Scope of fire claim settlement: pool, fences, aerial, telephone and Foxtel cabling
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 345309 Determination Page 1 of 7
Case number : 345309 1 July 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim upon his Landlord Insurance policy for significant
fire damage to the insured property on 13 May 2012.
The FSP accepted the claim for a total rebuild of the insured dwelling and
associated structures. The Applicant remains dissatisfied with a number of
aspects of the claim relating to works completed and/or declined by the FSP
under the claim.
1.2 Issues and key findings
Is the Applicant entitled to indemnity for the outstanding issues/items that
remain in dispute between the parties?
The Applicant is entitled to some additional cover under the claim, however, not
all that has been listed as his expectation under the claim and referred to the
Service for consideration. The additional components of cover, the FSP is obliged
to include within its settlement, are set out within the Determination.
Is the Applicant entitled to compensation under 9.3 of Terms of Reference?
Having considered the available evidence the FSP is required to arrange payment
of $300 to the Applicant by way of compensation, in line with Section 9.3 of the
Service‟s Terms of Reference (ToR).
1.3 Determination
The Determination is in favour of the Applicant.
The FSP is to:
arrange for the swimming pool to be repainted
arrange payment of 25% of the cost to replace the southern fence.
arrange for the replacement of pot plants to the rear deck
arrange for the rear deck fence and side fence to meet pool regulatory
requirements
arrange for a five meter pole for the aerial to be installed
cover the cost associated with installation of the telephone and Foxtel line
arrange to pay the Applicant $300 by way of compensation under ToR.
pay interest at the statutory rate upon any cash settlement issued under the
claim (not including compensation amount), in line with Section 57 of the
Case No: 345309 Determination Page 2 of 7
Insurance Contracts Act 1984, from 17 December 2013, (date of its final
decision) till the date such payment is issued to the Applicant.
2 Reasons for Determination
2.1 Is the Applicant entitled to indemnity for the outstanding
issues/items that remain in dispute between the parties?
The Applicant has established an entitlement to some of the outstanding
issues/items in dispute
It is an accepted principle of insurance law that the onus rests with an insured to
prove, upon the balance of probabilities, that they have sustained a loss by an
event insured under the policy. Where the insured fulfils this onus, the burden
then shifts to the FSP to establish an entitlement to decline indemnity under the
policy.
It is clear the insured property suffered significant damage due to the insured
event „Fire‟ and which resulted in the FSP authorising the total demolition and
reconstruction of the dwelling. Accordingly, it is reasonable to expect a significant
scope of works of this nature may give rise to some issues, as has been the case
in this instance.
The parties were able to successfully resolve some of the issues in dispute and
the outstanding issues have been considered below:
Swimming pool and plumbing
One of the main issues in dispute between the parties relates to the swimming
pool, whereby the Applicant maintains the FSP‟s representatives left the pool area
in an inappropriate state i.e. soil and rocks from the demolition left in the pool as
well as the pool surface was left discoloured from the fire.
The available evidence establishes, on balance, the FSP arranged for the pool to
be cleaned on two occasions over the course of the c laim. Further, the
consultants determined there was no damage to the pool shell, however,
engineers “J” did note the pool finish was affected by the event and requires re-
repainting.
There is no evidence to suggest the FSP arranged to have the pool shell
repainted and it would seem the final position taken by the FSP was that the pool
was in its current state due to wear, tear and deterioration over time.
Although, the evidence does establish there was no structural and/or shell
damage arising from the fire, the FSP is obliged to authorise the re-painting of the
insured pool by a suitably qualified expert, in line with J‟s assessment.
The Applicant has raised concern regarding the FSP‟s representatives leaving the
pool plumbing (valves and taps etc), in a disassembled state exposed to the
elements. The evidence shows the FSP‟s representatives, as part of the
Case No: 345309 Determination Page 3 of 7
investigations into whether the pool was damaged due to the insured event, did
disassemble the pool filter and which was not reassembled after the assessment.
The evidence shows the pool filter had dangerous pre-existing damage which
prevented the FSP representative from reassembling the pool filter. Also, the
assessment supported by photographic evidence shows t he filter‟s seal and
valves in a poor and corroded condition. A leak was found in the pool pipe work
under the concrete about one metre from the pool which was not related to the
fire event.
In the circumstances I am not satisfied that the FSP should be responsible for the
reassemble and/or repair of the pool filter.
Laundry
The Applicant details that the FSP ‟s authorised plans for the reconstruction of the
insured dwelling, failed to include a laundry, which was present prior to the loss.
