Home / Financial Firm (Unknown - Insurer) / Determination 343049

Determination 343049

Denial of storm water damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2015-03-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$35,958
Non-financial loss—
Amount claimed$71,911
SourceAFCA PDF

Summary

The applicants claimed for cellar clean-up after a July 2011 storm and the FSP denied liability for the inundation. AFCA found the FSP liable under the storm cover but ordered it to pay only half of the claimed clean-up costs, with interest, because the applicants' delay prejudiced the FSP.

The FSP bore the onus of proving an exclusion and could not establish one, but the applicants' unreasonable delay in lodging the claim justified sharing the clean-up costs equally.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 343049 Determination Page 1 of 8 Case number : 343049 20 February 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) after their property suffered damage during a storm in July 2011. The FSP arranged for the repair of water damage to the ceilings of the property. However, it denied liability for the damage caused by mud and water inundating the cellar during the storm, on the basis that the Applicants had failed to maintain the property while they were undertaking renovations. The FSP also says that it has been prejudiced by the delay of almost fifteen months before the Applicants lodged their claim. The FSP offered to contribute $10,000 towards the costs incurred by the Applicants in cleaning the cellar, on an ex gratia basis. However, the Applicants have rejected this offer and seek reimbursement for the full amount of their clean- up costs (being $71,911.45), plus interest. 1.2 Issue and key findings Is the FSP entitled to deny the Applicants’ claim? The Applicants have established a prima facie claim under the policy for damage caused by stormwater run-off. The available information does not establish that, on the balance of probabilities, the inundation of the cellar was caused by factors which are excluded under the policy. Accordingly, the FSP is liable for the claim. How should the claim be settled? The Applicants’ delay in lodging the claim denied the FSP the opportunity to accurately assess its liability and manage the clean-up process. In these circumstances, it is fair that the clean-up costs are shared between the Applicants and the FSP on an equal basis. 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is to pay the Applicants the amount of $35,958, together with interest on this amount in accordance with section 2.2 below. Case No: 343049 Determination Page 2 of 8 2 Reasons for Determination 2.1 Is the FSP entitled to deny the Applicants’ claim ? Policy provides cover unless FSP can show an exclusion applies It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. The Applicants’ pol icy provides cover for damage to their property caused by the events listed in the policy (including the insured event of storm), subject to the conditions and exclusions set out in the policy. The insured event of storm includes cover for damage caused b y the sudden, excessive run-off of water as a direct result of a storm in the local area. The Applicants have provided photographs showing their cellar inundated by mud and water during the storm in July 2011. The engineer (IC) appointed by the FSP has confirmed that a significant (if not the sole) source of this water was stormwater run-off. Accordingly, the Applicants have established a prima facie claim under the policy. In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicants’ claim. The FSP says that it is not liable because the damage to the cellar was caused by one or more of the following factors, each of which is excluded under the policy:  water entering through an opening in the roof or walls that was not created by the storm;  water entering through tarpaulins or fixings set up while the Applicants were renovating their home;  the Applicants failing to maintain their home in good repair and condition (that is watertight, structurally sound, secure and well maintained); and/or  faulty design or workmanship that the Applicants knew about or should reasonably have known about. In order to establish an exclusion applies, the FSP must show that the proximate cause of the damage to the Applicants’ cellar (that is, the real, effective or dominant cause) was one or more of the excluded factors outlined above. Available information does not clearly establish cause of inundation The available information establishes that at the time of the storm, the Applicants had commenced substantial renovations to their property (No.6) in conjunction with the owners of the neighbouring semi-detached property (No.4). The renovations to the Applicants’ property included the underpinning of the rear part Case No: 343049 Determination Page 3 of 8 of the property and the construction of a new two storey extension. Around the same time, the owners of the neighbouring property on the other side (No. 8) had installed an in-ground concrete pool in their rear yard. Both parties have provided a considerable amount of information about the condition of the Applicants’ property at the time of the storm, including the possible implications of the various building activities being undertaken. However, despite this, neither party has been able to establish with any certainty precisely how the Applicants’ cellar came to be inundated by mud and water in July 2011. The engineer (IC) appointed by the FSP to determine the cause of the inundation initially concluded that it had occurred due to the lack of adequate overland stormwater drainage around the house prior to and/or during the extensive renovations carried during the first half of 2011. In particular, IC noted the lack of paving or overland drainage to the narrow pathway along the western side of the house. IC commented that, due to the slope of the land, water would drain alongside the western wall, where there were periodic depressions left by underpinning excavations