Determination 345830

Further cash settlement payment for storm damage repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants had accepted a $134,454.94 cash settlement for storm damage and sought further payments and an ex-gratia payment for the prolonged claim. The Panel ordered nothing further.

Paragraph 100 of the primary determination covers only previously unforeseen damage found during repairs, and ex-gratia payments are at the FSP's discretion.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 345830 Determination Page 1 of 4 Case number: 345830 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount 6 May 2014 Summary Description  Claim under a Home Building & Contents Policy for damage sustained during a storm. The claim has been subject to a prior Determination and the dispute cash settled by the FSP subject to that Determination. A dispute now arises as to whether the Applicants are entitled to further payments under the requirements of the primary Determination Basis of Determination  The Applicants‟ claim for storm damage lodged on 29 January 2011 has being cash settled pursuant to a Determination issued by the Service on 8 August 2012.  The Determination provided the FSP may be subject to further payments provided the Applicants could justify those payments were additional payments required to complete the repairs as set out in DWA‟s report.  The Applicants‟ claim for additional costs are based not on repairs being completed but are based on a revised quotation as t he FSP‟s builder C refused to complete the work.  The quotations provided do not include any additional works outside the Scope of Works provided by DWA.  The Terms of Reference provide that a determination is final and is not subject to review by the parties. Determination  Based on the available information, the Panel determines the Applicants are not entitled to any further payment. Addendum Determination Case No: 345830 Determination Page 2 of 4 Background 1. The Applicants held a home building and contents insurance policy with the Financial Services Provider (FSP) which was in force at the time of the loss. 2. On 29 January 2011, the Applicants lodged a claim for storm damage to the home building, which the FSP accepted. A dispute arose later when the Applicants considered the FSP‟s cash settlement offer was insufficient to complete the repair to the building. 3. In the primary Determination No. 259811, a copy of which is attached, the Panel determined the FSP was to cash settle the Applicants for the repair of the building based on an amended quotation by the FSP‟s builder (C), which was to include further provisions detailed in the scope of works from the FSP‟s consulting engineer (DWA). 4. A new dispute has since arisen as to whether the Applicants are entitled to a further payment under the requirements of the primary Determination. Issues 5. Whether the Applicants are entitled to a further payment under the requirements of the Panel‟s primary Determination? 6. Whether the Applicants are entitled to an ex-gratia payment for the disruption caused to their family due to the prolonged time the claim has taken to be finalised? Reasons for decision 7. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference (TOR). 8. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. Are the Applicants entitled to a further payment for the additional costs required to complete repairs? 9. Prior to issuing the primary Determination in this matter in August 2012, there was a full exchange of material between the parties with detailed submissions being made by both parties. 10. The Panel took into account various quotations and information with respect to Scope of Works. At that time, the Panel determined the amount quoted by Case No: 345830 Determination Page 3 of 4 C needed to be adjusted to reflect the works recommended in the Scope of Works provided by DWA. 11. At paragraph 99 of the Determination, the Panel was quite specific in its Determination as to not only the method by which the amended quotation was to be obtained but also the further matters to be taken into consideration and the method of payment. 12. The Determination does not contemplate anything other than a cash settlement. Whilst the Applicants in the current dispute have argued that they accepted the primary Determination relying on the fact that C would be willing to carry out the repairs and could do so at an advantageous cost, there is no reference in the prior Determination to C either being prepared to carry out the work or actually performi ng the work. 13. The Panel is satisfied that insofar as the quotations were obtained from C and the matter was cash settled based on the quotation provided by C, that the FSP has settled the claim in accordance with paragraph 99 of the primary Determination. 14. At paragraph 100 of the primary Determination, the Panel determined given that DWA had indicated there may be additional repairs required that had not been allowed for in the Scope of Works, that the FSP may be subject to further payments provided the Applicants can justify the additional costs required to complete the repairs as set out in DWA‟s report. 