Denial of building damage claim - movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP declined building damage claimed to result from the 25 December 2011 storm, attributing it to drainage problems and climatic movement. AFCA found the FSP had not established the movement exclusion, that stormwater pooling was the proximate cause, and ordered indemnity under the policy with interest on any cash settlement; no figure was stated.

The insurer bears the onus of proving an exclusion, and where accidental stormwater pooling was the proximate cause of later soil movement, the movement exclusion does not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 345635 Determination Page 1 of 5 Case number : 3 3 45635 11 July 2014 1 Overview 1.1 Dispute The Applicant held a Home Insurance Policy (the policy) with the Financial Services Provider (FSP), which provides indemnity for „Accidental Damage‟, subject to the specified policy exclusions. A claim was lodged upon the policy on 19 March 2012, for significant building damage claimed to have been caused by the major weather event which took place on 25 December 2011, in Victoria. The FSP has declined the claim on the basis the damage was not due to the major weather event, rather is due to poor/inadequate site drainage and climatic weather variations in Victoria over the years. 1.2 Issues and key findings Has the Applicant established a prima facie claim? The Applicant has established a prima facie claim because it clearly falls within the policy definition for accidental damage, which is the nature of cover provided by the policy. Has the FSP established the loss claimed is excluded from cover? The FSP has failed to establish an entitlement to decline indemnity because:  the damage falls within cover for accidental damage  it has not established the specific loss is excluded from cover  the available evidence establishes, on balance, the proximate cause for the damage was the significant rainfall event on 25 December 2011. 1.3 Determination The Determination is in favour of the Applicant. The FSP is to provide indemnity for the loss claimed in line with the policy. If any aspect of the claim is cash settled the FSP is to pay interest upon such settlement in line with Section 57 of the Insurance Contracts Act 1984 (the Act) from 15 February 2013 till such payment is issued to the Applicant. Case No: 345635 Determination Page 2 of 5 2 Reasons for Determination 2.1 Has the Applicant established a prima facie claim? There exists a prima facie claim The policy provides indemnity for accidental damage which the Product Disclosure Statement (PDS) defines as loss or damage that occurs without intent and which is not subject to the specified policy exclusion/limitations. There is no assertion that the damage subject of the claim was intended and/or expected and therefore there exists a prima facie claim. 2.2 Was the damage claimed covered by the policy? The proximate cause for the damage is covered by the policy It is accepted insurance law that the onus is on an insured to establish, on the balance of probabilities, that a claim falls within the scope of cover available under the policy. Should this onus be discharged, it is then the responsibility of the insurer to establish, on balance, the application of any exclusion on which it relies to deny a claim. The evidence establishes the insured building has sustained damage consistent with movement of its foundations. There is no reference to this damage being intended by the Applicant and accordingly it is consistent with accidental damage for the purpose of the policy. The FSP therefore bears the burden to establish the damage claimed is due to circumstances clearly excluded from cover. The Applicant maintains the damage started to become evident shortly after the significant storm/rainfall event (a 1 in a 100 year weather event) which took place on 25 December 2011. It is his position that due to the significant rainfall the area surrounding the insured property was flooded. He states that although the flash flooding of the area may have cleared within a short period, the sub-floor area of the insured building remained inundated by stormwater for several weeks after the storm event. The Applicant refutes the FSP‟s assertion that the damage claimed is the result of poor and inadequate site drainage and significant climatic weather variations experienced in Victoria over the previous years. Rather, it is clear that the damage to the insured building is due to the introduction of moisture to t he foundation soils and resultant reaction (movement) of the reactive clay soils. The Applicant has made available photographic evidence to support his position regarding the extent of flash flooding that occurred in the area of the insured property. The FSP maintains its decision to decline the claim on the basis of reports submitted by its preferred consultants (engineers) “C” , commissioned to examine the claim. The FSP maintains this establishes there was no storm or rainwater related damage to the insured building. Also, that it was noted the insured building Case No: 345635 Determination Page 3 of 5 has been subject to previous cracking consistent with foundation movement. In the absence of conflicting expert evidence the FSP maintains the Applicant has not established the damage is related to the storm. Further, in the absence of expert evidence indicating otherwise, the policy clearly excludes from cover loss or damage caused by movement. The Panel has considered the available evidence including reports from the consultants C, “AL” (leak detectors) and “LP” (plumbers). The Panel is satisfied these reports provide the following relevant information:  the insured building was approximately 43 years old and reasonably well maintained  C believed there was an absence of suitable surface or sub-surface drainage provisions  the building showed evidence (patching/repairs) of previous damage due to differential foundation movement and in particular within the southern and eastern corner  C observed fresher internal cracking damage of plaster walls, lining and cornices