Arising from this, the FSP‟s builder accommodated a laundrette into the kitchen
area which affected the space in the kitchen. The Applicant, however,
acknowledges that now the construction of the home is complete , there is nothing
much that can be done to resolve this matter.
The FSP acknowledges the construction plans/scope of works (SOW), did not
include a laundry. However, the FSP maintains that all the construction works
completed under the claim were subject to the Applicant‟s approval , having
discussed his options with the architect and after which they were submitted to
Council for approval. It is unfortunate the Applicant failed to identify, prior to giving
the FSP the go ahead to register plans with the Council, that they did not include
a laundry within the dwelling.
Having considered the evidence, it does establish on the balance of probabilities,
that the construction of the dwelling did take place on the basis of plans
authorised by the Applicant, after having discussed his options with the architect
and also after having received approval from the Council. Accordingly, the FSP is
not to be held liable for the omission of the laundry from the scope of works.
Driveway and driveway entrance
The Applicant notes that the new driveway authorised under the claim by t he
FSP, is not the same as the original, with a definite narrowing and curve evident.
Also, the Applicant maintains the driveway entrance was damaged during the
course of the works authorised under the claim, arising from heavy machinery
traffic.
The FSP accepts the new driveway is not identical to the original driveway
however this is not due to error. Rather it had to be positioned slightly differently
for certification purposes, having regard to boundary setbacks. Also, as was the
case with the laundry, these works were only authorised after having obtained the
Applicant‟s approval a nd submitting the plans to the Council.
The Applicant has not provided any evidence to establish a ny prejudice arising
from the slight variation in the construction of the driveway and/or that it was not
Case No: 345309 Determination Page 4 of 7
required to be constructed in such a way, as claimed by the FSP. In the absence
of evidence to the contrary, I accept the FSP has fulfilled its obligations in this
respect under the claim.
In regards to the cracking of the concrete driveway entrance, the evidence shows,
this area did not form part of the newly constructed driveway. Also, photographic
evidence made available by the FSP, shows this concrete area had pre-existing
cracking prior to the insured event.
Accordingly, the Applicant has not established, on the balance of probabilities,
that the cracks to this concrete area were due to circumstances covered under or
arising from the claim.
Rear Deck
The Applicant says the rear deck has been constructed 600mm shorter than the
original deck destroyed by the fire. Also, there were dangerous burrs and nails left
protruding. The deck was left covered in dirt, with some pot plants killed down the
south side.
The FSP provides the deck was shortened due to existing setback at the property
and that this required redesign from the original specifications. As has been
advised previously, the authorisation and completion of these works was subject
to the Applic ant‟s approval of the rebuild plans. The FSP arranged for its assessor
to attend and inspect the quality of the decking and he signed off on the
workmanship.
The Applicant has not provided any evidence to counter the FSP‟s position in this
regard and/or the fact that the FSP had no choice but to redesign the deck from
its original specifications, for the purposes of Council approval.
The Applicant maintains there were several pot plants killed, arising from the
works authorised by the FSP. The FSP has not responded to this loss and
therefore, in the absence of contrary evidence, the FSP is to arrange
replacement/settlement for this component of the Applicant‟s claim.
Ceiling Batts/Insulation
The Applicant was of the opinion the FSP would authorise installation of pink
ceiling batts as he believes these are mandatory. Further, the Applicant had
originally installed foil insulation prior to the fire event.
The FSP having considered this aspect of the Applicant‟s concerns , confirms that
insulation and sarking have been installed under the metal roof and therefore
there is no requirement to install pink ceiling batts. Further, the Applicant has not
made available any evidence to establish the alleged mandatory requirement to
install the insulation batts.
The available evidence from appropriately qualified consultants establishes, on
balance, that the rebuild process of the insured dwelling includes the installation
of insulation and sarking underneath the metal roof. Accordingly, the Applicant, in
Case No: 345309 Determination Page 5 of 7
the absence of substantiating evidence, has not established an entitlement for the
FSP to also install insulation batts, in addition to the works already completed.
Fencing
The Applicant states that the southern fence (old and small) had to be rebuilt by
his neighbour and the Applicant, as it was damaged by fire fighters during the
course of fighting the fire. Accordingly, the demolitions team removed the entire
existing southern fence after the fire. Also, the top rear deck gate and side fence
are not high enough to be pool compliant, for which the Applicant was issued with
a Council notice. The northern fence was settled by way of a cash settlement by
the FSP, however, on inquiry, the settlement amount is not enough to undertake
the work as it will cost a lot more to remove the old burnt out posts.
