Home / Financial Firm (Unknown - Insurer) / Determination 340355
Determination 340355
claim_denial
Summary
The applicants' home insurance claim for water damage was partly declined and the insurer's claim handling was delayed. AFCA upheld the decline for the driveway and retaining wall, ordered indemnity for the bamboo flooring and cellar with statutory interest, and found compensation for the delay was not warranted.
An excluded storm cause prevails under the Wayne Tank principle for the driveway and retaining wall, but the FSP did not substantiate its refusal for the flooring.
Issues
- Claim denial primary · upheld
“The FSP was not able to establish an entitlement to decline indemnity for the bamboo flooring and cellar damage; it must cash settle these, but the driveway and retaining wall decline was upheld.”
- Delay secondary · upheld
“The FSP's management of the claim was less than satisfactory and it delayed settlement, though no compensation was awarded for the delay.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Delay in claim
handling
Determination
Case No: 340355 Determination Page 1 of 6
Case number : 3 3 40355 9 July 2014
1 Overview
1.1 Dispute
The Applicants lodged a claim on their Home Building and Contents Insurance
policy (the policy) for water damage to the insured property claimed to have
occurred on 16 October 2012.
The Financial Services Provider (FSP) has refused to provide indemnity to the
Applicants for the damage claimed.
1.2 Issues and key findings
Has a prima facie claim been established?
The Applicants have been successful in fulfilling the onus to establish, on the
balance of probabilities, the damage claimed is the result of the events clearly
covered under the policy and so a prima facie claim exists.
The burden therefore shifts to the FSP to establish, on balance, an entitlement to
limit or decline indemnity to the Applicants under the policy.
Is the FSP entitled to decline indemnity to the Applicants?
The available evidence establishes the FSP was entitled to decline indemnity to
the Applicants for the damage to the driveway and retaining wall as the policy
excludes from cover, storm damage to retaining walls, paths and driveways.
The presence of internal damage to the bamboo flooring (the flooring) is not in
dispute. In the absence of substantiating evidence to support its decision, to
decline cover for the damage to internal flooring and moisture damage to the
cellar flooring, the FSP is to provide indemnity for this damage under the claim,
subject to satisfactory proof of costs expended by the Applicants to repair the
internal flooring and the cellar flooring.
Is the FSP required to make payment to the Applicants by way of
compensation?
Although the FSP‟s management of the claim was less than satisfactory, the FSP
has also argued that the Applicants‟ failure to allow its assessors to further review
the claim has contributed to the delays. Overall, the Panel is not persuaded that
the circumstances are such that compensation is appropriate in this matter.
Case No: 340355 Determination Page 2 of 6
1.3 Determination
This Determination is partially in favour of the Applicants.
The FSP has not been able to establish, on the balance of probabilities, an
entitlement to decline indemnity for the damage to the bamboo flooring and
cellar flooring
The FSP is not obliged to provide indemnity for the storm/rainwater damage to
the driveway and retaining wall
The FSP is not required to pay compensation
The FSP is to pay interest at the statutory rate in line with Section 57 of the
Insurance Contracts Act 1984 (the Act) upon the final settlement amount, from
16 April 2013 (six months from claim lodgement), until such payment is issued
to the Applicants.
Case No: 340355 Determination Page 3 of 6
2 Reasons for Determination
2.1 Have the Applicants established a prima facie claim under the
policy?
The Applicants have established a prima facie claim under the policy
The policy is an insured events policy which provides indemnity for loss or
damage to the insured property caused by the listed insured events and subject to
the specified policy exclusions and limitations.
The available evidence shows that there is damage to the insured property
including the driveway paving, retaining wall, in the cellar and to bamboo flooring
within various areas of the home. Further, the evidence also establishes, on the
balance of probabilities, this damage is due to two causes: a leaking main water
pipe identified by the Water Corporation (WC) and a significant rainfall event
which occurred in October 2012.
Both the above noted events are listed as „Insured Events‟ under the policy and
therefore loss or damage arising from these events does establish a prima facie
claim. However, such cover is subject to the specified policy limitations and/or
exclusions provided within the policy.
2.2 Is the FSP entitled to decline indemnity to the Applicants?
FSP not obliged to provide indemnity to the Applicants for the damage to
the driveway and retaining wall
The parties each rely upon the evidence made available by the consultants
commissioned to the claim. The available evidence clearly establishes (and which
is not in dispute) that the paved driveway and connecting retaining wall were
damaged due to the pooling of excessive water at the south east corner of
driveway. It is also accepted by the parties that the pooling of water occurred
subsequent to a significant rainfall event which occurred in the area of the insured
property in October 2012. The FSP states it is not obliged to provide indemnity to
the Applicants for this damage as the policy clearly excludes storm damage to
driveways and retaining walls.
The Applicants have raised concerns with the FSP‟s decision and maintain the
FSP failed to consider the evidence made available by „BS‟ on behalf of WC.
Further, that this evidence establishes there was a burst main water pipe in the
vicinity of the insured property resulting in water accumulation problems and
which continued to occur until such stage as the water main was identified and
repaired. The Panel has considered the letter from BS dated 11 July 2013 and
accepts this confirms there was a leaking main water pipe which may have been
a contributing factor in the ponding of stormwater in the area of the driveway and
retaining wall in October 2012. It is noted that escape of fluid from a leaking pipe
is an insured event for which there is no exclusion for damage to retaining walls,
driveways and pathways.