carried out in preparation for the construction of the rear extension. IC noted that the original in-ground drainage system which flowed to a rubble pit in the rear yard of the Applicants’ property would also have been interrupted by the underpinning works. The Panel notes that, by the time IC inspected the property in October 2013, not only had all of the mud and water resulting from the inundation been removed from the cellar, the Applicants had also undertaken further works to the cellar area, including the installation of a reinforced concrete floor slab incorporating a sump pit, submersible pump and associated drainage system. Additional underpinning works and the construction of the two store y rear extension had also been completed. Accordingly, at the time of IC’s inspection, the site bore little resemblance to its condition at the time the inundation occurred. The Applicants have since provided information (including photographs and invoices) which appears to contradict some of the assumptions on which IC based his conclusions. In particular, the Applicants say that:  the paving on the pathway at the western side of the house was never removed, but was covered by a layer of soil to provide a ramp for contractors to access the neighbouring property (No. 8) and therefore would have continued to provide a barrier to water run-off;  the underpinning of the western wall (which IC has referred to as creating depressions in the ground) was not undertaken until after the storm in July 2011, while the earlier underpinning works related to the internal party wall only and therefore would not have affected the drainage along the western wall; and  the in-ground drainage system remained in place throughout the renovations and was not compromised by the underpinning works carried out prior to the storm. Case No: 343049 Determination Page 4 of 8 Following the provision of this additional information, IC confirmed his earlier view that the drainage along the western wall was inadequate, on the basis that the layer of soil on the pathway would have prevented the free drainage of overland stormwater run-off. In a subsequent report dated November 2014, IC concluded that the stormwater must have entered the cellar through the side pathway as the result of the underpinning works (despite the additional information provided by the Applicants as to the timing of these works). However, IC also suggested that:  water may have entered through the southern wall of the cellar as a result of excavation works undertaken in connection with the installation of the concrete slab for the new extension at the rear area of the property; and  the various excavation works undertaken at the property may have led to a build-up of soil in the cellar, and may also have resulted in groundwater seepage to the cellar due to changes in soil conditions. The Panel notes that IC has also referred to the potential for overland run-off to drain into the Applicants’ property from the neighbouring property at No. 8, due to the absence of a retaining wall or any overland drainage next to the house and rear yard at No. 8. Accordingly, while IC was confident that the inundation of the cellar had been caused by the lack of sufficient drainage in the context of the extensive renovation works being undertaken at the time of the storm, he was unable to identify exactly how the water had entered the cellar. However, the Panel notes that IC’s task in this respect was undoubtedly made more difficult as a result of the significant changes to the property which had occurred by the time IC undertook his inspection. Despite the male Applicant’s qualifications as a structural engineer, the Applicants have also been unable to identify how the stormwater made its way into the cellar. In this regard, the Panel notes that:  t he FSP’s records suggest that, when the Applicants lodged their claim, they indicated that the inundation was due to the drainage conditions at their property having been adversely affected by their neighbours’ renovations;  the FSP’s builder (DW) reported that the Applicants had advised him that the inundation was attributable to the installation of the in-ground pool at No.8;  additional information provided by the Applicants later in the claim process indicated that they believed that the water had entered at the ground level on the western side of the property (which the Panel notes is consistent with IC’s views as to the primary cause of the inundation); and  the Applicants now consider the path by which the water flowed into the cellar to be “unknown”, although they hypothesise that the water initially built up in the sub-floor area under the original part of the house and then flowed down hill into the cellar. Case No: 343049 Determination Page 5 of 8 Available information does not establish inundation was caused by excluded factors As outlined above, the onus rests with the FSP to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicants’ claim. Having carefully considered the various explanations provided by the parties, the Panel is of the view that the point of entry of the stormwater into the cellar (and therefore the proximate cause of the inundation) remains unclear. In these circumstances, the Panel is not satisfied that the FSP has established the application of any of the specific exclusions on which it has sought to rely. In relation to each of these exclusions, the Panel notes that:  the available information does not establish that the water entered through an opening in the roof or the walls. While the FSP’s engineer (IC) has identified the southern wall of the cellar as a potential point of water entry, he has also identified a number of other possible entry points;  there is no suggestion that the water entered the cellar through a tarpaulin or any other fixing installed during the renovations. While the damage to the ceilings (for which the FSP has accepted liability) was caused by water entering through a tarpaulin blown off during the storm, IC has confirmed that this did not contribute to the inundation of the cellar;  given the lack of certainty as to the source of the inundation (and the various alternative explanations offered), there is insufficient information to conclude that the inundation was caused by the Applicants’ failure to adequately maintain their property during the renovations; and  likewise, the FSP has not established any specific failure of design or workmanship which can be considered to be the proximate cause of the inundation. Accordingly, under the terms of the policy, the FSP is liable for the Applicants’ claim. 