Home / Financial Firm (Unknown - Insurer) / Determination 342714

Determination 342714

Denial of flood-related water damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-26
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$35,000
SourceAFCA PDF

Summary

A strata unit owner claimed about $35,000 for water damage in January 2011, saying stormwater inundated the unit before floodwater arrived. The FSP denied under its flood exclusion. AFCA found on the balance of probabilities that stormwater did not overtop the floor before the flood, so the FSP is not liable.

Once a prima facie claim is established the insurer must prove an exclusion applies, and the hydrology evidence showed the inundation was from floodwater rather than stormwater.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 342714 Determination Page 1 of 7 Case number: 342714 General Insurance - Domestic Insurance - Home Building - Strata - Flood - FSP Decision - Denial of Claim 26 June 2014 Summary Description  A claim under a residential strata policy for loss following a significant weather event. Basis of Determination  A consideration of the circumstances of the Applicant‟s loss and the coverage provided by the policy. Determination  On the basis of the available information the Panel determines the FSP is not liable for the Applican t‟s claim. Background 1. The Applicant is the owner of a unit which was insured under a residential strata policy held with the Financial Services Provider (FSP). 2. In January 2011, the unit in Brassall was inundated with water following severe weather events in Queensland. 3. The Applicant‟s claim was refused on the basis the loss was caused by flood, which is an exclusion under the policy. 4. While the Applicant acknowledges that the peak inundation was caused by flood, he believes the unit was initially inundated with stormwater runoff before the flood water arrived and he seeks a review of the FSP‟s decision. Determination Case No: 342714 Determination Page 2 of 7 Summary of Applicant’s position 5. The Applicant says that when he left the unit at around 12:40pm on 11 January 2011, water was lapping at his back step and heavy rain continued during the day. 6. He says the unit would have been inundated with 8 to 10 inches (approximately 20-25mm) of water before the floodwater inundated the property at about 7:30pm that night, as indicated by the hydrologist. 7. He provides some evidence that there was heavy rain throughout the day in the western part of the Ipswich area and notes the FSP‟s hydrologist stated there could have been some stormwater runoff inundation at his unit in the event of heavy rain. 8. He provides a photograph taken at 12:31pm on 11 January 2011 showing water lapping at the back door of the property. 9. His courtyard is higher than the Bremer River and nearby Mihi Creek but slightly lower than the property behind his unit. He strongly disagrees with the FSP‟s position that water in his courtyard was caused by water being diverted from Mihi Creek and the Bremer River. 10. Once water entered his courtyard the only escape path was through his unit, noting the fence does not have gaps. 11. The Applicant estimates the loss from 8 - 10 inches to be approximately $35,000. Summary of FSP’s position 12. The FSP says that the policy specifically excludes loss caused by flood. 13. It provides a site- specific hydrology report which concludes the Applicant‟s unit was inundated by floodwater on the evening of 11 January 2011. 14. There was insufficient rainfall on 11 January 2011 to cause stormwater runoff that would inundate the Applicant‟s unit and the majority of the rainfall that did fall occurred after 6:00pm on 11 January 2011. 15. The Applicant left the property in the early afternoon before any inundation had occurred and therefore cannot say if there was any inundation before the arrival of the floodwaters. 16. However, even if there was an inundation in the early afternoon on 11 January 2011, this would be from water diverted to the unit because the Bremer River was already in flood and Mihi Creek and the drainage depression to the east of the complex had elevated water levels. This would still be considered floodwater and therefore excluded. Case No: 342714 Determination Page 3 of 7 17. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “Exclusions ( page 16) We will not pay for: … 8 Loss or damage caused by: a. flood, being the inundation of normally dry land by water which escapes or is released from the confines of any natural or artificial watercourse, lake, reservoir, canal or dam….” Issue 18. Whether the FSP is entitled to refuse l iability for the Applicant‟s loss under the terms and conditions of the policy? Reasons for decision 19. As advised to the parties, the Financial Ombudsman Service has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 20. The decision has been made by a Panel of three decision makers, including an Ombudsman and decision makers with experience in the insurance industry and consumer rights. 