Case No: 340355 Determination Page 4 of 6
The Panel is satisfied that the evidence, on balance, would therefore suggest that
there were two contributing factors for the damage to the external area of the
insured property. However, this does not assist the Applicants as in line with an
accepted insurance legal principle (Wayne Tank Principle), if damage to an
insured property is the result of two contributing causes (e.g. storm and escape of
water), one of which is covered by the policy whilst the other excluded, the
exclusion prevails allowing an insurer to decline indemnity for such loss, if
claimed.
Accordingly, having regard to the available evidence, the Panel is satisfied the
FSP was entitled to decline indemnity to the Applicants for the damage to the
retaining wall and driveway under the claim.
FSP is obliged to provide indemnity to the Applicant’s for the internal
damage (flooring and cellar)
The Applicants have sought indemnity for internal damage to the insured building
which they maintain occurred when the water which had pooled outside the
dwelling on or about 16 October 2012, eventually overflowed into their home. The
Panel notes the evidence shows the insured dwelling is constructed over a few
levels, with the insured property sloping front to back i.e. from the area of the
driveway at the front of the home, down towards the rear of the property.
The FSP acknowledges the appointed consultants „C‟ having assessed the
insured dwelling, confirmed the presence of water damage to the flooring in
several areas/rooms of the home. The FSP acknowledges evidence of water
damage to the flooring, which it initially accepted. However, it has later sought to
decline indemnity for this aspect of the claim on the basis the Applicants (having
been requested to do so) have failed to make available evidence to show the
flooring had been replaced recently, following previous damage.
The FSP submits that the Applicants were (at their request), cash settled for
significant water damage under two previous claims (lodged on 21 February 2011
and 28 February 2011) in the amounts of $55,954.55 and $50,517.30, including
water damage to the flooring. The FSP maintains that there is an absence of
evidence to establish the Applicants had actually undertaken the flooring
replacement works (for which they had previously been cash settled), which
would confirm the current damage is due to the insured event the subject of the
current claim. Further, if the Applicants were able to make such evidence
available the FSP would be prepared to settle this component of the claim.
The Applicants state the FSP has no evidence to establish the works were not
undertaken by the Applicants and if it does they challenge the FSP to bring this
forward. The Applicants also note there is no dispute they had undertaken all the
other works recommended by the FSP, under the previous claims, at their own
cost, such as the guttering, drainage pipes and weep holes etc. The Applicants
maintain it is not logical to assume in authorising all the other recommended
works the Applicants would have ignored the damaged flooring in the hope
another insured event would occur in the future. The Panel also notes the
Applicants, (which has not been disputed), since purchasing the property in 2009
Case No: 340355 Determination Page 5 of 6
had undertaken extensive internal and external renovations at the cost of over
$250,000.
The Panel notes the FSP was allowed numerous opportunities to assess the
claimed damage as well as appoint whichever consultants it wished and did in
fact appoint several consultants to assess and provide quotes regarding the
claimed damage. The FSP also commissioned the services of engineers “HD” and
had the benefit of its findings during the course of the claim. The FSP at one
stage having received HD‟s report verbally informed the Applicants that the claim
for the flooring would be covered and it was only after receiving the quotations it
chose to further investigate the claim.
The evidence establishes a significant period of time (since lodgement of the
claim) had elapsed by this stage and several consultants had already investigated
and made their finding available confirming the presence of water damage to the
flooring due to the overflow of stormwater from outside the dwelling. The FSP
arising from its concerns, having had ample opportunity and time, proposed that it
be allowed the opportunity to arrange yet another assessment by the assessor
who completed assessments under the previous claims.
The Applicants arising from the need to move interstate d ue to a change in their
employment circumstances and considering the extended period the FSP had
delayed settlement/acceptance of their claim, proceeded to authorise repairs to
the flooring at their own cost, so the property could be placed on the market. The
Applicants have expressed dissatisfaction regarding the FSP‟s obvious delays
and believe these were due to its desire to decline the claim.
The Panel acknowledges the Applicants‟ concerns in this regard and accepts the
FSP had sufficient opportunity and time to arrange any assessments it deemed
necessary, including assessment of the flooring which it was aware of from very
early in the claim. Additionally, the FSP clearly has within its possession
assessment reports and photographs obtained under the previous claims in
addition to all the recently acquired evidence under the current claim. The FSP,
having regard to all the evidence and opportunities available to it, should
reasonably have been able to establish, on balance, the flooring damage was pre-
existing and was not due to the recent insured event.
The Panel, however, is not satisfied the FSP has fulfilled the onus to establish, on
balance, the entitlement to decline indemnity to the Applicants under the claim for
the flooring damage as well as damage in the cellar. The evidence does establish
the claimed damage is consistent with the circumstances arising from the insured
events and in the absence of evidence to the contrary, there exists a prima facie
claim as discussed above.
Accordingly, the FSP is to provide indemnity to the Applicants for the costs
associated with the repair/replacement of the water damaged bamboo flooring as
well as the moisture damage noted within the cellar. On the basis that the repair
work has been carried out by the Applicants, the FSP is to cash settle the
Applicants for the costs of repairs to the bamboo flooring and water damage to
the cellar flooring.
Case No: 340355 Determination Page 6 of 6
The Applicants are to provide details of the costs associated with those repairs
and invoices, receipts etc in support of the amounts expended.