The FSP states on investigating the southern fence claimed it was found this was
a fibro-asbestos fence and which was not damaged due to the insured event.
Further, the Applicant had paid the demolitions team an additional fee to remove
this fence. The Applicant was asked for some evidence to establish his claim this
fence had been damaged, however, no such evidence has been provided.
The available evidence, on balance, establishes that sections of all fences at the
property were actually damage by the fire and/or in the effort to extinguish the fire.
However, there is no evidence to support the total replacement of the southern
side fence nor does this seem to be a reasonable position. In saying that,
considering the significance of the event and damage as a whole , it is not
unreasonable to accept this fence may have received some damage.
Accordingly, considering what is fair in the circumstance and accepting the
southern fence did not require total replacement, the FSP is to provide indemnity
to the extent of 25% of the total costs incurred by the Applicant‟s neighbours and
the Applicant, in this regard.
In relation to the issues identified with the top rear deck gate and side fence
installed in or around the pool area, during the course of repairs, the FSP (if it has
not already done so), is obliged to arrange for these aspects of the repairs to be
corrected, so to ensure they meet compliance requirements.
TV Aerial
The Applicant advises the replaced TV aerial is not installed to a similar height to
the aerial in place prior to the loss, which was five meters high. The Applicant is
aware of this as he maintains the property lies in a black spot and so he had to
install the aerial on a five meter high pole.
The FSP in addressing this concern has referred to it replacing the aerial with a
new digital model and was therefore an upgrade of the aerial. This may be the
case, however, the concern raised by the Applicant relates to the height at which
the aerial has been installed and not the aerial itself.
Accordingly, in the absence of a five meter pole being installed by the FSP, it is
obliged to arrange for the installation of the aerial upon a five meter pole and/or
cash settle the Applicant for the reasonable cost to do so.
Case No: 345309 Determination Page 6 of 7
Telstra and Foxtel cables
The Applicant is seeking indemnity for the costs associated with the reconnection
of Telstra and Foxtel lines, which were in place prior to the insured event. The
FSP has refused to extend indemnity on the basis these connections fall outside
the scope of the policy and are not considered a building item under the policy.
The Product Disclosure Statement (PDS) on pages 7 and 8 (What we cover – the
landlord building) states that the building includes services, whether above or
below ground, that are your property or for which you are liable. I am satisfied that
a telephone line and Foxtel cable reasona bly falls within the scope of „ Services ‟
and therefore the FSP is obliged to cover the Applicant for costs associated with
installation of the telephone and Foxtel line (not the phone or Foxtel connection
itself, rather the cable, plugs etc).
The coverage for these services only extends to that part of the service which is
the Applicant‟s property or for which the Applicant is liable, as required by the
policy provisions.
Concrete works
The Applicant maintains the concrete works to the north side of the dwelling were
not deemed necessary by t he FSP‟s contractor(s). The Applicant proceeded to
arrange for these works to be done at a cost of $1,800. The FSP states the
Applicant has not made available any evidence to establish the alleged additional
concrete work was required due to the insured event and/or of the costs claimed
to have been incurred by him.
The onus rests with the Applicant to establish the loss claimed is due to
circumstances for which the policy provides cover i.e. an insured event. In the
absence of such evidence the FSP is not obliged to extend indemnity to the
Applicant in this regard. However, if the Applicant is able to provide evidence to
establish such entitlement to the FSP, it is obliged to take this into consideration
under the claim.
2.2 Is the Applicant entitled to compensation under 9.3 of the
Services Terms of Reference (ToR)?
The Applicant is entitled to compensation under ToR
I consider the following FOS Terms of Reference relevant to this dispute:
“ 9.3 Other compensation
a) …
...
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial loss but
only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant‟s expectation of
enjoyment or peace of mind has occurred; or
Case No: 345309 Determination Page 7 of 7
(ii) …
The maximum amount of compensation for non-financial loss will be $3,000 per
claim made in the Dispute.
c) …”
Under 9.3(b) of the Terms of Reference (TOR) there must be an unusual degree
or extent of physical inconvenience, time taken to resolve the situation or
interference with the Applicant‟s expectation of enjoyment or peace of mind has
occurred before compensation for non-financial loss may be determined.
In line with the matters discussed above, the available evidence a nd the FSP‟s
clear commitment to a stress and hassle free claims experience, it is accepted
that the FSP‟s error in excluding from cover certain aspects of the Applicant‟s
claim will have resulted in an unusual degree of interference with both his and his
family‟s expectation of enjoyment and peace of mind. Therefore , the FSP is to
arrange payment of $300 to the Applicant by way of compensation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.