Claim declined for internal and external building cracking

FirmFinancial Firm (Unknown - Insurer)
Decided2015-03-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed building cracking damage, attributed to nearby construction works or leaking pipes, after the FSP declined the claim. AFCA found no insured event was established and the damage was due to excluded soil movement.

The insured must first establish a prima facie claim under a listed event, and soil movement damage is excluded.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 347349 Determination Page 1 of 7 Case number : 347349 31 March 2015 1 Overview 1.1 Dispute The Applicant held a Home building and contents insurance policy (the policy) with the Financial Services Provider (FSP) over the relevant period of 27 November 2011 to 27 November 2012. A claim was lodged on 27 February 2012 seeking cover for building damage in the form of internal and external cracking. The FSP has declined the claim on the basis the Applicant has not established the damage is due to an insured event. Also , that the evidence establishes the damage is due to long term differential footing movement, which is excluded by the policy. 1.2 Issues and key findings Has the Applicant established the damage claimed is covered under the policy? The available evidence does not support the Applicant‟s position that the cracking damage to the insured building is the result of construction works completed by “Y” in 2009. Further, the evidence does not establish the damage is due to an event listed within the policy i.e. the Applicant has not established a prima facie claim. 1.3 Determination This Determination is in favour of the FSP. The damage claimed has not been established to be due to an event insured under the policy. Rather, the evidence supports the FSP‟s position that the damage is due to factors clearly excluded from cover. Case No: 347349 Determination Page 2 of 7 2 Reasons for Determination 2.1 Has the Applicant established the damage is covered under the policy? Policy provides cover for listed events only The Applicant‟s policy provides cover for loss or damage caused by the specific events listed in the policy, subject to the various conditions and exclusions set out in the policy. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. Accordingly, the Applicant is required to show that, on balance, the damage claimed was due to one of the events listed in the policy. The Applicant has not established a prima facie claim under the policy The Applicant at lodgement of the claim on 27 February 2012, was of the view the damage claimed was due to the droughts and hot weather experienced in the area of the insured property. The FSP completed its investigation into the probable cause for the damage claimed, including obtaining a leak detection specialist‟s report. It was on the basis of these investigations that the FSP formed the view the damage was not due to an event insured under the policy. Accordingly, the claim would not be one for acceptance. The Applicant disputed the decision to decline the claim. It was at this point she raised the possibility that construction works undertaken by the council at the front of the property may have caused the damage. The parties have both submitted reports made available by the various consultants who have had the opportunity to assess the insured property and/or provide opinion on the events claimed to be responsible for the damage claimed. All the consultants‟ reports have been carefully considered in providing this Determination. They have been referred to in more detail within Section 3 of this Determination. The damage claimed is not due to vibration The available evidence establishes the local council, for the area where the insured property is situated, authorised construction works June 2009. Case No: 347349 Determination Page 3 of 7 These works included use of heavy machinery in order to replace water pipes. Engineers “T” were appointed to monitor the ground movement generated by the works. T has submitted a report. The Applicant is of the view that these works have played a significant part in the building damage the subject of the claim. Subsequent to the works being completed and arising from concerns raised by the Applicant, building consultants „J‟ were appointed to undertake an assessment of the insured property in January 2010. The evidence made available in the prior reports was also considered by the FSP‟s appointed engineers „F‟ in 2012. The expert evidence in this regard establishes that the insured building did have some pre-existing cracking damage to the front path and in the wall on the south side. Also, that there appeared to be new cracks that had appeared as well (in 2009). In saying that, all the above noted consultants were reasonably consistent in the view that the damage claimed was not the result of the construction works. The maximum ground level vibrations recorded by T were well below the levels at which even minor damage may occur in both industrial and light framed structures (including houses). T determined the maximum level recorded was in the „no damage‟ zone. The overall opinion of the consultants was consistent in that the damage was due to differential soil movement caused by environment factors (drought) in the area. The Applicant‟s po sition is acknowledged, however, in the absence of substantiating evidence supporting her opinion, it has not been established the damage claimed was due to or arose from the construction works in question. The damage was not due to leaking pipe(s) The available evidence shows that at lodgement of the original claim on 27 February 2012, the Applicant was of the view the damage claimed was due to drought and hot weather conditions. The FSP appointed an assessor in March 2012, to undertake an assessment of the damage claimed. The assessor noted internal and external cracking to the insured building as well as to the concrete path from the driveway to the entry porch. The FSP proceeded to appoint leak detections specialists “AL” to the claim who submitted its report dated 10 April 2012. AL completed pressure tests to the cold and hot water domestic lines as well as CCTV investigations into the sewer and stormwater lines. AL found that all the tests completed passed with no blockages and/or breaks found in the lines inspected. It also found the air vents to the house towards the rear were lower than the path/ground height. Also, there were gaps noticed where the ducted heating was located. Case No: 347349 Determination Page 4 of 7 F (engineers) were also appointed to the claim and they