The landlord applicant claimed water entry damage to a rented building after a February 2010 storm. AFCA found the damage most likely resulted from gradual deterioration and water entry not through a storm-made opening, so the FSP was not liable.

The insurer established exclusions for gradual deterioration, seepage from structural defects and water entering through openings not made by storm.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 347408 Determination Page 1 of 5 Case number : 347408 1 9 September 2014 1 Overview 1.1 Dispute The Applicant lodged a claim against his Landlord Insurance policy held with the Financial Services Provider (FSP) after water entered his home in February 2010. The FSP denied liability for the claimed damage on the basis that the water did not enter through a storm created opening but had entered the building as the result of structural defects, faulty workmanship or failure to adequately maintain the building. The Applicant disagrees with the decision and seeks a review by the Service. 1.2 Issue and key findings Is the FSP liable for the damage to the Applicant’s building ? The FSP is not liable for the damage to the Applicant’s building because:  the damage sustained to the property most likely occurred over a long period of time resulting in the gradual deterioration of the building.  insofar as there was damage as a result of storm in February 2010, that damage was not caused through an opening made by storm. 1.3 Determination This Determination is in favour of the FSP. The FSP is not liable for the damage to the Applicant’s home building and is not required to reimburse the Applicant for costs associated with the repairs . Case No: 347408 Determination Page 2 of 5 2 Reasons for Determination 2.1 Is t he FSP liable of the damage to the Applicant’s building ? It is an accepted principle of general insurance law that an insured bears the onus to establish that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove the application of an exclusion if it wishes to deny or limit its liability for the loss. The Applicant reported that water entered his building, which he rents out to tenants, during a rainstorm in February 2010, and the FSP arranged for building services firm “L S ” to report on the claimed damage. The report from LS dated 26 February 2010 confirmed that rain had entered and caused damage to various parts of the building, and it is therefore accepted that the Applicant has established a prima facie claim under the policy insured event of storm, rain and runoff. The onus now shifts to the FSP to prove the application of an exclusion. The policy provides a number of exclusions that apply to the damage. The FSP argues that the following exclusions apply:  damage by water seeping into the building  damage caused by inherent defects, structural defects, faulty workmanship or faulty design  damage caused by gradual deterioration. There is no dispute that the damage occurred over time. The Applicant maintains water first entered the property in 2007 during a storm. The Applicant employed a roofing plumber to repair what he believed were the leaks and attended to the other repairs himself. Following the February 2010 storm, the Applicant appointed water proofing consultants to carry out work on the property. The consultant BT identified the structure had been exposed to water ingress over a long period of time and considered that that led to the gradual deterioration of the balcony. BT identified water had entered through a section of tiles and considered that there was a failure of the water proofing to the dividing wall. BT concluded that the damage observed was not as a result of a storm or a one off incident where water had breached a building component but was a result of a longer term exposure to the timber structure due to a failure of the balcony water proofing. The FSP obtained a report from a building service company LS. Following inspection of the property, LS identified large quantities of silicone and other sealants had been laid over the grout lines between the tiles as well as the perimeter of the tile balcony. LS considered that the problem appeared to be due Case No: 347408 Determination Page 3 of 5 to a failure of or omission of proper membraning at the time of construction. A roof inspection report was obtained by the FSP from PBS. PBS considered the first point of water ingress was related to roof drainage at the property where the apron flashings at the property had not been properly installed. The second issue was identified above the kitchen where the balcony is situated. PBS considered that there were cracks in the mortar of the balcony tiles and drain caps were missing. PBS considered the water ingress was related to water proofing issues which is commonly seen when water proofing has been done incorrectly. The Applicant strongly disputes the comments of BT, LS and PBS and maintains the property had been constructed correctly and the water proofing done correctly. The Applicant relies upon water spray tests conducted by P&C that showed water ingress occurred via the doorways. According to the report from P&C the water damage to the ceiling was due to faulty seals on the balcony door and window. The Applicant relies on the report from P&C as evidence that there was not a failure of the water proofing membrane. The report from P&C is dated 18 August 2012 and follows an inspection on that day. The report follows rectification works being undertake n by BT in 2010. BT in the report of 10 January 2013 confirmed that the rectification work was water (flood) tested and found to be water tight. Having considered