Denial of further storm damage claim on the basis of long term earth movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2014-12-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The homeowner claimed further storm damage after an earlier accepted storm claim, and the insurer denied it as long term earth movement. AFCA found the insurer had not shown the exclusion applied, and ordered the claim settled on the repair scope in the insurer's favourable engineer report, with interest if cash settled.

Where the insurer's expert reports conflict and it has not satisfactorily explained why one should be disregarded, the insurer bears the onus of establishing the exclusion and has not done so.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision - Denial of Claim Determination Case No: 345389 Determination Page 1 of 6 Case number: 345389 26 November 2014 1 Overview 1.1 Dispute This dispute arises as a result of the denial by the Financial Services Provider (FSP) of the Applicant’s claim for further storm damage, after the identification of new damage in or about December 2013 following on the FSP’s acceptance of a claim for damage after a storm event in early 2012. The FSP denied the claim, based on its engineer s’ opinions that the damage was not caused by the same storm event but by long term earth movement, which is excluded from cover under the policy. The Applicant is dissatisfied with this outcome and wants her claim paid in full. A Financial Ombudsman Service (FOS) Case Manager made a Recommendation in this dispute partially in favour of the Applicant. The Applicant accepted the Recommendation but it was rejected by the FSP. A copy of the Recommendation is attached. Both parties made post-Recommendation submissions which included a report from a third engineer (M) from the FSP. 1.2 Issue and key findings Is the FSP entitled to deny the Applicant's claim? The FSP is not entitled t o deny the Applicant’s claim because:  T he FSP’s engineers’ reports have contradictory opinions on whether the damage falls under the scope of cover of the policy.  The FSP has not provided a satisfactory explanation as to why the engineer B report should be disregarded. 1.3 Determination This Determination is partially in favour of the Applicant.  Within 15 days of confirmation to both parties of the acceptance of this Determination, the FSP is to obtain a scope of works and quotation on the repair of the damage as reported by the FSP’s engineer B plus the damage in the area near bedroom 4, as id entified by the FSP’s engineer F.  Within 30 days of confirmation to both parties of the acceptance of this Determination, the FSP is to settle the claim for the repair of the damage based on its scope of works and quotation. Case No: 345389 Determination Page 2 of 6  Insofar as the FSP cash settles the claim, the FSP is to pay interest on the settlement amount in accordance with section 57 of the Insurance Contracts Act 1984 from 8 November 2013 , being the date of the FSP’s final decision, to the date of payment of the claim. Case No: 345389 Determination Page 3 of 6 2 Reasons for Determination FOS approach for this dispute There has been a full exchange of relevant information between the parties and each party has had the opportunity to address the issues raised. In making this decision, the entire file, including all communications with and between the parties have been considered. The focus has been on the relevant material for the outcome. I have been provided with expert opinions expressed by engineers in respect to the cause of the damage to the Applicant’s home. I must take such opinions into account in accordance with the law which allows them as an exception to the principle of exclusion of hearsay evidence. However, it must be understood that they are only professional opinions and are not binding on a decision-maker. There can be conflicting expert opinions, as evidenced in this dispute, and they must be weighed in conjunction with all the evidence in the making of a decision. 2.1 Is the FSP entitled to deny the Applicant's claim? The FSP’s reports have differing opinions on the cause of damage The Applicant has made a claim for additional damage to her home in December 2013 which she says was the consequence of a storm event in early 2012. The FSP had previously accepted a claim for some damage arising from that event. The dispute is about whether damage from the movement of her home and other damage was caused by the storm event. There is no dispute that the home has undergone movement and suffered additional damage. The issue is whether the damage is covered under the policy. The FSP denied the claim, based on its engineer ’ s opinion that the damage was not caused by the same storm event but by long term earth movement, which is excluded from cover under the policy. The Applicant has the onus to establish, on the balance of probabilities, that a claim fits the definition of an insured event. If this onus is discharged, the onus shifts to the FSP to establish the application of any exclusion or provision on which it relies to deny the claim. In this instance, the cover is for accidental damage and the fact the claimed damage was accidental is not in dispute. Further, there is evidence that the claimed damage followed a substantial recorded storm event in early 2012 that impacted on the area in which the Applicant lived. Therefore, it is incumbent on the FSP to establish any exclusion or provision it wishes to apply to defeat the claim. Case No: 345389 Determination Page 4 of 6 Following a site inspection by a loss adjuster, the FSP commissioned engineer B to assess the claimed damage and provide a report. The report favoured the Applicant but the FSP was not satisfied with aspects of the report and commissioned engineer F. The FSP then denied the claim in part on the basis of F’ s report that the damage was not caused by a storm event covered by the policy. The initial expert evidence can be found in detail in section 3.2 of the Recommendation. It was also summarised in the body of the Recommendation. The Recommendation pointed out that the reports not only had contradictory conclusions, they also had contradictory findings, such as:  Different opinions as to what are the consequences of receiving a significant amount of water over a short or long period on clay soils.  