21. On 20 June 2014 the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. The policy 22. The Panel has reviewed the terms and conditions of the PDS containing the details of cover for the unit complex, including the Applicant‟s unit. 23. The Panel is satisfied the policy covers accidental loss or damage to the building, including the events of storm and rainwater but specifically excludes loss caused by flood, defined as water escaping or released from any natural or artificial watercourse. As the loss suffered clearly responds in a prima facie sense to the policy provision of accidenta l damage, the FSP bears the onus of proof of demonstrating the totality of the loss was attributable to the excluded event of flood. Was the loss caused by flood, as defined by the policy? Case No: 342714 Determination Page 4 of 7 24. It is not in dispute that the peak inundation at the Applicant‟s un it was caused by floodwater from the Bremer River. 25. The Applicant accepts that the ultimate inundation was from flood as defined by the policy; however, he says there was initial stormwater runoff on 11 January 2011 of around 8 to 10 inches that caused damage before the floodwaters arrived. 26. For completeness, the Panel has reviewed the hydrology evidence for the location and is satisfied that the peak inundation of the unit was caused by flood as defined by the policy. 27. As this is not in dispute, the Panel is only required to consider whether there was an initial inundation of stormwater runoff before the floodwater arrived, as alleged by the Applicant. Was the unit inundated with stormwater runoff before floodwater arrived? 28. The Applicant says water was lapping at his back door at 12:31pm on 11 January 2011 and he provides a photograph in support of his submission. He says there was heavy rain in the area and the unit would have been inundated with stormwater runoff before the floodwater caused inundation that evening. 29. The FSP says there is no evidence stormwater runoff caused inundation before floodwater damaged the unit and even if there was inundation earlier in the day, this proximate cause would also have been flood due to the elevated levels of water in the surrounding watercourses preventing the water from flowing into the watercourse. 30. The FSP provides a site- specific hydrology report from „V‟ dated March 2013, which provides the following relevant information:  The floor level of Unit 2 is 160mm above the surrounding ground.  Even accounting for fully blocked drains, the rain was not likely to result in stormwater inundating Unit 2.  The owner of Unit 1 noted that water flowed from the back of Unit 2 and started to rise quickly after lunch time of 11 January 2011. The owner left property at 6:30pm and water had not inundated Unit 1 at that time.  The Applicant said water flowed to the back of Unit 2 from the back neighbour and forced its way through the fence to Unit 1. He opened up a few panels of the fence to allow water the escape. He left in the late morning and water was 200mm to 300mm deep at the back of Unit 2, but no water had flowed into the building at the time he left the property. It was raining heavily.  The owner of Unit 6 left the property at 4:00pm and at that time no water had entered her Unit. Case No: 342714 Determination Page 5 of 7  The tenant of Unit 8, who was staying in Unit 7 at the time, said he left the property at 1:30pm on 11 January 2011 and it was raining heavily. No inundation of the unit floors was noted.  The tenant of Unit 9 who was staying in Unit 22 said there was a long period of moderate rain on 11 January 2011 and when she left the property at 11:00am, Unit 9 had not been inundated with water.  The owner of Unit 42 said there was a long period of rain on 11 January 2011 and she left at 12:30pm. The report concludes: “ 4 Findings (page 26) …  There is only 160 mm of freeboard in the backyard of Unit 2. Given that upstream overland flow does enter the yard and discharge towards Unit 1, it is possible that the floor could be overtopped in intense local events. In this instance the testimony of the owner indicates that the floor was not overtopped, but following removal of a fence panel the stormwater escaped into Unit 1 backyard. … 5 Expert Opinion (page 28) …  The inundation of the ground floor of Unit 2 occurred when floodwater from the drainage depression and Mihi Creek/Bremer River rose above 16.36 m AHD at about 7:30 pm on 11 January 2011;  The maximum depth of over-floor inundation of Unit 