15. The Panel in making the Determination contemplated that there may be some additional costs incurred outside of the Scope of Works provided for by DWA and the quotation of C. The Determination does not contemplate cost overruns for completing the actual Scope of Works, but additional costs incurred. 16. The Panel is satisfied that the intention of paragraph 100 was to allow for further payments in the case of previously unforeseen damage being identified as related to the claim during the course of repairs. This view is also corroborated by referring to paragraphs 83 to 87 of the original Determination. 17. The Applicants‟ arguments in the current dispute are essentia lly that as C would not carry out the repairs and had not intended to carry out the repairs then additional costs would be incurred as per the quotations provided by CH, S and WACB. 18. The submissions by the Applicants do not identify any additional costs incurred by unforeseen damage identified after or during the course of repairs. 19. The Panel is satisfied that to read paragraph 100 of the primary Determination in the manner suggested by the Applicants would be to read the paragraph out of context and would be inconsistent with the Service‟s Terms of Reference that provide that the Determination be final. Case No: 345830 Determination Page 4 of 4 20. Based on all the available information, the Panel is satisfied none of the Applicant‟s further information or arguments establishes they are entitled to further payments under paragraph 100 of the primary Determination for identification of previously unforeseen damage. Are the Applicants entitled to an ex-gratia payment for the disruption caused to their family due to the prolonged time the claim has taken to be finalised? 21. The Panel notes an ex-gratia payment is a matter, which is entirely up to the FSP‟s discretion. There is no scope under the TOR to compel an FSP to provide ex-gratia payments under any basis. 22. Accordingly, the Panel is unable to consider this issue further and is satisfied the FSP is not obliged to make such payment. Determination 23. Based on the available information, the Panel determines the Applicants are not entitled to any further payment. Case No: 345830 Determination Page 1 of 12 Case number: 259811 General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision - Denial of claim 8 August 2012 Background 1. The Applicants held a home building and contents insurance policy with the Financial Services Provider (FSP) which was in force at the time of the loss. The insured property is located in WA. 2. On 29 January 2011, the Applicants lodged a claim for storm damage which caused the roof to detach from the building and caused major structural damage throughout the property. 3. The FSP accepted liability and, based on reports from an engineer (DWA) and its preferred builder (C), offered the Applicants a cash settlement of $134,454.94. 4. The Applicants have accepted this offer; however, they seek a further payment as they consider the amount is not sufficient to complete the repairs of the property. Summary of Applicants’ position 5. In the structural report DWA prepared for the FSP, they clearly state that the property requires extensive work. 6. After an initial denial, the FSP appointed C to quote on the repairs needed. C issued a quota tion of $110,572.34. However, they noticed C‟s scope of works had many shortcomings and would not finalise repairs up to the standard DWA indicated. 7. The FSP asked them to source additional quotations and offered to pay the cost. They obtained quotations from builders HTC ($232,248) and KC ($212,455). They also obtained a letter from builder WACB saying it would be more economical to replace the house at a cost of $300,000-$320,000. 8. The FSP has not taken into account these quotations in its subsequent decisions. HTC are registered builders in NSW and only require a building permit to work in WA. Determination Case No: 345830 Determination Page 2 of 12 9. The roof was installed before they purchased the house and before the policy was taken out. They were unaware of any structural problems with the building and did not conceal this from the FSP. Also, the FSP conducted an inspection of the property prior to insuring it and at that point it did not advise of any repairs needed before offering cover. 10. The damage was solely caused by a severe storm that was capable of removing roofs despite their structural soundness. This is supported by DWA‟s report which says building codes and standards do not guarantee against structural failure. 11. As to the shortcomings in C‟s scope of works, they note as follows:  C has only allowed $1,928.50 for the repair of damaged sections of brickwork. Upon reading DWA‟s specified repair methods, they do not believe that amount will cover the cost of these repairs.  C has not included the repair of cracking caused by subsidence; however, C would not be able to repair the house to building standards without first repairing the cracking.  