Determination 345830
Further cash settlement payment for storm damage repairs
Summary
The Applicants had accepted a $134,454.94 cash settlement for storm damage and sought further payments and an ex-gratia payment for the prolonged claim. The Panel ordered nothing further.
Paragraph 100 of the primary determination covers only previously unforeseen damage found during repairs, and ex-gratia payments are at the FSP's discretion.
Issues
- Claim amount dispute primary · not upheld“the Panel determines the Applicants are not entitled to any further payment”
- Delay secondary · unclear“the Panel is unable to consider this issue further and is satisfied the FSP is not obliged to make such payment”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 345830 Determination Page 1 of 4
Case number: 345830
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount
6 May 2014
Summary
Description
Claim under a Home Building & Contents Policy for damage sustained
during a storm. The claim has been subject to a prior Determination
and the dispute cash settled by the FSP subject to that Determination.
A dispute now arises as to whether the Applicants are entitled to further
payments under the requirements of the primary Determination
Basis of Determination
The Applicants‟ claim for storm damage lodged on 29 January 2011
has being cash settled pursuant to a Determination issued by the
Service on 8 August 2012.
The Determination provided the FSP may be subject to further
payments provided the Applicants could justify those payments were
additional payments required to complete the repairs as set out in
DWA‟s report.
The Applicants‟ claim for additional costs are based not on repairs
being completed but are based on a revised quotation as t he FSP‟s
builder C refused to complete the work.
The quotations provided do not include any additional works outside
the Scope of Works provided by DWA.
The Terms of Reference provide that a determination is final and is not
subject to review by the parties.
Determination
Based on the available information, the Panel determines the
Applicants are not entitled to any further payment.
Addendum Determination
Case No: 345830 Determination Page 2 of 4
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) which was in force at the time of the loss.
2. On 29 January 2011, the Applicants lodged a claim for storm damage to the
home building, which the FSP accepted. A dispute arose later when the
Applicants considered the FSP‟s cash settlement offer was insufficient to
complete the repair to the building.
3. In the primary Determination No. 259811, a copy of which is attached, the
Panel determined the FSP was to cash settle the Applicants for the repair of
the building based on an amended quotation by the FSP‟s builder (C), which
was to include further provisions detailed in the scope of works from the
FSP‟s consulting engineer (DWA).
4. A new dispute has since arisen as to whether the Applicants are entitled to a
further payment under the requirements of the primary Determination.
Issues
5. Whether the Applicants are entitled to a further payment under the
requirements of the Panel‟s primary Determination?
6. Whether the Applicants are entitled to an ex-gratia payment for the
disruption caused to their family due to the prolonged time the claim has
taken to be finalised?
Reasons for decision
7. As advised to the parties, due to the nature of the dispute, the Financial
Ombudsman Service (FOS) has considered it appropriate to expedite the
dispute to Determination in accordance with the Operational Guidelines to
the FOS Terms of Reference (TOR).
8. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
Are the Applicants entitled to a further payment for the additional costs
required to complete repairs?
9. Prior to issuing the primary Determination in this matter in August 2012,
there was a full exchange of material between the parties with detailed
submissions being made by both parties.
10. The Panel took into account various quotations and information with respect
to Scope of Works. At that time, the Panel determined the amount quoted by
Case No: 345830 Determination Page 3 of 4
C needed to be adjusted to reflect the works recommended in the Scope of
Works provided by DWA.
11. At paragraph 99 of the Determination, the Panel was quite specific in its
Determination as to not only the method by which the amended quotation
was to be obtained but also the further matters to be taken into consideration
and the method of payment.
12. The Determination does not contemplate anything other than a cash
settlement. Whilst the Applicants in the current dispute have argued that they
accepted the primary Determination relying on the fact that C would be
willing to carry out the repairs and could do so at an advantageous cost,
there is no reference in the prior Determination to C either being prepared to
carry out the work or actually performi ng the work.
13. The Panel is satisfied that insofar as the quotations were obtained from C
and the matter was cash settled based on the quotation provided by C, that
the FSP has settled the claim in accordance with paragraph 99 of the
primary Determination.