Different findings as to the extent of damage, with F having identified more damage. In addition, the Recommendation made findings in respect to the damage in the area near bedroom 4 and mould damage. I am satisfied with the conclusions reached in the Recommendation on the information available at the time. The FSP has not provided a satisfactory explanation as to why the B engineer report should be disregarded The Recommendation made findings in respect to the B engineer report commissioned by the FSP to assess the claim and a second report the FSP commissioned from engineer F. This report had been obtained because, in the FSP’s or its representative’s view, there was an alleged lack of thoroughness in the B report and a disregard of engineering principles. The Recommendation concluded, in light of contradictions in the respective reports, the reasons presented by the FSP as to why engineer B’s opinion should be disregarded were insufficient. After the Recommendation, the FSP commissioned a third engineer, M, to provide a report to clarify any contradictions. M’s report was a desk report made on 19 September 2014, some considerable time after the claim. Both parties have sought to blame each other for these circumstances, with the Applicant expressing concerns about the fairness of the FSP and the non-reliance on the B engineer report. I accept that the Applicant, as an insured, has an obligation under the policy to cooperate with the FSP in facilitating the assessment of a claim but there must be a degree of r easonableness on an insurer’s part in its expectation. This is an instance in which, following an inspection by the FSP’s loss assessor , engineer B was appointed to assess the Applicant’s damage in March 2013. Following receipt of a report that was favourable to the Applicant in relation to the inundation of water and the damage it caused, the FSP sought to obtain a second report from engineer F in June 2013. This report was to form the basis for the FSP’s denial of a major aspect of the Applicant’s claim. Case No: 345389 Determination Page 5 of 6 Then, subsequent to the FOS Recommendation which found that there were contradictions in the reports and that the FSP should be liable for certain works, the FSP sought to commission a third engineer report from M, almost two and a half years from the storm event. It would not be unusual for any insured to question the conduct of an insurer in such circumstances. Leaving that aside, the engineer M report generally agreed with the engineer F report and said it “generally disagreed” with engineer B’s comments that had determined that the movements observed “can be attributed to the subfloor being inundated ” . It made comments about inadequate drainage , long term ponding of water under the house and the quality of a previous restumping. The Applicant maintained her position after the receipt of this report. She pointed out that, following the restumping of her home some 15 years previously, her area had experienced a 10 year drought between 1998 and 2008. She said that there was no water pooling or ponding under her house in that time as assumed in engineer M ’ s report or problems with the restumping. She further pointed out that it had been an extreme storm event in early 2012 and the drainage system coped with six inches of rain which fell overnight from 4am. Credence must be given to the Applicant’s evidence as she had lived in the house during a long drought period in Victoria and experienced the storm event. In order to reach an outcome, FOS relies on what is fair in all circumstances The Recommendation noted that only the FSP has provided FOS with expert evidence. It found these reports had conflicting findings and the FSP has not provided a satisfactory explanation as to why one should be preferred over the other. The FSP, as a consequence of this, obtained the third report from M. The combination of expert opinion in support of the FSP cannot be determinative of the issue. I must weigh the conflicting expert opinions with the evidence provided by the Applicant, who obviously has had the first hand experience of living in her home after it had been restumped and experiencing the impact of the climatic conditions about which the experts have made post-facto assumptions. In all the circumstances, I am satisfied that it is both fair and that there is sufficient evidence from the report of engineer B and the Applicant to support the conclusion and findings in the Recommendation. As a consequence I agree with same. Case No: 345389 Determination Page 6 of 6 3 Supporting information 3.1 Additional supporting information  Post-Recommendation submissions  Engineer M’s report Recommendation General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision - Denial of Claim U LYVC 130 01 Recommendation Case No: 345389 Recommendation Page 1 of 5 Case number: 345389 19 August 2014 1 Overview 1.1 Dispute This dispute arises as a result of the denial by the Financial Services Provider (FSP) of the Applicant’s claim for further storm damage, after the identification of new damage and based on the FSP’s acceptance of a recent storm claim. The FSP denied the claim because it says the damage was not caused by the same storm event but by long term earth movement, which is excluded from cover under the policy. The Applicant is dissatisfied with this outcome and wants her claim paid in full. 1.2 Issue and key findings Is the FSP entitled to deny the Applicant's claim? The FSP is not entitled to deny the Applicant’s claim because:  the FSP’s reports have contradictory opinions on whether the damage falls under the scope of cover of the policy  the FSP has not provided a satisfactory explanation as to why the first report should be disregarded. 