Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 340647 Determination Page 1 of 15
Case number : 340647 3 February 2015
1 Overview
1.1 Dispute
The Applicant‟s claim follows damage to his home by storm on 26 January 2013.
The FSP accepted liability for the internal damage and partial liability for external
damage. The Applicant has disputed the FSP‟s decision and in addition seeks
payment for non- financial loss due to the FSP‟s poor claims handling process and
the delays associated with his claim.
1.2 Issues and key findings
Is the FSP’s offer to settle the Applicant’s claim for the internal damage
reasonable?
The offer to settle the internal damage claim is not reasonable because:
the offer does not take into account the likely additional costs incurred in
rectifying damage to the ceiling as an asbestos ceiling.
Is the FSP ’s limited offer to cover external damage reasonable?
The FSP‟s limited offer for external damage is not reasonable because:
on the balance of probabilities that the damage to the foundations was caused
during the event
the offer to settle does not include cost of rectification of the damage to the
foundations.
Is the Applicant entitled to compensation for non-financial loss?
The Applicant is entitled to compensation for non-financial loss because:
there were considerable delays in the claims process and handling
as a result of the delays, there was an unusual degree of inconvenience and
time taken resulting in the Applicant‟s loss of enjoyment or peace of mind.
1.3 Determination
This Determination is substantially in favour of the Applicant.
The FSP is to obtain a further Scope of Works including the costs of removing
and replacing the asbestos ceiling area damaged as a result of the storm,
rectifying the damaged foundations and repairing the damaged brick work .
Case No: 340647 Determination Page 2 of 15
The FSP is entitled to cash settle the Applicant‟s claim in line with the revised
Scope of Works.
The FSP is to pay the Applicant the sum of $2,000 pursuant to paragraph 9.3 of
the Terms of Reference for non-financial loss.
The FSP is to pay the Applicant the sum of $880 pursuant to paragraph 9.4 of the
Terms of Reference to cover the costs of engineer E‟s report.
Case No: 340647 Determination Page 3 of 15
2 Reasons for Determination
There has been a full exchange of material between the parties and each party
has had the opportunity of addressing the issues that arise from the material
exchanged.
This Determination is based on what is fair in all the circumstances having regard
to the information exchanged, relevant legal principles, terms of the policy, good
industry practise, and where appropriate, prior Determinations.
The Policy provides general cover for storm damage including subsidence if
it occurs immediately as a result of a storm
The general exclusions relating to cover note that subsidence and landslip are
excluded unless it happens immediately as a result of a storm. This is consistent
with the cover provided under storm cover.
It is noted that the Policy does not cover loss or damage “arising” from the
settling, shrinkage or expansion in buildings, foundations, walls or pavements.
This exclusion must be applied in context of the actual cover and proximate
cause. That is, if the loss or damage arises in and of itself from settling, shrinkage
or expansion of the footings then it would not be covered. However, if the storm is
the proximate cause of subsidence resulting in damage to the footings it would be
covered under the Policy.
2.1 Is the FSP’s offer to meet the costs of the internal damage
adequate?
The FSP‟s offer to meet the costs of the internal damage does not adequately
provide for the costs to either repair or replace the asbestos sheeting.
Engineer R referred to the plaster board ceilings being sound and not displaying
any noticeable loss of strength. Engineer R considered if asbestos was present in
the ceilings, it would only be an issue if removal was necessary.
It is now agreed between the parties that the ceiling sheets in the kitchen, lounge
room and passage way are asbestos sheeting.
There is an indication in the report from engineer R that there was some cracking
identified along the joints and storm damage to the panels. Engineer R believed
the panels could be dried out and painted, but it is unclear given his assessment
that the panels were plaster board that he would make such an assessment in the
understanding that the panels were asbestos.
The quotations provided by the Applicant do not clearly identify that the ceiling
sheets have been compromised.
In my view, it is fair in the circumstances that in the event that the ceiling sheets
have been damaged, that it would be necessary to remove the s heeting. In my
view, it is reasonable for a cautious approach to be taken to the material which is
hazardous and which may well have been damaged by the storm.
Case No: 340647 Determination Page 4 of 15
In the circumstances, the parties should obtain a report form a mutually agreeable
asbestos expert as to the condition of the ceilings. In the event that the expert
determines that the asbestos ceiling panels have been damaged, then the FSP
should meet the cost to remove and replace the ceilings with appropriate ceiling
sheets prior to repainting.
