Home / Financial Firm (Unknown - Insurer) / Determination 341731

Determination 341731

Denial of flood damage claim after Charlton inundation; further payment sought after ex gratia payment

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$7,000
SourceAFCA PDF

Summary

Homeowners claimed for January 2011 inundation of their Charlton home after the FSP denied the claim under the flood exclusion and made a $64,000 ex gratia payment. AFCA found the above-floor water was overflow from the Avoca River, which is excluded flood, and ordered no further payment.

Water escaping the normal confines of a watercourse is flood as defined and excluded, the ex gratia payment did not admit liability, and the applicants did not prove stormwater caused the below-floor damage.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 341731 Determination Page 1 of 10 Case number: 341731 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Flood 10 April 2014 Summary Description  Claim for storm runoff damage under a Home Insurance Policy following inundation of the property in Charlton, Victoria, in January 2011. The FSP rejected the claim relying on a flood exclusion within the policy. Basis of Determination  The property was first inundated between 7.00pm and 11.00pm on 14 January 2011.  The inundation occurred after the overflow of the Avoca River.  Some of the inundation may have been contributed to by stormwater runoff but this would have combined with the flood waters from the Avoca River and be excluded from cover.  The ex gratia payment of $64,000 does not entitle the Applicant to any additional payment. Determination  The FSP is entitled to rely on the terms of the policy to deny payment of the claim. Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP). Th e policy provided cover over the Applicants’ home building and contents and was current at the time of the loss. 2. The Applicants’ home in Charlton Victoria was inundated with water in January 2011 and they lodged a claim for the damage to their property. Determination Case No: 341731 Determination Page 2 of 10 3. The FSP denied liability for the damage on the basis that it was caused by flood, which is excluded from cover under the policy and made an ex gratia payment to the Applicants of $64,000. 4. The Applicants maintain the damage was caused by runoff and not flood, and the FSP should meet its liability to pay an amount sufficient to complete their repairs. Summary of Applicants ’ position 5. The Applicants say the water which inundated their property did not come from the river. They believe that the drains in the town were blocked and stormwater overflowed from these drains and caused damage to their property. 6. The Applicants say that they were paid $64,000 but the FSP told them the damage was not covered. 7. They say the amount they were paid was not enough for the restumping of the house, for which they obtained a quotation in the amount of $39,000. 8. However, they are only seeking a payment of about $7,000 to allow them to finish the laundry, toilet and sunroom. Summary of FSP’s position 9. The FSP says that the evidence from its assessor and an independent hydrologist confirms that the water which inundated the Applicants’ home was flood. 10. The FSP says that as the policy specifically excludes damage caused by flood, it was entitled to deny liability for the claim. 11. The FSP also says that $64,000 was paid to the Applicants as an ex-gratia payment as a gesture of goodwill. 12. However, as it has no liability for the damage, the Applicants are not entitled to any further ex-gratia payments. 13. The FSP relies on the following policy provisions: “ WHAT YOU ARE COVERED FOR ... Storm If your home or contents suffers loss or damage caused by:  a violent wind, cyclone or tornado  thunderstorm or hail which may be accompanied by rain or snow, or Case No: 341731 Determination Page 3 of 10  a sudden, excessive run-off of water as a direct result of a storm in your local area we will under contents insurance  replace or repair your damaged contents we will under building insurance  rebuild or repair that part of your home that was damaged ... however we will NOT cover loss or damage caused by flood ... however under buildings insurance we will NOT cover loss or damage … when water enters through an opening that was not created by the storm. ... Glossary ... flood the covering of normally dry land by wate r escaping or released from the normal confines of a wat ercourse or lak e, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this Policy. ” Issue 14. W hether the FSP is liable for the damage to the Applicants’ home and contents. Reasons for decision 15. Due to the nature of the dispute, FOS has considered it appropriate to refer this directly to a Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 16. This decision has been made by a Panel of three decision makers including an Ombudsman and two decision makers with extensive experience in insurance and consumer claims. 17. An exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. Case No: 341731 Determination Page 4 of 10 18. The policy covers loss or damage caused by the insured event of storm, which includes a sudden, excessive run-off of water as a direct result of a storm in the local area. 19. There is no dispute that:  an extreme weather event affected the region around the Charlton township in January 2011, including heavy rainfall over several days;  the Applicants’ home and contents were damaged by water inundation around the time of this weather event; and  the policy does not cover damage caused by flood. 