1.3 Recommendation This Recommendation is partially in favour of the Applicant.  Within 15 days of confirmation to both parties of the acceptance of this Recommendation, the FSP is to obtain a scope of works and quotation on the repair of the damage as reported by the FSP’s engineer (B) plus the damage in the area near bedroom 4, as identified by the FSP’s other engineer (F).  Within 30 days of confirmation to both parties of the acceptance of this Re commendation, the FSP is to settle the claim for the repair of the damage based on its scope of works and quotation.  Insofar as the FSP cash settles the claim, the FSP is to pay interest on the settlement amount in accordance with section 57 of the Insuran ce Contracts Act 1984 from 8 November 2013 , being the date of the FSP’s final decision, to the date of payment of the claim. Case No: 345389 Recommendation Page 2 of 5 2 Reasons for Recommendation 2.1 Is the FSP entitled to deny the Applicant's claim? The FSP’s reports have contradictory opinions on the cause of damage The Applicant has the onus to establish on the balance of probabilities that a claim fits the definition of an insured event. If this onus is discharged, the onus shifts to the FSP to establish the application of any exclusion or provision on which it relies to deny the claim. In this instance, the cover is for accidental damage and the fact the claimed damage was accidental is not in dispute. Therefore, it is incumbent on the FSP to establish any exclusion or provision it wishes to apply to defeat the claim. The only expert evidence available is the opinion of the FSP’s engineers. This can be found in detail in section 3.2 of this Recommendation. In summary, they say: Engineer Summary of cause of damage B The storm and subsequent inundation event caused damage to the flooring and stumping at the rear entry, bathroom door and bathroom wall crack. F Ongoing long term differential soil movement has damaged the building, save for the area in the vicinity of bedroom 4. The reports not only have contradictory conclusions, they also have contradictory findings, such as:  different opinions as to what are the consequences of receiving a significant amount of water over a short or long period on clay soils  different findings as to the extent of damage, with F having identified more damage. Further, F considers the damage in the area near bedroom 4 is not caused by long term differential soil movement and recommends the Applicant organises further action to identify the cause of damage in the area near bedroom 4. However, as previously stated, it is the FSP’s onus to establish the damage to this area is excluded from cover. In the absence of evidence to the contrary, the damage near bedroom 4 should be covered by the policy. As to the mould damage, F recommends the Applicant address the damage and the Applicant has recently explained she has. In principle and according to the Product Disclosure Statement, damage by mould is not covered. There is no available evidence, which links the mould damage to a cause that could be covered by the policy. Thus, the FSP is entitled to rely on the mould exclusion to deny the mould damage. As to the rest of the damage, it is not possible to reconcile both engineers’ opinions. Case No: 345389 Recommendation Page 3 of 5 The FSP has not provided a satisfactory explanation as to why B’s engineer report should be disregarded To assess the claim, the FSP first appointed B, who issued a report stating the claim should be covered as storm damage. After receiving B’s report, the FSP said it needed to obtain a report from F because:  B’s report was not thorough enough as to the damage identified  apparently, B was disregarding basic engineering principles (not specified) when assessing the behavior of clay foundation soils subjected to water  there was the need to do a floor levels survey. A review of B’s opinion indicates:  B’s report is not as thorough as F’s, however, in his clarification email of 16 May 2013, B provides further detail regarding the cause of damage and also acknowledges being aware of the engineerin g principles applied to B’s report  appointing either engineer to do the floor level survey makes no difference as to which engineer should be relied on because the survey consists in measuring floor levels throughout the building with a measuring instrument, it does not require a certain engineering expertise. In light of this, the reasons presented by the FSP as to why B’s opinion should be disregarded are considered as insufficient. In order to reach an outcome, the Financial Ombudsman Service relies on what is fair in all circumstances Only the FSP has provided the Financial Ombudsman Service (FOS) with expert evidence. However, these reports have conflicting findings and the FSP has not provided a satisfactory explanation as to why one should be preferred over the other. Prior to its submission based on F’s report, the FSP on its Internal Dispute Resolution letter stated it could not cover additional damage that B had not identified but could agree to cover the damage as reported by B. As one can not fully rely on B’s or on F’s opinion, in order to achieve an outcome that is fair in all the circumstances, the following flexible approach is considered appropriate:  the damage, for which the FSP initially accepted cover as reported by B should be settled, as well as the damage F considers has not been caused by long term soil differential movement (the area near bedroom 4).  