Cash settlement amount for malicious damage and loss of rent benefits

FirmFinancial Firm (Unknown - Insurer)
Decided2014-10-22
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$23,939
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The landlord claimed further amounts for malicious damage repairs and loss of rent after a cash settlement was offered. AFCA ordered a $1,000 increase to the cash settlement plus interest on that amount, and a balance of rent benefits capped at $11,602 in total.

The scope of works captured the bulk of covered damage, with only specific omitted items added, and loss of rent was payable for the period reasonably required to repair after the insurer's assessment and settlement steps.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 347909 Determination Page 1 of 8 Case number : 347909 20 October 2014 1 Overview 1.1 Dispute The Applicant lodged a claim under his landlord insurance policy with the Financial Services Provider (FSP) for malicious damage, rental default and loss of rent, after his tenants stopped paying rent and vacated his investment property in December 2013. T he FSP accepted the Applicant’s claim and offered him a cash settlement of $19,396.53 for malicious damage to the property. The FSP also paid the Applicant benefits for rent foregone as a result of the malicious damage incident. The Applicant says that the cash settlement offered by the FSP is insufficient. He also seeks payment of additional benefits for loss of rent. 1.2 Issues and key findings Is the cash settlement offered for malicious damage fair and reasonable? The scope of works and repair quote relied on by the FSP to determine the cash settlement amount include the bulk of the damage for which the FSP is liable and have otherwise been prepared on an appropriate basis. However, the cash settlement amount should be increased by $1,000 to take into account repairs to electrical wiring and an additional door jamb, which have been omitted from the scope of works. Is the Applicant entitled to an additional amount for loss of rent? The Applicant is entitled to total benefits of $11,602 for rental default and loss of rent. To the extent that this amount exceeds the benefits paid to date, the Applicant is entitled to payment of the difference. Case No: 347909 Determination Page 2 of 8 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is required to:  increase the cash settlement amount offered for the Applicant’s malicious damage claim by an additional $1,000 (plus interest on this additional amount only, calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 25 February 2014 until the payment date) and pay the total cash settlement amount to the Applicant; and  pay the Applicant the difference (if any) between the amount of $11,602 and the total amount of benefits paid to date for rental default and loss of rent. To the extent that the FSP has paid the Applicant benefits for loss of rent and rental default exceeding $11,602, any excess amount paid is to be offset against the additional amount of $1,000 to which the Applicant is entitled in respect of his malicious damage claim (as outlined above), provided that the Applicant shall not be required to refund any remaining portion of the excess to the FSP. The Applicant is not entitled to any further amounts. Case No: 347909 Determination Page 3 of 8 2 Reasons for Determination 2.1 Is the cash settlement offered for malicious damage fair and reasonable? Settlement offer was based on scope of works and repair quote The cash settlement of $19,396.53 offered by the FSP was based on a q uote provided by the FSP’s builder (A) for undertaking the necessary repairs to the Applicant’s property, as set out in a scope of works prepared by the FSP’ s assessor (SM) following his inspection of the property. The FSP accepted A ’s quote as it was less than a quote for $22,040 obtained by the FSP from another builder, based on the same scope of works. FSP’s s cope of works includes bulk of damage covered by policy The Applicant says that the quoted amount of $19,396.53 is insufficient to repair the damage to the property, on the basis that A’s quote:  does not address all of the malicious damage caused by the tenants; and  provides for the repair of some items which are not capable of repair and need to be replaced. Under the terms of the policy, the FSP is entitled to repair damaged items unless it can be shown that repairs will be ineffective, in which case the items should be replaced. The Applicant has provided a copy of a quote for $52,296.20 obtained from his own builder (H). H ’s quote is based on a broader scope of works than the scope of works prepared b y the FSP’s assessor and used by A for the purposes of his quote. The Applicant has also provided a copy of A’s quote, amended to show the areas where H considers that the repairs proposed by A are inadequate. The information provided by the parties includes a number of photographs of the property both before and after the malicious damage incident, which are of significant assistance in determining which items of damage are covered under the policy and the nature of the repairs required. Having reviewed the available information, I am satisfied that the scope of works prepared by the FSP’s assessor includes the bulk of the damage to the property for which the FSP is liable under the policy. I am also satisfied that the repairs proposed by A are appropriate. In considering the Applicant’s entitlement to cover under the policy, I have had regard to the terms of the product disclosure statement (PDS) dated 12 July 2007, which applied when the Applicant originally incepted the policy rather than the terms of the updated PDS dated 19 October 2012 which the FSP says applied at the time the malicious damage incident occurred. This is appropriate