Home / Financial Firm (Unknown - Insurer) / Determination 346884
Determination 346884
Claim amount - loss of rent after sewage inundation
Summary
A hotel owner claimed loss of rent under a landlord's policy after sewage inundated the building four days before flooding. AFCA found the building uninhabitable from the sewage, limited the covered loss to the pre-flood period, and ordered $12,040.
The loss of rent clause is triggered by damage that makes the building uninhabitable, and flood-period losses are excluded, so the loss is limited to the pre-flood period.
Subjects and remedies
business interruptionnatural disastersmall businesspay claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Claim amount
Determination
Case No: 346884 Determination Page 1 of 6
Case number : 3 3 46884 8 July 2014
1 Overview
1.1 Dispute
The Applicant is a claimant on behalf of his hotel for cover under an insurance
policy for losses arising from the inundation of escaping sewage on or about 7
January 2011. This loss narrowly predated wider and more severe flooding events
that affected much of Queensland, as well as the insured building from around 11
January 2011. The building caters for 45 units available for “nightly hire as hotel
rooms”.
A claim was lodged with the Financial Services Provider (FSP) seeking cover for
loss of rent allegedly incurred for the period from 7 January 2011, until 31 January
2011. The Applicant estimates that this loss was worth $117,760.
1.2 Issues and key findings
Was the Applicant entitled to claim for loss of rent under the policy?
Whilst the cover chosen was not ideal for what the Applicant required, damage
was caused to the building and the loss of rent provision can be enlivened.
Was the property rendered uninhabitable as a result of the sewage
overflow?
The circumstances of the loss were sufficient for the building to be “uninhabitable”
within the term’s normal and everyday meaning.
What was the extent of the loss incurred?
The loss is limited to the period prior to flooding event on 11 January 2011, when
the building’s occupants were evacuated by order of the relevant city authorities .
A reasonable estimate of this loss is $12,040.
1.3 Determination
This Determination is partially in favour of the Applicant.
The FSP must provide payment to the Applicant of $12,040.
Case No: 346884 Determination Page 2 of 6
2 Reasons for Determination
2.1 Was the Applicant entitled to claim for loss of rent under the
policy?
The Applicant’s loss fits within the loss of rent provision
The cover purchased by the Applicant was “Landlord’s Residential Property”
cover, which typically relates to residential tenancy situations for singular or family
based tenants.
This policy identifies that the relevant calculable amount of a loss of rent claim is
based on the rental agreement or periodic tenancy agreement in force at the time
of a loss. Ideally this provision serves a policy established for a landlord/rental
property situation and not for a hotel which is the case here.
The Panel is satisfied that the onus rests with the Applicant’s brok er to ensure
that the correct cover is selected for its client. Nevertheless, the policy in force
specified that the cover was for 45 units and that loss of rent cover was for up to
$1,226,900. Clearly, such a level of cover would not be extended in a typical
residential tenancy situation. The FSP should have been aware that the risk
presented was on a greater scale for what the policy would ideally provide.
Whilst the cover may not be ideal for the Applicant’s circumstances, he is entitled
to the protectio n the cover provides. The FSP’s policy schedule notes the
existence of 43 hotel rooms (45 in the broker’s schedule). The FSP presumably
knew the arrangement for which it was providing cover.
Whilst there are no formal rental agreements or periodical tenancy agreements to
consider, these are not prerequisites to cover under the terms of the policy. They
are merely guides as to how the loss should be quantified. In the absence of such
documentation, the daily room rates used by the hotel would prove sufficient.
Consideration of the clause only requires that there has been damage
The relevant clause for loss of rent cover only requires that the building “suffer[s]
loss or damage and [is] uninhabitable as a result”. The requirement for “damage”
is not conditional on there being a payout under this policy before the clause for
loss of rent is enlivened.
As damage was caused to the insured building, the Applicant is entitled to seek
cover for his loss of rent.
2.2 Was the property rendered uninhabitable as a result of the
sewage overflow?
Definition of “uninhabitable”
The FSP’s policy does not define the term “uninhabitable”. The Panel therefore
considers that the term should be interpreted within the context of its normal,
everyday meaning.
Case No: 346884 Determination Page 3 of 6
In layman’s terms, a property would be “uninhabitable”, when it is not fit, or cannot
be used, for its normal or everyday purpose.
This is not to say that a property is “uninhabitable” if a resident was simply
inconvenienced. In the Panel’s view, there has to be some measure o f prejudice
suffered, making it unreasonable for the tenants/guests to live in the building.
Such a prejudice may vary in individual circumstances, depending on what was
involved.
The Applicant’s building was “uninhabitable” after the loss
It is accepted t hat the Applicant’s hotel building suffered from an overflow of
sewage into its basement area on 7 January 2011.
The Applicant says that between 7 and 11 January 2011, many tenants/guests at
the hotel left the building owing to the “unavailability of the s ervices and the
stench coming from the basement”. He also suggests that the loss of certain
systems, including electrical power, communications and fire and safety backups
made the building unsafe and that he cancelled advertisements for the hotel and
taking forward bookings due to the problem.
No evidence was supplied in relation to the cancelled advertisements or forward
bookings.