14. At paragraph 100 of the primary Determination, the Panel determined given
that DWA had indicated there may be additional repairs required that had not
been allowed for in the Scope of Works, that the FSP may be subject to
further payments provided the Applicants can justify the additional costs
required to complete the repairs as set out in DWA‟s report.
15. The Panel in making the Determination contemplated that there may be
some additional costs incurred outside of the Scope of Works provided for by
DWA and the quotation of C. The Determination does not contemplate cost
overruns for completing the actual Scope of Works, but additional costs
incurred.
16. The Panel is satisfied that the intention of paragraph 100 was to allow for
further payments in the case of previously unforeseen damage being
identified as related to the claim during the course of repairs. This view is
also corroborated by referring to paragraphs 83 to 87 of the original
Determination.
17. The Applicants‟ arguments in the current dispute are essentia lly that as C
would not carry out the repairs and had not intended to carry out the repairs
then additional costs would be incurred as per the quotations provided by
CH, S and WACB.
18. The submissions by the Applicants do not identify any additional costs
incurred by unforeseen damage identified after or during the course of
repairs.
19. The Panel is satisfied that to read paragraph 100 of the primary
Determination in the manner suggested by the Applicants would be to read
the paragraph out of context and would be inconsistent with the Service‟s
Terms of Reference that provide that the Determination be final.
Case No: 345830 Determination Page 4 of 4
20. Based on all the available information, the Panel is satisfied none of the
Applicant‟s further information or arguments establishes they are entitled to
further payments under paragraph 100 of the primary Determination for
identification of previously unforeseen damage.
Are the Applicants entitled to an ex-gratia payment for the disruption caused
to their family due to the prolonged time the claim has taken to be finalised?
21. The Panel notes an ex-gratia payment is a matter, which is entirely up to the
FSP‟s discretion. There is no scope under the TOR to compel an FSP to
provide ex-gratia payments under any basis.
22. Accordingly, the Panel is unable to consider this issue further and is satisfied
the FSP is not obliged to make such payment.
Determination
23. Based on the available information, the Panel determines the Applicants are
not entitled to any further payment.
Case No: 345830 Determination Page 1 of 12
Case number: 259811
General Insurance - Domestic Insurance - Home Building - Storm - FSP
Decision - Denial of claim
8 August 2012
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) which was in force at the time of the loss.
The insured property is located in WA.
2. On 29 January 2011, the Applicants lodged a claim for storm damage which
caused the roof to detach from the building and caused major structural
damage throughout the property.
3. The FSP accepted liability and, based on reports from an engineer (DWA)
and its preferred builder (C), offered the Applicants a cash settlement of
$134,454.94.
4. The Applicants have accepted this offer; however, they seek a further
payment as they consider the amount is not sufficient to complete the repairs
of the property.
Summary of Applicants’ position
5. In the structural report DWA prepared for the FSP, they clearly state that the
property requires extensive work.
6. After an initial denial, the FSP appointed C to quote on the repairs needed. C
issued a quota tion of $110,572.34. However, they noticed C‟s scope of
works had many shortcomings and would not finalise repairs up to the
standard DWA indicated.
7. The FSP asked them to source additional quotations and offered to pay the
cost. They obtained quotations from builders HTC ($232,248) and KC
($212,455). They also obtained a letter from builder WACB saying it would
be more economical to replace the house at a cost of $300,000-$320,000.
8. The FSP has not taken into account these quotations in its subsequent
decisions. HTC are registered builders in NSW and only require a building
permit to work in WA.
Determination
Case No: 345830 Determination Page 2 of 12
9. The roof was installed before they purchased the house and before the
policy was taken out. They were unaware of any structural problems with the
building and did not conceal this from the FSP. Also, the FSP conducted an
inspection of the property prior to insuring it and at that point it did not advise
of any repairs needed before offering cover.
10. The damage was solely caused by a severe storm that was capable of
removing roofs despite their structural soundness. This is supported by
DWA‟s report which says building codes and standards do not guarantee
against structural failure.
11. As to the shortcomings in C‟s scope of works, they note as follows:
C has only allowed $1,928.50 for the repair of damaged sections of
brickwork. Upon reading DWA‟s specified repair methods, they do not
believe that amount will cover the cost of these repairs.
C has not included the repair of cracking caused by subsidence;
however, C would not be able to repair the house to building standards
without first repairing the cracking.