in circumstances where the Applicant acknowledges that he received the earlier version of the PDS but says that he never received a copy of the updated PDS, Case No: 347909 Determination Page 4 of 8 and the FSP has not provided any information which establishes that the updated PDS was sent to the Applicant (see section 3.1 below for further details). In relation to the some of the key issues identified by the Applicant and his builder (H), I make the following comments: Damage d item Comments Carpet The photographs provided by the parties show that the carpets throughout the property were dirty when the tenants vacated. However, there is no evidence of any malicious damage to the carpets by the tenants . The policy contains a general exclusion for damage caused by wear and tear and loss of maintenance. On this basis, the FSP is not liable for the damage to the carpets and therefore is not required to include the replacement of the carpets in the scope of works. K itchen, bedroom and bathroom cupboards The photographs show that several of the cupboard doors and cabinet drawers hav e become detached . The scope of works provides for these items to be repaired and refitted (apart from one kitchen cupboard door , which is to be replaced). Given the nature of the damage, I am satisfied that the doors and drawers are able to be repaired and reattached and therefore the cupboards do not need to be replaced in their entirety . Bathroom door While the photographs show that the bathroom door has been dislodged, it does not appear to have been damaged beyond repair. Accordingly, it is appropriate that the door be refitted, as provided for in the scope of works. Skirting boards The photographs show that the skirting boar ds and architraves throughout the property have been sprayed with white paint from a spray can. It appears that this has been done in a misguided attempt to improve the appearance of the property, rather than maliciously with the intent of causing damage t o the property. On this basis, the FSP is not liable for the cost of repainting the skirting boards and architraves. Shed The photographs show damage to the metal sliding doors of the shed. The scope of works provides for the replacement of these doors . T here is no reason to believe that the shed needs to be replaced in its entirety. Scope of works omits certain additional items Based on the available information, I consider that the scope of works prepared by the FSP’s assessor omits the following items: Damaged item Comments Electrical rewiring The photographs show dangling wiring at the property which is consistent with malicious damage by the tenant. The Applicant says that the cost of replacing and reconnecting the electrical wiring is $2,000, although he has not provided an itemised quote to support Case No: 347909 Determination Page 5 of 8 this. While A’s quote provides an allowance for electrical works, it is not clear whether this includes the repair of the damaged wiring. The FSP has not specifically addressed the Applicant’s com ments about the wiring in its submissions to FOS. The remaining items of damage (including fraying wiring in an air conditioning unit and electrical cables left at the property) are not consistent with malicious damage by the tenant and therefore are not s ubject to cover under the policy. Door jambs While the photographs show damage to two door jambs, the scope of works only provides for the repair of one door jamb and is therefore inadequate in this regard. In the interests of resolving this dispute, I consider that it is fair in all the circumstances that the cash settlement amount offered by the FSP be increased by $1,000 to reflect the cost of repairing these additional items of damage. Applicant has not shown that A’s quote is otherwise inadequate The Applicant has suggested that the FSP’s builder (A) has provided an artificially low quote because of his relationship with the FSP and in the knowledge that the Applicant’s claim wo uld be cash settled. I do not consider that the available information establishes that A’s quote was artificially low. In this regard, I note that:  A’s quote was broadly consistent with the second quote obtained by the FSP, as well as the rough estimate provided by the FSP’s asses sor when he prepared the scope of works. By contrast, the quote provided by the Applicant’s builder is more than double each of these amounts;  due to the volume of work provided to its contractors, an insurer such as the FSP is able to obtain the benefits of substantial discounts and rebates, which mean that the cost to it of undertaking repairs may be considerably less than the cost to a private consumer; and  at the time A prepared his quote, it was not clear that the Applicant’s claim would be cash settled. While t he Applicant had advised the FSP’s assessor that he might prefer a cash settlement, this had not been confirmed as the Applicant was still awaiting council approval for the demolition and rebuilding of the property. A prepared his quote on the basis that he was willing to complete the repairs for the quoted amount. It was not until sometime later that the Applicant demolished the property and confirmed that he would definitely be seeking a cash settlement. 