Denial of further storm damage claim on the basis of long term earth movement exclusion
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision -
Denial of Claim
Determination
Case No: 345389 Determination Page 1 of 6
Case number: 345389 26 November 2014
1 Overview
1.1 Dispute
This dispute arises as a result of the denial by the Financial Services Provider
(FSP) of the Applicant’s claim for further storm damage, after the identification of
new damage in or about December 2013 following on the FSP’s acceptance of a
claim for damage after a storm event in early 2012.
The FSP denied the claim, based on its engineer s’ opinions that the damage was
not caused by the same storm event but by long term earth movement, which is
excluded from cover under the policy. The Applicant is dissatisfied with this
outcome and wants her claim paid in full.
A Financial Ombudsman Service (FOS) Case Manager made a Recommendation
in this dispute partially in favour of the Applicant. The Applicant accepted the
Recommendation but it was rejected by the FSP. A copy of the Recommendation
is attached. Both parties made post-Recommendation submissions which
included a report from a third engineer (M) from the FSP.
1.2 Issue and key findings
Is the FSP entitled to deny the Applicant's claim?
The FSP is not entitled t o deny the Applicant’s claim because:
T he FSP’s engineers’ reports have contradictory opinions on whether the
damage falls under the scope of cover of the policy.
The FSP has not provided a satisfactory explanation as to why the engineer B
report should be disregarded.
1.3 Determination
This Determination is partially in favour of the Applicant.
Within 15 days of confirmation to both parties of the acceptance of this
Determination, the FSP is to obtain a scope of works and quotation on the
repair of the damage as reported by the FSP’s engineer B plus the damage in
the area near bedroom 4, as id entified by the FSP’s engineer F.
Within 30 days of confirmation to both parties of the acceptance of this
Determination, the FSP is to settle the claim for the repair of the damage
based on its scope of works and quotation.
Case No: 345389 Determination Page 2 of 6
Insofar as the FSP cash settles the claim, the FSP is to pay interest on the
settlement amount in accordance with section 57 of the Insurance Contracts
Act 1984 from 8 November 2013 , being the date of the FSP’s final decision, to
the date of payment of the claim.
Case No: 345389 Determination Page 3 of 6
2 Reasons for Determination
FOS approach for this dispute
There has been a full exchange of relevant information between the parties and
each party has had the opportunity to address the issues raised.
In making this decision, the entire file, including all communications with and
between the parties have been considered. The focus has been on the relevant
material for the outcome.
I have been provided with expert opinions expressed by engineers in respect to
the cause of the damage to the Applicant’s home. I must take such opinions into
account in accordance with the law which allows them as an exception to the
principle of exclusion of hearsay evidence.
However, it must be understood that they are only professional opinions and are
not binding on a decision-maker. There can be conflicting expert opinions, as
evidenced in this dispute, and they must be weighed in conjunction with all the
evidence in the making of a decision.
2.1 Is the FSP entitled to deny the Applicant's claim?
The FSP’s reports have differing opinions on the cause of damage
The Applicant has made a claim for additional damage to her home in December
2013 which she says was the consequence of a storm event in early 2012. The
FSP had previously accepted a claim for some damage arising from that event.
The dispute is about whether damage from the movement of her home and other
damage was caused by the storm event. There is no dispute that the home has
undergone movement and suffered additional damage. The issue is whether the
damage is covered under the policy.
The FSP denied the claim, based on its engineer ’ s opinion that the damage was
not caused by the same storm event but by long term earth movement, which is
excluded from cover under the policy.
The Applicant has the onus to establish, on the balance of probabilities, that a
claim fits the definition of an insured event. If this onus is discharged, the onus
shifts to the FSP to establish the application of any exclusion or provision on
which it relies to deny the claim.
In this instance, the cover is for accidental damage and the fact the claimed
damage was accidental is not in dispute. Further, there is evidence that the
claimed damage followed a substantial recorded storm event in early 2012 that
impacted on the area in which the Applicant lived. Therefore, it is incumbent on
the FSP to establish any exclusion or provision it wishes to apply to defeat the
claim.
Case No: 345389 Determination Page 4 of 6
Following a site inspection by a loss adjuster, the FSP commissioned engineer B
to assess the claimed damage and provide a report. The report favoured the
Applicant but the FSP was not satisfied with aspects of the report and
commissioned engineer F. The FSP then denied the claim in part on the basis of
F’ s report that the damage was not caused by a storm event covered by the
policy.
The initial expert evidence can be found in detail in section 3.2 of the
Recommendation. It was also summarised in the body of the Recommendation.
