Home / Financial Firm (Unknown - Insurer) / Determination 347481

Determination 347481

Storm damage claim declined as excluded subsidence

FirmFinancial Firm (Unknown - Insurer)
Decided2014-11-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$33,048
SourceAFCA PDF

Summary

The insurer declined a building claim for storm-damaged concrete slab and water tanks as excluded earth movement. AFCA found the sinkholes formed within 72 hours of the storm, so the claim is covered and must be accepted under the policy, with interest on any cash settlement.

Under the policy's exception for subsidence occurring within 72 hours of a storm, the storm was the proximate cause of the loss, so the exclusion does not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition Determination Case No: 347481 Determination Page 1 of 9 Case number : 347481 1 8 November 2014 1 Overview 1.1 Dispute The Applicant lodged a claim upon her Building and Contents Insurance Policy (the policy) held with the insurer (FSP) for storm damage to the insured property in January 2013. The FSP declined the claim on the basis the Applicant had not established the loss claimed was the result of circumstances insured under the policy, rather the loss was excluded from cover. 1.2 Issues and key findings Is the FSP entitled to deny the Applicant’s claim ? The FSP is not entitled to deny the Applicant’s claim. The proximate cause of the damage was the storm, which caused sinkholes beneath the concrete slab supporting the water tanks. Such subsidence occurred within 72 hours of the storm and is therefore not excluded under the policy. 1.3 Determination The Determination is in favour of the Applicant. The FSP is to arrange settlement of the Applicant’s claim in accordance with the terms and conditions of the policy. In the event any part of the claim is settled by way of a cash settlement, the FSP is to pay interest in accordance with section 57 of the Insurance Contracts Act 1984 from 10 January 2014 until payment is made. Case No: 347481 Determination Page 2 of 9 2 Reasons for Determination I have decided this dispute on its merits, doing what is fair in the all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. The dispute has been expedited to a Determination. No Recommendation was issued. 2.1 Is the FSP entitled to deny the claim? The policy covers storm damage caused from subsidence that occurs within 72 hours The contract of insurance relevantly provides cover for loss or damage caused to the insured property by storm including rain. However, excluded from cover is loss or damage caused by:  general wear and tear, or  subsidence, collapse, shrinkage or any other earth movement, unless the damage occurs within 72 hours of a storm. The relevant extracts of the policy are set out in section 3.1 below. The proximate cause of the damage must be identified The Applicant’s claim relates to damage to a concrete slab that sits under two water tanks. The slab was originally constructed as the floor of a garden shed. After the tanks were installed, there was significant rainfall during the weekend of 25 to 28 January 2013. The Applicant, who relies on the water in the tanks for her water supply, checked the water tanks before going away for that weekend. On her return she again checked the tanks and noticed they were at their highest level – three quarters full. However, she also noticed damage to the slab and area underneath the tanks. There were holes underneath the tanks and some parts of the concrete slab had fallen away. The Applicant lodged a claim with the FSP on 31 January 2013 in respect of the damage which the FSP subsequently denied. During the period of this dispute, the parties have identified four possible causes of the damage to the concrete. They are:  The storm (which is covered by the policy).  The quality of the slab which was poor and had deteriorated over time (which is not covered by the policy).  Sinkholes which had occurred over a period of time (which are not covered by the policy).  Sinkholes which occurred within 72 hours of the storm (which are covered by the policy). Case No: 347481 Determination Page 3 of 9 The cause of the damage to the slab is determined by deciding what is the proximate cause of the damage, or the effective or dominant cause of the loss. The proximate cause of the damage is the storm which caused sinkholes within 72 hours of the storm On the balance of probabilities, I determine that the proximate cause of the damage to the concrete was the storm which created sinkholes within 72 hours of the storm. I accept the Applicant’s submission that there was no evident damage or collapse of the concrete prior to the January 2013 storm. A previous storm had damaged her property in December 2010. She made a claim in respect of that damage which was accepted by the FSP. According to the Applicant, no concerns were raised and there was no evidence of sinkholes near the shed site when inspected by the FSP’s assessor in February 2011. Such damage occurred closer to the home and was accepted under the relevant claim. The Applicant paid careful attention to the water tanks given they were her sole source of water