2.2 Is the Applicant entitled to additional payments for loss of rent? FSP has paid benefits for rent foregone The FSP advised FOS in June 2014 that it had paid the Applicant total benefits of $8,060 for rent foregone as a result of incidents covered under the policy. This reflects 13 weeks’ worth of rent for the period from 28 December 2013 to 5 March Case No: 347909 Determination Page 6 of 8 2014, calculated at the weekly rental of $620. It is not clear whether the FSP has paid any further benefits to date. Applicant has been overpaid benefits for rental default The Applicant’s policy provides cover for rental default, in circumstances where a tenant fails to pay rent owed under a written rental ag reement or periodic tenancy agreement. N o cover is provided for the first four weeks’ rent during the default period. The Applicant’s tenant failed to pay rent from 6 November 1013. Accordingly, rental default benefits became payable under the policy from 4 December 1013. However, the Applicant’s written rental agreement with his tenant expired on 28 December 2013 and the tenant vacated the property on 30 December 2013, at which time the Applicant’s entitlement to rental default benefits ceased. Accordingly, the Applicant was entitled to rental default benefits for a maximum of 26 days (equivalent to $2,302 on a pro rata basis). On this basis, it appears that the FSP has incorrectly characterised the full 13 weeks ’ worth of rent paid to the Applicant as “rental default” benefits and therefore has paid him more than he was entitled to under this section of the policy. Applicant is entitled to benefits for loss of rent In addition to benefits for rental default, the Applicant is entitled to benefits for loss of rent. Under the policy, such benefits are payable where the Applicant’s property becomes uninhabitable as a result of damage covered by the policy. Benefits for loss of rent are payable for the period reasonably required to repair the property. The FSP acknowledges that the Applicant’s property became uninhabitable as a result of the malicious damage incident and therefore he is entitled to benefits for loss of rent. However, the parties disagree as to the period for which loss of rent benefits are payable. In determining the period “reasonably required to repair” the property, it is appropriate to have regard to the time taken by the FSP to assess the claim and make arrangements for the necessary repairs (or cash settlement) as well as the period required to actually undertake the repairs. The available information establishes that:  by 4 February 2013, the FSP had assessed the damage, prepared a scope of works, obtained two quotes for the repair of the damage and selected A as its preferred builder;  although the FSP was in a position to settle the claim at this time, it provided the Applicant with an opportunity to obtain a revised quote from H (based on the FSP’s scope of works) , given the significant difference between the quotes provided by A and H respectively;  when the Applicant had not responded by 21 March 2013 , the FSP asked him to confirm whether he wanted A to carry out the repairs or would prefer a cash settlement; Case No: 347909 Determination Page 7 of 8  the Applicant replied to the FSP on 23 March 2014, further disputing the adequacy of the quote provided by A; and  the quote provided by A provides for an estimated repair period of seven weeks. In the circumstances, I consider that it is fair and reasonable that the FSP be required to pay the Applicant loss of rent benefits for the period from 31 December 2013 (when his entitlement to rental default benefits ceased) until 15 April 2014 (being ten weeks after the FSP wrote to the Applicant on 4 February 2014). I have reached this conclusion on the basis that an additional period of three weeks (from 4 February 2014) should have been sufficient for the Applicant to respond to the FSP’s settlement offer and also allow time for the FSP to arrange for the repairs to commence (or pay the cash settlement). On this basis, I consider that the Applicant was entitled to loss of rent benefits for a total period of 15 weeks from 31 December 2013 until 15 April 2014 (equivalent to $9,300). The Applicant is not entitled to benefits for loss of rent for the additional period required to rebuild the property in its entirety (given that it has now been demolished). Any loss of rent during this period has occurred as a direct result of the Applicant’s decision to demolish and rebuild, rather than due to the malicious damage incident. Applicant is entitled to balance of loss of rent payments As outlined above, the Applicant is entitled to total benefits of $11,602 for rent foregone as a result of the malicious damage incident (comprising $2,302 for rental default and $9,300 for loss of rent). Accordingly, the FSP is required to pay the Applicant the difference (if any) between this amount and the total benefits paid to date. To the extent that the FSP has paid the Applicant benefits exceeding $11,602, the excess is to be offset against the additional amount of $1,000 to which the Applicant is entitled in respect of his malicious damage claim (as outlined above), provided that the Applicant is not required to refund any remaining portion of the excess to the FSP. Case No: 347909 Determination Page 8 of 8 3 Supporting information 3.1 Terms of policy Claim is to be determined based on terms of earlier PDS The Applicant originally incepted his policy on 5 June 2012 and renewed it with effect from 5 June 2013. The Applicant acknowledges that he received a copy of the PDS at the time he incepted the policy (which the FSP has confirmed would have been the version dated 12 July 2007). However, the Applicant says that he was never provided with a copy of the updated PDS dated 19 October 2012, which the FSP says was in force at the time of his claim. The FSP has not provided any information which establishes that the updated PDS was sent to the Applicant. In these circumstances, I consider that it is appropriate to determine the Applicant’s entitlements under the policy having regard to the terms of the earlier PDS dated 12 July 2007, rather than the terms of the updated PDS dated 19 October 2012. Having said that, the provisions of the two documents are relatively similar, to the extent relevant to this dispute.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.