Determination 345724

Service quality

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$152,295
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed under a building policy for damage from water escaping a neighbour's pipe and soil movement, and disputed the insurer's repairs. AFCA ordered the insurer to pay $122,895 plus $29,400 temporary accommodation, a higher cash settlement than offered, and rejected the service complaint.

Expert evidence showed the damage was partly covered and partly due to non-insured soil movement, so AFCA settled the claim on the insurer's scope of works with added contingency and removal allowances.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Service - Service quality Case No 123456 Report type Page 2 of 2 Case number : 345724 14 August 2014 1 Overview 1.1 Dispute The Applicants hold a home building insurance policy with the Financial Services Provider (FSP). The Applicants lodged a claim against their policy in May 2011 because of property damage which they attributed to water having escaped from a neighbour’s water pipe. The FSP accepted the claim and arranged for repairs to be carried out. However, the Applicants remain dissatisfied with those repairs and require the FSP to undertake certain actions to rectify the situation. The matter still remains unresolved and as such, the Applicants want the Service to review it. 1.2 Issues and key findings What was the ca use of damage to the Applicants’ property ? The cause of damage was partly due to the change in weather patterns from a long dry period to a generally wetter period, resulting in soil movement which impacted on the house’s foundations and partly due to soil inundation as a result of a burst water pipe on an adjoining property. Did the FSP attempt to repair the damage? The FSP carried out some repairs, although there still remains unrepaired damage, a portion of which may not be covered under the policy. Has the FSP attempted to settle this dispute? The FSP has offered to cash settle the dispute, however , the Applicants have not accepted the offer. What is the offer based on? This offer is based on a comprehensive scope of works, which the FSP obtained from a building consultant company. Was the FSP’s quality of service unsatisfactory? There is no evidence that indicates the FSP’s service to the Applicants was unsatisfactory. Case No: 345724 Determination Page 2 of 7 1.3 Determination This determination is based on the FSP’s offer of settlement with some adjustments which the Panel considers to be fair and reasonable in the circumstances. The FSP’s offer of settlement is for a sum of $102,987 and is based on a scope of works submitted by a firm of building consultants. The Panel notes that there is no actual commitment from a builder to complete the work for this amount and that the consultant’s estimate provides no contingency for undiscovered damage or other work necessitating contract variations. The Panel also notes that some minor matters raised by the Applicant appear reasonable for inclusion. The Panel has determined that the FSP should pay the Applicants the sum of $122,895, calculated as follows: Building Consultant’s Estimate $102,987 Allowance for Contingencies 15% $ 15,448 Allowance for Removal and Storage $ 3,795 Allowance for Curtain Tracks $ 665 $122,895 Plus an Allowance for Temporary Accommodation $ 29,400 Case No: 345724 Determination Page 3 of 7 2 Reasons for Determination 2.1 What was the cause of damage to the Applicants’ property ? The cause of damage was partly due to the change in weather patterns from a long dry period to a generally wetter period and partly due to inundation from a damaged water pipe The Applicants commented on the possible cause of the damage, however, they are not experts in this respect. Since both parties to this dispute obtained reports from experts, these experts’ findings are of greater relevance. The information provided by these experts indicates the damage to the Applicant’s property resulted to some extent from the water which leaked from a neighbour’s water pipe. The Applicants’ engineer (MT) said this was the most likely cause of damage. MT said there were a number of structural defects to the house. MT also referred to the loss or gain of moisture content in reactive clay as the main cause of foundation failure. Another engineer (CI) also said the principal current defects/damage related to the performance of the house’s foundations. The Applicants obtained a report from a geologist (SG) who confirmed there we re “susceptible soils” present at the Applicants’ property. SG said there was poor sub-surface drainage and impermeable clays. The FSP obtained a report from a technical building company (IL) which indicated that a portion of the damage to the house was a ttributable to the water leakage. However, the movement and cracking to the house likely resulted from a change in weather patterns from a long dry period to a generally wetter period. IL also identified structural defects to the foundations. The FSP asked a building consultant (MB) to produce a scope of works. MB said there was evidence of pre-existing damage to numerous building elements from a range of non-insurable causes. On the balance of probabilities, the information establishes the damage was largely due to reactive clays and poor drainage, with a change in weather patterns from a long dry period to a generally wetter period. These factors impacted on the house’s foundations. The water leakage from the neighbour’s property caused some damage to the house, but not all the damage. As a consequence, only some of the damage falls within the scope of insurance cover. 