C‟s quotation does not provide for replacement of the roof rafters with Jarrah, which is the material that it had. Jarrah is readily available within Australia and the FSP is obliged to use this material to repair the property to a condition as close as possible to the original. The policy does not say the FSP can use a cheaper type of material at its choice.  C has not quoted for the replacement of the entire roof‟s timbe rwork, but only the damaged part. Further, C has only quoted for the repainting of the veranda roof beams to match the existing ones.  C has underestimated the cost of installing the roof ties and has not quoted the retiling of the bathroom and toilet after the ties are installed. C has not quoted the removal and storage of furniture.  C quoted an amount that is not firm; C has not allowed for any additional unforeseen costs. For this reason, they do not believe the figure C quoted represents the reasonable a mount required to repair the house. 12. They have endured considerable hardship due to the lack of a roof, which is also causing further damage to the plasterwork in the walls. 13. They believe the FSP is obliged to repair the house as specified by DWA and in compliance with relevant construction standards. In order to comply with regulations, the FSP will first have to rectify other parts of the building such as posts, cracks and wall plate anchors. 14. As such, they want the FSP to not only pay for the accidental damage but for the extra cost required to comply with building standards. 15. They want the FSP to cash settle them for an average of all the quotations provided, in the amount of $221,539.71. They have agreed to receive a Case No: 345830 Determination Page 3 of 12 payment of $134,454.94 but are seeki ng to be paid the difference between this payment and the average of all the quotations, being $87,084.77. 16. They also want the FSP to pay the reasonable cost of renting temporary accommodation. Summary of FSP’s position 17. C provided a quotation for the repairs at a cost of $110,572.34. Upon receipt of the Applicants‟ quotations, it offered a cash settlement amount based on C‟s quotation. It made this offer on a without prejudice basis, meaning it was willing to make further payments if as a result of further i nformation it was established the repair cost more. 18. Upon receiving the Applicants‟ comments regarding the shortcomings of C‟s scope of works, it asked C to revise its quotation. C provided a revised quotation for the repairs in the sum of $134,454.94, which it considers is in accordance with the scope of works contained in DWA‟s report. 19. The original roof was replaced with a metal clad roof without replacing the original battens or installing positive ties. The battens had not been strapped to the rafters and these were not anchored to the wall plate. 20. The policy does not cover the cost for any work the roof required before the damage occurred. 21. The male Applicant‟s father, who is not a registered builder, installed the new roof without knowledge or compliance with the required building code and wind load requirements. Consequently, the Applicants are not covered for the cost of upgrading the roof, as this was work required before the damage occurred. 22. It is only obliged to repair the damaged part of the building as far as possible to its original condition or pay for the reasonable cost of doing so. 23. It is not obliged to use a particular builder as requested by the Applicants. Further, HTC are not registered builders in WA and for that reason their quotation should not be considered. 24. Also, KC has not been cooperative in providing a breakdown of their quotation. However, the FSP considers that the difference between C and KC‟s quotations might be the use of Jarrah wood for the roof and veranda and the inclusion of repair works that are not covered under the policy. 25. As C is an insurance builder only, they are able to secure contractors on set rates, even in country areas. Thus, C is able to complete repairs at a more cost effective price than other builders. Case No: 345830 Determination Page 4 of 12 26. Based on this information, it is satisfied the building is repairable and C‟s revised quotation represents the reasonable cost of repairing the damaged part of the building. 27. Considering this, WACB‟s quotation for the rebuilding of the house is not relevant and has not been taken into account. 28. C‟s quotation specified plaster repairs for the brickwork according to the engineer‟s recommendation. However, it does not include repairs to cracking due to subsidence, as this is specifically excluded under the policy. 29. The Applicants are entitled to the benefit for temporary accommodation. However, a resolution needs to be first achieved in respect of the settlement for repairs. 30. The FSP relies on the following policy provisions: “ What is not insured This policy does not insure You against: 1 damage directly caused by:  ...  