supply and she had horses on her property that also relied on the water tanks. There was no damage to the concrete and there were no sinkholes under the tanks prior to the January 2013 storm. The Applicant’s expert, a geological engineer (AW) reported that the soil under the tanks was dominated by dispersive soils which, when saturated simply “dissolve”. AW stated this only occurs when the soil becomes very wet and the rainfall records demonstrate sinkholes would be expected with the levels of rai n that occurred from 25 to 28 January 2013. If the soils had retained moisture the rains from 25 to 27 February 2013 would have been enough to reactive the dispersion (but would not be enough on their own to create sinkholes). Based on this evidence, I do not accept the FSP’s submission, from its engineer (JH) that the sinkholes would have been occurring over a long period of time, possibly from run off from the garden shed roof or from over flow of the tanks. JH submitted the fact that crusher dust was used to re-level the concrete slab supports that there was soil movement long before the rain events. Whether there was run off from the garden shed roof is pure speculation. I accept the Applicant’s submission that her two 17,000 litre tanks had only ever made it to three quarters full and overflow was therefore not an issue. I also accept the Applicant’s explanation in respect of the use of crusher dust, which is referred to below. AW explained in its report that the sinkholes only occur when the soil is saturated such as in January 2013. Therefore, on the evidence before me, I do not accept JH’s submission that the sinkholes under the tanks would have been occurring over a period of time. Case No: 347481 Determination Page 4 of 9 Instead, I accept the Applicant’s submission that the sinkholes o ccurred within 72 hours of the storm. This is consistent with AW’s evidence and the timing in which the Applicant lodged her claim, on 31 January 2013. I note the FSP was not able to arrange an inspection of the property until 11 February 2013, well after the 72 hour period had elapsed. The poor grade concrete was not a proximate cause of the damage While I accept the F SP’s submission that the concrete was not of high quality, with limited structural integrity, I do not consider this was the dominant cause of its failure. The documents submitted by the Applicant show the recommended site preparation for the tanks is a base that must be 300mm wider than the tank and made of 75-100mm of compacted crusher dust or concrete. The Applicant submits the existing slab is up to 10cm thick, which was measured prior to installation of the tanks, together with a 50-100mm crusher dust base which was also placed over the slab. Additional crusher dust was available as it had been left over from other work and was therefore available to reinforce the site. Crusher dust was also added around the slab. The Applicant states the crusher dust was compacted with a packing device and levelled using a laser level to ensure the surface was level. The site is level at least 300mm in all directions from the tanks. Based on this, I agree with AW’s observation that a n engineer designed concrete based was not required. In fact, no concrete base was required at all for the tanks and the Applicant’s preparation for installation of the tanks was adequate. As such, I conclude that the quality of the concrete was not the cause of its failure. Rather, as stated by AW, once the sinkholes occurred, they removed support for the slab which was the dominant cause of its failure. In reaching this conc lusion, I have also considered JH’s finding that the exposed reinforcing was severely rusted, which does not happen from one singular rain event. While I accept this to be the case, for the reasons set out above, on the balance of probabilities, I consider the lack of support for the concrete caused by the sinkholes, to have been the dominant cause of the damage to the concrete. Had the sinkholes not occurred I do not consider the concrete would be in need of replacement. This is consistent with AW’s repor t. Finally, I note that some of the hypotheses posed by JH (such as whether the water tanks had overflowed and the reason for the use of crusher dust) could have been resolved with a discussion with the Applicant. This would have expedited the resolution of this claim. The FSP must accept the claim. The FSP is therefore obliged to provide indemnity for the loss claimed in line with its obligations under the policy which includes “new for old” cover for home claims . In the interest of completeness, the policy includes the “Additional feature” Case No: 347481 Determination Page 5 of 9 which states the FSP will also cover, if necessary, extra costs required to comply with the latest building regulations. The Applicant has provided a quote to undertake the necessary scope of works from “KB” in the amount of $33,047.96. However, the FSP is entitled to settle the claim in its preferred manner and in line with what it would cost the FSP to authorise the works. In saying that, if the FSP elects to cash settle the c laim the settlement must be based upon a quote from an adequately qualified and licensed professional who is prepared to honour such quote regardless of whether works are authorised by the FSP or privately by the Applicant. 