C‟s quotation does not provide for replacement of the roof rafters with
Jarrah, which is the material that it had. Jarrah is readily available
within Australia and the FSP is obliged to use this material to repair the
property to a condition as close as possible to the original. The policy
does not say the FSP can use a cheaper type of material at its choice.
C has not quoted for the replacement of the entire roof‟s timbe rwork,
but only the damaged part. Further, C has only quoted for the
repainting of the veranda roof beams to match the existing ones.
C has underestimated the cost of installing the roof ties and has not
quoted the retiling of the bathroom and toilet after the ties are installed.
C has not quoted the removal and storage of furniture.
C quoted an amount that is not firm; C has not allowed for any
additional unforeseen costs. For this reason, they do not believe the
figure C quoted represents the reasonable a mount required to repair
the house.
12. They have endured considerable hardship due to the lack of a roof, which is
also causing further damage to the plasterwork in the walls.
13. They believe the FSP is obliged to repair the house as specified by DWA
and in compliance with relevant construction standards. In order to comply
with regulations, the FSP will first have to rectify other parts of the building
such as posts, cracks and wall plate anchors.
14. As such, they want the FSP to not only pay for the accidental damage but for
the extra cost required to comply with building standards.
15. They want the FSP to cash settle them for an average of all the quotations
provided, in the amount of $221,539.71. They have agreed to receive a
Case No: 345830 Determination Page 3 of 12
payment of $134,454.94 but are seeki ng to be paid the difference between
this payment and the average of all the quotations, being $87,084.77.
16. They also want the FSP to pay the reasonable cost of renting temporary
accommodation.
Summary of FSP’s position
17. C provided a quotation for the repairs at a cost of $110,572.34. Upon receipt
of the Applicants‟ quotations, it offered a cash settlement amount based on
C‟s quotation. It made this offer on a without prejudice basis, meaning it was
willing to make further payments if as a result of further i nformation it was
established the repair cost more.
18. Upon receiving the Applicants‟ comments regarding the shortcomings of C‟s
scope of works, it asked C to revise its quotation. C provided a revised
quotation for the repairs in the sum of $134,454.94, which it considers is in
accordance with the scope of works contained in DWA‟s report.
19. The original roof was replaced with a metal clad roof without replacing the
original battens or installing positive ties. The battens had not been strapped
to the rafters and these were not anchored to the wall plate.
20. The policy does not cover the cost for any work the roof required before the
damage occurred.
21. The male Applicant‟s father, who is not a registered builder, installed the new
roof without knowledge or compliance with the required building code and
wind load requirements. Consequently, the Applicants are not covered for
the cost of upgrading the roof, as this was work required before the damage
occurred.
22. It is only obliged to repair the damaged part of the building as far as possible
to its original condition or pay for the reasonable cost of doing so.
23. It is not obliged to use a particular builder as requested by the Applicants.
Further, HTC are not registered builders in WA and for that reason their
quotation should not be considered.
24. Also, KC has not been cooperative in providing a breakdown of their
quotation. However, the FSP considers that the difference between C and
KC‟s quotations might be the use of Jarrah wood for the roof and veranda
and the inclusion of repair works that are not covered under the policy.
25. As C is an insurance builder only, they are able to secure contractors on set
rates, even in country areas. Thus, C is able to complete repairs at a more
cost effective price than other builders.
Case No: 345830 Determination Page 4 of 12
26. Based on this information, it is satisfied the building is repairable and C‟s
revised quotation represents the reasonable cost of repairing the damaged
part of the building.
27. Considering this, WACB‟s quotation for the rebuilding of the house is not
relevant and has not been taken into account.
28. C‟s quotation specified plaster repairs for the brickwork according to the
engineer‟s recommendation. However, it does not include repairs to cracking
due to subsidence, as this is specifically excluded under the policy.
29. The Applicants are entitled to the benefit for temporary accommodation.
However, a resolution needs to be first achieved in respect of the settlement
for repairs.
30. The FSP relies on the following policy provisions:
“ What is not insured
This policy does not insure You against:
1 damage directly caused by:
...
earth movement (except earthquake) no matter how caused, including
erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage, settling, expansion or heaving
...