The Recommendation pointed out that the reports not only had contradictory
conclusions, they also had contradictory findings, such as:
Different opinions as to what are the consequences of receiving a significant
amount of water over a short or long period on clay soils.
Different findings as to the extent of damage, with F having identified more
damage.
In addition, the Recommendation made findings in respect to the damage in the
area near bedroom 4 and mould damage. I am satisfied with the conclusions
reached in the Recommendation on the information available at the time.
The FSP has not provided a satisfactory explanation as to why the B
engineer report should be disregarded
The Recommendation made findings in respect to the B engineer report
commissioned by the FSP to assess the claim and a second report the FSP
commissioned from engineer F. This report had been obtained because, in the
FSP’s or its representative’s view, there was an alleged lack of thoroughness in
the B report and a disregard of engineering principles.
The Recommendation concluded, in light of contradictions in the respective
reports, the reasons presented by the FSP as to why engineer B’s opinion should
be disregarded were insufficient.
After the Recommendation, the FSP commissioned a third engineer, M, to provide
a report to clarify any contradictions. M’s report was a desk report made on
19 September 2014, some considerable time after the claim. Both parties have
sought to blame each other for these circumstances, with the Applicant
expressing concerns about the fairness of the FSP and the non-reliance on the B
engineer report.
I accept that the Applicant, as an insured, has an obligation under the policy to
cooperate with the FSP in facilitating the assessment of a claim but there must be
a degree of r easonableness on an insurer’s part in its expectation. This is an
instance in which, following an inspection by the FSP’s loss assessor , engineer B
was appointed to assess the Applicant’s damage in March 2013.
Following receipt of a report that was favourable to the Applicant in relation to the
inundation of water and the damage it caused, the FSP sought to obtain a second
report from engineer F in June 2013. This report was to form the basis for the
FSP’s denial of a major aspect of the Applicant’s claim.
Case No: 345389 Determination Page 5 of 6
Then, subsequent to the FOS Recommendation which found that there were
contradictions in the reports and that the FSP should be liable for certain works,
the FSP sought to commission a third engineer report from M, almost two and a
half years from the storm event. It would not be unusual for any insured to
question the conduct of an insurer in such circumstances.
Leaving that aside, the engineer M report generally agreed with the engineer F
report and said it “generally disagreed” with engineer B’s comments that had
determined that the movements observed “can be attributed to the subfloor being
inundated ” . It made comments about inadequate drainage , long term ponding of
water under the house and the quality of a previous restumping.
The Applicant maintained her position after the receipt of this report. She pointed
out that, following the restumping of her home some 15 years previously, her area
had experienced a 10 year drought between 1998 and 2008. She said that there
was no water pooling or ponding under her house in that time as assumed in
engineer M ’ s report or problems with the restumping.
She further pointed out that it had been an extreme storm event in early 2012 and
the drainage system coped with six inches of rain which fell overnight from 4am.
Credence must be given to the Applicant’s evidence as she had lived in the house
during a long drought period in Victoria and experienced the storm event.
In order to reach an outcome, FOS relies on what is fair in all circumstances
The Recommendation noted that only the FSP has provided FOS with expert
evidence. It found these reports had conflicting findings and the FSP has not
provided a satisfactory explanation as to why one should be preferred over the
other.
The FSP, as a consequence of this, obtained the third report from M. The
combination of expert opinion in support of the FSP cannot be determinative of
the issue. I must weigh the conflicting expert opinions with the evidence provided
by the Applicant, who obviously has had the first hand experience of living in her
home after it had been restumped and experiencing the impact of the climatic
conditions about which the experts have made post-facto assumptions.
In all the circumstances, I am satisfied that it is both fair and that there is sufficient
evidence from the report of engineer B and the Applicant to support the
conclusion and findings in the Recommendation. As a consequence I agree with
same.
Case No: 345389 Determination Page 6 of 6
3 Supporting information
3.1 Additional supporting information
Post-Recommendation submissions
Engineer M’s report
Recommendation
General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision -
Denial of Claim
U LYVC 130 01
Recommendation
Case No: 345389 Recommendation Page 1 of 5
Case number: 345389 19 August 2014
1 Overview
1.1 Dispute
This dispute arises as a result of the denial by the Financial Services Provider
(FSP) of the Applicant’s claim for further storm damage, after the identification of
new damage and based on the FSP’s acceptance of a recent storm claim.
The FSP denied the claim because it says the damage was not caused by the
same storm event but by long term earth movement, which is excluded from cover
under the policy. The Applicant is dissatisfied with this outcome and wants her
claim paid in full.
1.2 Issue and key findings
Is the FSP entitled to deny the Applicant's claim?
