Home / Financial Firm (Unknown - Insurer) / Determination 340370
Determination 340370
Storm damage claim: roof, foundation subsidence and cash settlement amount
Summary
A homeowner claimed storm damage including roof replacement and foundation subsidence repairs. AFCA accepted the storm as an insured event but found the roof failure was wear and tear and the subsidence pre-dated the policy and is excluded, and that the $17,087 cash settlement was reasonable, so no compensation is payable.
The onus shifts to the insurer to establish exclusions, which it did for wear and tear and pre-existing or excluded earth movement, and the cash settlement met policy obligations.
Issues
- Claim denial primary · not upheld
“The FSP is not obliged to provide indemnity to the Applicant for all the damage because not all the damage claimed is the result of circumstances (insured event) covered by the policy.”
- Claim amount dispute secondary · not upheld
“the cash settlement of $17,087 paid/offered to the Applicant under the claim by the FSP, is reasonable and in line with its obligations under the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Determination
Case No: 340370 Determination Page 1 of 5
Case number : 340370 7August 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim for storm damage to her home insured under a
Home Building and Contents Insurance policy (the policy) held with the Financial
Services Provider (FSP) on 2 February 2013.
The FSP accepted the claim however excluded from cover loss/damage it does
not believe to be related to the insured event. The Applicant remains dissatisfied
with the extent of indemnity offered by the FSP under the claim.
1.2 Issues and key findings
What is the scope of cover available under the policy?
The contract of insurance provides cover for loss or damage to the insured
contents and building caused by one or a combination of the listed insured events
subject to the specified limitations/exclusions.
Is the FSP obliged to provide indemnity for all the damage claimed?
The FSP is not obliged to provide indemnity to the Applicant for all the damage
because not all the damage claimed is the result of circumstances (insured event)
covered by the policy. It is clear certain aspects of the damage are excluded from
cover.
Does the FSP’s cash settlement of the claim fulfil its policy obligations?
The FSP’s calculations and resultant cash settlement of the Applicant’s claim is
both reasonable and in line with its obligations under the policy.
Is the Applicant entitled to compensation?
The FSP is not obliged to pay compensation to the Applicant.
1.3 Determination
The Determination is in favour of the FSP.
The manner by which the FSP has cash s ettled the Applicant’s claim fulfils its
obligations under the claim.
The FSP is not obliged to arrange payment to the Applicant by way of
compensation.
Case No: 340370 Determination Page 2 of 5
2 Reasons for Determination
2.1 What is the scope of the Applicant’s policy ?
The policy is an insured events contract of insurance
The Applicant’s policy is a contract of insurance which provides indemnity for loss
or damage arising from the defined insured events only. Further, it excludes from
cover loss or damage which is found to be due to the specifically listed policy
limitations and exclusions.
The FSP has accepted the claim which establishes the insured property was
damaged due to a significant storm (insured event) experienced in the vicinity of
the insured property on or about 1 February 2013.
The issue for consideration is whether the damage the FSP has denied indemnity
for under the claim is due to the insured event or whether it arose from
circumstances excluded from cover under the policy.
2.2 Is the FSP obliged to provide cover for all the damage claimed?
The FSP has established not all damage is due to the insured event
The FSP accepted the Applicant’s claim and therefore also accepted the insured
property was damaged due to an insured event. Accordingly, the onus rests with
the FSP to establish, on balance, an entitlement to decline indemnity for a portion
of the damage claimed on the basis of the exclusions it seeks to rely upon.
The Applicant, under storm damage cover, is seeking for the FSP to also cover
the damage to the roof, damage to the building from alleged sinking of the
foundations as well as the cost to rectify the sinking of the foundations. The Panel
acknowledges that both parties rely upon the information they have made
available to the Service, including very helpful photographic evidence. The Panel
has carefully considered all of the evidence relied upon by the parties in providing
this Determination.
The Panel also notes that prior to and during the course of referring this dispute to
the Service there were several issues in dispute be tween the parties, however,
several of these have been resolved and no longer remain in dispute. This
Determination will limit consideration to the outstanding issues in dispute.
Roof and water ingress
The evidence establishes that the weather event which occurred on or about 1
February 2013, in the vicinity of the insured property, consisted of significantly
strong winds and high levels of rainfall. It is clear that rainwater has entered the
insured building through the roof and resulted in water damage to the dwelling.
The FSP has accepted to cover the internal water ingress damage, however,
cover for the roof itself has been declined.
Case No: 340370 Determination Page 3 of 5
The Panel has carefully considered the evidence made available by the various
consultants, including the very helpful photographs of the external roof. It is clear
the water ingress had occurred due to lifting of the roof sheets but that the lifting
occurred due to wear and tear rather than the insured event.
Although the Applicant had recently before the storm authorised some roof
maintenance works (replacement of gutters and some roof sheets), these were
not sufficient to address the overall obvious existing weathered and deteriorated
condition of the roof.
The evidence establishes, on balance, the roof was deteriorated, corroded, rusted
and basically at the end of its serviceable life prior to the insured event.
