, electrical report and scope of works plus costs to rectify poorly finished paint work were sought. FSP’s Loss Adjuster (C) Report 18/2/14 The roofing consultant RC advised ;  only the bathroom and kitchen had ongoing leakage problems. These occurred around 2 skylights via overflow soaker flashing. This was not due to the storms.  The tile profile was a good match with existing tiles but a poor colour match. The new tiles could b e painted and original tiles moved to the blind side.  The new flexible pointing was non - compliant. There was no evidence of further storm damage or incomplete storm damage repairs.  There was widespread and extensive maintenance issues.  Extensive traffic da mage to tiles was found but this damage pre - dated the storms.  The rear veranda roof was not damaged by the storm. The Applicant had replaced this roof which was not installed in Case No: 348142 Determination Page 13 of 14 the correct manner.  Leaks in the front veranda were d ue to faulty non - complian t works and not storm related.  RC concluded the roof sustained only a limited amount of actual storm damage.  RC recommended: - re - do flexible pointing to comply with regulations - re - position new replacement tiles to least visible site of roof and apply matching paint to replacement tiles. Roofing Contractor RC Report 17/2/14  t here was only a limited amount of actual storm damage to the roof.  o nly about 20 tiles had been replaced as part of the storm damage.  t iles could have been placed in areas of the roof which was not visible and been painted to achieve an esthetic finish.  t wo areas were observed where a number of ridge capping have had an application of flexible pointing applied. This failed to comply with Australian Roof Tiling Standards.  t he only f urther storm damage works required were to install new bedding and pointing and repositioning of the replacement tiles to the least visible side of the roof and paint the replacement tiles.  there were no further storm damage repairs to be carried out to th e roof.  there was widespread and extensive maintenance issues. there was extensive evidence of pedestrian traffic damage to roof tiles. This was old damage and pre - dated the storm events. This was established by paint covering the break line on broken flan ges.  the roof required considerable maintenance upgrade. These include: - past roof repairs and non - compliant works - absence of mandatory mechanical fastening - chimney flashing - eaves gutter – pre - existing installation issue. - deterioration of eaves gutter and o ngoing leakage issue - rear veranda roof - front verandah roof RC recommended  Storm damage repairs: - install new bedding and pointing to replace the two areas of storm damage repairs - reposition all replacement tiles to least visible site of roof - a pply matching paint to replacement tiles Case No: 348142 Determination Page 14 of 14  Maintenance work required: - install new bedding and pointing to all ridge capping and valley tiles save for those included in storm damage repairs - install new flashings around chimney - install new flashings to rende r soaker flashings redundant - install new metal deck roof over front and rear veranda - install new eaves and gutter around perimeter of roof. FSP‟s building contractor LBG Scope of works  Property Repair Quotation - Roof Tiles $7,535  Property Repair Quotat ion – Insulation $6,215  Property Repair Quotation – Painting $1,012  Entry locks - $487.20 FSP‟s Assessors Site Report Executive Compliant 3/7/12  Concerned at the way the property was left by electricians  The entire property and contents was covered in plaster dust. 3.2 Additional material The following additional material has also be relied on:  The Applicant‟s submissions  The Applicant‟s Impact Statement  The FSP‟s submissions  Roof inspection report “ IL ” dated 11/7/12  Roof inspection report “IL” dated 16/5/12.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.