Home / Financial Firm (Unknown - Insurer) / Determination 345635
Determination 345635
Denial of building damage claim - movement exclusion
Summary
The FSP declined building damage claimed to result from the 25 December 2011 storm, attributing it to drainage problems and climatic movement. AFCA found the FSP had not established the movement exclusion, that stormwater pooling was the proximate cause, and ordered indemnity under the policy with interest on any cash settlement; no figure was stated.
The insurer bears the onus of proving an exclusion, and where accidental stormwater pooling was the proximate cause of later soil movement, the movement exclusion does not apply.
Issues
- Claim denial primary · upheld
“the FSP has not fulfilled its onus to establish the damage claimed is due to the general exclusion relating to movement.”
- Inadequate claim investigation secondary · upheld
“there is no evidence of C ever undertaking an assessment of this area, undertaking any tests of the sub-soils.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestrepair or rectify
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 345635 Determination Page 1 of 5
Case number : 3 3 45635 11 July 2014
1 Overview
1.1 Dispute
The Applicant held a Home Insurance Policy (the policy) with the Financial
Services Provider (FSP), which provides indemnity for „Accidental Damage‟,
subject to the specified policy exclusions. A claim was lodged upon the policy on
19 March 2012, for significant building damage claimed to have been caused by
the major weather event which took place on 25 December 2011, in Victoria.
The FSP has declined the claim on the basis the damage was not due to the
major weather event, rather is due to poor/inadequate site drainage and climatic
weather variations in Victoria over the years.
1.2 Issues and key findings
Has the Applicant established a prima facie claim?
The Applicant has established a prima facie claim because it clearly falls within
the policy definition for accidental damage, which is the nature of cover provided
by the policy.
Has the FSP established the loss claimed is excluded from cover?
The FSP has failed to establish an entitlement to decline indemnity because:
the damage falls within cover for accidental damage
it has not established the specific loss is excluded from cover
the available evidence establishes, on balance, the proximate cause for the
damage was the significant rainfall event on 25 December 2011.
1.3 Determination
The Determination is in favour of the Applicant.
The FSP is to provide indemnity for the loss claimed in line with the policy.
If any aspect of the claim is cash settled the FSP is to pay interest upon such
settlement in line with Section 57 of the Insurance Contracts Act 1984 (the Act)
from 15 February 2013 till such payment is issued to the Applicant.
Case No: 345635 Determination Page 2 of 5
2 Reasons for Determination
2.1 Has the Applicant established a prima facie claim?
There exists a prima facie claim
The policy provides indemnity for accidental damage which the Product
Disclosure Statement (PDS) defines as loss or damage that occurs without intent
and which is not subject to the specified policy exclusion/limitations.
There is no assertion that the damage subject of the claim was intended and/or
expected and therefore there exists a prima facie claim.
2.2 Was the damage claimed covered by the policy?
The proximate cause for the damage is covered by the policy
It is accepted insurance law that the onus is on an insured to establish, on the
balance of probabilities, that a claim falls within the scope of cover available under
the policy. Should this onus be discharged, it is then the responsibility of the
insurer to establish, on balance, the application of any exclusion on which it relies
to deny a claim.
The evidence establishes the insured building has sustained damage consistent
with movement of its foundations. There is no reference to this damage being
intended by the Applicant and accordingly it is consistent with accidental damage
for the purpose of the policy. The FSP therefore bears the burden to establish the
damage claimed is due to circumstances clearly excluded from cover.
The Applicant maintains the damage started to become evident shortly after the
significant storm/rainfall event (a 1 in a 100 year weather event) which took place
on 25 December 2011. It is his position that due to the significant rainfall the area
surrounding the insured property was flooded. He states that although the flash
flooding of the area may have cleared within a short period, the sub-floor area of
the insured building remained inundated by stormwater for several weeks after
the storm event.
The Applicant refutes the FSP‟s assertion that the damage claimed is the result of
poor and inadequate site drainage and significant climatic weather variations
experienced in Victoria over the previous years. Rather, it is clear that the
damage to the insured building is due to the introduction of moisture to t he
foundation soils and resultant reaction (movement) of the reactive clay soils. The
Applicant has made available photographic evidence to support his position
regarding the extent of flash flooding that occurred in the area of the insured
property.
The FSP maintains its decision to decline the claim on the basis of reports
submitted by its preferred consultants (engineers) “C” , commissioned to examine
the claim. The FSP maintains this establishes there was no storm or rainwater
related damage to the insured building. Also, that it was noted the insured building
Case No: 345635 Determination Page 3 of 5
has been subject to previous cracking consistent with foundation movement. In
the absence of conflicting expert evidence the FSP maintains the Applicant has
not established the damage is related to the storm. Further, in the absence of
expert evidence indicating otherwise, the policy clearly excludes from cover loss
or damage caused by movement.