What We do if Your Home is accidentally damaged
If „Building‟ and „Replacement‟ are shown on the certificate of insurance, We
replace, reinstate or repair the part of Your Home that is accidentally
damaged as far as possible to its original condition, using materials that are
readily available in Australia. Or, at Our option, We pay You the reasonable
cost to do so.
...
We pay only up to the amount shown as the sum insured for the „Building‟ on
the certificate of insurance where an amount is shown next to the word
„Replacement‟.
...
Additional benefits
The following additional benefits are in addition to any sums insured
shown on the certificate of insurance for ‘Building’ and ‘Contents’.
...
Costs connected with rebuilding
If We have paid or agreed to pay a claim to replace or reinstate Your Home
(other than under the additional benefit „Flood cover‟ in this policy), We pay
for:
the extra cost to comply with the requirement of a public authority in
relation to rebuilding Your Home but not the cost for work You were
required to do before the damage occurred”.
Case No: 345830 Determination Page 5 of 12
Issue
31. Whether the FSP‟s settlement offer is fair and reasonable and in accordance
with the terms and conditions of the policy.
Reasons for decision
32. As advised to the parties, due to the nature of the dispute a nd the amount
claimed, the Financial Ombudsman Service (FOS) has considered it
appropriate to expedite the dispute to Determination by the Panel in
accordance with the Operational Guidelines to the FOS Terms of Reference.
33. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
34. The Panel is satisfied that a full exchange of information has taken place
between the parties and each party has had the opportunity to address the
issues raised.
35. There is no dispute between the parties that the property suffered damage
as a result of a severe storm. The central issue in dispute is whether the
scope of works the FSP proposed is adequate to repair the property and
consequently, whether the amount quoted for repairs is fair and reasonable.
Whether the scope of works proposed is adequate
36. Based on DWA‟s report and HTC and KC‟s quotations, the Applicants allege
C‟s scope of works does not cover for all the repairs the property needs.
Further, they note WACB recommends to rebuild the property.
37. Following the FSP‟s instructions, C revised its quotation and included a
portion of the works the Applicants said were not included in C‟s initial scope
of works.
38. The F SP notes the Applicants‟ builders have quoted for other repairs not
included in C‟s revised quotation; however, the FSP says these are either
not covered or represent betterment to what the property was. It further
notes it is not required to rebuild the home as it can be repaired.
39. The Panel draws attention to DWA‟s report. This report is specific and
detailed about the damage sustained to the property and the repair method.
This report states:
“While we have described the method of repair to the damaged section of the
house in the following, the insurer and the owner need to be aware that while
the other parts of the house may appear intact and as this report only covers
the damage reported , it does not necessarily mean that the rest of the building
is in compliance with the current Building Code of Australia and Australian
Standards guidelines” [emphasis added].
Case No: 345830 Determination Page 6 of 12
40. Based on this submission, the Panel is satisfied that DWA‟s reported repair
method is solely for the damaged sections of the house.
41. The Panel shall now address the Applicants‟ concerns about the adequacy
of the scope of works in detail and refer to C‟s email of 14 October 2011, in
which it addresses the Applicants‟ concerns regarding the shortcomings of
C‟s initial scope of works.
Veranda posts
42. The A pplicants note that DWA‟s report states that all damaged feature posts
must be replaced and new and existing ones must be positively anchored
down.
43. C says it has quoted repairs in accordance with DWA‟s recommendations.
However, C says DWA also refers to upgrades required to bring the building
up to standard. C says it has only quoted to replace damaged posts, not
upgrade undamaged ones.
44. DWA‟s report says in this regard:
“Replace the damaged feature concrete posts at the veranda with similar.
However, all ne w and existing posts shall be positively anchored down.”
45. Based on the photographic evidence, the Panel notes there are remaining
veranda posts that are in average to good condition whereas others are
missing.
46. As per paragraphs 39 and 40 of this Determination, the Panel is satisfied
DWA refers only to replacing the damaged posts and anchoring down the
replacement (new) and existing posts. DWA‟s report contains no suggestion
of upgrading or replacing undamaged posts.
47. Further, in the light of the type of damage the property sustained, the Panel
is of the view that anchoring down new and existing posts is consistent with
repairs necessary to ensure the soundness of the posts.