Accordingly, the FSP was not obliged to authorise replacement of the roof under
the claim and/or increase the level of indemnity it has already offered the
Applicant, in this regard.
Movement of the insured building
The Applicant is of the view that the extreme levels of rainfall experienced during
the storm has had an effect upon the foundation soils of the home, causing it to
sink. The Applicant asserts that after the storm event she noted cracking damage
in certain areas of the home with the most significant indication of the sinking
being one of the garage gate doors which fell in level and got stuck.
It is not in dispute that there exists a certain level of subsidence, however, the
issues in contention between the parties relate to the extent of this subsidence as
well as to whether it actually occurred before or after inception of the policy in
June 2010. Numerous consultants were commissioned, for the most part by the
FSP, to investigate and report on the extent and proximate cause for the damage
claimed to be due to subsidence.
The experts include assessors, builders and engineers, all of who were suitably
qualified to provide their respective opinions having assessed and investigated
the extent and cause of the damage the subject of this dispute. Having
considered the available evidence the Panel is satisfied the FSP has successfully
established, on the balance of probabilities, the movement in the upper level of
the building structure is not due to subsidence caused by the insured event for
which the claim was lodged. Further, the structural integrity of the insured
building had not been compromised due to the subsidence.
The available evidence also supports the FSP’s position that photographs of the
insured property taken in April 2010, years before the insured event, establish on
balance that the damage the subject of this claim pre-existed inception of the
policy and definitely the insured event. In the absence of reasonable
substantiating evidence to support an assertion the storm event caused and/or
contributed to the movement damage claimed, the Panel is not satisfied the
insured event caused and/or contributed to the movement damage claimed.
Case No: 340370 Determination Page 4 of 5
Sinking of foundation stumps
The Panel notes that the dispute relating to rectification of the insured building’s
foundation stumps has not been considered/discussed in great detail within the
available information submitted to the Service. In saying that, the evidence does,
however, make reference to, in order to rectify the effects of subsidence upon the
left hand side of the dwelling, jacki ng up the floor level and replacing five stumps
at an estimated cost of $5,000.
Having considered the available evidence and noting the absence of
substantiating evidence to the contrary, the Panel does not accept it has been
established that the insured building has suffered any subsidence arising from the
insured event. Rather, the available evidence does establish, on balance, that the
insured building has been the subject of gradual ongoing foundation movement
for some time, which dates back to before the policy was incepted.
Also, the policy clearly excludes from cover loss or damage caused by erosion,
landslide, subsidence, earth movement (except earthquake), earth shrinkage or
expansion, no matter how caused. Therefore, in line with the relevant policy
wording, the FSP is not obliged to provide indemnity to the Applicant for any loss
or damage arising from the sinking of the dwelling’s foundations.
2.3 Does the FSP’s cash settlement of the claim fulfil its obligations?
The FSP cash settlement of the claim fulfils its obligations under the policy
The Panel acknowledges the Applicant’s concern that although the FSP has
settled the claim based on a quote from “LB”, who was appointed by the
Applicant, LB was no longer prepared to do the repairs, due to dissatisfaction with
the conduct of the FSP. In saying that, the Panel also notes that LB’s quote was
significantly higher when compared to the quotes submitted by the FSP’s
preferred repairers, however, the FSP still proceeded to settle the claim on the
basis of LB’s quote.
The Panel has not been provided with any additional substantiating evidence
which establishes that the cash settlement amount offered by the FSP is not
sufficient to undertake the repairs which are actually covered under the claim.
Accordingly, the Panel is satisfied that the cash settlement of $17,087
paid/offered to the Applicant under the claim by the FSP, is reasonable and in line
with its obligations under the policy.
2.4 Is the Applicant entitled to compensation?
The FSP is not obliged to pay compensation to the Applicant
The Service has the power to offer compensation in certain circumstances, with a
limit of $3,000 available.
There is no evidence to support the FSP has not handled the claim in a
reasonable manner. Further, in line with matters discussed and determined
above, the FSP has fulfilled its obligations under the claim. The award of
Case No: 340370 Determination Page 5 of 5
compensation under the Service’s Terms of Reference requires the occurrence of
an unusual degree or extent of physical inconvenience, time taken to resolve the
situation or interference with the Applicant’s expectation of enjoyment or peace of
mind due to the insurer’s management of a claim.
In considering all of the provided information, there is no persuasive reason to
suggest that compensation should be payable to the Applicant in this instance.
3 Supporting information
3.1 Consultants’ reports and supporting evidence
The parties in support of their positions rely upon the opinion(s) of their appointed
consultants’ provided in the following reports/statem ents:
Statements from witnesses AE, BP, JB, CC and DC dated 14 January 2014
S’s (Assessors/Loss adjusters) Reports (1 -12) Feb 2013 – November 2013
J’s Make Safe Report dated 11 February 2013
I’s Engineer Inspection Report dated 19 July 2013
L’s Quote dated 6 September 2013
AN Roof Report dated 4 December 2013.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.