2 was 3.14 m caused by floodwater from Mihi Creek/Bremer River as a result of water level at Bremer River Ipswich Alert gauge reaching a peak of 19.5 m AHD at about midday on 12 January 2011; and  Whilst local stormwater from the upstream catchment was directed into the backyard of Unit 2 at about midday on 11 January 2011, it is unlikely in my opinion that local stormwater flows entered Unit 2 habitable floor and caused any internal damage.. …” 31. In reviewing V‟s report, the Panel has also reviewed the site survey information which indicates that Unit 2 and Unit 1 have a floor level of 16.36m AHD. The Panel notes that the owner of Unit 1 reportedly left the property at around 6:30pm on 11 January 2011 and at that time there was no above floor inundation. 32. However, the hydrologist does indicate that there could be stormwater runoff overtopping the floor level of Unit 2 during “intense local events”. 33. The Applicant provides some evidence that there was rain in the western area of Ipswich on 11 January 2011. The screen shots provided by the Applicant indicate there was moderate to heavy rain in the morning and early afternoon of 11 January 2011. Case No: 342714 Determination Page 6 of 7 34. In reviewing the comments from Unit owners and tenants in the hydrologist‟s report, most indicate there was a long period of rain on 11 January 2011. 35. Further, the Applicant provides a photograph reportedly taken at 12:31pm on 11 January 2011, showing some water pooling at the rear of the property, although it is not clear exactly how high the water was and the photograph does not in itself establish above floor inundation occurred. 36. The FSP notes that there was 110mm of rain on 12 January 2011, which is reportedly the rainfall for the period from 9:00am on 11 January 2011 until 9:00am on 12 January 2011. The hydrologist says this has an ARI of 2 - 5 years. Interestingly, the FSP has submitted that this means that there would be rainfall of this nature up to five times a year. 37. This is a complete misunderstanding of the ARI measurement. An ARI of 2-5 years actually means that rainfall of that intensity would only occur every 2-5 years on average, meaning it is of a higher intensity. An ARI of less than one year means the event occurs more commonly. 38. The fact that Table 2.2 quoted in the FSP‟s submission shows higher rainfall for an ARI of 2 - 5 years than the rainfall for an ARI of less than one year, should have alerted the author of the FSP‟s submission to this issue and diminishes the value of the FSP‟s submission . 39. Further, the FSP states the majority of the rainfall that did fall occurred after 6:00pm on 11 January 2011, however it has provided no evidence to support that statement. Conversely, the ICA report data provided by the Applicant (which has generally been accepted as an authoritative report) states “ There was no rain of consequence over Ipswich City LGA after about 1800 hours on Tuesday 11 January…” This appears to counter the author‟s statement. 40. Be that as it may, in order to conclude the Applicant has established a valid claim, the Panel must be satisfied that stormwater did overtop the floor level of Unit 2 before the floodwater arrived. 41. Unfortunately, as the Applicant vacated the subject Unit at around 12:40pm, it has not been visually confirmed either by him or any of his neighbours that stormwater runoff did overtop the floor level. 42. Significantly, the owner of Unit 1 who was at the property until 6:30pm on 11 January 2011, reports that there had been no inundation of Unit 1 at the time they vacated. Noting that Unit 1 and Unit 2 have the same floor level of 16.36m AHD, this raises significant doubt as to whether Unit 2 would have been inundated during the early afternoon, albeit that the Units are not identical. 43. Further, the hydrologist also reports that it is unlikely the Unit was inundated with stormwater runoff, given the size of the catchment, the rainfall and the level of the relevant unit and its height above the ground level. Case No: 342714 Determination Page 7 of 7 44. Even after disregarding the erroneous parts of the FSP‟s submissions, the hydrology expert‟s conclusions appear well reasoned and are supported by the appropriate data. Given there is no contrary expert evidence, and the absence of any eye-witness evidence of a contrary fact, the Panel concludes, on the balance of probabilities that Unit 2 was unlikely to have been inundated with stormwater runoff above floor level prior to the flood event. In these circumstances, the FSP is entitled to rely upon its flood exclusion. Determination 45. On the basis of the available information the Panel determines the FSP is not liable for the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.