2.2 Is the FSP’s offer to cover the external damage reasonable?
The FSP is liable to meet the cost of repair to the brick works
The FSP agreed to pay for the external brick work given the evidence of SS and
BB with both engineers suggesting the pooling of water was an active cause of
the damage.
Engineer R and Engineer E‟s reports both indicate that between 4 to 5 square
meters of brick should be rebuilt. Engineer R indicated that there was too much
rotation for the wall to be patched and it appears Engineer E‟s report is in
agreement.
Both Engineer R and Engineer E have provided diagrams regarding the remedial
works. Engineer E has provided the measurements for both portions of the wall
which extend from the corner of dwelling where the damage has appeared
whereas Engineer R has only provided for one side of the wall. Engineer E
recommends that the existing damaged brickwork should be removed and
replaced along the rear and side walls, up to a point where no further storm
damage is evident.
In my view, the report of engineer E is to be preferred.
I am satisfied that as the policy includes cover to meet the current building
regulations in building a home, that any quotation for repair of the brick work
should ensure that the repairs are consistent with current building regulations.
The FSP should obtain a Scope of Works and quotations to complete the
rectification works to the external brick works in accordance with the
recommendations of engineer E.
The damage to the footings and foundation is covered under the terms of
the policy
The damage to the footings and foundation is on the balance of probabilities
covered under the terms of the policy.
Both Engineer R and Engineer E have indicated the footing and slab system was
built in accordance with normal practice at the time of construction. Further, both
note that the building stood for 35 years without damage which suggests its
construction was sound.
Whilst the policy excludes loss or damage associated with faulty workmanship,
there is no evidence that the construction of the footings and foundation was
faulty at the time of construction. It follows that the FSP has not established the
application of the exclusion relating to faulty workmanship.
Case No: 340647 Determination Page 5 of 15
Engineer R has indicated that the footing is inherently weak particularly due to
downward subsidence at the corners because it was not reinforced with any top
reinforcing steel. Engineer R believed the slab movement had developed over a
period of time but it was reasonable to accept that the infiltration of ground water
(via overland flow and heavy rain) near the back left hand corner of the house
was one of the initiating factors leading to movement/damage. Further minor
settlement to the sewer trench bedding materials occurred due to the ingress of
water, causing localised and minor reduction in support where sewer trench
passes beneath the corner of the footing.
In a later report Engineer R notes the relative movement does not indicate a
failure of the footings. The comment regarding minor strengthening work to the
footings was not an essential part of the repair work to reinstate the item.
Engineer E generally concurred with Engineer R‟s report, however he considered
that in order to restore the property to a pre-existing condition to a satisfactory
engineering standard that it was not just prudent but necessary to strengthen the
western corner‟s foundations.
I accept based on both reports that whilst there was some movement in the
footings prior to the January 2013 storm that the inundation of the property as a
result of the storm was an initiating factor leading to movement and damage to
the footings and foundations.
The policy provides cover for subsidence occurring immediately after a storm.
Based on the information available, I am satisfied that the damage to the
foundations occurred immediately after the storm.
Accordingly, I am satisfied based that the FSP is liable to meet the cost of repair
of the footings and foundations and to ensure that the footings and foundations
meet current building regulations.
That is the circumstance in the current dispute.
Is the FSP’s offer for the other external damage reasonable?
The FSP‟s offer to cover the other external damage including the costs of the pipe
vent in the sum of $528, the glazing in the sum of $390.01 and the cost of the
external door repair is reasonable.
2.3 Is the Applicant entitled to compensation for non-financial loss?
Paragraph 9.3 of the Terms of Reference provide that the Service may determine
to award compensation for non-financial loss in limited circumstances, to a
maximum of $3,000.
It is necessary for awarding compensation to be satisfied that the Applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant‟s expect ation of enjoyment
or peace of mind.
Case No: 340647 Determination Page 6 of 15
It is accepted that an insurer is entitled to investigate a claim appropriately and
that in some circumstances, delays will occur, in particular, where there are
significant weather events resulting in a large influx of claims. That is the
circumstances in the current dispute.
Although the FSP notified the Applicant on 20 March 2013 of its decision to
partially decline the claim, it is clear from the information exchanged that the FSP
had not completed its investigations at that time.
The Applicant disputed the FSP‟s decision to partially decline the claim in July
2013. The review was not completed until February 2014. At that time, the FSP
agreed to pay for some internal damage as well as the cracked brick work and to
waive an excess.
The delays were associated with the failure to obtain an engineering report or to
in fact arrange for an engineering report until October 2013. This is eight months
after the original claim.