the reports as provided, I am persuaded by the reports presented by the FSP that the damage sustained was most likely due to gradual deterioration caused by water seeping, percolating or otherwise penetrating into the building as a result of structural defects, faulty design, faulty workmanship and/or the failure to adequately maintain the building. As such damage is specifically excluded under the terms of the policy, I am satisfied based on the information exchanged that the FSP has established the application of the relevant exclusion. Further, P&C concluded that the cause of the damage was due to faulty seals on the balcony doors and windows. The policy specifically excludes damage caused by wind, rain water, hail or snow entering the buildings through an open window or door or any opening not made by the storm unless the loss is caused by runoff. There is no suggestion that the damage was caused by runoff. P&C consider the damage due to faulty seals. This is not damage caused by an opening made by the storm and therefore would be excluded under the terms of the policy. 3 Supporting information 3.1 Report from LS “My inspection was completed in the presence of the tenant who has lived there for several years and who reported the ingress of rainwater was somewhat of an ongoing matter that had certainly worsened in recent times and when you complete Case No: 347408 Determination Page 4 of 5 a clo se and detailed inspection of the tiles balcony areas above (Fig. 4 & 5) it is clear some effort has been made to stop rain penetrating beyond. Large quantities of silicone and other sealants have been laid over grout lines between tiles (Fig.6) as well as around the perimeter of these tiled balcony areas (Fig.7) but the problem seems more complicated than that and I suspect that failure of / omission of proper membraning at the time of construction is the primary reason these problems have developed. ” 3.2 Rep ort from PBS Services “INSPECTION : Inspection of this property was carried out on Wednesday 22nd August. They attended the property as requested to provide a report on damages sustained and determine cause of water entry via roof. ISSUE : The first point of water ingress is situated in the lounge room, this is a minor dripping which is related to the roof drainage at the property. The apron flashings at the property do not have lips installed. This is a very poor design and the plumber who installed the fl ashings, should have noticed these issues during the installation… The second issue is above the kitchen where the balcony is situated. There are cracks in the mortar of the balcony tiles and drain caps missing. The water ingress is related to water proofi ng issues from the balcony. This is commonly issue seen with water proofing being done incorrectly.” (sic) 3.3 Report from BT “ BT inspected the property and provided recommendations and a quotation to carry out remedial repairs to an existing first floor balcony… During my site inspection I observed the following issues in regards to the balcony:  Little or no provision had been provided at the door seal to the balcony detail  An attempt had been made by the owner to seal areas of the balcony with silicone s ealant, in particular sections of tile grout lines which had cracked and to the up stand detail beneath the timber door sill.  The balcony had some debries from the trees and I noted a large brown stain clearly visible on the tiled area in front of the door .  Internal damage was observed to the ceiling are on the ground floor (sic) In my opinion and experience the damage as observed during our time on site was as a result of the structure being exposed to water ingress over a long period of time which had gra dually caused deterioration of the timber building components at the wall to floor area of the balcony located beneath the timber door frame and adjacent weatherboard clad dividing wall…. The failure of the waterproofing to the dividing wall also indicated that the upstand detailing of the balcony had failed at this junction detail.” Case No: 347408 Determination Page 5 of 5 3.4 Report from P&C “ I now proceeded to flow test the bedroom door and windows onto the balcony area. I noted that this is not sealed properly and is therefore allowing rain water to leak onto the bedroom floor in front of the door. This rain water is then tracking into the ceiling below from where it is then causing the damage to the ceiling below. The balcony door of the 2 nd balcony was also flow tested and one can see that the door does not seal properly and is therefore allowing rain water to leak through it. In my professional opinion, the cause of water damage to the ceiling is due to faulty seals on the balcony doors and window. ” 3.5 Policy wording Words with special meanings … “rainwater” means rain falling naturally from the sky onto buildings and/or the ground. … “run - off” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … “storm” means vio lent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. … Insured events we will pay … 9. Storm, rainwater or runoff … We will pay for loss or damage caused by storm, rainwater or runoff. We will not pay for loss or damage: … g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of:  structural defects  faulty design of the buildings  faulty workmanship in the construction of the buildings; or  your failure to adequately maintain the buildings; h. caused by wind, rainwater, hail or snow entering the buildings through an open window or door or any opening not made by the storm, unless the loss or damage is caused by runoff; or ...”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.