20. The issue for consideration therefore is whether the water which inundated their home was stormwater run-off or flood water. 21. The Applicants say that the water did not come from the river. They say that water which filled their home came from the rear and came up through the carpet. 22. The FSP arranged for an assessor (“DR”) to attend the Applicants’ property and report on the damage. In his report of 1 February 2011, DR provided the following information about the inundation:  the water:  first entered the property on the evening of Friday 14 January 2011;  came from the front of the house and from beneath it initially;  took 2 hours (7pm until 9pm) to rise;  was observed to be knee-deep in the house;  was brown and contained effluent, silt and mud;  came from the Avoca River, 120 metres from the front gate; and  the property was affected by water for three days. 23. The FSP also appointed hydrology firm “WT” to report on the flooding mechanisms at the Applicants’ property. 24. The report by WT dated 5 September 2013 was produced after a site inspection on 27 August 2013, and a review of synoptic, rainfall and water flow data relating to the inundation event. 25. The report by WT provided the following information with respect to the female Applicant’s version of events:  Water came from under the railway bridge toward the property on the evening of Friday 14th January 2011 and filled the low depression between the railway bridge and the property. Case No: 341731 Determination Page 5 of 10  By 11pm the front yard was inundated but it had not yet entered the house.  She believes that water was also coming down the Calder tributary into the nearby wetlands (locally known as the railway dam).  She went to bed after 11pm on Friday night and woke on Saturday morning and water was below knee level inside the house.  They were evacuated Saturday morning and as they were leaving, she observed water flowing fast under the railway line and also from behind the property flowing from the Calder Highway tributary and the railway dam. 26. With re spect to the town of Charlton in which the Applicants’ property is located, the report by WT provided the following information:  Charlton is located on the eastern bank of the Avoca River, which has a catchment area of around 3,000km 2 upstream of the town, including its tributaries.  The major tributary is Yeungroon Creek, located approximately 1.5km to the east of the township. Its catchment is estimated to be 72km 2 .  Between the Avoca River and Yeungroon Creek, there are two unnamed tributaries or drainage lines. i. one of these crosses Charlton-St Arnaud Road and joins the Avoca River upstream of the town. Its catchment is estimated to be 7km 2 ; ii. the second tributary flows through the town and under the Calder Highway and enters the Avoca River downstream of the railway line. Its catchment is estimated to be 3km 2 ; and iii. i n the report, references to these tributaries are the “Charlton -St Arnaud tributary ” and the “Calder Highway tributary” respectively. 27. The report by WT examined various flooding mechanisms in Charlton: stormwater from the local catchment; flooding from breakouts from the Charlton-St Arnaud and Calder Highway tributaries and from Yeungroon Creek; and flooding directly from overflows from the Avoca River. 28. With respect to the rainfall in the vicinity around the time of the inundation and effect of stormwater, the report by WT provided the following information:  Data from the rainfall gauge at Donald St in the township of Charlton (which records daily rainfall data) and the Charlton gauge south-west of the town centre (which records continuous rainfall data), for the period 10 January to 14 January 2011 was examined.  Charlton received its highest daily rainfall of 66mm in the 24 hours to 9am 14 January 2011.  Broadly, there were three main bursts of rainfall during the relevant period. The last of these main bursts ceased at 6.24 am on 14 January Case No: 341731 Determination Page 6 of 10 2011 and had a duration of approximately 24 hours, with an average rainfall intensity of 3.4 mm/hour.  The highest hourly rainfall rate, which occurred from 4.18pm to 5.18pm on 11 January 2011, was 16.8mm/hour and corresponded to an Average Recurrence Interval, or ARI, of 2 years.  The highest rainfall rate recorded at the Charlton rainfall gauge during the relevant period was 28 mm/hr, with an ARI of 2-5 years. This was 15mm of rainfall over 32 minutes from 6.21am on 13 January 2011, and was preceded by more than 37 hours of no rainfall.  The largest burst event was preceded by 22 hours of no rainfall.  The design capacity of the stormwater system in Charlton was unknown but it was considered likely to be around an ARI of 5 years.  The catchment area contributing the stormwater flows is approximately 3km 2 , and would have a response time of about 2 hours. This means that most of the flow of the direct effects of rainfall on the catchment would have dissipated significantly within 2 hours of the cessation of rain.  From this analysis, the report’s author conclu ded that locally derived stormwater flows could not have caused significant flooding in Charlton after about 7 or 8am on 14 January 2011. 