The Applicant provided a psychological report that makes it abundantly clear that
the claims process and interaction with the FSP has significantly impacted on his
peace of mind. He has suffered symptoms of anxiety and depression which the
psychologist has directly linked to the claims handling process. The FSP has not
provided any evidence to dispute this.
I am satisfied based on the information exchanged that the delay in the claim
process and the claims handling has had a significant impact on the Applicant‟s
mental health. Given the nature of the impact, I am satisfied that the Applicant is
entitled to an award of $2,000 under the Terms of Reference for non-financial
loss.
Other matters
The Applicant has complained that he was not provided proper access to the
claim file.
It would appear based on the information exchanged that he did not receive the
file in its entirety at first instance which may in part be due to a miscommunication
between the Applicant and the FSP.
The FSP has provided information that it believed the A pplicant‟s request
contained in a letter dated 7 January 2013 was a request for the relevant
information to be exchanged. The FSP has apologised to that for any
misunderstanding.
The issues with respect to the exchange of information are issues which more
appropriately are dealt with by the Code Compliance Committee. Whilst the
delays and claims handling is relevant in terms of consideration as to the
Applicant‟s entitlement to compensation for non -financial loss, it is not appropriate
as part of this Determination to determine whether there has been a breach of the
relevant industry code of conduct.
Case No: 340647 Determination Page 7 of 15
Is the Applicant entitled to reasonable costs of obtaining an expert opinion?
Paragraph 9.4 of the Terms of Reference provides that the Service may
determine that the FSP contribute to professional costs by the Applicant in the
course of the dispute.
In determining whether the FSP should contribute to an Applicant‟s costs, it is
appropriate to take into account the complexity of the dispute, whether the
Applicant reasonably needed the advice and whether the advice assisted in the
resolution of the dispute.
I am satisfied that the report of engineer E has been of significant assistance in
helping resolve this dispute and in the circumstances, I am satisfied the FSP
should meet the costs of the report in the sum of $880 inclusive of GST.
Case No: 340647 Determination Page 8 of 15
3 Supporting information
3.1 Relevant Policy Wording
“Storm
…
Covered
- violent wind, cyclone or tornado
- rain, thunderstorm, hail or snow
- landslide or subsidenc e that happens immediately as a result of storm
…
Meeting building regulations
..
Covered under Buildings Insurance
- The costs to meet current building regulations to repair or rebuild the part of your home
that was damaged.
Not covered
- Costs to meet building regulations:
- that were already in place when your home was built, renovated or altered
- for undamaged parts of your home – for example, installing insulation in ceilings that
were not damaged
…
Exclusions for all cover
These exclusions apply to all cover under your policy
What we don‟t cover
Loss, damage, injury or death arising from:
…
Subsidence or landslide unless it happens immediately as a result of:
..
- a storm or flood
..
- the settling, shrinkage or expansion in buildings, foundations, walls or pavements.
…
Maintaining and occupying your home
We don‟t cover loss, damage, injury or death arising from:
Faulty design or workmanship”
3.2 Relevant Terms of Reference
“9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services
Provider compensate the Applicant for consequential financial loss or damage up to a
maximum amount of $3,000 per claim made in the Dispute
...
b) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial loss
but only where:
(i) An unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interfe rence with the Applicant‟s
expectation of enjoyment or peace of mind has occurred; or
(ii) In the case of a Dispute pertaining to an individual‟s privacy rights –
injury has occurred to the Applicant‟s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000 per claim made
in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for:
(i) Consequential financial loss; or
(ii) Non-financial loss,
Case No: 340647 Determination Page 9 of 15
In a Dispute arising as a result of a claim on a General Insurance Policy that e xpressly excludes
such liability
...
9.6 Other types of damages
Punitive, exemplary or aggravated damages may not be awarded.”
3.3 Claim Description provided on 26 January 2013
“Stormwater damage to foundations and walls and cracking of glass of windows and
possibly concrete flooring.”
3.4 Expert Reports and other relevant material/reports
Report provider and date Relevant information
Assessment report dated
28 February 2013
Storm conditions resulted in rainwater entering the
home through flashing and tile clips. The roof is
generally well maintained and the insured would not
have been aware of any defect prior to the event as
there is no evidence of damage pre - dating the incident.
The cycloni c wind ha impacted on the front roof plane
of the property causing the internal linings to crack and
the fixings supporting the ceiling linings to pop.
There are structural issues to the external eastern wall
and this is the result of unstable ground. The assessor
could not confirm whether the damage is consistent
with the claimed event.
