Determination 340370

Storm damage claim: roof, foundation subsidence and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed storm damage including roof replacement and foundation subsidence repairs. AFCA accepted the storm as an insured event but found the roof failure was wear and tear and the subsidence pre-dated the policy and is excluded, and that the $17,087 cash settlement was reasonable, so no compensation is payable.

The onus shifts to the insurer to establish exclusions, which it did for wear and tear and pre-existing or excluded earth movement, and the cash settlement met policy obligations.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 340370 Determination Page 1 of 5 Case number : 340370 7August 2014 1 Overview 1.1 Dispute The Applicant lodged a claim for storm damage to her home insured under a Home Building and Contents Insurance policy (the policy) held with the Financial Services Provider (FSP) on 2 February 2013. The FSP accepted the claim however excluded from cover loss/damage it does not believe to be related to the insured event. The Applicant remains dissatisfied with the extent of indemnity offered by the FSP under the claim. 1.2 Issues and key findings What is the scope of cover available under the policy? The contract of insurance provides cover for loss or damage to the insured contents and building caused by one or a combination of the listed insured events subject to the specified limitations/exclusions. Is the FSP obliged to provide indemnity for all the damage claimed? The FSP is not obliged to provide indemnity to the Applicant for all the damage because not all the damage claimed is the result of circumstances (insured event) covered by the policy. It is clear certain aspects of the damage are excluded from cover. Does the FSP’s cash settlement of the claim fulfil its policy obligations? The FSP’s calculations and resultant cash settlement of the Applicant’s claim is both reasonable and in line with its obligations under the policy. Is the Applicant entitled to compensation? The FSP is not obliged to pay compensation to the Applicant. 1.3 Determination The Determination is in favour of the FSP. The manner by which the FSP has cash s ettled the Applicant’s claim fulfils its obligations under the claim. The FSP is not obliged to arrange payment to the Applicant by way of compensation. Case No: 340370 Determination Page 2 of 5 2 Reasons for Determination 2.1 What is the scope of the Applicant’s policy ? The policy is an insured events contract of insurance The Applicant’s policy is a contract of insurance which provides indemnity for loss or damage arising from the defined insured events only. Further, it excludes from cover loss or damage which is found to be due to the specifically listed policy limitations and exclusions. The FSP has accepted the claim which establishes the insured property was damaged due to a significant storm (insured event) experienced in the vicinity of the insured property on or about 1 February 2013. The issue for consideration is whether the damage the FSP has denied indemnity for under the claim is due to the insured event or whether it arose from circumstances excluded from cover under the policy. 2.2 Is the FSP obliged to provide cover for all the damage claimed? The FSP has established not all damage is due to the insured event The FSP accepted the Applicant’s claim and therefore also accepted the insured property was damaged due to an insured event. Accordingly, the onus rests with the FSP to establish, on balance, an entitlement to decline indemnity for a portion of the damage claimed on the basis of the exclusions it seeks to rely upon. The Applicant, under storm damage cover, is seeking for the FSP to also cover the damage to the roof, damage to the building from alleged sinking of the foundations as well as the cost to rectify the sinking of the foundations. The Panel acknowledges that both parties rely upon the information they have made available to the Service, including very helpful photographic evidence. The Panel has carefully considered all of the evidence relied upon by the parties in providing this Determination. The Panel also notes that prior to and during the course of referring this dispute to the Service there were several issues in dispute be tween the parties, however, several of these have been resolved and no longer remain in dispute. This Determination will limit consideration to the outstanding issues in dispute. Roof and water ingress The evidence establishes that the weather event which occurred on or about 1 February 2013, in the vicinity of the insured property, consisted of significantly strong winds and high levels of rainfall. It is clear that rainwater has entered the insured building through the roof and resulted in water damage to the dwelling. The FSP has accepted to cover the internal water ingress damage, however, cover for the roof itself has been declined. Case No: 340370 Determination Page 3 of 5 The Panel has carefully considered the evidence made available by the various consultants, including the very helpful photographs of the external roof. It is clear the water ingress had occurred due to lifting of the roof sheets but that the lifting occurred due to wear and tear rather than the insured event. Although the Applicant had recently before the storm authorised some roof maintenance works (replacement of gutters and some roof sheets), these were not sufficient to address the overall obvious existing weathered and deteriorated condition of the roof. The evidence establishes, on balance, the roof was deteriorated, corroded, rusted and basically at the end of its serviceable life prior to the insured event. Accordingly, the FSP was not obliged to authorise replacement of the roof under the claim and/or increase the level of indemnity it has already