3 Supporting information 3.1 Summarise the key references Include only essential context What you are covered for (page 19) Storm and Flood We cover Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and damage caused by flooding from rivers, streets and canals . What we cover as your home (page 12) garden borders, pathways and paved or concreted floor areas What you are not covered for ( page 45) This section details what is not covered under any part of your policy We do not cover loss or damage: Erosi on or subsidence Caus ed by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover subsidence damage to your home if it is caused by: –– insured event 2 (burst pipes, leaks and overfl ows) –– contents items insured by portable cover –– these insured events if the damage occurs within 72 hours of the event happening:  insured event 1 (storm and flood)  insured event 8 (explosion) insured event 11 (earthquak e and tsunami) Case No: 347481 Determination Page 6 of 9 3.2 Chronology Date Event 2008  The Applicant purchased and took possession of the insured property.  The position and outlay of the property is subject to experiencing strong storm water run - off during periods of significant rainfall events. 2009  A garden shed built on a c oncrete slab was added to the property. December 2010  A storm damaged the garden shed, which was subsequently removed.  The Applicant made a claim in respect of this storm damage which was ultimately accepted by the FSP. February 2011  The FSP assessed the claim. No concerns were raised and there was no evidence of sinking or sinkholes near the shed site.  According to the Applicant sinkholes and related damage (including concrete areas) were noted closer to the home and accepted under t he relevant claim. February 2012  The Applicant installed two 17,000 litre water tanks on the concrete slab where the shed had been and added crusher dust on top of and to the perimeter of the slab to ensure it accommodated the tanks.  The tanks were insta lled according to the manufacturer’s recommendations. A structural slab was not required, just a paved or crusher dust base on a level site . The Applicant produced the installation structures in support of this. 25 January 2013  T he Applicant left the pr operty for the weekend. According to the Applicant, there was no evidence of any damage at this time. She regularly check ed the tanks. 25 - 28 January 2013  253mm rain fell 28 January 2013  On her return the Applicant checked on the water tanks and note d they we re ¾ full.  Applicant also note d damage to the slab and area underneath it. 31 January 2013  The Applicant lodged a claim (the subject of this dispute) 11 February 2013  The FSP’s assessor report ed that the concrete slab showed cracking and breaking away of sections of the concrete. The earth from under the slab had been significantly washed out and undermined. 3.3 Expert reports Case No: 347481 Determination Page 7 of 9 The FSP obtained expert reports from a qualified engineer, JH, in respect of the concrete slab supporting the water tanks. The Applicant obtained an expert report from a geotechnical engineer , AW, in respect to the soil supporting the concrete slab and water tanks. A summary of the reports is set out below. Expert report Key points FSP’s expert ( JH ) 16 May 2013 At the time of this report, JH was not aware that the concrete slab had been used for the garden shed. The Applicant was not present during JH’s inspection.  The steel reinforcement is visible in the edge of the concr ete slab well under the outer wall of the tanks and this indicates that: a) the concrete clad was not wide enough to start with, and does not match the circumference / base of the rainwater tank b) the steel reinforce ment was placed too close to the edge of the concrete slab c) the concrete slab is grossly undersized in depth to support the intended load of the rainwater tank.  The steel reinforcement has corroded to the point where it is now stressing the concrete along the edge of the slab, causing a large section of the corner under the tank to crack and fall away.  Surface water and possibly tank overflow has then been finding its way under this rear section of the tank, and a large deep hole under the slab has developed.  There is also a hole at the f ront of the tank, which JH attributes to the hole at the rear of the tank causing erosion underneath the slab.  The visible concrete slab between the two tanks was of a very poor grade concrete – soft, sandy and crumbled easily with thickness of less than 7 5mm in one area.  The cause of the concrete ground slab sinking and breaking cannot be attributed to any rain event, but to those factors referred to above. It has been a long - term problem that has only been getting worse as the concrete slab deteriorated.  Surface, and possibly over - flowing tank water , has then found its way under the edge of the thin concrete slab, and commenced undermining it to the point where the corner of the concrete slab has broken off and the tank and concrete base have begun to subs ide into the “cavern” under the slab.  