Assessment report dated
21 June 2013 from “B”
B‟s inspection suggested that there was no storm
created opening but there was evidence of minor
cracking to the corner of so me roof tiles. The ridge did
not look to have been re - pointed since the dwelling was
constructed. Further, there was no sarking under the
tiles. There was also internal damage to the plaster and
to the laundry door.
There were structural issues noted to th e external
eastern wall of the dwelling which appeared to be the
result of unstable ground affecting the load bearing
walls of the dwelling from an unknown cause.
An investigation into the main and dwelling drain lines
determined no damage to these lines.
At the time of purchasing the property the Applicant
noted signs of cracking to the rear door and adjacent
window and corner. However, the cracking worsened
after the storm.
B opined that the damage to the ceiling and broken
laundry door were consistent wi th the storm event.
However B believed the cracking to the plaster joint
was from natural building movement rather than storm.
Further, the cracking to the brickwork was considered
to be the result of subsidence although B does confirm
that “it is possible that heavy rain may have contributed
to it.
Case No: 340647 Determination Page 10 of 15
Report dated 31 July 2013
from B
In addition to the damaged kitchen/dining and lounge
ceilings, the external laundry door is broken and the
bedroom adjacent to the laundry has a cracked glass
panel which the Ap plicant indicates is due to subsiding
brickwork during or shortly after storm.
There is no sarking under the roof tiles but this was not
a BCA requirement as the roof pitch is greater than 16
degrees.
The roof tiles were in good condition for the age of the
property although some cracking of the pointing to the
ridge and hip capping was noted. This did not
contribute to the water ingress during the storm event.
B believes the water ingress was due to rain driven
under the tiles by strong winds.
The sewer lines were undamaged.
During the storm event large volumes of water flowed
through and settled near the corner of the home.
An inspection of the bedroom adjacent to the subsided
brickwork did not show any signs of stress to the
internal walls or ceiling sh eets or mouldings. It is
assumed that the construction is an infill slab and the
concrete foundation has broken or subsided and the
slab is cantilevered on fill.
B recommends the engagement of a suitably qualified
Engineer to undertake a full investigation .
B confirms the damage is consistent with the recorded
incident.
Report dated 21 March
2013 from property
inspector “C”
Settlement has occurred at the rear south corner of the
building. A visual appraisal is that the footing edge of
the slab has settle d approximately 20 - 30mm and
caused rotational cracking in the brick veneer and
displacement around a window frame. There is some
evidence of prior repairs to cracking.
C opined that the damage to the building is a result of
subsidence of founding within t he sewer trench backfill.
The subsidence may be the result of broken pipework,
or leaching of backfill soils during recent storms and
flooding events.
C recommended that the sewer lines be checked for
breakages or leaks including the house drains.
Letter dated 27 September
2013 from “SS”
SS has been to the insured property a number of times
and can state the damage in the form of cracked and
displaced bricks between the back door and the corner
of the house extending around the corner and a long
the first part of the back wall appeared after the storm
in January 2013.
The damage appears to have resulted from subsidence
at the time the locale had significant rain and flooding.
Letter dated 5 December
2013 from the previous
owner of the residence
AW purchased the property in 1982 or 1983.
At the time of purchasing the property he noted a crack
existing in the wall which was repaired by the previous
Case No: 340647 Determination Page 11 of 15
“AW” owner.
A plumber who worked on the home informed AW that
the crack was “nothing to worry about”.
Reques t for personal
information
The Applicant signed a form requesting access to his
personal information on 8 January 2014. This
document was sent to the FSP on 9 January 2014 by
email with a request for reinstatement due to damage
caused by destructive testi ng.
Engineering Report dated
10 February 2014 by “R”
The footing and slab system was built in accordance
with normal practice for the time of construction.
It would be expected that this type of footing would
rotate outwards causing cracking as the slab i s not
connected to the footing.
The slab system can deflect vertically out of alignment
due to soil moisture effects because it does not contain
internal strengthening beams.
The footing is inherently weak particularly due to
downward subsidence at the cor ners because it has
not been reinforced with any top reinforcing steel.
The floor measurements suggest the overall slab
movements have developed progressively over a very
long period of time.
In relation to the brickwork damage occurring so soon
after Janu ary 2013 R states the following:
The brick work is in good condition.
The soil type is not subject to large movement due
to moisture variation.
It is reasonable to accept that the infiltration of ground
water (via overland flow and heavy rain) near the back
left hand corner of the house was one of the initiating
factors leading to movement/damage.
