Home / Financial Firm (Unknown - Insurer) / Determination 343358
Determination 343358
Landslide damage claim partly declined (soil stabilisation, water tanks, sewerage system)
Summary
The landlord claimed for landslide damage to soil, water tanks, the sewerage system and a fence; the FSP declined the whole claim and later accepted part of it. AFCA rejected the soil stabilisation claim, ordered payment for the sewerage system, fence and water tanks with interest, $750 non-financial loss and legal costs up to $3,000.
The policy's buildings definition covers water supply infrastructure but excludes loose or compacted soil, and the delays and IDR failure justified non-financial loss and legal costs under the Terms of Reference.
Issues
- Claim denial primary · upheld
“The FSP is responsible for the cost of relocating the water tanks because damage to the water tanks falls within the definition of building.”
- Complaint handling failure secondary · upheld
“the FSP has not provided the Applicant with its IDR decision with respect to the denial of part of his claim.”
- Delay secondary · upheld
“It is unclear why it took nearly three months from the Applicant's original claim to notify the Applicant of an intention to decline the claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 343358 Determination Page 1 of 5
Case number : 343358 2 7 June 2014
1 Overview
1.1 Dispute
The Applicant‟s property experienced heavy rainfall which caused a landslide on
12 April 2013. A claim was subsequently lodged under the Applicant‟s landlord‟s
insurance policy for damage sustained to the sewerage treatment system, water
tanks and fence.
On 21 April 2013 the FSP declined the Applicant‟s claim in its entirety. Following a
request for IDR, the FSP notified the Applicant‟s solicitors that it was prepared to
meet:
the cost replace the property‟s sewerage treatment system
the cost reinstate th e relevant piping and plumbing for the property‟s
sewerage and water tanks
50% of the cost to replace fence in the affected area.
The Applicant disputes the continued refusal of indemnity for the costs to:
rectify and stabilise the soils in the landslip area ($48,205)
relocate two water tanks ($2,035).
1.2 Issues and key findings
Is the FSP responsible for cost to rectify and stabilise soils in landslip area?
The FSP is not responsible for the cost to rectify and stabilise the soils in the
landslip area because:
The policy only extends to cover damage to buildings
Buildings include infrastructure services for the supply of electricity, gas, water
etc. Buildings do not include loose or compacted soil, gravel, pebbles, rocks or
sand.
Is the FSP responsible for cost to relocate the water tanks?
The FSP is responsible for the cost of relocating the water tanks because:
Damage to the water tanks falls within any definition of „building‟ as the water
tanks are part of the infrastructure for the supply of water
The piping and plumbing to the water tank was damaged as a result of
landslide within 72 hours of the heavy rainfall.
As a result of the landslide, the water tanks were damaged in that the damage
to the piping and plumbing caused detriment to the usefulness of the water
tanks.
Case No: 343358 Determination Page 2 of 5
Is the Applicant entitled to compensation pursuant to paragraphs 9.3 and
9.4 of the Terms of Reference?
The Applicant is entitled to compensation pursuant to paragraph 9.3 of the Terms
of Reference of $750.
The Applicant incurred legal costs as a result of the conduct of the FSP.
The Applicant is entitled to compensation for legal costs of up to $3,000 pursuant
to paragraph 9.4 of the Terms of Reference.
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP is entitled to decline liability for the cost of reinstating and stablising the
collapsed soil . Otherwise, the FSP is liable to meet the Applicant‟s claim.
The FSP is to pay interest at the statutory rate from the date the Applicant
incurred these costs until the date the claims are settled:
$19,740, being the cost to replace the damaged sewerage system
$528, being 50% of the cost to replace the damaged fence.
$2,035 being the cost to relocate the water tanks.
The FSP is to pay the Applicant $750 pursuant to paragraph 9.3(b)(i) of the Terms
of Reference.
The FSP is to pay the Applicant legal cost up to a maximum of $3,000 under
paragraph 9.4 of the Terms of Reference.
Case No: 343358 Determination Page 3 of 5
2 Reasons for Determination
2.1 Is FSP responsible for cost to reinstate collapsed soil?
Policy o nly covers loss or damage to “buildings”
Whilst the principle of indemnity ordinarily requires the FSP to place the Applicant
back to his pre-loss condition, it is not a principle of blanket application in all
instances.
The extent of the Applicant‟s entitlement to indemnity is also dependent on the
specific terms of his policy which, in this instance, is limited to structures the policy
specifically regards as “buildings”.
Soils at property not considered “buildings”
The property provides accidental damage cover for residential buildings and
includes in the definition of residential buildings „infrastructure for the supply of
electricity, gas, water and internet.‟ The policy specifically does not include within
the definition of buildings “loose or com pacted soil, gravel, pebbles, rocks or
sand.”
The policy does not extend to cover loss or damage sustained to loose or
compacted soil, gravel, pebbles, rock or sand and therefore does not extend to
indemnify the Applicant for the cost of rectifying and stabilising the soil affected by
the landslide.