29. With respect to the water levels in the vicinity of the property, the report by WT provided the following information:  Recorded water level data was examined for January 2011 for the Avoca River at Charlton at the confluence of the Avoca River and Yeungroon Creek. (No separate stream-flow data was available for any of the three tributaries to the Avoca River).  The water levels in the Avoca River began to rise steeply from about midday on 12 January 2011 and reached 5m at 4am on 13 January 2011 and 7m at 8.45 on 13 January 2011.  Water levels continued to rise, although less steeply, to 7.5m at 5.15pm on 14 January 2011, and reached a peak of 8.05m at 1.15am on 15 January 2011. This was followed by a fairly steady decline in water levels over the following three days. 30. The report by WT provided the following information about breakouts and transferred flows from the three identified tributaries to the Avoca River:  Available modelling suggest that the Charlton-St Arnaud tributary and Yeungroon Creek, and later from Avoca River further upstream, have transferred flows across the floodplain upstream of the town. Breakouts from these waterways would have been responsible for overland flows which contributed to continuing flows into the Calder Highway tributary after about 8am on 14 January 2011. Case No: 341731 Determination Page 7 of 10  The Charlton-St Arnaud tributary, because of its relatively small catchment size, would have contributed flows prior to any flows from the Yeungroon Creek or the Avoca River.  Flooding along the length of the Calder Highway tributary accounts for much of the flooding in the eastern part of the catchment.  The modelling also suggests that the Avoca River and Yeungroon Creek transferred flows across the floodplain upstream of town from approximately 5am of 14 January 2011. Given the timing of the flooding of the eastern edge of town, it is likely that the flows from these two waterways merged to become one system. 31. The report from WT also provided information about flooding directly from the Avoca River, as follows:  Stream- flow data obtained shows the Avoca River reached the “major” flood level of 7.5m at about 5pm on 14 January 2011. This corresponds with local reports of the river rising rapidly from this time.  Local observations also indicate that from around 6pm on 14 January 2011, houses in the township were inundated directly from overflows from the Avoca River.  The Avoca River continued to rise and reached a peak at 1.15am on 15 January 2011.  Properties on the western and southern side of Charlton would have been first affected by flooding from the Avoca River, which then expanded to the east and north.  As the last main burst of rain (81.4mm in total) finished at 6.24am on 14 January 2011, the flooding from the Avoca River occurred more than 10 hours after the last rainfall event. 32. With respect to the Applicants’ property and the Calder Highway tributary, the report by WT provided the following information:  The property is approximately 200m south east of the Avoca River and 400 southwest of where the Calder Highway tributary enters the Avoca River.  The Applicants’ property lies within the Land Subject to Inundation Overlay (LSIO) for the Avoca River and the Calder Highway tributary, which indicates the site has a history of flooding or is considered to be at risk of flooding from a 100 year ARI event.  Downstream of the railway line, the Calder Highway tributary crosses GF Road and low flows are diverted through a gross pollutant trap and into the wetland reserve locally known as “the railway dam”, which is located within A Square (in which the Applicants’ property is situated).  The railway dam has an outlet on the eastern side to allow flows exceeding its capacity to flow back into the tributary. Case No: 341731 Determination Page 8 of 10  The main channel of the tributary continues from the diversion point and on north to the Avoca River.  Between the railway bridge and the property, the Avoca River floodplain is very low and rises up to the A Square roadway.  The report’s author observed what seemed to be a very gentle fall from the railway dam towards the Applicants’ property. 33. The report by WT provided the following summary of the flooding at the Applicants’ property:  The Applicants do not know the exact time of the above floor flooding at their property (the female Applicant was asleep when this occurred). However, it is understood the front yard was inundated by 11pm on 14 January 2011, and above floor flooding occurred between 11pm on 14 January and the morning of 15 January 2011.  Water was likely to have first approached the property along A square from a south-westerly direction from the railway bridge, inundating the low lying area between A Square and the Avoca River.  At the same time, water was coming from the Calder Highway tributary, likely through the diversion channel, the natural channel and spilling out onto the floodplain.  Any significant continuing flows in the Calder Highway tributary after about 8am on 14 January 2011 would have been caused by overland flows due to “breakouts” from the Charlton -St Arnaud tributary, Yeungroon Creek and Avoca River.  By the time the flooding occurred in A Square (late afternoon/early evening 14 January 2011), water flowing through the Calder Highway tributary would have been combined with flow from breakouts from Yeungroon Creek and the Avoca River.  