Determination 346973

Refusal to cover roof and internal damage from inherent defect or poor workmanship

FirmFinancial Firm (Unknown - Insurer)
Decided2014-09-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for roof and internal damage after a storm claim, saying the FSP's repairer failed to identify the underlying roof problem. AFCA found the damage was caused by an inherent defect or poor workmanship, but ordered the parties to share 50% of the repair costs, with interest if cash settled.

The policy excludes inherent defects and poor workmanship, but the repairer failed to identify the underlying issues at the first claim, so fairness required the costs be shared.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 346973 Determination Page 1 of 9 Case number : 346973 25 August 2014 1 Overview 1.1 Dispute The Applicants made a claim on their home building insurance policy for storm damage on 17 October 2011. The Financial Services Provider (FSP) accepted the claim and ar ranged for repairs to the Applicants’ roof through builder “CO”. On or about 10 May 2013, the Applicants re-approached the FSP about the condition of their roof, which had further sagged and allowed water into the home. They said the internal and external damage was because of the failure by CO to identify the cause of the damage and or by poor workmanship of CO. The FSP investigated and considered that it was not responsible for this damage which it said was caused by an inherent defect as the join in the rafters was not supported adequately in work done before the storm event and that no insured event had occurred to cause the claimed damage. The Case Manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was partly in favour of the Applicants. The Recommendation was not accepted by the Applicants. The FSP has not commented. In the circumstances, the dispute has been referred to me for Determination. 1.2 Issues and key findings Is the FSP liable for the cost of repairs to the roof and the ensuing internal damage? Although the FSP can establish that the damage to the roof is caused by an inherent defect or poor workmanship is has not adequately addressed or explained why CO did not identify this at the time of the first claim. Further damage to the roof and to the internals of the house has ensued. It is fair in all the circumstances that each party contribute 50% to the cost of the required roof repairs and identified internal repairs. 1.3 Determination This Determination is partially in favour of the Applicants. Case No: 346973 Determination Page 2 of 9 The FSP is to arrange for MC to provide a scope of works and the parties are to obtain quotes to repair the internal damage and to ensure the roof is properly repaired and structurally sound. Each party is to contribute 50% towards the cost of the work required to reinstate the roof to a satisfactory condition and to repair the internal damage. Should the Applicants prefer to be cash settled rather have the FSP’s contractors attend to the work, this may be done. In this event, the FSP should pay 50% of the assessed and agreed cost of the repairs to the Applicants, together with interest at the statutory rate from 29 November 2013 (being the date of the IDR letter) until the date of settlement. Case No: 346973 Determination Page 3 of 9 2 Reasons for Decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. No new information provided after the Recommendation After the Recommendation was rejected, the FSP made no comment. The Applicants made further submissions. They essentially reiterated their position that:  the problems stem from the FSP’s a ssessor who stated that the damage to the roof was due to strong winds  the Applicants should not be prejudiced by his mistake  what was recommended was not adhered to and as such the current result exists  further damage has occurred internally which the FSP should rectify also. 2.1 Is the FSP liable for the internal and external damage to the insured property? It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The Applicants must establish that the damage was caused by an insured event or because the FSP failed to identify the cause of damage The loss or damage claimed by the Applicants includes external and internal damage to the insured property. They say this was caused by the poor workmanship of CO, the FSP’s repairer and or by his failure to i dentify the cause of the loss at the time of the first claim. The Applicants must establish that the damage was caused this way or by an insured event such as storm or accidental damage. If so established the onus shifts to the FSP to show it can rely on a policy exclusion or otherwise limit its liability. The FSP must establish the claimed loss is caused by an inherent defect or by the defective workmanship of the original builder The Applicants do not contend that the damage the subject of this dispute was caused by storm. If they can establish that the alleged damage to the building is unintended and unexpected accidental damage or damage caused by the poor Case No: 346973 Determination Page 4 of 9 workmanship of the FSP’s repairer then the onus shifts to the FSP who says that the claimed loss is caused by an inherent defect or by the defective workmanship of the original builder RC. Many causes of the damage are identified by the experts A number of expert reports have been provided by the parties. Not surprisingly CO and RC defend the work they have done. However the FSP’s own assessor CR is critical of the work done by CO. CR says the steel supports installed by CO were not strong enough as they had started to bend. He also notes that the