earth movement (except earthquake) no matter how caused, including erosion, vibration, subsidence, seepage, saturation, creeping, landslip, mudslide, collapse, shrinkage, settling, expansion or heaving ... What We do if Your Home is accidentally damaged If „Building‟ and „Replacement‟ are shown on the certificate of insurance, We replace, reinstate or repair the part of Your Home that is accidentally damaged as far as possible to its original condition, using materials that are readily available in Australia. Or, at Our option, We pay You the reasonable cost to do so. ... We pay only up to the amount shown as the sum insured for the „Building‟ on the certificate of insurance where an amount is shown next to the word „Replacement‟. ... Additional benefits The following additional benefits are in addition to any sums insured shown on the certificate of insurance for ‘Building’ and ‘Contents’. ... Costs connected with rebuilding If We have paid or agreed to pay a claim to replace or reinstate Your Home (other than under the additional benefit „Flood cover‟ in this policy), We pay for:  the extra cost to comply with the requirement of a public authority in relation to rebuilding Your Home but not the cost for work You were required to do before the damage occurred”. Case No: 345830 Determination Page 5 of 12 Issue 31. Whether the FSP‟s settlement offer is fair and reasonable and in accordance with the terms and conditions of the policy. Reasons for decision 32. As advised to the parties, due to the nature of the dispute a nd the amount claimed, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination by the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. 33. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 34. The Panel is satisfied that a full exchange of information has taken place between the parties and each party has had the opportunity to address the issues raised. 35. There is no dispute between the parties that the property suffered damage as a result of a severe storm. The central issue in dispute is whether the scope of works the FSP proposed is adequate to repair the property and consequently, whether the amount quoted for repairs is fair and reasonable. Whether the scope of works proposed is adequate 36. Based on DWA‟s report and HTC and KC‟s quotations, the Applicants allege C‟s scope of works does not cover for all the repairs the property needs. Further, they note WACB recommends to rebuild the property. 37. Following the FSP‟s instructions, C revised its quotation and included a portion of the works the Applicants said were not included in C‟s initial scope of works. 38. The F SP notes the Applicants‟ builders have quoted for other repairs not included in C‟s revised quotation; however, the FSP says these are either not covered or represent betterment to what the property was. It further notes it is not required to rebuild the home as it can be repaired. 39. The Panel draws attention to DWA‟s report. This report is specific and detailed about the damage sustained to the property and the repair method. This report states: “While we have described the method of repair to the damaged section of the house in the following, the insurer and the owner need to be aware that while the other parts of the house may appear intact and as this report only covers the damage reported , it does not necessarily mean that the rest of the building is in compliance with the current Building Code of Australia and Australian Standards guidelines” [emphasis added]. Case No: 345830 Determination Page 6 of 12 40. Based on this submission, the Panel is satisfied that DWA‟s reported repair method is solely for the damaged sections of the house. 41. The Panel shall now address the Applicants‟ concerns about the adequacy of the scope of works in detail and refer to C‟s email of 14 October 2011, in which it addresses the Applicants‟ concerns regarding the shortcomings of C‟s initial scope of works. Veranda posts 42. The A pplicants note that DWA‟s report states that all damaged feature posts must be replaced and new and existing ones must be positively anchored down. 43. C says it has quoted repairs in accordance with DWA‟s recommendations. However, C says DWA also refers to upgrades required to bring the building up to standard. C says it has only quoted to replace damaged posts, not upgrade undamaged ones. 44. DWA‟s report says in this regard: “Replace the damaged feature concrete posts at the veranda with similar. However, all ne w and existing posts shall be positively anchored down.” 45. Based on the photographic evidence, the Panel notes there are remaining veranda posts that are in average to good condition whereas others are missing. 46. As per paragraphs 39 and 40 of this Determination, the Panel is satisfied DWA refers only to replacing the damaged posts and anchoring down the replacement (new) and existing posts. DWA‟s report contains no suggestion of upgrading or replacing undamaged posts. 47. Further, in the light of the type of damage the property sustained, the Panel is of the view that anchoring down new and existing posts is consistent with repairs necessary to ensure the soundness of the posts. 