The sewage rose to a depth of about 1m throughout the basement of the building.
In addition to the stench arising from such a problem and the potential health risk
to tenants/guests and employees, numerous electrical and safety systems were
affected or incapacitated as a result.
In the Panel’s view, this left the building unfit for its normal or everyday purpose,
bearing in mind that the repairs required to attend to this damage exceeded
$250,000 and cannot by any measure be considered insignificant. This triggers
consideration of the loss of rent provision for the policy.
2.3 What was the extent of the loss incurred?
Impact of the floods cannot be overlooked
Four days after the loss affected the insured property, many parts of Queensland,
including this property, were subjected to severe flooding. The insured property
received an evacuation notice on 11 January 2011, due to the impending arrival
of flood waters, which caused widespread damage.
Flood damage is not covered under the FSP’s policy.
Whilst the Applicant was not to blame for the impact of the flood damage, the
parties agree that the building was affected by floodwater on or after 11 January
2011. The power was subsequently disconnected to local areas between 12 and
24 January 2011.
It is almost certain that the eventual repairs conducted to the property were
delayed as a result of the flood damage, taking several months to complete.
Case No: 346884 Determination Page 4 of 6
The Panel accepts that such delays were widespread across Queensland during
this time, due to several factors, including:
the extent of damage caused by the floods
the shortage of appropriately qualified experts
the need to review and assess claims and
the prioritisation of work.
To this end, the Panel also accepts that any loss of rent suffered by the Applicant
ceased to be covered after the floods on 11 January 2011. Regardless of any
entitlements the Applicant may have received in normal circumstances, the
impact rendered by the floods meant that the building was not inhabitable
anyway. The FSP is not responsible for this.
Noting the extensive destruction caused by the floods and the flow on delays
incurred for the processing of all insurance c laims, it is not unfair to say that this
was the dominant reason that the building incurred reduced or absent tenancy for
sustained periods after 11 January 2011.
Accordingly, the extent to which the FSP should be liable for any loss of rent
claim, can only be ascertained by calculating the loss incurred between 7 and 11
January 2011.
The extent of the actual loss was likely minimal
The Applicant has produced records to attest to the occupancy of the 45 units
over the period through to the end of January 2011. The Applicant employed two
charge-out rates, being $120 for a single room and $160 for a suite.
In the four days prior to 11 January 2011, the Applicant had 83 rooms out of the
180 available rooms, occupied or booked. This means there was an occupancy
rate of less than 50%. Whilst asked for information about usual occupancy rates
by the FSP, the Applicant has not provided this information.
Three of the 45 rooms for this four day period were charged at the higher rate of
$160 per night and over the 12 accumulated nights for the suite rooms, they were
only occupied for two of those nights.
In total monetary terms, the Applicant suffered a shortfall on maximum occupancy
over the pre-flood period of $12,040 (87 rooms at $120 per room plus 10 rooms at
$160). This is without considering expenses (which would likely increase with the
occupancy of the rooms) and whatever the usual occupancy rate might be, noting
that very few hotels ever operate at maximum occupancy or charge the quoted
rack rate.
The above figure does not factor in possible bookings that were foregone or
cancelled by the Applicant, although the Panel notes that the Applicant incurred
no refund costs for the period. In consideration of the problems in the basement, it
is conceivable that the occupancy rate was likely somewhat lower than normal as
the hotel would not have been an attractive proposition at the time.
The loss of business through this period might effectively be off-set with the
administration and cleaning costs incurred to handle an increased patronage of
Case No: 346884 Determination Page 5 of 6
the hotel. In consideration of what is fair in all the circumstances, the figure of
$12,040 is a reasonable approximation of the Applicant’s maximum likely loss.
3 Supporting information
3.1 FOS approach to this dispute
General Information
The Applicant has lodged this dispute as the designated representative of the
insured party under the insurance contract. The FSP has not raised any issues
with his entitlement to bring the claim.
He is represented by a broker and where submissions ha ve been made by the
broker or on behalf of the hotel generally, this document has referred to any such
submissions as having been made by “the Applicant”.
As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
All of the provided material has been read and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of
this Determination, commentary is restricted to only those issues considered
relevant to the outcome.
This decision has been made by a Panel consisting of an Ombudsman, and two
representatives with extensive experience in insurance and consumer claims.
Issues in agreement
It is not in dispute between the parties that:
The insured property suffered sewage inundation through the basement area
on or about 7 January 2011, approximately four days prior to the building
suffering further inundation from the flooding events which affected much of
Queensland
The flood damage amounted to $256,166.95 (exclusive of GST), which was
covered under a separate policy
Amongst the damaged areas were: elevator controls and motors,
communications and entertainment equipment, fire services equipment, base
pumps and some electrical reticulation systems
This policy does not provide flood cover and insofar as the building was left
uninhabitable as a result of the subsequent flood events, the Applicant is not
entitled to cover for this
Case No: 346884 Determination Page 6 of 6
An evacuation notice was issued to the building relevant to the flooding events
on 11 January 2011.
The Panel understands that an offer for settlement was proposed and
subsequently withdrawn by the FSP. This offer was not accepted by the Applicant
and the FSP is not obliged to reinstate it.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.