The FSP is not entitled to deny the Applicant’s claim because:
the FSP’s reports have contradictory opinions on whether the damage falls
under the scope of cover of the policy
the FSP has not provided a satisfactory explanation as to why the first report
should be disregarded.
1.3 Recommendation
This Recommendation is partially in favour of the Applicant.
Within 15 days of confirmation to both parties of the acceptance of this
Recommendation, the FSP is to obtain a scope of works and quotation on the
repair of the damage as reported by the FSP’s engineer (B) plus the damage
in the area near bedroom 4, as identified by the FSP’s other engineer (F).
Within 30 days of confirmation to both parties of the acceptance of this
Re commendation, the FSP is to settle the claim for the repair of the damage
based on its scope of works and quotation.
Insofar as the FSP cash settles the claim, the FSP is to pay interest on the
settlement amount in accordance with section 57 of the Insuran ce Contracts
Act 1984 from 8 November 2013 , being the date of the FSP’s final decision, to
the date of payment of the claim.
Case No: 345389 Recommendation Page 2 of 5
2 Reasons for Recommendation
2.1 Is the FSP entitled to deny the Applicant's claim?
The FSP’s reports have contradictory opinions on the cause of damage
The Applicant has the onus to establish on the balance of probabilities that a
claim fits the definition of an insured event. If this onus is discharged, the onus
shifts to the FSP to establish the application of any exclusion or provision on
which it relies to deny the claim.
In this instance, the cover is for accidental damage and the fact the claimed
damage was accidental is not in dispute. Therefore, it is incumbent on the FSP to
establish any exclusion or provision it wishes to apply to defeat the claim.
The only expert evidence available is the opinion of the FSP’s engineers. This can
be found in detail in section 3.2 of this Recommendation. In summary, they say:
Engineer Summary of cause of damage
B The storm and subsequent inundation event caused damage to the flooring
and stumping at the rear entry, bathroom door and bathroom wall crack.
F Ongoing long term differential soil movement has damaged the building,
save for the area in the vicinity of bedroom 4.
The reports not only have contradictory conclusions, they also have contradictory
findings, such as:
different opinions as to what are the consequences of receiving a significant
amount of water over a short or long period on clay soils
different findings as to the extent of damage, with F having identified more
damage.
Further, F considers the damage in the area near bedroom 4 is not caused by
long term differential soil movement and recommends the Applicant organises
further action to identify the cause of damage in the area near bedroom 4.
However, as previously stated, it is the FSP’s onus to establish the damage to this
area is excluded from cover. In the absence of evidence to the contrary, the
damage near bedroom 4 should be covered by the policy.
As to the mould damage, F recommends the Applicant address the damage and
the Applicant has recently explained she has. In principle and according to the
Product Disclosure Statement, damage by mould is not covered.
There is no available evidence, which links the mould damage to a cause that
could be covered by the policy. Thus, the FSP is entitled to rely on the mould
exclusion to deny the mould damage.
As to the rest of the damage, it is not possible to reconcile both engineers’
opinions.
Case No: 345389 Recommendation Page 3 of 5
The FSP has not provided a satisfactory explanation as to why B’s engineer
report should be disregarded
To assess the claim, the FSP first appointed B, who issued a report stating the
claim should be covered as storm damage. After receiving B’s report, the FSP
said it needed to obtain a report from F because:
B’s report was not thorough enough as to the damage identified
apparently, B was disregarding basic engineering principles (not specified)
when assessing the behavior of clay foundation soils subjected to water
there was the need to do a floor levels survey.
A review of B’s opinion indicates:
B’s report is not as thorough as F’s, however, in his clarification email of 16
May 2013, B provides further detail regarding the cause of damage and also
acknowledges being aware of the engineerin g principles applied to B’s report
appointing either engineer to do the floor level survey makes no difference as
to which engineer should be relied on because the survey consists in
measuring floor levels throughout the building with a measuring instrument, it
does not require a certain engineering expertise.
In light of this, the reasons presented by the FSP as to why B’s opinion should be
disregarded are considered as insufficient.
In order to reach an outcome, the Financial Ombudsman Service relies on
what is fair in all circumstances
Only the FSP has provided the Financial Ombudsman Service (FOS) with expert
evidence. However, these reports have conflicting findings and the FSP has not
provided a satisfactory explanation as to why one should be preferred over the
other.
Prior to its submission based on F’s report, the FSP on its Internal Dispute
Resolution letter stated it could not cover additional damage that B had not
identified but could agree to cover the damage as reported by B.
As one can not fully rely on B’s or on F’s opinion, in order to achieve an outcome
that is fair in all the circumstances, the following flexible approach is considered
appropriate:
the damage, for which the FSP initially accepted cover as reported by B
should be settled, as well as the damage F considers has not been caused by
long term soil differential movement (the area near bedroom 4).
any other damage that was not identified by B, but later identified by F, should
be excluded from cover.
