Home / Financial Firm (Unknown - Insurer) / Determination 341861

Determination 341861

Additional Cyclone Yasi damage (roof battens, electrical work) claim refused beyond FSP's accepted settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2014-10-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant sought further cyclone damage costs for roof battens and electrical work after the FSP settled the original claim. AFCA found he had not established the roof damage was caused by Cyclone Yasi and found the FSP's $4,653.33 electrical settlement reasonable.

The applicant bears the onus of proving the additional damage arose from the insured event, and the contemporaneous engineer's report of no batten lift was preferred over later reports prepared years after the cyclone.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 341861 Determination Page 1 of 5 Case number: 341861 General Insurance - Domestic Insurance - Home Building - Extent of Damage due to Insured Event - Service 7 October 2014 Background 1. The Applicant holds a home building insurance policy with the Financial Services Provider (FSP), which was current at the time of the loss. Cyclone Yasi caused damage to the Applicant’s home and as a result, he lodged a claim with the FSP on 3 February 2011. 2. The FSP accepted and settled the claim in accordance with the scope of works a nd paid the Applicant’s preferred builder, based on his quote. 3. While carrying out the repairs, the builder said there was additional damage due to the cyclone. The Applicant claimed for additional repair costs. However, the FSP does not agree there was any additional damage due to the cyclone. The Applicant wants the Service to review the FSP’s decision. 4. The dispute was considered by a Case Manager of the Service who issued a Recommendation. In that Recommendation, the Case Manager determined the dispute in favour of the FSP on the grounds that he was not satisfied that the Applicant had established that the additional damage claimed was as a result of the insured event. 5. The Recommendation was not accepted by the Applicant. Pursuant to paragraph 8.5 c) of the Terms of Reference of the Service, the Applicant requested that the dispute proceed to Determination. Summary of Applicant’s p osition 6. The Applicant maintains that the additional damage to the roof is as a result of Cyclone Yasi and not shrinkage as alleged by the FSP. 7. Further, the claimed electrical work also relates to Cyclone Yasi and should be attended to under the terms and conditions of the policy. Summary of FSP’ s position 8. The FSP maintains that it has provided coverage for the loss and damage arising from the insured event and that the Applicant has not provided Determination Case No: 341861 Determination Page 2 of 5 sufficient evidence to establish that the claimed additional damage relates to the insured event. 9. Further, the FSP maintains that it has been prejudiced by the actions of the Applicant, first in refusing to allow the FSP’s experts access to further assess the insured property and second by completing the electrical work prior to the FSP’s experts having the opportunity to assess the loss and damage claimed. 10. The FSP says that most of the additional items for which the Applicant is now claiming resulted from wear and tear and this is excluded from cover. In this respect, the FSP is relying on the following policy provision: “ Section A – Home Cover What you are not insured for Under Section A – Home Cover, we will not pay for: … 2. loss of or damage to your property caused by: … f. wear, tear, rust, corrosion, depreciation, gradual deterioration, mildew, mould, dampness of atmosphere or variations in temperature; …” Issue 11. Whether the Applicant has established that the additional damage to his home is covered under the terms and conditions of the policy. Reasons for Decision 12. I have reviewed all of the material provided by the parties, together with the reports which have been included within their respective submissions. 13. The Recommendation of the Case Manager has not been accepted by the Applicant and as such, this matter will proceed to Determination in accordance with the Terms of Reference of the Service. “8.5 Dispute is resolved on the basis of the Recommendation. c) If, within 30 days of receiving the Recommendation, either: (i) The Financial Services Provider does not accept the Recommendation in relation to the Dispute; or (ii) Either party requests FOS to proceed from a Recommendation to a Determination. FOS will proceed to a Determination by either an Ombudsman or by a FOS Panel (as the Chief Ombudsman or his or her delegate decides is appropriate). Before the Determination is made, the parties will be given a reasonable opportunity to make submissions, Case No: 341861 Determination Page 3 of 5 and provide any further information, in response to the Recommendation.” 14. Subsequent to the Case Manager’s Recommendation , both parties have provided further submissions and reports and I have considered all of the material as part of this Determination. 15. The law is clear in that the Applicant carries the onus to show that he has suffered a loss which is covered under the terms and conditions of the policy. 16. The Applicant says that he suffered a loss in that there was damage to this home and the FSP accepted the Applicant’s loss and made payment to the Applicant in respect to the necessary repair. 17. The Applicant says that during the course of the repairs, he was advised of additional damage as a result of Cyclone Yasi and he now seeks for the cost in respect to the additional damage to be met by the FSP, under the terms and conditions of the policy. 18. I am satisfied that it is the Applicant who carries the onus to establish that the additional damage arises from the insured eve nt and is covered by the terms and conditions of the policy. 19. In respect to the roof of the home, there is significant disagreement between the parties as to the cause for the separation of the roof battens, from the supporting rafters. 