It is probable that minor settlement to the sewer trench
bedding materials occurred due to the ingress of water,
causing localised and minor reduction in supp ort where
sewer trench passes beneath the corner of the footing.
In order for subsidence to have occurred some or all of
the following issues would need to have contributed:
The construction of the footings over a sewer.
The extreme weather conditions whic h resulted in
ground saturation and caused previously poorly
compacted trench backfill to subside.
There is no obvious sign of settlement at the surface. R
concludes that the footing and slab system must
therefore have been a significant contributory fact or.
The building has moved marginally but the damage
exceeds what would ordinarily be expected. The lateral
rotation of the brickwork is to major for patching the
brickwork. It will require demolishment and rebuilding.
This remedial action would place the building back to
its pre - existing condition but R recommends
strengthening this corner of the home to avoid any
issues created by the close proximity of the Council
Case No: 340647 Determination Page 12 of 15
sewer pipe.
The vertical crack in the brickwork below the window
jambs on the rear wall of the building are minor in
nature and can be repaired if this is considered
appropriate. The cracking has occurred over time and
is probably due to the lack of any control jointing.
The roofing is at a pitch at which sisilation is not
required to prevent w ater ingress. The water was most
likely driven under the tiles due to high winds.
The plasterboard roof sheeting is sound and does not
display any noticeable loss of strength, sagging or
similar. R opines the joints could be dried out and
repair work simpl y involve painting of the ceiling.
R does not agree that the removal of the ceilings in the
kitchen, lounge room and passageway is warranted to
repair the affected rooms.
Builder Assessment
Report dated 28 February
2014 by “A”
A provides a costing/scope of works based on the
report of engineer “R”.
A states that the damage sustained as a result of
tropical cyclone Oswald includes the plasterboard
ceilings to the kitchen, dining and lounge rooms,
broken glass to the laundry door and bedroom 3
window and cracking to external brickwork.
A opines that the effective cause of damage to the
insured residence are weather factors associated with
the cyclone.
The assessed amount for building works was $6,256 .
Engineering Report by R
2 June 2014
R denies accurate measurements were not taken of the
brick work, that 2/3rds of the ramp needs to be
removed or that there is no accurate scope of works in
regard to the requirement to replace brickwork.
The ceilings do not need to be removed as the material
is sound and has not lost strength. If asbestos was
present in the ceiling sheeting such a presence would
only be an issue if removal was necessary. Further
temporary accommodation is not required for the
painting of ceilings.
R accepts that the kitchen, lounge and hallway ceilings
need to be repainted to provide uniform finish after
localized repairs. However there is no need to paint
walls or remove cornices.
R accepted in its report dated 10 February 2014 it was
reasonable to accept infilt ration of ground water near
the back left hand corner of the house was one of the
initiating factors but there was no suggestion of
ongoing settlement.
R accepted that the isolated damage at the back left
hand corner of the house is storm damage requiring
replacement of around 4 - 5 square meters of brickwork.
The relative movement does not indicate a failure of
the footings. The comment regarding minor
strengthening work to the footings was not an essential
Case No: 340647 Determination Page 13 of 15
part of the repair work to reinstate the item.
Eve n if the building occurred over the sewer lines, it
has had no damage for 35 years since construction
which indicates it has not been an issue.
Any footing movements would be minor in nature. The
brickwork will be replaced and the footings can be
reused.
R confirms the causes of the cracking have occurred
over a long time, and it is not disputed that the crack
occurred after the cyclone. Repairs would involve
installing a brick control joint because no structural
damage has occurred.
R did not consider so il tests were required in the
circumstances.
The gap between brickwork and window is not a defect
as it is not a „crack‟. Remedial work would include
touch up painting inside and provision of a minor
aluminium cover strip between the window and bricks.
R i s not aware of building costs in the Applicant‟s locale
and would have no basis to claim the costs should be
higher because of the locale.
Doctor’s Report
11 July 2014
The Applicant has been regularly seeing a psychologist
since January 2014 with ongoing review and support.
The Applicant has commenced medication for
psychological distress.
Engineering Report by “E”
24 July 2014
E noted cracking to the brickwork in various locations
around the western corner of the house.
The eave was out of alignment at the western corner of
the home.
There was a sewer located in close proximate to the
western corner of the home.
E generally concurs with the content of R‟s report.
However in order to restore the property to pre - existing
condition to a satisfactory enginee ring standard it is not
only prudent but completely necessary to strengthen
the western corner‟s foundations.
