Home / Financial Firm (Unknown - Insurer) / Determination 345975
Determination 345975
Dispute over cash settlement for water damage and kitchen bench top
Summary
The applicant claimed for water damage to his home and a kitchen bench top and sought compensation for claim handling. The FSP had cash settled the claim for $10,287 in total and AFCA found it had met its policy obligations.
The policy allows the FSP to cash settle, the cash settlement covered the quoted repairs, and the bench top damage was not shown to be caused by the leaking pipe.
Issues
- Claim amount dispute primary · not upheld“The FSP is not liable to meet the cost of repair to the bench top because there is no evidence the bench top was damaged due to the leaking pipe.”
- Poor claim handling secondary · not upheld“I am not satisfied that the Applicant has established that due to the FSP's conduct there was an unusual degree of physical inconvenience or time taken.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building – Home Contents - FSP
Decision - Claim Amount
Determination
Case No: 345975 Determination Page 1 of 6
Case number : 345975 1 6 December 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim with the Financial Services Provider (FSP) for water
damage sustained to his home as a result of a leaking pipe on the 7 April 2013.
Although the FSP accepted the claim, the dispute has arisen as to the extent of
the damage sustained and the FSP’s claim handling .
The Applicant seeks payment of the costs of replacing his kitchen bench tops and
compensation.
1.2 Issues and key findings
Is the FSP liable for the Applicant’s bench top ?
The FSP is not liable to meet the cost of repair to the bench top because there is
no evidence the bench top was damaged due to the leaking pipe.
Has the FSP met its obligations under the terms of the policy?
The FSP has met its obligations under the terms of the policy because :
the policy provides that the FSP may repair, replace or cash settle the
Applicant’s claim
the FSP has provided cash settlement to the Applicant with respect to the
damage sustained.
Should the Applicant be awarded compensation?
The Applicant has not established entitlement to compensation pursuant to
paragraph 9.3 of the Terms of Reference in support.
1.3 Determination
This Determination is in favour of the FSP.
The FSP has met its liability in accordance with the terms and conditions of the
policy.
The Applicant has not established an entitlement to compensation pursuant to
paragraph 9.3 of the Terms of Reference.
Case No 345975 Determination Page 2 of 6
2 Reasons for Determination
There has been a full exchange of material between the parties and each party
has had an opportunity to address the issues that arise from the material
exchanged.
This Determination follows consideration of all of the material exchanged and is
based on what is fair in all the circumstances having regard to relevant legal
principles, terms of the policy, good industry practice and prior Determinations
where relevant.
2.1 Is the FSP liable to meet costs of replacing the Applicant’s bench
top?
The FSP is not liable to meet the cost of replacing the Applicant’s bench top
The Applicant lodged his claim against the FSP on 7 April 2013 because of water
damage due to a leaking pipe. The Applicant previously lodged a claim for water
damage as a result of a leaking pipe on 18 January 2013 which had been settled
by the FSP.
In lodging the second claim, the Applicant included items such as the kitchen floor
tiles and a lambs wool carpet that had been settled from the previous claim on
18 January 2013.
The FSP accepted liability with respect to the damage sustained as a result of the
leaking pipe on 7 April 2013. Various attempts were made to settle the dispute.
The FSP ultimately paid the Applicant the sum of $5,230.30 (on top of the
$5,056.70 payment rejected by the Applicant), which incorporates a number of
quotes obtained by the Applicant (plasterer, electrician, painter, builder and
accommodation). The FSP also allowed for kitchen cupboards and carpentry
work.
The Applicant maintains however, that the FSP should be liable to meet the cost
of replacing or repairing the kitchen bench top. The Applicant contends that it was
damaged as a result of the leaking pipe.
The Applicant provided a brief letter from a kitchen building company (KE) in
relation to the bench top. KE said the bench top was warped due to the water
damaged cupboard beneath it. However, the building company utilised by the
FSP (UBS) negated this by providing an explanation of why this is not the
situation.
I have considered both explanations.
KE has not explained how water from the leaking pipe would have caused the
bench top to warp.
UBS has provided an explanation as to why the damage to the bench top was not
due to the water from the leaking pipe.
Case No 345975 Determination Page 3 of 6
In my view it is unlikely that the bench top was warped due to the water damage
to the cupboards beneath it. I prefer the opinion of UBS. I accept that the bench
top was not damaged as a consequence of the leaking pipe.
The FSP is not liable to meet the Applicants for the cost of repair or replacement
of the kitchen bench top.
2.2 Has the FSP fulfilled its obligations toward the Applicant with
respect to his claim?
The FSP has met its liability under the terms of the policy
The policy provisions allow for the FSP to cash settle a claim, if it elects to do so.
The FSP chose to cash settle the claim.