2.2 How should the claim be settled? FSP has been prejudiced by Applicants’ delay in lodging claim The Applicants did not lodge their claim until October 2012, approximately fifteen months after the inundation occurred. Further, it appears that they did not advise the FSP of the extent of the clean-up costs they were seeking until April 2013. The Panel considers that the FSP has been p rejudiced by the Applicants’ delay in lodging their claim. In addition to the prejudice caused by the delay itself, the FSP has also been prejudiced by the significant additional works undertaken at the property during the intervening period. As outlined above, the extensive changes made to the property have necessarily made it difficult for the FSP and its contractors to determine how the claimed damage occurred. Further, the fact that the Applicants had already incurred significant clean-up costs over a period of thirteen months before they lodged their claim meant that Case No: 343049 Determination Page 6 of 8 the FSP was denied the opportunity to assess the extent of the works reasonably required and obtain quotes from its preferred contractors to undertake the necessary works. The Applican ts’ policy does not impose an express obligation on them to lodge their claim within a particular period. However, the Panel considers that it is reasonable to expect an insured to lodge their claim within a reasonable time after they become aware of the damage (which, in the present case, occurred immediately after the storm in July 2011). The Applicants have provided a letter from their insurance broker confirming that the delay in lodging the claim was due to the fact that they initially sought to recover under their construction insurance policy, and only lodged a claim with the FSP once the construction insurer had denied their claim. The Panel accepts that the Applicants sought to pursue their claim under their construction insurance policy first. Howe ver, in circumstances where they were undertaking extensive repairs to the property (and had the benefit of a broker’s advice), the Panel does not considers that it was reasonable for the Applicants to delay for over a year in lodging their claim with the FSP. FSP disputes reasonableness of clean-up costs The Applicants have provided copies of invoices for expenses totalling $71,911.45 which they say were incurred over a period of thirteen months, in removing mud and water from the cellar. The expenses incurred relate to the hire of skip bins, pumps, labour and tip fees. The FSP’s engineer (IC) says that the costs claimed by the Applicants are excessive, given the nature of the works required. In particular, IC says that, given the dimensions of the cellar, the nature of the soil and the extent of the inundation (as shown in the Applicants’ photographs), the removal of the muddy soil:  would have only required five skip bins (rather than the seventeen claimed by the Applicants); and  could have been completed in 80 hours (rather than the 959 hours claimed by the Applicants). IC also queried costs of $12,000 claimed by the Applicants for services provided by a specialist excavation, building and underpinning contractor (R) for works carried out in August 2012. IC considers that, given the timing of these works and the nature of R’s expertise, these costs are more likely to relate to the upgrading of the cellar than the removal of mud and water resulting from the inundation in July 2011. The Applicants say that the extent of the costs claimed reflect the practical difficulties encountered in removing the mud and water from the cellar, whereas IC has considered the matter from a theoretical perspective only. In particular, they say that:  the slope of the land and the ongoing wet weather conditions made it very difficult and time-consuming to remove the muddy soil; and Case No: 343049 Determination Page 7 of 8  the apparent discrepancy in soil volumes can be explained by additional mud having been swept into the cellar from the other sub-floor rooms and/or the soil having bulked up during the excavation process. The Applicants have not provided any further information about the works undertaken by R, other than to confirm that the costs claimed relate to the clean- up only, and do not include any additional construction works or other improvements. Clean-up costs should be shared between the parties The Panel accepts that the Applicants incurred significant costs in order to remove the mud and water from their cellar. However, based on the available information, the Panel considers that the total costs of $71,911.45 claimed by the Applicants significantly exceed the costs which the FSP would have incurred had it had the opportunity to undertake the clean-up itself (or cash settle the Applicants for the reasonable costs of doing so). Given the FSP’s ability to assess its liability and manage the clean -up process has been significantly prejudiced by the Applicants’ delay in lodging their claim, the Panel considers it fair in all the circumstances for the costs of the clean-up to be shared between the Applicants and the FSP on an equal basis. Accordingly, the FSP is required to reimburse the Applicants for 50% of the claimed amount (being $35,958). The FSP is to pay interest on this amount at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 24 October 2013 until the payment date. Case No: 343049 Determination Page 8 of 8 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.