48. C‟s scope of works is not clear on this regard. It only says: “2 -2-3 Replace damaged concrete piers in accordance to engineer’s recommendations.” 49. The Panel is satisfied the scope of works should contain a specific breakdown for replacement of the damaged posts , and the anchoring down of all replacement and existing posts. This should be quoted for accordingly. Cracks on walls 50. The Applicants say C has not allowed for any repairs to cracks in brickwork and intends to plaster over them without doing structural repairs. 51. C says its scope of work allows for plaster repairs according to DWA‟s recommendations. Further, C says DWA advises the majority of the Case No: 345830 Determination Page 7 of 12 structural cracking is not storm related and C has not quoted for repair of cracking caused by subsidence. 52. In this regard, DWA‟s report says the following: “There were a number of cracks on the external walls and veranda walls, some of which were storm movement related and others were pre-existing due to expansive clay ground movements. The causes of each is described with the photos in the Appendices A and B” [sic]. 53. Upon review of the photographs contained in Appendices A and B, the Panel notes that under Appendix A, labelled “Photographic record of storm damaged property”, there are images of cracks on external walls and internal walls in pages 9, 10 and 12 of DWA‟s report. 54. Further, under Appendix B, labelled “Photographic record of pre -existing damage” there is a single image of a veranda perimeter wall. 55. Considering this information, the Panel accepts the majority of the structural cracking is storm related. In this regard the Panel is satisfied that only the veranda perimeter wall constitutes pre-existing damage, which under the policy exclusion for subsidence, should not be covered. 56. The Panel notes that, in general, C‟s quotation allows for “plaster repair” of wall cracks. This does not specify the method of repair based on the type of crack, as DWA‟s report outlines. However, in the Panel‟s view, the low price quoted in C‟s scope of works gives an indication that th e quoted repairs for wall cracks may not allow for the method outlined in DWA‟s report. 57. The Panel is of the view that the scope of works should include the repair of all cracks on walls save for the crack in the veranda perimeter wall and should also speci fy the repair method according to what is said in DWA‟s report, as opposed to “plaster repair”. Ceiling joists 58. The Applicants say C did not access the roof or ceiling during their inspection of the property. Therefore, the Applicants are concerned C did not allow for checking of all ceiling joists as recommended by DWA. Further, the Applicants note it is KC‟s opinion that the ceiling would need replacing due to water damage during the storm. 59. C says they did access the roof and in their opinion the ceilings do not require replacement. 60. DWA reports that most of the ceiling joists in the damaged area are reusable. However, it recommends that all ceiling joists are checked individually for structural integrity and stability of fixings. 61. The Panel considers that the checking of the ceiling joists is required because the detaching of the roof might have affected the whole integrity of the ceiling joists, even in areas that might look undamaged. Case No: 345830 Determination Page 8 of 12 62. In the Panel‟s view, this does not represent betterment or allowing for works that might not be covered under the policy. It is simply a recommendation to ensure that there is no underlying or not readily visible damage. 63. The Panel observes that C‟s response is not specific as to whether the ceiling joists were checked and refers only to photographic evidence. However, the only photographs available were supplied by DWA. 64. In the absence of evidence to the contrary, the Panel considers that the scope of works should contain an allowance for checking of the ceiling joists and potential further repairs of any damaged joists. 65. As to the ceiling, there is insufficient evidence to indicate the ceiling needs complete replacement. Jarrah roof frame (rafters and battens) 66. The Applicants allege their roof frame is made of Jarrah and want it to be replaced with Jarrah. They say C has only allowed for the replacement of the roof with treated pine. They note DWA lists Jarrah as a suitable material and it is their view that this material is readily available within Australia. 67. C alleges Australian building standards do not require the replacement of the roof frame with Jarrah wood. C also says they do not require Jarrah wood to replace the battens. 68. DWA‟s report allows for replacement of roof rafters with Jarrah (if available), treated pine or treated graded timber. However, DWA does not allow for replacement of the battens with Jarrah wood. Instead, DWA recommends replacement with bigger battens of steel top span 40, blue pine or treated graded timber. 