offered the Applicant, in this regard. Movement of the insured building The Applicant is of the view that the extreme levels of rainfall experienced during the storm has had an effect upon the foundation soils of the home, causing it to sink. The Applicant asserts that after the storm event she noted cracking damage in certain areas of the home with the most significant indication of the sinking being one of the garage gate doors which fell in level and got stuck. It is not in dispute that there exists a certain level of subsidence, however, the issues in contention between the parties relate to the extent of this subsidence as well as to whether it actually occurred before or after inception of the policy in June 2010. Numerous consultants were commissioned, for the most part by the FSP, to investigate and report on the extent and proximate cause for the damage claimed to be due to subsidence. The experts include assessors, builders and engineers, all of who were suitably qualified to provide their respective opinions having assessed and investigated the extent and cause of the damage the subject of this dispute. Having considered the available evidence the Panel is satisfied the FSP has successfully established, on the balance of probabilities, the movement in the upper level of the building structure is not due to subsidence caused by the insured event for which the claim was lodged. Further, the structural integrity of the insured building had not been compromised due to the subsidence. The available evidence also supports the FSP’s position that photographs of the insured property taken in April 2010, years before the insured event, establish on balance that the damage the subject of this claim pre-existed inception of the policy and definitely the insured event. In the absence of reasonable substantiating evidence to support an assertion the storm event caused and/or contributed to the movement damage claimed, the Panel is not satisfied the insured event caused and/or contributed to the movement damage claimed. Case No: 340370 Determination Page 4 of 5 Sinking of foundation stumps The Panel notes that the dispute relating to rectification of the insured building’s foundation stumps has not been considered/discussed in great detail within the available information submitted to the Service. In saying that, the evidence does, however, make reference to, in order to rectify the effects of subsidence upon the left hand side of the dwelling, jacki ng up the floor level and replacing five stumps at an estimated cost of $5,000. Having considered the available evidence and noting the absence of substantiating evidence to the contrary, the Panel does not accept it has been established that the insured building has suffered any subsidence arising from the insured event. Rather, the available evidence does establish, on balance, that the insured building has been the subject of gradual ongoing foundation movement for some time, which dates back to before the policy was incepted. Also, the policy clearly excludes from cover loss or damage caused by erosion, landslide, subsidence, earth movement (except earthquake), earth shrinkage or expansion, no matter how caused. Therefore, in line with the relevant policy wording, the FSP is not obliged to provide indemnity to the Applicant for any loss or damage arising from the sinking of the dwelling’s foundations. 2.3 Does the FSP’s cash settlement of the claim fulfil its obligations? The FSP cash settlement of the claim fulfils its obligations under the policy The Panel acknowledges the Applicant’s concern that although the FSP has settled the claim based on a quote from “LB”, who was appointed by the Applicant, LB was no longer prepared to do the repairs, due to dissatisfaction with the conduct of the FSP. In saying that, the Panel also notes that LB’s quote was significantly higher when compared to the quotes submitted by the FSP’s preferred repairers, however, the FSP still proceeded to settle the claim on the basis of LB’s quote. The Panel has not been provided with any additional substantiating evidence which establishes that the cash settlement amount offered by the FSP is not sufficient to undertake the repairs which are actually covered under the claim. Accordingly, the Panel is satisfied that the cash settlement of $17,087 paid/offered to the Applicant under the claim by the FSP, is reasonable and in line with its obligations under the policy. 2.4 Is the Applicant entitled to compensation? The FSP is not obliged to pay compensation to the Applicant The Service has the power to offer compensation in certain circumstances, with a limit of $3,000 available. There is no evidence to support the FSP has not handled the claim in a reasonable manner. Further, in line with matters discussed and determined above, the FSP has fulfilled its obligations under the claim. The award of Case No: 340370 Determination Page 5 of 5 compensation under the Service’s Terms of Reference requires the occurrence of an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind due to the insurer’s management of a claim. In considering all of the provided information, there is no persuasive reason to suggest that compensation should be payable to the Applicant in this instance. 3 Supporting information 3.1 Consultants’ reports and supporting evidence The parties in support of their positions rely upon the opinion(s) of their appointed consultants’ provided in the following reports/statem ents:  Statements from witnesses AE, BP, JB, CC and DC dated 14 January 2014  S’s (Assessors/Loss adjusters) Reports (1 -12) Feb 2013 – November 2013  J’s Make Safe Report dated 11 February 2013  I’s Engineer Inspection Report dated 19 July 2013  L’s Quote dated 6 September 2013  AN Roof Report dated 4 December 2013.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.