20. On the one hand, the Applicant says that the cause of this problem was the Cyclone winds, whereas on the other hand, the FSP maintains that the problem is related to timber shrinkage and/or poor construction techniques. 21. Within the Recommendation, the Case Manager was not satisfied that the Applicant had established that the problem was related to Cyclone Yasi. This conclusion was based upon the Case Manager’s consideration of the numerous reports and submissions made by the respective parties. 22. Subsequent to the Case Manager’s Recommendation, the Applicant has provided a further report from the structural engineer, which provides a detailed analysis and numerous calculations in respect to the separation of the battens. 23. The structural engineer reinspected the property on 11 April 2014, for the purposes of the provision of the report. 24. The structural engineer concludes that there were too many examples of batten separation of varying degrees of separation, combined with consistent depths along the length of individual battens that make the cause of the separation most likely to be due to uplift wind pressures from a major wind event and that Cyclone Yasi is the most recent wind event to fit this category. Case No: 341861 Determination Page 4 of 5 25. The Applicant has also provided a further report from a builder to the effect that the shrinkage of any timber is likely to have occurred at a much earlier date. 26. I note that the report from the builder, on two occasions refers to Cyclone Larry (March 2006) and makes no reference to Cyclone Yasi. Further, the builder does not reach a conclusion that the problem was caused by the insured event of Cyclone Yasi, but rather, simply that any shrinking of the timber had stopped some time earlier. 27. On the other hand, the structural engineer is of the view that the only explanation for the random lifting of roof battens, between post Cyclone Larry and the present time, was the major wind event of Cyclone Yasi. 28. However, the structural engineer’s further report does not take into account the FSP’s alternate submission of poor construction techniqu es. 29. I have difficulty with both the structural engineer and the builder’s reports to the extent that they both reach their conclusions, at least partly on the basis “it must have been” Cyclone Yasi. This, in my view, is quite different from saying, “It was Cyclone Yasi.” 30. I am satisfied that there were other potential causes for the batten lift, including poor construction which have not been adequately discounted. 31. Further and most significantly, I am not satisfied that the Applicant’s structural engineer and builder, account for the comments of the Applicant’s original engineer, who inspected the property only three months after Cyclone Yasi. 32. The original engineer inspected the Applicant’s premises with the specific purpose of assessing the impact, loss and damage of the high and damaging winds from Cyclone Yasi. 33. At that time, the Applicant’s original engineer confirmed that the roof sheeting was inspected and appeared sound and that the frame appeared structurally sound. 34. There was no reference to batten lifting at that time. The first reference to batten lifting occurs in excess of two years after Cyclone Yasi. 35. Having considered all of the available evidence and including the further reports from the structural engineer and builder, which were obtained by the Applicant, specifically to explain the cause of the additional damage, I am not satisfied that the Applicant has met his onus to establish that the additional damage is related to the insured event of Cyclone Yasi. 36. The expert evidence contemporaneous in time to the insured event, the report from the Applicant’s original engineer, confirms no batten lift. 37. I am satisfied that the report from the Applicant’s original engineer, prepared within 3 months of the insured event, is to be preferred to the reports from Case No: 341861 Determination Page 5 of 5 the Applicant’s subsequent engineer, prepared 32 and 40 months respectively, post the insured event. 38. In respect to the second issue of the electrical work which is claimed by the Applicant, I note that the Applicant has provided a report from an electrical contractor which again relates to an inspection which occurred in excess of two years after the date of the insured event, Cyclone Yasi. 39. It is difficult to understand how the property was inspected by engineers and builders at a time reasonably proximate to the insured event, yet neither the original structural engineer nor the original builder makes any reference to a need for electrical work. It is only more than two years after Cyclone Yasi that the Applicant has obtained a report seeking to replace substantial parts of the electrical cabling to the property. 40. In this regard, I also note that the builder who engaged the electrician to attend in 2013, advised that the electrical wiring was the old rubber wire which would not meet the relevant statutory code. 41. This suggests that the wiring was old and in any event in need of updating. 42. Further, I note that the electrical work was completed prior to the FSP having the opportunity to consider the claim for the electrical work. 43. Given my concerns regarding the delay in reaching a conclusion that the electrical work was needed to be carried out and given the builder’s commentary in respect to the age and compliance of the wiring, I am satisfied that the FSP’s acceptance of the claim for the rewiring and the replacement of the main switchboard for the reduced amount of $4,653.33, is reasonable in the circumstances. Determination 44. I determine that save for the settlement amount of $4,653.33, for the rewiring and the replacement of the main switchboard, the FSP has otherwise met its obligations in respect to the Applicant’s claim for loss and damage arising from the insured event of Cyclone Yasi.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.