69. The Panel draws the attention to the relevant p olicy which says “We ... repair the part of Your Home that is accidentally damaged as far as possible to its original condition, using materials that are readily available in Australia”. 70. In their submissions, the parties disagree as to the availability of Jarrah wood within Australia. 71. DWA does not state that Jarrah is the only type of replacement material for the roof frame; however, the FSP, as per its policy, should repair the home as far as possible to its original condition. 72. The FSP has not disputed the property had Jarrah roof rafters and battens. As such, in principle and as per the policy, the FSP should attempt to replace the Jarrah roof frame with Jarrah rafters and beams. 73. Neither of the parties has provided evidence to indicate the availability of Jarrah wood in WA. However, the Panel notes that C‟s scope of works allows in item “2 -13- 7” for the replacement of three Jarrah doors. Case No: 345830 Determination Page 9 of 12 74. The Panel is satisfied that on the balance of probabilities this indicates that Jarrah wood is in fact available to be so urced in WA. However, the Panel also notes that following DWA‟s recommendations, the roof battens need to be of different size and material to comply with DWA‟s recommendations. 75. As such, the Panel is of the view the scope of works should allow for replacement of roof rafters with Jarrah wood and of roof battens with treated pine. The price for these repairs should be adjusted accordingly following the method DWA recommended for the installation of the roof frame. Jarrah floorboards 76. The Applicants say they have removed floorboards out of bedroom 3 to protect them from the elements. They say that otherwise, the FSP would have had to replace them. They consider C should include a quote for floor refitting. 77. C says there was no requirement to remove the floorboards as they can be exposed to the elements for an extended period of time, only requiring sanding and sealing afterwards. C‟s revised scope of works has allowed for sanding and sealing of the floor. 78. There is no indication in DWA‟s report for the need to rem ove floorboards and there is no evidence in the parties‟ materials indicating the need to remove them. 79. The Panel considers the Applicants did this in good faith on the belief they were mitigating the loss. However, the Panel is not satisfied this was neces sary. As such, the Panel accepts C‟s allowance for sanding and sealing of the floorboards is appropriate. Removal, storage and reinstatement of furniture 80. The Applicants say C has not allowed for removal, storage and reinstatement of furniture. C says it has not allowed for this as this is generally arranged by other parties. 81. The Panel notes it is the FSP‟s obligation under the policy to pay the reasonable cost to repair the house. It is the Panel‟s view that the cost of removal, storage and reinstatement of furniture in order to prevent them from damage resulting from the building‟s repairs is reasonably a part of the cost to repair the house. 82. The Panel notes C does not allow for this service and therefore has not quoted for it. Accordingly, the FSP is to source a quotation for this cost and include it as part of the settlement. Case No: 345830 Determination Page 10 of 12 Potential additional costs 83. The Applicants note C‟s quotation says that additional costs may apply. In particular, they are concerned that additional costs may apply for the anchoring down of existing roof timbers and wall plates, the replacement of three jarrah doors, the repair of the broken window in the laundry and plaster walls, the installation of power points and light fittings, the painting of internal and external walls, the protection of carpets and travel and the cost of freight, meals and accommodation of builders. 84. They contend C‟s quoted amount is not a fair cash settlement figure because there is no guarantee that the price will not increase. 85. C says it is standard issue to provide a disclaimer for potential additional costs. 86. The Panel notes that the FSP is aware of C‟s disclaimer and has offered the Applicants to make further payments if, after cash settlement is paid in full and repairs are carried out, it turns out there are additional costs. 87. The FSP has said it would consider these further payments subject to the Applicants justifying them with appropriate evidence. The Panel is satisfied the FSP‟s offer is fair and reasonable. Other issues 88. The Panel has omitted reference to issues which the Panel is satisfied have been addressed in C‟s revised scope of works. This is made under the proviso the FSP reviews these costs if there is reasonable evidence that the Applicants will incur additional costs. Whether the amount quoted for the repairs is fair and reasonable 89. Based on the findings regarding the scope of works, the Panel is not satisfied that C‟s revised price of repairs is sufficient to cover for the repairs of the property. 