Home / Financial Firm (Unknown - Insurer) / Determination 344359
Determination 344359
Mould damage and loss of rent claim denial after cyclone
Summary
After Cyclone Oswald, the landlord sought reimbursement for mould remediation, ceiling and insulation repairs and lost rent, having already received a cash settlement of $4,660.04. AFCA found the mould growth resulted from the applicant's repairers' inadequate work, which the policy excludes.
The policy excludes damage from faulty building work and consequential loss, and loss of rent was not covered because the optional cover was not elected.
Issues
- Claim denial primary · not upheld
“the FSP is not liable for the costs incurred by the Applicant as a result of the additional mould growth, due to the policy exclusions for faulty building work”
- Delay secondary · not upheld
“The available information establishes that the FSP acted promptly to assess the Applicant's claim”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 344359 Determination Page 1 of 5
Case number : 344359 22 October 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim under his landlord insurance policy with the
Financial Services Provider (FSP) for damage to his investment property following
Cyclone Oswald in January 2013.
The FSP initially denied the Applicant’s claim but later agreed to cash settle him
for the cost of repairing the internal damage to the property, based on a quote
provided by his preferred repairer.
However, the Applicant also wants the FSP to reimburse him for costs incurred in
removing mould from the property and repairing the ceilings and roof insulation.
The Applicant says that the FSP should be responsible for these costs as it failed
to advise him to remove the damp roof insulation, which caused the mould to
develop. He also seeks compensation for loss of rent during the period when the
property was uninhabitable due to mould.
1.2 Issue and key findings
Is the FSP required to reimburse the Applicant for the mould-related repair
costs?
The additional mould growth following the storm occurred due to the failure of the
Applicant’s repairers to take appropriate steps to address the known mould issues
Damage caused in this manner is excluded under the policy. The FSP complied
with its obligations under the policy by cash settling the Applicant based on
quotes provided by his repairers. It was not obliged to provide the Applicant with
advice about the repairs required.
Is the Applicant entitled to compensation?
The Applicant’s policy does not provide co ver for loss of rent. The FSP was not
responsible for the additional mould growth and therefore is not liable for a ny
losses incurred by the Applicant as a result.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not required to make any further payment to the Applicant.
Case No: 344359 Determination Page 2 of 5
2 Reasons for Recommendation
2.1 Is the FSP required to reimburse the Applicant for the mould-
related repair costs?
Policy provides cover subject to exclusions
The Applicant’s po licy provides cover for damage caused by the specific events
listed in the policy (including storm). The policy schedule shows that the Applicant
had elected to take out optional cover for accidental damage.
The cover provided under the policy is subject to exclusions for loss or damage
arising from or connected with:
faulty design or workmanship;
any building work; and
failure to keep the property in good repair.
The Applicant says that the exclusions under the policy should not apply because
he was never provided with a copy of the product disclosure statement (PDS) for
the policy.
The Applicant arranged his policy through a broker. In these circumstances, the
FSP is deemed to have provided the Applicant with the policy documentation
when it provided a copy of the PDS to the Applicant’s broker.
Accordingly, the FSP is entitled to re ly on the terms and conditions of the policy
as set out in the PDS and the policy schedule.
FSP cash settled the Applicant for repair of the internal damage
Under the terms of the policy, if the FSP accepts a claim for property damage, it
may decide whether to repair the damage or pay the Applicant the cost of
repairing the damage.
After the Applicant lodged his claim in February 2013, the FSP asked the broker
to provide photographs of the damage and a quote for the necessary repairs. The
broker provided this information on 13 March 2013.
The FSP appointed an assessor (C) to inspect the property in late March 2013.
After reviewing C’s report , the FSP declined the Applicant’s claim on the basis
that the damage had been caused by water entering the property due to pre-
existing maintenance issues with the roof, rather than because of the storms.
Following a further assessment of the property by the FSP’s building consultant
(M) in April 2013, the FSP maintained its view that the existing condition of the
roof had contributed to the storm-related damage. However, the FSP decided to
accept the Applicant’s claim for the internal water damage caused by water
entering through the roof, as well as for a portion of the roof repairs.
In May 2013, the FSP cash settled the Applicant for $4,660.04, based on quotes
obtained by the Applicant from two contractors (PS and BB), copies of which had
Case No: 344359 Determination Page 3 of 5
been provided to the FSP by the broker in March 2013. The Applicant
subsequently arranged for most (if not all) of the repairs to be completed.