2.2 Did the FSP attempt to repair the damage? The FSP carried out some repairs Case No: 345724 Determination Page 4 of 7 The FSP arranged for builders to carry out repair work. The Applicants raised issues about the repairs in September 2012, after the builders had commenced work in August 2012. These complaints related to issues such as certain repairs not being to the required standard, the floor levels were not true and the builders caused further damage to the house. The Applicants also complained about the FSP’s conduct throughout the process. As stated above, the Applicants are not experts in relation to these matters and, given that experts have been involved, the expert’s comments are more persuasive in connection with these particular issues. IL stated the spirit level readings indicated a “substantially level floor, with only a minor variation from perfectly level”. IL referred to it as a “minor variation” which was “well within acceptable tolerances”. CI said the change from the previously capped soils next to the house being changed to uncapped would have accelerated the structure movement. However, IL said the damage to the house was not due to uncapped perimeter soils. MB provided a scope of works (dated 23 May 2014) which referred to pre-existing damage such as “settlement and general wear and tear typically found in buildings of this age”. MB indicated that “some repairs [would] reflect some of these pre-existing con ditions”. MT concurred with IL in relation to the attributing of fifty per cent of the damage to the eastern side of the house to the leaking pipe. MT did not concur entirely with IL in relation to the western and northern side. However, MT did not definitely conclude the damage resulted entirely from the water leakage. In conclusion, the information provided nothing definitive with respect to repair work which the FSP needs to carry out (either through work already carried out by the FSP’s builders or beca use the damage resulted from an insured event – the water leakage). 2.3 Has the FSP attempted to settle this dispute? The FSP has offered to cash settle the dispute The FSP has indicated it is prepared to cash settle this dispute with the payment of $102,987, to cover the cost of repairs to the building, with an additional allowance of $29,400 (previously paid at the rate of $350 per night) for a period of 12 weeks. 2.4 What is the offer based on? This offer is based on a comprehensive scope of works The FSP obtained a scope of works (dated 23 May 2014) from MB. This scope of works provided a comprehensive outline of the repair work to be carried out on the Applicants’ home for a total amount of $102,987 (including GST). The FSP Case No: 345724 Determination Page 5 of 7 offered to pay this amount to the Applicants to settle their claim in relation to the building repairs. The Applicants commented on the absence of a breakdown of this total, although the scope of works they obtained in June 2014, also only provided a total amount. The Applicants obtained a scope of works from building consultants (MG) which provided a total amount of $149,719 (including GST). There was no useful information provided in relation to the various items listed in the scope of works. In this respect, MB’s scope of works is more pe rsuasive since the document provides a full outline of the repairs to be carried out within each room. However, MG’s scope of works merely lists the tasks to be carried out without providing any support information. There is no evidence before the Service which indicates that MB’s scope of works does not cover all necessary repair work. The only notable omission is that MB’s estimate is not supported by a builder willing to complete the work at that price and it does not provide any contingency allowance for undiscovered damage or other possible building work variations. However, MB’s scope of works is the more persuasive of the documents submitted and its estimate of $102,987 (including GST) has been accepted by the Panel as the basis for a reasonable offer of settlement. The Panel has added the following items: Allowance for Contingencies 15% $ 15,448 Allowance for Removal and Storage $ 3,795 Allowance for Curtain Tracks $ 665 The inclusion of these items results in a total sum of $122,895 which is considered to be fair in all the circumstances. The FSP has offered the Applicants for 12 weeks temporary accommodation at the rate of $350 a night, making a total payment of $29,400. In the absence of information to the contrary, this represents a fair amount in the circumstances and should be paid by the FSP. Therefore, the FSP is required to cash settle the Applicants for $122,895 (including GST) plus $29,400.00, in full and final settlement of the claim. 2.5 Was the FSP’s quality of service unsatisfactory? There is no evidence that indicates the FSP’s service to the Applicants was unsatisfactory The Applicants have expressed dissatisfaction about the FSP’s conduct in the processing of the claim. The Applicants have made a number of disparaging comments in connection with the FSP’s conduct in the processing of their claim. Case No: 345724 Determination Page 6 of 7 The Applicants have also alleged the FSP’s builders caused damage to their property when carrying out repair work and also alleged the builders did not perform the repairs in a competent manner. These comments could only be accepted if supported by evidence from an independent party. There is no such evidence in support. Further, the information before the Service indicates the FSP responded to requests by the Applicants in relation to various enquiries. Accordingly, the Panel does not find in favour of the Applicants with respect to this issue. 3 Supporting information There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues contained within the material exchanged. In reaching this Determination, the Panel has taken into account all of the material exchanged and various submissions made by the parties. Key information Main reports: Record Key p oints FSP’s expert ( IL ) Technical building company - Report 14/11/2011  Portion of damage attributable to water from neighbour  Movement and cracking likely result of change from long dry period to generally wetter period IL - Report 10/12/2012  Spirit level readings indicated substantially level floor  Only minor variation from perfectly level  Minor variation within acceptable tolerances IL – Report 3/12/2013  Cracking of masonry wall caused by absence of articulation joints  Also caused by insufficient s tructural design of foundations  Damage not related to uncapped perimeter soils FSP’s expert (MB) Building consultant - Scope of works 23/5/2014  Evidence of pre - existing damage to numerous building elements from a range of non - insurable causes  Total cost (including GST): $102,987 A pplicants’ expert (SG ) Consulting geologists - Report 30/09/2013  Susceptible soils present  Poor sub - surface drainage  Impermeable clays Applicants’ expert (CI)  Principal current defects / damage related to performance Case No: 345724 Determination Page 7 of 7 Consulting engineer - Report 12/11/2013 of foundations  Most likely associated with abnormal moisture conditions of founding material Applicants’ expert (MT) Consulting engineer - Report 20/05/2014  There are a number of structural defects to dwelling  The most likely cause of damage is leakage from adjoining water service pipe  Main cause of foundation failure in reactive clay sites is due to loss or gain of moisture content Applicants’ expert (MG) Building consultants - Scope of works 06 /2014  Total cost (including GST): $149,719