any other damage that was not identified by B, but later identified by F, should be excluded from cover. Case No: 345389 Recommendation Page 4 of 5 3 Supporting information 3.1 FOS approach for this dispute There has been a full exchange of relevant information between the parties and each party has had the opportunity to address the issues raised. In making this decision, the entire file, including all communications with and between the parties have been considered. The focus has been on the relevant material for the outcome. 3.2 Key Points from the engineers’ reports/statements Record Key points FSP’s engineer ( B ) Report 26 Mar 2013 Email 16 May 2013  Clay soils in this area are of moderate plasticity and typically have soil movement of 40mm. Wetting these soils from a relatively dry state will cause them to swell and rise.  House stumps tend to rise as the surface soils swell.  Differential movement of the house structure can occur when the wetting of the soils is not uniform across said structure.  The subfloor is built on a mixture of brick piers and concrete and timber stumps. The Applicant explained the area beneath the dwelling was inundated by the 2012 floodwaters.  Since the in undation, the Applicant has noticed one crack in the kitchen, floor dropping in the rear entry and the bathroom door not closing properly.  The recent inundation and wetting of the foundations soils could exacerbate house movements.  Due to the different typ e of stumps and piers, individual stumps may behave differently after being inundated.  The duress caused to the cornice and walls is caused by foundation movement due to soil saturation (soil losing strength) and/or soil swelling.  Damage to flooring and st umping at the rear entry, bathroom door and wall crack can be attributed to the inundation event.  The movement observed is attributed to the subfloor being inundated. When stump footings are inundated, some may heave and some may subside because the soil i s packed around a stump and water can penetrate down the stump hole and cause the stump to settle.  The floor has subsided and not heaved in this case. The trees have not caused the damage. FSP’s engineer ( F ) Report 20 Dec 2013  The site is relatively flat and is considered to have poor surface drainage . The ground floor is supported on concrete stumps.  F did not access the subfloor due to the very low clearance. Part of the subfloor is lower than the surrounding ground.  The floor levels survey indicates a m aximum of 74mm below datum (southeast corner of the sitting room) and 80mm above datum (bedroom 4). There is localised heave in bedroom 4.  There is general settlement towards the northeast corner of the house, Case No: 345389 Recommendation Page 5 of 5 where a group of medium and large trees.  The A pplicant says 300mm of rain fell over a few days in late February - early March 2012 and water leaked through the kitchen roof, damaging the kitchen and sitting room areas.  She says the subfloor was inundated, the subfloor soil remained damp for about 6 mont hs and the wall cracks appeared around June 2012 and have not worsened since.  The damage is cosmetic only with no structural damage observed. The cracking, gaps, cornice damage and binding doors/windows are all consistent with building movement.  The clay s oils at the site would be highly reactive and would experience significant volumetric changes when moisture content changes.  The floor level survey indicates a region of localised heave in bedroom 4, which indicates there is a potential leak in the hydraul ic services underneath this region of the house  The survey also indicates a general pattern of settlement towards the northeast corner of the house, which is in the general direction of a group of trees. Trees remove moisture from clay soils, resulting in settlement of nearby structures.  The floor levels at the southern and north - western sides are generally higher, which suggests the irrigation of garden beds in those regions is countering the tree root drying effects.  There are no irrigated garden beds in the northeast corner, thus this area is more prone to tree root drying of foundation soils.  The observed damage (with the possible exception of the area near bedroom 4) is due to ongoing long term differential soil movement caused by moisture content varia tions caused by highly reactive soils, tree root drying of foundation soils, seasonal changes in moisture contents and irrigation of the garden beds in the southern and north - western sides house.  The short term flooding of the site has not caused nor contr ibuted to the movement of the footings and building.  Clay soils typically have low permeability and generally form a barrier to stop ingress of stormwater. Therefore, it would take a considerable amount of water over a prolonged period of time (such as lea ks) to penetrate deep enough to create differential movement in the foundation soils.  The mould contamination observed in the bathroom ceiling is likely to have resulted from high moisture conditions due to inadequate ventilation of the bathroom during and after usage.  F notes the roof was repaired. It is unclear whether the mould in bedroom 4 occurred before or after these repairs. 3.3 Other information relied upon  The Product Disclosure Statement with preparation date 30 May 2008.  The renewal schedules for the periods 1 May 2011 to 1 May 2012 and 1 May 2012 to 1 May 2013.  The parties’ submissions. 44

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.