Water then approached A Square from the Avoca River downstream of the railway bridge. It spilled into the vacant area directly behind the properties on the south western side of A Square and onto the Applicants’ property. Damage observed to a fence of a nearby property confirms the direction of the flow.  The timing of the above floor flooding (after 11pm on 14 January 2011, according to the female Applicant) fits the timing of the Avoca River flood mechanism, as the Avoca River water level peaked at 1.15am on 15 January 2011.  This strongly suggests that the water entering the Applicants’ home above floor level was directly from the Avoca River. 34. The Panel has considered the submissions from the parties. 35. According to the report by WT, the female Applicant indicated to the author of the WT report that the above floor flooding occurred sometime after 11pm Case No: 341731 Determination Page 9 of 10 14 January 2011, but she was asleep by the time this above floor flooding occurred. 36. Conversely, the assessor DR recorded in his report that water entered the home on the evening of 14 January 2011 between 7.00pm and 9.00pm. 37. Following the flooding event in Charlton in January 2011, the Panel Chair Ombudsman, Panel Member and a Case Manager attended a number of properties in Charlton and the surrounding area in order to gain a broader understanding of the mechanism of the inundations. In addition to the direct impact of the rainfall, the Panel has co nsidered the impact of a number of contributing mechanisms, including the Calder Highway Tributary, Charlton- St Arnaud Road works and Yeungroon Creek. 38. From the Panel’s experience, it has found in previous matters that much of Charlton was inundated by water which is properly characterised as stormwater runoff during the day of 14 January 2011 up until about 5.30pm on that day, and at the very latest 6.00pm on that day. 39. Generally, inundation of any properties after that time was due to water which had escaped from the Avoca River or water which was prevented from entering the river, given that it was in flood. Such water is properly characterised as floodwater. 40. The report by WT identifies that stormwater could not have caused the above floor flooding of the Applicants’ home. It states that the last main burst of rain during the weather event finished early in the morning of 14 January 2011. Given the response time of the catchment was about 2 hours, any stormwater runoff could not have caused significant flooding after about 7 or 8am on 14 January 2011, according to WT. 41. Despite the inconsistency in the reporting of the time of inundation at floor level, even if it was sometime between 7.00pm and 9.00pm this is 1.5 to 3.5 hours after the water from the river would hav e reached the Applicants’ home. 42. Accordingly, the Panel finds that on the balance of probabilities, the above floor inundation of the Applicants’ home was the result of water overflowing the normal confines of the Avoca River. The Panel accepts that this is flood, as defined in the policy, and is excluded from cover. 43. The Applicants say they know that the water did not come from the river. 44. Based on the evidence provided, the Panel considers it highly likely that at least some of the water first reaching the Applicants ’ property came from the Calder Highway tributary and the railway dam (to the west and south of the property). This may account for the Applicants’ statement of water coming from a direction other than the Avoca River. 45. However, again, a combination of such water is also considered floodwater and therefore is excluded from cover under the policy. Case No: 341731 Determination Page 10 of 10 46. The Panel notes that part of the Applicants’ claim is for re -stumping of their home, which would be below floor level, and arguably could have bee n caused by stormwater before the river water arrived. However the Applicants have not presented any evidence that stormwater as opposed to floodwater had caused such damage. The onus of proof is on the Applicants to establish that any loss suffered has resulted from an insured event, in this case stormwater. 47. The Panel notes that even though the FSP decided in 2011 that it had no liability for the damage to the Applicants’ home or contents, it provided an ex-gratia payment of $64,000 to the Applicants. The Applicants now seek a further payment of approximately $7,000. 48. The Panel notes that the assessment of the damage by DR was used as a basis for calculating the amount of this ex- gratia or “goodwill” payment. 49. The Panel accepts that the FSP is not liable for any of the damage to the Applicants’ home or contents, as it was caused by the excluded event of flood. The ex-gratia payment made by the FSP does not establish that the FSP has accepted liability under the policy for the damage to the Applicants’ home or contents. 50. Accordingly, the Panel finds that the FSP has no obligation to provide any further payments to the Applicants with respect to their claim under the policy for the damage to their property. Determination 51. On the basis of the available information the Panel determines that the FSP is not required to make any further payments to the Applicants with respect to the damage to their home or contents.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.