48. C‟s scope of works is not clear on this regard. It only says: “2 -2-3 Replace
damaged concrete piers in accordance to engineer’s recommendations.”
49. The Panel is satisfied the scope of works should contain a specific
breakdown for replacement of the damaged posts , and the anchoring down
of all replacement and existing posts. This should be quoted for accordingly.
Cracks on walls
50. The Applicants say C has not allowed for any repairs to cracks in brickwork
and intends to plaster over them without doing structural repairs.
51. C says its scope of work allows for plaster repairs according to DWA‟s
recommendations. Further, C says DWA advises the majority of the
Case No: 345830 Determination Page 7 of 12
structural cracking is not storm related and C has not quoted for repair of
cracking caused by subsidence.
52. In this regard, DWA‟s report says the following:
“There were a number of cracks on the external walls and veranda walls,
some of which were storm movement related and others were pre-existing
due to expansive clay ground movements. The causes of each is described
with the photos in the Appendices A and B” [sic].
53. Upon review of the photographs contained in Appendices A and B, the Panel
notes that under Appendix A, labelled “Photographic record of storm
damaged property”, there are images of cracks on external walls and internal
walls in pages 9, 10 and 12 of DWA‟s report.
54. Further, under Appendix B, labelled “Photographic record of pre -existing
damage” there is a single image of a veranda perimeter wall.
55. Considering this information, the Panel accepts the majority of the structural
cracking is storm related. In this regard the Panel is satisfied that only the
veranda perimeter wall constitutes pre-existing damage, which under the
policy exclusion for subsidence, should not be covered.
56. The Panel notes that, in general, C‟s quotation allows for “plaster repair” of
wall cracks. This does not specify the method of repair based on the type of
crack, as DWA‟s report outlines. However, in the Panel‟s view, the low price
quoted in C‟s scope of works gives an indication that th e quoted repairs for
wall cracks may not allow for the method outlined in DWA‟s report.
57. The Panel is of the view that the scope of works should include the repair of
all cracks on walls save for the crack in the veranda perimeter wall and
should also speci fy the repair method according to what is said in DWA‟s
report, as opposed to “plaster repair”.
Ceiling joists
58. The Applicants say C did not access the roof or ceiling during their
inspection of the property. Therefore, the Applicants are concerned C did not
allow for checking of all ceiling joists as recommended by DWA. Further, the
Applicants note it is KC‟s opinion that the ceiling would need replacing due to
water damage during the storm.
59. C says they did access the roof and in their opinion the ceilings do not
require replacement.
60. DWA reports that most of the ceiling joists in the damaged area are
reusable. However, it recommends that all ceiling joists are checked
individually for structural integrity and stability of fixings.
61. The Panel considers that the checking of the ceiling joists is required
because the detaching of the roof might have affected the whole integrity of
the ceiling joists, even in areas that might look undamaged.
Case No: 345830 Determination Page 8 of 12
62. In the Panel‟s view, this does not represent betterment or allowing for works
that might not be covered under the policy. It is simply a recommendation to
ensure that there is no underlying or not readily visible damage.
63. The Panel observes that C‟s response is not specific as to whether the
ceiling joists were checked and refers only to photographic evidence.
However, the only photographs available were supplied by DWA.
64. In the absence of evidence to the contrary, the Panel considers that the
scope of works should contain an allowance for checking of the ceiling joists
and potential further repairs of any damaged joists.
65. As to the ceiling, there is insufficient evidence to indicate the ceiling needs
complete replacement.
Jarrah roof frame (rafters and battens)
66. The Applicants allege their roof frame is made of Jarrah and want it to be
replaced with Jarrah. They say C has only allowed for the replacement of the
roof with treated pine. They note DWA lists Jarrah as a suitable material and
it is their view that this material is readily available within Australia.
67. C alleges Australian building standards do not require the replacement of the
roof frame with Jarrah wood. C also says they do not require Jarrah wood to
replace the battens.
68. DWA‟s report allows for replacement of roof rafters with Jarrah (if available),
treated pine or treated graded timber. However, DWA does not allow for
replacement of the battens with Jarrah wood. Instead, DWA recommends
replacement with bigger battens of steel top span 40, blue pine or treated
graded timber.