consistent with having occurred over the previous few months. Also noted was more recent external building damage (brick veneer wall cracking) also consistent with foundation movement  considering the orientations of movements and cracking patterns it was determined that these had developed due to more recent foundation movements  south/west corner was surrounded by concrete pavement so this would make it less likely the recent movement was due to external surface rainwater flooding  C also noted the presence of a storm water drainage pit and pipeline system in this area and believed if this were to be leaking it would potentially be a significant contributing factor  investigation by leak detecting experts AL determined there were no leaks in the dwelling‟s plumbing and/or the storm water pipes however expressed concern about the presence of a build of mud in the storm water line  plumbers LP were appointed to inspect and clear the storm water lines  the volumetric changes in the soils were directly due to effects of changes in founding soil moisture which was possibly due to poor/inadequate drainage conditions and significant climatic weather conditions in Victoria. The Panel has considered the available evidence and is not satisfied the FSP has been successful in establishing the damage claimed, was on balance, due to the policy‟s general exclusion relating to movement, specifically „settling, shrinkage or expansion.‟ The Panel notes the following concerns/inconsistencies with the evidence relied upon by the FSP as it seeks to establish this policy exclusion:  there is reference to old movement damage due to the presence of previous repair/patch work present inside the building. It is not in dispute that this was done some 20 years prior because of damage which also became evident shortly after a significant storm event  there is no evidence to suggest there was an issue of ongoing gradual deterioration/damage occurring between the previous repairs completed some 20 years ago and the current fresh damage. This supports the view the Case No: 345635 Determination Page 4 of 5 insured property remained relatively stable over many years whilst the extended drought conditions prevailed in Victoria referred to within the FSP‟s evidence  the Applicant has continuously maintained the damage was due to pooling of storm water in the sub-floor area. However there is no evidence of C ever undertaking an assessment of this area, undertaking any tests of the sub -soils and/or addressing this aspect of the Applicant‟s position  there is no evidence to contradict the Applicant‟s firsthand account that water did actually pool under the building for an extended period of a few weeks and which would reasonably allow for the introduction of moisture into the sub- soils  although reference has been made to inadequate/poor drainage there is no evidence to suggest the present drainage set up is not in line with requirements set by the relevant authorities at the time of home‟s construction  further there is no actual substantiating evidence to establish that inadequate drainage was in fact the cause for the damage claimed and/or that a different drainage system would have been able to cope with the substantial rainfall and resulting flash flood conditions  it is consistently accepted by the various reports that damage was due to an introduction of moisture to the sub-soils resulting in movement within the reactive clay soils causing differential damage to the insured building  it is clear there were no significant issues and/or leaks within both the domestic and storm water plumbing systems and therefore this could not be established to be a contributing factor for the introduction of moisture to the sub-soils. The Panel having considered the available evidence and in line with the matters noted above, is of the opinion the FSP has not fulfilled its onus to establish the damage claimed is due to the general exclusion relating to movement. Rather, the Panel, having carefully considered the expert evidence, determines on the balance of probabilities, that the proximate cause of the loss was the action of the stormwater pooling under the house for a period of several weeks; then as a consequence the subterranean earth became reactive and caused the house foundations to move. Such a scenario does not permit the application of the general policy exclusion relating to movement, as the damage was proximately (as in directly attributable) to the accidental damage wreaked by the pooling stormwater and the earth movement was then consequent upon that event. Established case law directs that in these circumstances an insurer must provide indemnity. The Panel has not been provided with an itemized scope of works and/or estimate for the cost of repairs to attend to the recent and fresh internal and external building damage. The Applicant, in a conversation with the Case Manager, has expressed the costs and scope of works will be reasonably significant. The Panel determines the FSP is to within 21 days of the Applicant‟s acceptance of th is Determination make arrangements for adequately qualified consultants to attend the insured property and provide a quote for the required repairs. Case No: 345635 Determination Page 5 of 5 The FSP is to either authorise repairs to the insured property in line with this Determination and its obligations under the policy and/or elect to cash settle the Applicant for the cost to undertake the repairs. If the FSP elects to settle any aspect of the claim by way of a cash settlement it is to pay interest upon such payment in line with section 57 of the Act. 3 Supporting information 3.1 Product Disclosure Statement “ Significant features and benefits The Apia Home Insurance Extra Accidental Damage Policy offers four types of cover to choose from. The cover you choose will be shown on your certificate. ” 3.2 Expert reports relied upon  C‟s Expert Report dated 30 April 2012  AL Leak Detection Report dated 21 March 2012  LP Plumber‟s Report dated 3 July 2012  C‟s Expert Report dated 18 September 2012 .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.