timber support was to be replaced but this was not done. He said it had bowed. He does not identify which timber support this is or why it was not replaced even though he says it was in the original specification. The FSP engaged two other experts. MG does not blame RC or CO. Rather he attributes the damage to poor workmanship done when additions were made to the house before the Applicants purchased it. MC says that the damage to the roof is due to the lack of sufficiently spaced struts and that a strutting beam spanning north west across the lounge should have been installed in the lounge. It is not clear whether he attributes this fault to the work done by RC or to earlier work as referred to by MC. The claimed damage was caused by an inherent defect or by poor workmanship In any event I am persuaded that the material provided is sufficient to support the FSP in its contention that the claimed damage was caused by an inherent defect or by poor workmanship. The FSP has not adequately addressed CO’s performance at the time of the first claim However I am not satisfied that the FSP has adequately addressed the Applicants’ submission that it has some liability for the current damage as CO failed to identify the cause of the loss at the time of the first claim. CO says that: “The damage originally occurred due to mov ement due to strong winds impacting the roof structure. However, it was not clear at that time that there were underlying issues with the timber roof.” CO does not explain or amplify this statement. However CR describes the work done by CO when he undertook the repairs and it appears to include work to the hip and rafters and installation of metal supports. Due to the nature of this work as described by CR I am not persuaded by CO’s assertion that the underlying issues with the roof were not identified or should not have been identified at the time of the first claim. CR says the work done then included: “removal of ridge capping, roof tiles, repositioning of roof hip and rafters, installation of metal supports and reinstatement all caused by high winds …” CR also says: “The original specification of work was to replace the timber support that had bowed, although this was not undertaken”. Case No: 346973 Determination Page 5 of 9 In all the circumstances while I accept that the FSP has established facts that enable it to rely on the policy exclusion, I am not persuaded that it has adequately explained or addressed the reason why CO did not identify the underlying problems with the roof at the time of the repairs in the first claim. Had CO done so the Applicants would have been responsible for all of the cost to rectify the roof at that time. Instead further damage has been done to the roof and to the internal parts of the house because the problem was not identified and repaired at that time. It is fair in all the circumstances that the parties share the cost of rectifying the damage to the roof and the internal damage Having considered all the material I accept therefore that it is fair in all the circumstances that the parties share the cost of rectifying the damage to the roof and the internal damage identified by MC and caused by water coming into the ceiling of the lounge room, damage to the fan, the cracking of the tile pointing and damage to the brickwork in the lounge. The cost of rectifying the damage to the roof and the internal damage is to be assessed CO quoted $6,749.60 to repair the roof but does not refer to internal damage. MG quoted $11,264 to correct the sagging roof without reference to internal damage. MC provided no quote or scope of works. The quotes are out of date and do not refer to the internal damage. MC should be engaged to provide a scope of works and the parties may then obtain quotes to repair the damage. Once the cost of repairs to the external and internal damage is agreed then I am satisfied that it is fair in all the circumstances of the dispute that the FSP pay 50% of the reasonable cost of repairing the external and internal damage. Case No: 346973 Determination Page 6 of 9 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Extract from Policy (effective 27 November 2010) Insuranc e Product Disclosure Statement and Policy Wording ….. Storm, rain or We will cover: flash flood ✓ damage to your building and/or your contents caused by storm, rain or flash flood. We will not cover: X water damage to your building caused by storm or rain seeping or Otherwise entering your building unless the water entered through an opening in the wall or roof that had been made directly by the storm or rain or as a direct result of it; X damage caus ed by wat er penet rating or entering your building because it has not been properly maintained or as a result of a design fault, structural defect or because of defective workmanship; ….. Accidental If thi s policy insure s your building, for an additional premium we will cover: ✓ unintended and unexpected accidental damage to your building. We will not cover if the incident arise s from or i s in connection with: X any damage caused by an event excluded under any section of this policy except when: ….. X an event that is covered by anot her section of the policy. ….. When you are not insured You are not insured under any section of thi s policy if the incident arise s from or i s connected with: X damage caus ed by atmospheric conditions, mould, mildew, insects, vermin, action of light, rot or inherent defect; Case No: 346973 Determination Page 7 of 9 ….. How we settle your claim Your building What we pay If this policy insures your building and we accept your claim, at our option we will pay for the reasonable cost of:  repairing,  rebuilding or  replacing, your home at the site to its condition when new or to its condition when last renovat ed, altered or restored. We will only pay for damaged parts If we accept a claim, we will only pay for the part of the home that has been damaged. ….. We will not pay: X to modify your building to rectify a fault that is causing loss or damage to your building under this policy. 