Home / Financial Firm (Unknown - Insurer) / Determination 342542

Determination 342542

Underpinning and repainting costs denied: damage not caused by insured event

FirmFinancial Firm (Unknown - Insurer)
Decided2014-07-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants claimed under home building cover for underpinning and repainting after cracking attributed to a sewerage overflow and damaged pipes. AFCA found the damage was not caused by a sudden and unexpected escape of liquid and the FSP is not required to pay.

The insured must first establish a prima facie claim under the sudden and unexpected escape of liquid cover, and slow escape they could reasonably be aware of is excluded.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 342542 Determination Page 1 of 4 Case number : 342542 9 July 2014 1 Overview 1.1 Dispute The Applicants lodged a claim against their home building insurance policy held with the Financial Services Provider (FSP) for underpinning work they had undertaken to rectify cracks to walls of their home. The FSP denied the claim on the basis that the damage was not caused by an insured event but by soil movement, settlement or subsidence, which are excluded from cover. The Applicants believe that the damage is covered under the insured event of liquid escaping suddenly and unexpectedly from broken sewerage and stormwater pipes and they want a review of the FSP‟s decision by the Service. 1.2 Issue and key findings Is the FSP liable for the damage to the Applicants’ home building ? The FSP is not liable for the damage to the Applicants‟ home building because:  the evidence indicates the liquid which affected the soil around the foundations of the home causing the damage to the home building did not escape suddenly and unexpectedly  the liquid which caused the damage escaped slowly over a period of time and the Applicants could have reasonably been expected to know of this happening  the Applicants have failed to establish that the damage was caused by an insured event under the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is not required to pay the Applicants the costs associated with restumping and underpinning their home, or the costs for painting the b uilding. Case No: 342542 Determination Page 2 of 4 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the Applicants’ home building? The Applicants have not established that liquid escaping suddenly and unexpectedly caused the damage It is an accepted principle of general insurance law that an insured bears the responsibility to establish, on the balance of probabilities, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove the application of an exclusion if it wishes to deny or limit its liability for the loss. The Applicants claim that the damage to their house was caused by an ongoing and undetected leak of the sewerage and storm water pipes at the rear of their property. In support of their position that the damage should be covered, they have provided documentation from:  plumber “AL” who attended to various plumbing issues at the property since January 2012  underpinning contractor “BB”  engineer “YPT”, who insp ected the property prior to the commencement of the underpinning work in June 2013. The FSP has provided a report by engineer “F” dated 25 July 2013, produced after an inspection of the property on 3 July 2013. The material presented shows that:  the Applicants had been having sewerage blockage issues over a number of years, with noticeable sewerage smells on and off over that time and on one occasion, the area under the rear deck flooded  AL was engaged in January 2012 and found and rectified damage to the 85- junction at the connection to the main sewer line  plumbers previously engaged by the Applicants cleared the blockages by the use of a metal snake, however, none of them noticed any breakages in the pipes at the overflow relief gully (ORG) or the 85-junction  the ORG is outside the back door, but concealed under the rear decking  a gully in the surface of the soil under the home building was observed by BB‟s work team and by AL, running from the rear to the front and consistent with having been formed by excessive and long term water flow  in June 2013, the sewerage piping and storm water piping were found by BB‟s work team to be damaged and AL was called in to rectify the damage to the pipes . BB‟s team also found remnants of sewerage (mainly toilet paper), underneath the decked area  water was noticed to be pooling at the base of each pit being dug by BB‟s team for the underpinning work  cracks to the internal walls (living/dining room) were first noticed by the Applicants around January 2012, about the time AL attended to fix a Case No: 342542 Determination Page 3 of 4 sewerage blockage problem, but the cracks had opened up noticeably in the last six months  the soil on the Applicants‟ property is silt (Quaternary aged basaltic deposits) overlying highly reactive clay. There is little doubt that the ongoing sewer blockage issues experienced by the Applicants resulted in sewerage overflowing from the ORG onto the surrounding ground. This would account for the earlier flooding of the underdeck area and the remnants of sewerage found under the deck by BB in June 2013. It is also highly likely that the overflow from the ORG was responsible for the gully evident in the surface of the soil, under the home (running through to the front of the home), as well as causing or contributing to the saturation o f the soil noticed by BB‟s team when they were digging pits for the underpinning. It is not clear when or how the damage to the stormwater pipe and the sewerage pipe at the rear of the property occurred. However, it is considered likely that this damage resulted from changes to the moisture content in the soil from the overflow from the ORG. The policy covers loss or damage caused by liquid escaping suddenly and unexpectedly from, among other things, pipes. However, as the function of the ORG is to allow sewerage to overflow outside (rather than inside) the home in the event of a blockage, any escape of water from the ORG could not be considered sudden or unexpected under the circumstances. While leakage from the damaged stormwater and sewerage pipes may have contributed to the moisture in the soil at the back of the home, as these pipes were underneath the surface of the soil, it is highly unlikely that any liquid escaping from these pipes would have formed part of the “excessive and long term flow” of liquid which caused the gully in the surface of the soil underneath the home. In any event, the leaking of liquid from the damaged pipes could not be considered liquid escaping suddenly and unexpectedly. It is accepted that changes to the moisture content of the soil around the home would have changed the load bearing capacity of the layer of highly reactive clay. It is noted that:  some of the cracking to the external walls appeared to F to have been present for some period of time  some of the cracks to the internal plasterwork has been subject to previous repairs and repainting, again indicating its presence over a period of time  the underpinning was required to the foundations to the rear and the front of the home (essentially consistent with the path of the gully underneath the home) and was not confined to the rear of the property were the damaged pipes were located. For these reasons, i t is considered that the damage to the Applicants‟ home building was caused by the overflow of liquid from the ORG at the rear of the Case No: 342542 Determination Page 4 of 4 property over a considerable period of time, which gradually changed the moisture content of the soil around the foundations. Applicants could reasonably be expected to be aware of the slowly escaping liquid Even if it could be said that the liquid did not escape suddenly and unexpectedly (noting my finding that the liquid „did‟ escape suddenly and unexpectedly), t he insured event relating to escaping liquid excludes cover for loss or damage resulting from liquid escaping slowly over a period of time, where the Applicants could reasonably be expected to be aware of this condition. The Applicants argue that they could not have been aware of the problems with the damaged stormwater and sewerage pipes for quite some time. However:  the damage to the pipes at the rear of the home is likely to have been caused by the changes in moisture content of the surrounding soil as a result of the overflow from the ORG  given the ongoing sewerage issues experienced, the Applicants would be reasonably expected to have been aware of the escape of liquid from the ORG. The Applicants have therefore not established a prima facie claim under the policy and the FSP is not required to pay for the underpinning work undertaken or any repainting of the Applicants‟ home. 3 Supporting information 3.1 Policy provisions What we cover – insured events ... Yes You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: No You are not covered for: ... ... Liquid escaping suddenly and unexpectedly from a: water main, drain, fixed pipe, gutter, guttering, fixed tank or drain , sink, basin, bath, shower, toilet or spa bath, dishwasher or washing machine, fixed heating or cooling system, aquarium Damage or loss resulting from: liquid escaping slowly over a period of time where you could reasonably be expected to be aware of this condition. The cost of repairing or replacing the item from which the water or liquid escaped.