69. The Panel draws the attention to the relevant p olicy which says “We ... repair
the part of Your Home that is accidentally damaged as far as possible to its
original condition, using materials that are readily available in Australia”.
70. In their submissions, the parties disagree as to the availability of Jarrah
wood within Australia.
71. DWA does not state that Jarrah is the only type of replacement material for
the roof frame; however, the FSP, as per its policy, should repair the home
as far as possible to its original condition.
72. The FSP has not disputed the property had Jarrah roof rafters and battens.
As such, in principle and as per the policy, the FSP should attempt to
replace the Jarrah roof frame with Jarrah rafters and beams.
73. Neither of the parties has provided evidence to indicate the availability of
Jarrah wood in WA. However, the Panel notes that C‟s scope of works
allows in item “2 -13- 7” for the replacement of three Jarrah doors.
Case No: 345830 Determination Page 9 of 12
74. The Panel is satisfied that on the balance of probabilities this indicates that
Jarrah wood is in fact available to be so urced in WA. However, the Panel
also notes that following DWA‟s recommendations, the roof battens need to
be of different size and material to comply with DWA‟s recommendations.
75. As such, the Panel is of the view the scope of works should allow for
replacement of roof rafters with Jarrah wood and of roof battens with treated
pine. The price for these repairs should be adjusted accordingly following the
method DWA recommended for the installation of the roof frame.
Jarrah floorboards
76. The Applicants say they have removed floorboards out of bedroom 3 to
protect them from the elements. They say that otherwise, the FSP would
have had to replace them. They consider C should include a quote for floor
refitting.
77. C says there was no requirement to remove the floorboards as they can be
exposed to the elements for an extended period of time, only requiring
sanding and sealing afterwards. C‟s revised scope of works has allowed for
sanding and sealing of the floor.
78. There is no indication in DWA‟s report for the need to rem ove floorboards
and there is no evidence in the parties‟ materials indicating the need to
remove them.
79. The Panel considers the Applicants did this in good faith on the belief they
were mitigating the loss. However, the Panel is not satisfied this was
neces sary. As such, the Panel accepts C‟s allowance for sanding and
sealing of the floorboards is appropriate.
Removal, storage and reinstatement of furniture
80. The Applicants say C has not allowed for removal, storage and
reinstatement of furniture. C says it has not allowed for this as this is
generally arranged by other parties.
81. The Panel notes it is the FSP‟s obligation under the policy to pay the
reasonable cost to repair the house. It is the Panel‟s view that the cost of
removal, storage and reinstatement of furniture in order to prevent them from
damage resulting from the building‟s repairs is reasonably a part of the cost
to repair the house.
82. The Panel notes C does not allow for this service and therefore has not
quoted for it. Accordingly, the FSP is to source a quotation for this cost and
include it as part of the settlement.
Case No: 345830 Determination Page 10 of 12
Potential additional costs
83. The Applicants note C‟s quotation says that additional costs may apply. In
particular, they are concerned that additional costs may apply for the
anchoring down of existing roof timbers and wall plates, the replacement of
three jarrah doors, the repair of the broken window in the laundry and plaster
walls, the installation of power points and light fittings, the painting of internal
and external walls, the protection of carpets and travel and the cost of
freight, meals and accommodation of builders.
84. They contend C‟s quoted amount is not a fair cash settlement figure because
there is no guarantee that the price will not increase.
85. C says it is standard issue to provide a disclaimer for potential additional
costs.
86. The Panel notes that the FSP is aware of C‟s disclaimer and has offered the
Applicants to make further payments if, after cash settlement is paid in full
and repairs are carried out, it turns out there are additional costs.
87. The FSP has said it would consider these further payments subject to the
Applicants justifying them with appropriate evidence. The Panel is satisfied
the FSP‟s offer is fair and reasonable.
Other issues
88. The Panel has omitted reference to issues which the Panel is satisfied have
been addressed in C‟s revised scope of works. This is made under the
proviso the FSP reviews these costs if there is reasonable evidence that the
Applicants will incur additional costs.
Whether the amount quoted for the repairs is fair and reasonable
89. Based on the findings regarding the scope of works, the Panel is not
satisfied that C‟s revised price of repairs is sufficient to cover for the repairs
of the property.