The FSP has paid an additional amount of $5,230.30 on top of $5,056.70 paid to
resolve this dispute. This additional amount takes the total payment to $10,287,
which includes UBS’s outline of the repair work required (email dated 29 August
2013), in addition to the various quotes obtained by the Applicant.
The Applicant has made a number of comments abo ut the condition of his
kitchen. However, without documents in support, these comments do not
establish the FSP’s payments fall short of what is require d to repair the
Applicant’s home following the water leakage in April 2013.
The cash settlement is sufficient to cover the quoted repair work. In the
circumstances, without evidence of further damage, the cash settlement meets
the FSP’s liability under the policy.
2.3 Should the Applicant be awarded compensation?
The Applicant is not entitled to compensation pursuant to paragraph 9.3 of the
Terms of Reference.
The Applicant is seeking compensation because of the FSP’s handling of the
claim. The Service’s T erms of Reference (TOR) provide that compensation may
be awarded to an Applicant for a non-financial loss to a maximum of $3,000. The
TOR states that compensation will only apply where there has been an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with the Applicant’s expectation of enjoyment or peace of mind has
occurred.
The Applicant has indicated that the claim process has caused him stress and
that, since the damage has not yet been repaired, his health has deteriorated.
The Applicant has provided a brief note from his doctor, however there is no proof
of a link between the Applicant’s health and the environment in his home.
The FSP arranged for a company (SA ) to test the Applicant’s home for possib le
air contamination. SA asked a laboratory to test the samples taken from the
Applicant’s home and concluded there was no evidence of mould spore growth
detected.
Case No 345975 Determination Page 4 of 6
Based on the information exchanged there is no evidence to establish the leaking
pipe caused air contamination or mould growth within the property.
Whilst there were some delays in the resolution of the claim the Applicant is
expected to be moderately robust and bear a normal degree of inconvenience
when problems do arise. The majority of the issues that have caused delay arise
from the Applicant’s dispute as to the extent of the damage suffered.
I am not satisfied that the Applicant has established that due to the FSP’s conduct
there was an unusual degree of physical inconvenience or time taken to resolve
the situation.
Case No 345975 Determination Page 5 of 6
3 Supporting information
3.1 Policy provisions
“ How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home or 'other cover' in
one of the following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your
home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
► pay you
► pay your nominated repairer, supplier or builder, or
► provide you with store credits from one of our nominated suppliers.
For example, we may pay you directly when:
► you decide not to repair or rebuild your home, or
►you don’t start repairing or rebuilding your home within 6 months from when the
damage takes place, or within any longer period we agreed to in writing.
3.2 Service ’s Terms of Reference
Paragraph 9.3b) of the TOR states that:
“Subject to paragraph 9.3c) [where a general insurance policy expressly excludes such
liability] and paragraph 9.7 [cap on maximum value of remedy], [the Service] may decide
that the Financial Services Provider compensate the Applicant for non-financial loss but
only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant’s expectation of enjoyment or
peace of mind has occurred; …
…
The maximum amount of compensation for non-financial loss will be $3,000 per claim
made in the Dispute. ”
3.3 Expert Evidence
Record Key points
FSP’s expert – Building
company (UBS )
Report dated 5 June
2014
There is / was no swelling of the bench top to the wall
between the bathroom (where the leak was) and the
kitchen where the disputed bench top is.
Before UBS removed the cupboards of the bench top to
repair the wall, UBS noted –
o there was no silicone or other seal between
the bench top and the sink
Case No 345975 Determination Page 6 of 6
o Applicant was renovating the kitchen – thus no
wall tiles
UBS negated Applicant’s contention the floor had risen
causing a noticeable lip between the sink and bench top –
If the floor had risen, both the sink and cupboard would rise
together as they sit on the same floor.
Applicant’s expert –
Kitchen Builders (KE )
Report dated 4 July 2014
KE has 3 0 years in the kitchen trade rep airing and
replacing damaged cupboards .
It is necessary for the bench top to be replaced because it
is warped as the result of having been lifted up at one end
by the water damaged cupboard below .
The laminex bench top cannot be reused by screwing it
down .
FSP’s expert –
specialised cleaning
company (SA)
Report dated 20 August
20 13
SA inspected kitchen cupboard framework and bench top
regarding treatment for mould contamination and the repair
method undertaken by UBS.
Five tape lift samples taken from cupboard, timber
underside of bench top – no evidence of any visible
microbial growth, nor was there evidence of any water
damage or swelling.
FSP’s expert –
laboratory company
(AAL)
Report dated 20 August
2013
Analysed five tape lift specimens.
No evidence of mould spore growth.
Information relied upon
UBS email dated 29 August 2013
FSP letter dated 10 June 2014
Applicant’s doctor’s letter dated 30 November 2013 .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.