submitted a report to the FSP dated 1 November 2012. After having completed the investigation and assessment of the i nsured property, F determined that the damage claimed was due to long term differential footing movement. I note the Applicant has made available evidence in the form of reports from a leak detection expert „LD‟ and engineers “C” , obtained under a subsequent claim lodged with her current insurer in 2014. These reports were commissioned by the Applicant‟s current insurer under a claim lodged for storm damage to the insured property in 2014. This being some two years after the claim the subject of this dispute and five years after the 2009 construction works. LD found no leaks in the sewer lines however CCTV investigations identified two breaks in the stormwater lines and a further break in the stormwater drain under the driveway. The stormwater pit on the west end of the north side of the insured building revealed it was not water tight. C‟s assessment of the insured property determined that the damage noted was due to:  soil moisture changes due to the proximity of trees  seasonal drying of soils  seasonal wetting of soils  blocked and leaking storm water pipes  long term dilapidation of gutters. I acknowledge the evidence provided by LD and C, however, it cannot be ignored that these reports were obtained a few years after the claim the subject of this disp ute was lodged and the FSP‟s investigations of the damage. It cannot be ignored that the FSP in 2012, had also undertaken plumbing investigations at which stage there were no leaks or breaks in the lines noted. Also, the opinions provided by the various consultants again are for the most part consistent in that the cracking is due to soil/ground movement over an extended period of time. Damage caused by, arising from or involving soil movement is specifically excluded from cover under the policy. Accordingly, on the basis of the available evidence, I am not satisfied the Applicant has established the damage is due to an event insured under the policy. Rather, the evidence supports the conclusion that the damage is due to circumstances clearly excluded from cover. Case No: 347349 Determination Page 5 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. I have reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination, commentary has been restricted to only those issues which are considered to be directly relevant to the outcome. 3.2 Relevant experts’ evidence Record Key points Assessor Report  undertook assessment of insured property on 8 March 2012  the App licant moved in approximately 10 years prior when renovation works were completed  cracks began to be noticed within the last 12 months  assessor no ted internal and external cracking. Also, cracking of the concrete path from the driveway to entry porch  assessor of the view leak detection consultants need to be appointed. AL Leak Detection Specialists Report 10 April 2012  carried out an investigation to locate source of cracking to internal and external surfaces  CCTV sewer and stormwater pipes tests completed including pressure testing of hot and cold domestic lines  all tests passed with no blockages or breaks all the way through to easement points at the front and rear of the property  air vents to the house towards the rear were found to be lower than path/ground height F (Engineer) Investigation Report 1 November 2012  carried out inspection of insured property 17 October 2012  F concluded:  the observ ed distress to the insured building was due to long term differential footing movements  the poor footing system (compared to current code requirements) has also contributed to the buildings distress  the construction works associated with replacing Melbourn e Water pipes on 23 and 24 June 2012 did Case No: 347349 Determination Page 6 of 7 not cause nor contributed to the observed damage. T (Engineering) Ground Vibration Monitoring Report  T were requested to monitor the ground vibration generated by replacing Melbourne Water pipes in Pascoe Vale in June 2009  monitoring was conducted to determine the effect of the works on nearby structures and dwellings  MiniMate Plus vibration monitors were used to record ground vibration levels at 11 monitoring stations across three works sites  while there are n o Australian Standard for limiting ground vibration from construction sites, guidance can be taken from British Standard 7385, which is accepted by many Australian Authorities  the maximum level recorded near the closest residential structures neighbouring worksites was 11.3mm/s which is in the “no damage” zone  the maximum ground vibration levels recorded were well below levels at which were even minor damage may occur in both industrial and light framed structures including houses. J Building Consultant Report 30 January 2010  inspected the insured property on 28 January 2010 to assess damage alleged to have been caused due to building construction works outside the property  the Applicants advised J the cracks in the front path and in the wall on the south side pre - existed the works but became worse  all other cracks noted were said to be new cracks  J formed the opinion that the cracks assessed were consistent with effects of drought and as garden water had practically ceased. Leak Detection and Plumbing Report (Obtained by separate insurer for a different claim lodged by Applicant)  attended the site on 1 December 2014  noted cracking to plaster walls and ceilings to hallway, entry, front bedroom, bathroom and living room as well as cracks to external rende r walls  there was no evidence of leaks/cracks to sewer system  CCTV investigation of stormwater drains discovered two breaks between the south western corner of the home and street discharge  also found was a break in the stormwater drain SWD approximately underneath the driveway concrete crossover  testing of the stormwater pit on the west end of north side which revealed stormwater pit not water tight. C (Engineer) Report 3 December 2014 (Obtained by separate insurer for a different claim lodged by Applic ant)  C concluded the water wall damage noted was due to:  soil moisture changes due to proximity of trees  seasonal drying of soils  seasonal wetting of soils  blocked and leaking pipes  long term dilapidation of gutters. Case No: 347349 Determination Page 7 of 7 3.3 Policy Provisions RELEVANT POLICY PROVISIONS Page 14 ‘What we do not cover – general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by or arising from or involving: arises from or involves: Soil movement or settlement,’

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.