90. The Panel notes the FSP‟s allegation that HTC are not registered builders in WA. The Panel reminds the parties that when making a submission, the onus is on the party presenting the allegation to provide the relevant supporting evidence. 91. The Panel has not found any evidence in the parties‟ materials t o support the fact HTC is not a registered builder. Further, the Applicants have clarified HTC has a building license in NSW and they only require a building permit to work in WA. As such, the Panel is not satisfied HTC‟s submission and quotation should be disregarded. 92. The Panel has reviewed both KC and HTC‟s quotations and submissions and notes that both their quotations do not present an itemised breakdown of Case No: 345830 Determination Page 11 of 12 the costs for each work required. As such, it is difficult to compare these documents with C‟s s cope of works. 93. HTC and KC have allegedly refused to provide an itemised price breakdown of their costs because they are concerned their prices would become public. Since the dispute process handled by the Financial Ombudsman Service (FOS) is dealt with in strict application of privacy laws, the Panel sees no reason why HTC or KC would have refused to provide a breakdown of costs at the dispute stage. The Panel is not satisfied HTC and KC‟s concern is sufficient reason not to present these costs. 94. For this reason, the Panel has opted not to consider the amounts in C, HTC and KC‟s quotations but focus on their scope of works only. Upon review of these, the Panel is satisfied that save for the points raised in paragraphs 36- 88 of this Determination, C‟s quotation has sufficiently addressed the works necessary to repair the claimed damage. 95. As to the WACB‟s suggestion that the property needs rebuilding, the Panel notes that three out of four builders (including two from the Applicants) are of the opinion that the building is repairable. As such, the Panel is satisfied repairing the property is the appropriate method to address the damage and is not prepared to take into account WACB‟s quotation for rebuilding of the property. 96. On the basis of the available information, the Panel is of the view that C‟s quoted amount needs to be adjusted to reflect the works recommended in DWA‟s report as per paragraphs 36-88 of this Determination. Temporary accommodation 97. The Applicants have asked to be paid the benefit of temporary accommodation. The FSP says the Applicants are entitled to this benefit but has not yet assessed this as it seeks to resolve the dispute regarding the repair of the property first. 98. Given that the Panel is satisfied the FSP should pay an additional amount for the repair of the building, the Panel considers the FSP should also assess and pay the cost of temporary accommodation according to the terms and conditions of the policy. Determination 99. Accordingly and provided the Applicants accept the Determination, the Panel determines that:  Within 30 days of notification of the acceptance of the Determination by the Applicants, the FSP is to obtain an amended quotation from C, taking into consideration: Case No: 345830 Determination Page 12 of 12  The anchoring down of all replacement and existing veranda posts.  The cost of repairing all cracks in the walls, save for the one in the veranda permitter wall, following the repair method recommended by DWA.  Allowance for checking of damage to all ceiling joists in the property and potential further repairs depending on the identification of underlying damage.  The roof rafters should be replaced with Jarrah wood and the roof battens with treated pine. Further, an allowance for following DWA‟s recommended method of repair should be included.  Within 30 days of notification of the acceptance of the Determination by the Applicants, the FSP sources a quotation for the removal, storage and reinstatement of the furniture and includes this in the overall cost of the property‟s repairs.  Within 60 days of notification of the acceptance of the Determination by the Applicants, the FSP, in accordance to C‟s new quotation, pays the difference between this amount and the $134,454.94 already paid.  Within 60 days of notification of the acceptance of the Determination by the Applicants, the FSP assesses the claim for temporary accommodation, establishes the amount payable and pays the Applicants accordingly.  Within 60 days of notification of the acceptance of the Determination by the Applicants, the FSP pays interest in accordance with Section 57 of the Insurance Contracts Act 1984, on the additional amount paid for the repair of the property and the amount paid for temporary accommodation, according to the orders of this Determination, from 19 May 2011, being the date of the FSP‟s initial decision to date of payment of the claim. 100. Further, the Panel determines the FSP may be subject to further payments, provided the Applicants can justify these were additional costs required to complete the repairs as set out in DWA‟s report. If the parties are in disagreement in this regard, the parties may lodge a new dispute before FOS.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.