The Panel has considered the available evidence including reports from the
consultants C, “AL” (leak detectors) and “LP” (plumbers). The Panel is satisfied
these reports provide the following relevant information:
the insured building was approximately 43 years old and reasonably well
maintained
C believed there was an absence of suitable surface or sub-surface drainage
provisions
the building showed evidence (patching/repairs) of previous damage due to
differential foundation movement and in particular within the southern and
eastern corner
C observed fresher internal cracking damage of plaster walls, lining and
cornices consistent with having occurred over the previous few months. Also
noted was more recent external building damage (brick veneer wall cracking)
also consistent with foundation movement
considering the orientations of movements and cracking patterns it was
determined that these had developed due to more recent foundation
movements
south/west corner was surrounded by concrete pavement so this would make
it less likely the recent movement was due to external surface rainwater
flooding
C also noted the presence of a storm water drainage pit and pipeline system
in this area and believed if this were to be leaking it would potentially be a
significant contributing factor
investigation by leak detecting experts AL determined there were no leaks in
the dwelling‟s plumbing and/or the storm water pipes however expressed
concern about the presence of a build of mud in the storm water line
plumbers LP were appointed to inspect and clear the storm water lines
the volumetric changes in the soils were directly due to effects of changes in
founding soil moisture which was possibly due to poor/inadequate drainage
conditions and significant climatic weather conditions in Victoria.
The Panel has considered the available evidence and is not satisfied the FSP has
been successful in establishing the damage claimed, was on balance, due to the
policy‟s general exclusion relating to movement, specifically „settling, shrinkage or
expansion.‟ The Panel notes the following concerns/inconsistencies with the
evidence relied upon by the FSP as it seeks to establish this policy exclusion:
there is reference to old movement damage due to the presence of previous
repair/patch work present inside the building. It is not in dispute that this was
done some 20 years prior because of damage which also became evident
shortly after a significant storm event
there is no evidence to suggest there was an issue of ongoing gradual
deterioration/damage occurring between the previous repairs completed some
20 years ago and the current fresh damage. This supports the view the
Case No: 345635 Determination Page 4 of 5
insured property remained relatively stable over many years whilst the
extended drought conditions prevailed in Victoria referred to within the FSP‟s
evidence
the Applicant has continuously maintained the damage was due to pooling of
storm water in the sub-floor area. However there is no evidence of C ever
undertaking an assessment of this area, undertaking any tests of the sub -soils
and/or addressing this aspect of the Applicant‟s position
there is no evidence to contradict the Applicant‟s firsthand account that water
did actually pool under the building for an extended period of a few weeks and
which would reasonably allow for the introduction of moisture into the sub-
soils
although reference has been made to inadequate/poor drainage there is no
evidence to suggest the present drainage set up is not in line with
requirements set by the relevant authorities at the time of home‟s construction
further there is no actual substantiating evidence to establish that inadequate
drainage was in fact the cause for the damage claimed and/or that a different
drainage system would have been able to cope with the substantial rainfall
and resulting flash flood conditions
it is consistently accepted by the various reports that damage was due to an
introduction of moisture to the sub-soils resulting in movement within the
reactive clay soils causing differential damage to the insured building
it is clear there were no significant issues and/or leaks within both the
domestic and storm water plumbing systems and therefore this could not be
established to be a contributing factor for the introduction of moisture to the
sub-soils.
The Panel having considered the available evidence and in line with the matters
noted above, is of the opinion the FSP has not fulfilled its onus to establish the
damage claimed is due to the general exclusion relating to movement. Rather, the
Panel, having carefully considered the expert evidence, determines on the
balance of probabilities, that the proximate cause of the loss was the action of the
stormwater pooling under the house for a period of several weeks; then as a
consequence the subterranean earth became reactive and caused the house
foundations to move. Such a scenario does not permit the application of the
general policy exclusion relating to movement, as the damage was proximately
(as in directly attributable) to the accidental damage wreaked by the pooling
stormwater and the earth movement was then consequent upon that event.
Established case law directs that in these circumstances an insurer must provide
indemnity.
The Panel has not been provided with an itemized scope of works and/or estimate
for the cost of repairs to attend to the recent and fresh internal and external
building damage. The Applicant, in a conversation with the Case Manager, has
expressed the costs and scope of works will be reasonably significant. The Panel
determines the FSP is to within 21 days of the Applicant‟s acceptance of th is
Determination make arrangements for adequately qualified consultants to attend
the insured property and provide a quote for the required repairs.
Case No: 345635 Determination Page 5 of 5
The FSP is to either authorise repairs to the insured property in line with this
Determination and its obligations under the policy and/or elect to cash settle the
Applicant for the cost to undertake the repairs. If the FSP elects to settle any
aspect of the claim by way of a cash settlement it is to pay interest upon such
payment in line with section 57 of the Act.
3 Supporting information
3.1 Product Disclosure Statement
“ Significant features and benefits
The Apia Home Insurance Extra Accidental Damage Policy offers four types of cover to
choose from. The cover you choose will be shown on your certificate. ”
3.2 Expert reports relied upon
C‟s Expert Report dated 30 April 2012
AL Leak Detection Report dated 21 March 2012
LP Plumber‟s Report dated 3 July 2012
C‟s Expert Report dated 18 September 2012 .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.