3.3 Expert reports A number of experts have compiled reports in relation to the consideration of the Applicants’ roof for this matt er: Record Key points Repair authorisation 31 October 2011  CO authorized to repair storm damage (which occurred 17 October 2011) for $2,389.72. The pitch increase and new props are to be installed at the insured’s expense. FSP’s expert ( CO ) Repairer’s Report 6 August 2013  Inspected 29 May 2013 after a fresh claim from Applicant 10 May 2013  Original damage due to effect of strong winds and it was not clear at that time that there were underlying issues with the timber roof  Left side front elevation of ro of has sagged along the hip and requires reinstatement  Damage as a direct result of the removal of internal load wall to lounge/dining/family rooms 5 - 6 years ago  Builder used by Applicants did not provide support steels or timber beams in accordance with r egulations to compensate for the removal of the load bearing wall  The roof is spreading due to insufficient and inadequate support causing it to sag and it will continue to sag and cause more damage unless steels are inserted to the roof at a cost of $6,74 9.60 FSP ’s expert ( CR ) Loss Adjuster Report  CR attended 16 August 2013 because the insured had noticed the roof was sagging in the same place as earlier Case No: 346973 Determination Page 8 of 9 26 August 2013 repairs  He noted CO undertook repairs in February 2012. The work done was removal of ri dge capping, roof tiles, repositioning of roof hip and rafters, installation of metal supports and reinstatement all caused by high winds in June 2010.  The Applicant advised him that RC inspected the property again and was satisfied that the new jarrah sup port he put in the roof was load bearing and was not the cause. Rather RC said the steel braces installed by CO were insufficient  CR inspected CO’s repairs and said it is clear that the steel supports (installed by CO) have started to bend and been unable to withstand the pressure/load of the roof and was insufficient. It would appear…. that CO should have used stronger supports. The original specification of work was to replace the timber support that had bowed, although this was not undertaken.  CR describ ed the extent of damage which included water ingress.  He asked that an engineer comment and provide a scope of works FSP’s expert (MG) Structural Engineer Report 11 September 2013  MG inspected the hip and valley rafters in the roof on 4 September 2013  He did not agree that the sagging of the hip and valley rafter is because of the wall removal  Hip rafter in roof had a smith strap installed by others that was sagging (not related to work by CO)  Valley rafter was joined together and not supported. This h as caused it to collapse. This section of the roof forms part of additions to the house done before the current owners.  The new valley and hip were installed over and through the existing roof rafters. There was no form of props evident to support these ti mbers. Over time and with the weight of the roof, the valley rafter has collapsed due to poor building practice and installation  Quoted $11,264 to correct the sagging roof FSP’s expert (MC) Project Engineer Report 18 November 2013 and 29 November 2013  MC inspected roof 14 November 2013  He noted the external and internal damage that included cracking, water damage and inoperative fan and light in lounge  The central valley adjacent to the strutted north - eastern hip is not supported  A ceiling hanger has been installed at the removed wall location in the lounge supporting ceiling loads only. The roof has been strutted off adjacent walls.  The north eastern tension strut is functioning  As there is excessive deflection to the northern central hip and valley the st rut there is not effective. This deflection will continue Case No: 346973 Determination Page 9 of 9  A strutting beam spanning north west across the lounge should have been installed in the lounge  Water entry coming into the ceiling and affecting the fan due to the deflection of the roof and the cracking of the tile pointing  Damage to the brickwork is likely settlement related, although lateral forces from the spreading of the rafters might have played a role  The deflection of the hips of the roof is due to lack of sufficiently spaced struts  Unabl e to comment on policy response  Provided no scope of works Applicant’s expert (RC) Builder Undated letter  RC is a roof carpenter with 30 years experience and he did renovations to the house some time ago  In the roof from north to south he placed a 3 meter laminated support beam before he removed the internal wall  Work done to the roof was 2.5m from the storm damaged area  The work by CO has worsened the condition of the roof – the flat metal bar hip strap has been placed in the middle of the hip which is pu lling the roof down instead of fixing it  It needed to be placed further down the hip closer to the bottom of the hip where it could have given it more support  The roof is now worse because of the incorrect repairs. The edge capping has cracked and the vall ey alongside the hip is sagging and because of this water runs into the ceiling and is pushing out the eaves