Owner maintenance is required and a new reinforced slab large enough to extend past the base of both rainwater tanks is necessary to provide total base support for the tanks. FSP’s expert (JH ) 8 May 2014 At this time JH is aware the concrete slab had been the floor of the garden shed.  The holes in the ground on both sides of the concrete floor slab Case No: 347481 Determination Page 8 of 9 Expert report Key points were considered to be very old, and had not just occurred weeks prior to inspection from the flooding rain at the end of January 2013.  The holes in the ground on both sides of the concrete slab appear to have been caused by concentrated water falling in these specific locations . This may have been from the roof of the old shed, spilling onto the ground in these locations from open or damaged gutter ends.  The section of damaged concrete at the back corner of the R/H tank also provided a very good opportunity to view the steel reinforcing in the slab. The exposed reinforcing was severely rusted, and had lost the greater perc entage of the steel diameter from very long term corrosion.  The pieces of broken concrete in this area are also a result of long - term corrosion of the steel reinforcement, as the steel has expanded with rust and literally forced the concrete apart. This t ype of damage in concrete usually takes years to occur, and does not happen from one singular rain event.  Due to the long - term escape of water under the concrete tank stand, large caverns under the slab have now been created and, once again, this type of c oncealed erosion does not occur as a result of one singular rain event, but occurs over many years as the water slowly washes the fine soil particles away into larger voids further under the ground. Applicant’s expert (AW) 22 July 2014  This area has exte nsive areas of dispersive soils. The holes which have developed onsite are a result of the dispersive soils becoming saturated during at least the January 2013 rainfall event, but also probably due to the February 2013 rainfall event, and simply dissolving .  The concrete slab onsite, whilst having limited structural integrity is probably similar to many other concrete slabs used to support similar rainfall tanks, and would have remained serviceable had the soils not dissolved during these rainfall events and removed support from the slab.  We do not believe that the slab is central to the issues on this site, even though others have focused on it. We believe the issue is the so - called “sink holes” which are removing support from the slab i.e. If the so called sinkholes had not developed, then the slab would not have started to break away.  An engineer designed slab was not required.  About 30% of Australia’s Landmass is covered by what is known as “dispersive soils”, and dispersive soils, when they become saturat ed simply “dissolve”. They don’t scour, they don’t erode in the normal sense of the word, they just “disappear”.  O ur tests prove conclusively that the soils to depths of 3000mm are dominated by soils with a potential to disperse.  For a dispersive soil to d isperse, it needs to become very wet, and in reading the referenced rainfall records, in our opinion, the Case No: 347481 Determination Page 9 of 9 Expert report Key points following can be said; - In January 2013, from the 25th January to the 28th January the daily rainfall was consistent and built up, and by the 27th Janu ary the ground would have been saturated and dispersion would have started. By the 28th, when another 90 - 100mm of rain fell, we would have expected to see holes developing. - The rain on the 18th and 19th of February 2013 would not have been sufficient to ma ke any noticeable difference to the holes, but if the soils retained any residual moisture, then 25th, 26th and 27th of February 2013 there was definitely enough rain to reactivate the dispersion. FSP’s expert (JH) 4 August 2014  The old conc rete slab was found to be grossly deficient, and obviously had sunk fr o m a level position long before the water tanks were ins talled , as there was a thick layer of “crusher dust” over the top of the old slab to re - level it under one of the water tanks. This suggests soi l movement (dispersion) under the concrete slab had been occurring long before the 2013 rain event and probably dates back to when there was a shed on the floor slab.  Water had been directed to the edge of the concrete slab at the rear of the tank, either initially f r om the roof of the old shed discharging roof water to this location or f r om the tank over - flow outlet that drains directly onto the ground at the back of the tank.  The extreme corrosion in the exposed steel reinforcement also clearly indicate s that the concrete slab had failed many years before the 2013 rain events, and that the damage to the concrete slab and the missing soil under the slab was already present in 2013.  There is no clear timeline as to when the dispersive soils began filtering away under the concrete slab.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.