90. The Panel notes the FSP‟s allegation that HTC are not registered builders in
WA. The Panel reminds the parties that when making a submission, the
onus is on the party presenting the allegation to provide the relevant
supporting evidence.
91. The Panel has not found any evidence in the parties‟ materials t o support the
fact HTC is not a registered builder. Further, the Applicants have clarified
HTC has a building license in NSW and they only require a building permit to
work in WA. As such, the Panel is not satisfied HTC‟s submission and
quotation should be disregarded.
92. The Panel has reviewed both KC and HTC‟s quotations and submissions
and notes that both their quotations do not present an itemised breakdown of
Case No: 345830 Determination Page 11 of 12
the costs for each work required. As such, it is difficult to compare these
documents with C‟s s cope of works.
93. HTC and KC have allegedly refused to provide an itemised price breakdown
of their costs because they are concerned their prices would become public.
Since the dispute process handled by the Financial Ombudsman Service
(FOS) is dealt with in strict application of privacy laws, the Panel sees no
reason why HTC or KC would have refused to provide a breakdown of costs
at the dispute stage. The Panel is not satisfied HTC and KC‟s concern is
sufficient reason not to present these costs.
94. For this reason, the Panel has opted not to consider the amounts in C, HTC
and KC‟s quotations but focus on their scope of works only. Upon review of
these, the Panel is satisfied that save for the points raised in paragraphs 36-
88 of this Determination, C‟s quotation has sufficiently addressed the works
necessary to repair the claimed damage.
95. As to the WACB‟s suggestion that the property needs rebuilding, the Panel
notes that three out of four builders (including two from the Applicants) are of
the opinion that the building is repairable. As such, the Panel is satisfied
repairing the property is the appropriate method to address the damage and
is not prepared to take into account WACB‟s quotation for rebuilding of the
property.
96. On the basis of the available information, the Panel is of the view that C‟s
quoted amount needs to be adjusted to reflect the works recommended in
DWA‟s report as per paragraphs 36-88 of this Determination.
Temporary accommodation
97. The Applicants have asked to be paid the benefit of temporary
accommodation. The FSP says the Applicants are entitled to this benefit but
has not yet assessed this as it seeks to resolve the dispute regarding the
repair of the property first.
98. Given that the Panel is satisfied the FSP should pay an additional amount for
the repair of the building, the Panel considers the FSP should also assess
and pay the cost of temporary accommodation according to the terms and
conditions of the policy.
Determination
99. Accordingly and provided the Applicants accept the Determination, the Panel
determines that:
Within 30 days of notification of the acceptance of the Determination by
the Applicants, the FSP is to obtain an amended quotation from C,
taking into consideration:
Case No: 345830 Determination Page 12 of 12
The anchoring down of all replacement and existing veranda
posts.
The cost of repairing all cracks in the walls, save for the one in
the veranda permitter wall, following the repair method
recommended by DWA.
Allowance for checking of damage to all ceiling joists in the
property and potential further repairs depending on the
identification of underlying damage.
The roof rafters should be replaced with Jarrah wood and the
roof battens with treated pine. Further, an allowance for following
DWA‟s recommended method of repair should be included.
Within 30 days of notification of the acceptance of the Determination by
the Applicants, the FSP sources a quotation for the removal, storage
and reinstatement of the furniture and includes this in the overall cost of
the property‟s repairs.
Within 60 days of notification of the acceptance of the Determination by
the Applicants, the FSP, in accordance to C‟s new quotation, pays the
difference between this amount and the $134,454.94 already paid.
Within 60 days of notification of the acceptance of the Determination by
the Applicants, the FSP assesses the claim for temporary
accommodation, establishes the amount payable and pays the
Applicants accordingly.
Within 60 days of notification of the acceptance of the Determination by
the Applicants, the FSP pays interest in accordance with Section 57 of
the Insurance Contracts Act 1984, on the additional amount paid for the
repair of the property and the amount paid for temporary
accommodation, according to the orders of this Determination, from 19
May 2011, being the date of the FSP‟s initial decision to date of
payment of the claim.
100. Further, the Panel determines the FSP may be subject to further payments,
provided the Applicants can justify these were additional costs required to
complete the repairs as set out in DWA‟s report. If the parties are in
disagreement in this regard, the parties may lodge a new dispute before
FOS.