FSP is not responsible for additional mould damage
In late 2013, it became apparent that there was extensive mould growth in the
ceilings throughout the property. The Applicant says that this occurred due to the
failure to remove and replace roof insulation batts which had become damp when
water entered the ceiling cavity during the storms in January 2013.
It is clear from the photographs and other information provided that mould
damage was apparent in the months following the storm. The quotes obtained by
the Applicant from his repairers variously noted that there was:
a “high degree of mould growth on the ceilings and walls [in] most areas of the
house” which creat ed a potential health risk (quote prepared by PS); and
mould growth where water had seeped through the gyprock ceiling in the
living/dining areas and a considerable amount of mould on the bathroom
ceiling (quote prepared by BB).
The Applicant selected the repairers and authorised the repairs. However, it
appears that the works carried out by the Applicant’s repairers were not adequate
to address the known mould issues, which resulted in the further growth of mould
throughout the enclosed ceiling cavity. Damage caused in this manner is not
covered under the policy, due to the exclusion for faulty building works.
While the FSP agreed to cash settle the Applicant for the cost of the repairs, it did
not choose the repairers, approve the scope of works or authorise the repairs. In
these circumstances, the FSP is not responsible for the failure of the repairers to
take necessary steps to prevent the further growth of mould throughout the
property.
The FSP complied with its obligations by cash settling the Applicant for the cost of
the repairs (which, based on the quotes provided, included addressing the mould
issues).
The Applicant says that the FSP is responsible for the mould damage because its
assessors (C and M) failed to advise him to remove the damp insulation batts
when they initially attended the property in March and April 2013. The Applicant
also says that M failed to identify the mould issues when he re-attended the
property in September 2013 to investigate the tenant’s con cerns about an
unpleasant smell.
However, the primary purpose of the assessors’ attendance at the property was
to:
identify the cause of damage so that the FSP could assess whether the claim
fell within the scope of cover under the policy; and
consider whether the quotes provided by the Ap plicant’s repairers were fair
and reasonable, given the extent of the damage (in the event that the FSP
decided to accept the claim).
Case No: 344359 Determination Page 4 of 5
The assessors were not under any obligation to advise the Applicant of the
repairs required to address the damage. The Applicant had already obtained
advice from his own contractors regarding the extent of repairs required.
While it appears that M failed to identify the presence of mould in September
2013, he did not have any obligation to the Applicant to do so. Further, M’s
findings did not prejudice the Applicant, as the FSP was not liable under the terms
of the policy for the additional mould growth, due to the policy exclusions for loss
or damage caused by faulty building work.
Accordingly, the FSP is not liable for the costs incurred by the Applicant as a
result of the additional mould growth.
2.2 Is the Applicant entitled to compensation?
Policy does not provide cover for loss of rent
The Applicant seeks compensation for loss of rent for the three and a half month
period during which his property was uninhabitable due to mould growth.
The Applicant’s policy expressly excludes cover for consequential loss of any kind
(other than loss of rent if the schedule specifies that this is covered under the
policy).
The policy schedule clearly shows that the Applicant did not elect to take out
optional cover for loss of rent. While the Applicant has provided a copy of an
invoice from his broker which refers to cover for loss of rent, this invoice relates to
a quote provided by another insurer, and not to the policy issued by the FSP.
The mould growth which resulted in the Applicant’s tenants vacating the property
was caused by the inadequate repairs carried out by the Applicant’s repairers,
and not by the actions of the FSP or its contractors.
Accordingly, the Applicant is not entitled to compensation for loss of rent.
FSP handled the Applicant’s claim appropriately in the circumstances
The available information establishes that the FSP acted promptly to assess the
Applicant’s claim, particularly given the volume of claims experienced by insurers
in the wake of Cyclone Oswald. In the circumstances, it was reasonable for the
FSP to propose that the initial reports and repair quotes be obtained b y the
Applicant.
While the Applicant says that the FSP unreasonably delayed the initial
assessment of his claim, copies of email correspondence between the FSP and
the Applicant’ s broker indicate that the FSP’s assessor (C) attended the premises
within around two weeks of the broker providing the information requested by the
FSP to assess the claim.
The Applicant has also raised concerns about the decision of the FSP’s Internal
Dispute Resolution (IDR) department to uphold the denial of his claim, based on
mould testing undertaken at the property after mould remediation works had
already been completed. While the Applicant’s concerns are understandable, he
Case No: 344359 Determination Page 5 of 5
has not suffered any loss as a result of the FSP’s actions in this regard, given my
finding that the FSP was entitled to deny his claim.
Accordingly, the Applicant is not entitled to any compensation as result of the
manner in which the FSP has handled his claim.