Further, E recommends that the existing damaged
brickwork should be removed and replaced along the
rear and side walls, up to a point where no fu rther
indication of the storm damage is evident. E has
attached designs to illustrate the works to be done.
E notes that the construction methodology used on the
insured premise was likely a common and acceptable
practice at the time of construction. Howev er, due to
the time that has elapsed it is difficult to comment on
the workmanship – but the fact it has stood 39 years
without a single crack suggests a high standard of
workmanship.
The drawings provide dimensions suggesting the rear
of the property shou ld have 4.9m of brick work repaired
and the side should have 5.15m of brick work repaired.
Further, that strip footing should extend 1m past
existing brickwork that is replaced.
The cost of the Report was $880 (GST inclusive).
Case No: 340647 Determination Page 14 of 15
Psychologist Report
4 September 2014
The psychologist notes the Applicant was referred by
his doctor for treatment of anxiety and stress
management. The psychologist states “…This was a
direct psychological consequence form the continuation
of an insurance claim for damage to h is property
resultant of the January 2013 floods.
The Applicant has been a patient for 12 months.
The Applicant‟s symptoms include restlessness,
irritability, depressed mood, frustration and anger
regarding the insurance claim, excessive financial
worries due to need for repairs, sleep disturbance, loss
of interest in food and low energy levels.
Testing revealed his anxiety and stress within the
extremely severe range and depression severe range.
The symptoms are consistent with the DSM - IV
diagnostic criter ia of mixed anxiety and depressed
mood.
The psychologist notes that the symptoms were
precipitated significantly by the management of the
claim for damages to his home. The symptoms are
likely to occur with his insurance claim being equitably
resolved.
The Applicant has no previous psychiatric history.
Laboratory Report Confirms that the material is asbestos .
Council Policy for Building
Over Sewers
Issue date: 31 October 2011
Generally the Council states it is undesirable for a
building to be located ove r a sewer line and that
construction of such is avoided if at all possible.
Pre - purchase inspection
report
The pre - purchase inspection report indicates “crack in
brick” to the external of the home but does not suggest
large cracking and structural instab ility.
The Applicant ‟ s submissions indicate the property was
purchased on 5 April 2000.
Undated letter from
Plumber “PB”
PB attended the property on 27 November 2012 to
provide a quotation to re - gutter the property and a
discussion ensued with the Applicant regarding
placement of rainwater tanks. In particular, PB
discussed whether to place the rainwater tanks to the
rear left or rear right hand side of the house.
PB notes that he would definitely have noticed damage
to the rear wall if it had exist ed at the time of preparing
this quotation.
PB states that there was “definitely no cracking in the
walls in November 2012 as we looked at both rear
walls for a fair time while discussing the guttering and
the positioning of rain water tanks.”
3.5 Quotations for Repair
Quotation Provider and Date Amount and scope of works
Plumbing Quotation
9 February 2014
Removal of vent pipe and installation of a new
PVC pipe to be painted the same colour .
Works would cost $490 (GST inclusive) .
Case No: 340647 Determination Page 15 of 15
Plumbing Quotation
28 February 2014
Replacement of vent pipe in 10mm PVC
including painting.
Works cost $528 (GST inclusive) .
Asbestos Removal Company
31 March 2014
The scope of works was to remove ceiling
sheets in lounge and dining/kitchen.
Remove insulation batts from ceili ng cavity .
Remove kitchen cabinets for decontamination .
The works do not include re - plastering or re -
installation of cabinets .
The works would cost $3,520 (GST inclusive) .
Asbestos Removal Quotation
7 April 2014
The removal of asbestos material and insulation
batts .
Saf ety works.
Installation of plaster sheeting together with
painting .
Replace external door using hardware and
paint .
The quotation costs $14,292 (GST inclusive) .
Plastering company
30 June 2014
Remove and replace 75mm cornice around
ki tchen cupboards.
The works would cost $220 (GST inclusive) .
Building Company “M”
27 August 2014
To underpin storm settlement damage as
suggested by E‟s drawings is $21,719 (GST
inclusive) .
Remove and replace storm damaged asbestos
ceilings would be $18,75 7 (GST inclusive).
Bricklaying company
5 September 2014
The scope of works includes pulling down
existing damaged wall to copper pipe and
removing from site, tooth out the existing wall
and relay with similar bricks not straight vertical
control joint.
The cost of these works would be $3,270 (GST
inclusive) provided there is no touching of the
concrete path way.
Glazing Company
12 September 2014
Re - glaze window and laundry door panel .
Cost of works would be $390.01 .