2.2 Is FSP responsible for cost to relocate water tanks
The FSP is liable to meet the costs of damage sustained to the water tanks
including the costs to relocate the water tanks.
The policy includes in the definition of „buildings‟ cover for infrastructure for the
supply of electricity, gas, water etc. The water tanks would fit within the policy
definition of „building‟.
There is evidence that the water tanks were damaged in that the piping and
plumbing to the water tanks were damaged during the landslide which occurred
within 72 hours of the heavy rain.
Whilst there was no apparent physical damage to the actual water tanks, the
tanks were left in a precarious position as a result of which they were damaged i n
that their usefulness was significantly compromised.
Whilst it is arguable that as the water tanks were not physically damaged (other
than the piping and plumbing that they are not covered) it is only fair in the
circumstances that the Applicant be entitled to have the water tanks reinstated to
the position they were in prior to the landslip.
In order to reinstate the water tanks to their former usefulness, it was necessary
for the Applicant to relocate the water tanks. In relocating the water tanks, the
Applicant was required to alter the nature of the piping and plumbing works.
The FSP should be liable to meet the costs of relocation of the water tanks and
costs of the piping and plumbing works.
Case No: 343358 Determination Page 4 of 5
2.3 Should Applicant be entitled to compensation under paragraphs
9.3 and 9.4 of the Terms of Reference?
The FSP should pay compensation pursuant to paragraph 9.3(b)(i) of the Terms
of Reference in the sum of $750 and pay legal costs pursuant to paragraph 9.4 of
the Terms of Reference.
Paragraph 9.3(b)(i) of the Terms of Reference provide that the Service may award
compensation up to $3,000 where there has been an unusual amount of time
taken to resolve an Applicant‟s claim or the process has caused an unusal
physical inconvenience.
The evidence indicates the FSP received advice that part of the claim at least
should have been covered. This advice was received at some stage between 15 th
and 24 April 2013. Despite this advice, the FSP declined the entire claim on 11
July 2013, relying on an engineer‟s report dated 8 May 2013.
It is unclear why it took nearly three months from the Applicant‟s original claim to
notify the Applicant of an intention to decline the claim.
Although it is arguable that the initial delay was partly attributable to the
complexity of the claim, the Applicant has been significantly inconvenienced as a
result of the initial denial of the claim by the FSP the Applicant having to:
seek legal assistance with respect to the claim denial
proceed with the repairs to his property at his own cost, which was fairly
substantial and which he should not have had to bear in full.
The FSP notified the Applicant‟s solicitors of acceptance of part of the claim on 12
September 2013.
Despite the Applicant forwarding various invoices and quotations to the FSP on 1
October 2013 and again on 22 October 2013 as at 18 December 2013, the FSP
had not paid the Applicant‟s claim.
Further, the FSP has not provided the Applicant with its IDR decision with respect
to the denial of part of his claim. This is despite the request for an IDR review on
21 August 2013.
The Applicant has been required to endure significant delays and inconvenience
in the processing of this claim and in the circumstances, I am satisfied it is
appropriate that the FSP pay the Applicant $750 pursuant to paragraph 9.3(b)(i)
of the Terms of Reference.
Further, as the Applicant was required to engage solicitors to deal with what is a
complex matter, I determine the Applicant is entitled to payment of legal costs up
to $3,000 subject to production of relevant invoicing, pursuant to paragraph 9.4 of
the Terms of Reference.
3 Supporting information
3.1 FOS approach to dispute
As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Case No: 343358 Determination Page 5 of 5
Reference. The dispute has not been the subject of a Recommendation and has
proceeded directly to Determination.
There has been an exchange of the material on which the parties rely and the
parties have had the opportunity of responding to the issues raised. Whilst all of
the material was reviewed, this Determination only refers to the information that is
relevant to explaining the outcomes reached .
3.2 Relevant policy wordings
Your buildings include:
residential buildings …
domestic outbuildings
…
infrastructure for services, including infrastructure for the supply of… water
items built in, fixed to, or on the buildings
…
Your buildings do not include:
…
loose or compacted soil, gravel, pebbles, rocks or sand
…
Landslide or subsidence
We will cover your buildings… for loss or damage as a result of subsidence.
We will only do this if the loss or damage occurs within 72 hours of:
…
a storm or flood, including rainwater or wind…
3.3 Relevant FOS Terms of Reference
9.3 Other compensation
…
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve the
situation or interference wi th the Applicant‟s expectation of enjoyment or peace of
mind has occurred…
…
The maximum amount of compensation for non-financial loss will be $3,000 per claim
made in the Dispute.
9.4 Applicant’ s costs in pursuing the matter
FOS may decide that the Financial Services Provider contribute to the legal or other
professional costs or travel costs incurred by the Applicant in the course of the
Dispute. Unless exceptional circumstances apply, FOS will not require the Financial
Services Provider to contribute more than $3,000 to these costs.