Case No: 345389 Recommendation Page 4 of 5
3 Supporting information
3.1 FOS approach for this dispute
There has been a full exchange of relevant information between the parties and
each party has had the opportunity to address the issues raised.
In making this decision, the entire file, including all communications with and
between the parties have been considered. The focus has been on the relevant
material for the outcome.
3.2 Key Points from the engineers’ reports/statements
Record Key points
FSP’s
engineer ( B )
Report
26 Mar 2013
Email
16 May 2013
Clay soils in this area are of moderate plasticity and typically have soil
movement of 40mm. Wetting these soils from a relatively dry state will
cause them to swell and rise.
House stumps tend to rise as the surface soils swell.
Differential movement of the house structure can occur when the
wetting of the soils is not uniform across said structure.
The subfloor is built on a mixture of brick piers and concrete and timber
stumps. The Applicant explained the area beneath the dwelling was
inundated by the 2012 floodwaters.
Since the in undation, the Applicant has noticed one crack in the
kitchen, floor dropping in the rear entry and the bathroom door not
closing properly.
The recent inundation and wetting of the foundations soils could
exacerbate house movements.
Due to the different typ e of stumps and piers, individual stumps may
behave differently after being inundated.
The duress caused to the cornice and walls is caused by foundation
movement due to soil saturation (soil losing strength) and/or soil
swelling.
Damage to flooring and st umping at the rear entry, bathroom door and
wall crack can be attributed to the inundation event.
The movement observed is attributed to the subfloor being inundated.
When stump footings are inundated, some may heave and some may
subside because the soil i s packed around a stump and water can
penetrate down the stump hole and cause the stump to settle.
The floor has subsided and not heaved in this case. The trees have not
caused the damage.
FSP’s
engineer ( F )
Report
20 Dec 2013
The site is relatively flat and is considered to have poor surface
drainage . The ground floor is supported on concrete stumps.
F did not access the subfloor due to the very low clearance. Part of the
subfloor is lower than the surrounding ground.
The floor levels survey indicates a m aximum of 74mm below datum
(southeast corner of the sitting room) and 80mm above datum
(bedroom 4). There is localised heave in bedroom 4.
There is general settlement towards the northeast corner of the house,
Case No: 345389 Recommendation Page 5 of 5
where a group of medium and large trees.
The A pplicant says 300mm of rain fell over a few days in late
February - early March 2012 and water leaked through the kitchen roof,
damaging the kitchen and sitting room areas.
She says the subfloor was inundated, the subfloor soil remained damp
for about 6 mont hs and the wall cracks appeared around June 2012
and have not worsened since.
The damage is cosmetic only with no structural damage observed. The
cracking, gaps, cornice damage and binding doors/windows are all
consistent with building movement.
The clay s oils at the site would be highly reactive and would
experience significant volumetric changes when moisture content
changes.
The floor level survey indicates a region of localised heave in bedroom
4, which indicates there is a potential leak in the hydraul ic services
underneath this region of the house
The survey also indicates a general pattern of settlement towards the
northeast corner of the house, which is in the general direction of a
group of trees. Trees remove moisture from clay soils, resulting in
settlement of nearby structures.
The floor levels at the southern and north - western sides are generally
higher, which suggests the irrigation of garden beds in those regions is
countering the tree root drying effects.
There are no irrigated garden beds in the northeast corner, thus this
area is more prone to tree root drying of foundation soils.
The observed damage (with the possible exception of the area near
bedroom 4) is due to ongoing long term differential soil movement
caused by moisture content varia tions caused by highly reactive soils,
tree root drying of foundation soils, seasonal changes in moisture
contents and irrigation of the garden beds in the southern and north -
western sides house.
The short term flooding of the site has not caused nor contr ibuted to
the movement of the footings and building.
Clay soils typically have low permeability and generally form a barrier
to stop ingress of stormwater. Therefore, it would take a considerable
amount of water over a prolonged period of time (such as lea ks) to
penetrate deep enough to create differential movement in the
foundation soils.
The mould contamination observed in the bathroom ceiling is likely to
have resulted from high moisture conditions due to inadequate
ventilation of the bathroom during and after usage.
F notes the roof was repaired. It is unclear whether the mould in
bedroom 4 occurred before or after these repairs.
3.3 Other information relied upon
The Product Disclosure Statement with preparation date 30 May 2008.
The renewal schedules for the periods 1 May 2011 to 1 May 2012 and 1 May
2012 to 1 May 2013.
The parties’ submissions. 44